Loading...
HomeMy WebLinkAboutTR 35337 HYDROLOGY REPORT-020 Spyglass Ranch Tract 35337 Hydrology Study M 5. Main outlet Q used to confirm WSE inside baffle chamber. Q not used in determining the route rating curve. Tables 7 summarizes the outlet structure design for Basin #2. Table 7: Basin #2 Outlet Structure Design Summary Outlet Structure Openings Number Invert orifices Dia. or Invert elev. or W (in) Area (sf) Elev. above Remark H (in) (MSL) bottom (ft) Stage 1 4 1.5 0.049 1292.00 2.74 At baffle wall Stage 2 5 12 3.927 1295.85 6.15 At baffle wall Stage 3 4 8 1.396 1297.18 7.65 At baffle wall Main Outlet 1.0 48 12.566 1291.20 0 At headwall Baffle Wall Weir (Stage 4) Invert Weir elev. Crest L (FT) Above Elev. bottom (MSL) (ft) 8.0 9.55 1298.75 As already discussed, there is no storm mitigation requirement at this location since the intended outlet is the Wasson Canyon Basin, an 11MS4" improved drainage facility owned and operated by RCFCD. However, in this case, since the goal is to match the approved 100-Year flows in the existing RCB culvert, the basin outlet is designed to mitigate the 100-Year storm flows. Table 8 provides a summary of the basin detention performance. Table 8: Basin #2 Detention Basin Route Summary Duration QPK3 (cfs) QPK (cfs) Max Water QPK (cfs) UHA into UHA out of Depth in (hr) basin basin reduction Basin (ft) 1 168.5 72.5 96.0 7.6 Notes: 1. UHA = unit hydrograph for Area "A" 2. Q is 100-Year Strom Frequency. 3. QPK for UHA is calibrated to match the rational method Q. H: \265324 Final \ilydrology\Report\324 Report 13ody.doex - 16 -