Loading...
HomeMy WebLinkAbout29970 CAMINO DEL NORTE_BLDG-2023-00501CITY OF LADE LSIHOKE DREAM EXTREME WWWAAKE-ELSINORE.ORG CITY OF LAKE ELSINORE 130 SOUTH MAIN STREET LAKE ELSINORE, CA 92530 (951) 674-3124 PROJECT ADDRESS 29970 CAMINO DEL NORTE LAKE ELSINORE, CA PERMIT CONTACTS HECATE GRID OWNER ANDREW RIEBEL UNITECH CONSTRUCTION APPLICANT GROUP Benny Afuta UN�TRk C—FIO —CONTRACTOR GROUP Benny Afuta SunGrid Solutions CONTRACTOR Ernest Padilla SunGrid OWNER Herman Brumme UNITECH CONSTRUCTION CONTRACTOR GROUP Neri Escalente PERMIT NUMBER: BLDG -2023-00501 Issue Date: 07/19/2023 Expiration: 07/25/2024 This permit will expire 365 days from the Issue Date or the date of the last completed inspection. It is the responsibility of the permittee to ensure this permit is finaled. Permits that expire will need to be pulled again and additional fees will be applicable. PARCEL NUMBER: 377200045 ADDRESS 2915 Alamitos PI. Escondido, CA 92027 Permit Type: BUILDING Work Classification: ELECTRICAL Permit Status: ISSUED Valuation: $300,000.00 Total Scl Ft: 0 PHONE (630)200-7952 (832)338-9367 (818)919-5342 CELL DESCRIPTION OF WORK TRACT: LOT: PLAN #: ELECTRICAL PERMIT IS FOR UNDERGROUND WORK, CONDUIT INSTALLETION, WIRING AND TERMINATION ONLY, ALL CONSTRUCTION AND CIVIL WORK WILL BE ON A SEPERATE PERMIT BY OTHERS. THE ORTEGA GRID PROJECT IS A 20 MW BATTERY ENERGY STORAGE SYSTEM (BESS) CONNECTING DIRECTLY TO 'S 33-K11-E-L�R4CAL DS,TR I BUTION SYST E M. -THE- P ROJ ECT -0O3N& -SrTS-0E-Ll1 [0N LFP BATTE R -Y -CELLS; MODULES, AND STRINGS CONNECTED TO POWER CONVERSION SYSTEM UNITS WHICH CONVERT THE DC BATTERY POWER TO AC POWER. MEDIUM -VOLTAGE TRANSFORMERS ARE USED TO CONNECT THE NATIVE VOLTAGE OF THE BESS POWER CONVERSION SYSTEM UNITS TO THE INTERCONNECTING GRID VOLTAGE. THE BATTERIES AND POWER CONVERSION SYSTEM UNITS TOGETHER WITH THE BATTERY MANAGEMENT SYSTEM, CONTROLS, CLEAN AGENT FIRE SUPPRESSION SYSTEM, AND BESS LOADS SUCH AS HVAC SYSTEM ARE INCLUDED IN CONTAINERS THAT ARE SHIPPED AND INSTALLED AT SITE AS INTEGRATED BESS UNITS. FEES TOTAL FEES: $2,329.50 AMOUNT DUE: $0.00 BASE BUILDING PERMIT FEE ELECTRICAL SERVICE (>200 AMPS) ELECTRICAL SERVICES UP TO 600 VOLTS (<200 AMPS) GREEN BUILDING FEE PERMIT ISSUANCE FEE PROFESSIONAL DEVELOPMENT FEE Permit Type BUILDING Application Date 03/14/2023 Owner: HECATE GRID, SunGrid Work Class: ELECTRICAL Issue Date: 07/19/2023 Parcel 377200045 Status: ISSUED Expiration Date: 07/25/2024 Address: 29970 CAMINO DEL NORTE LAKE ELSINORE, CA IVR Number 140700 Scheduled ActualReinspection Inspection Type Inspection No. Inspection Status Primary Inspector Required? Complete Date Start Date 07/26/2023 07/26/2023 ELECTRICAL IELE-003166-2023 PASSED (PERMIT) Dale Heglund No Complete Checklist Item COMMENTS App"'"`''' ELECTRICAL CONDUIT Yes UNDERGROUND Checklist Item COMMENTS Approved ELECTRICAL CONDUIT Yes UNDERGROUND Checklist Item COMMENTS Approved ELECTRICAL CONDUIT Yes UNDERGROUND May 15, 2024 2160 Satelite Blvd NW Suite 300 Duluth, GA 30097 Page 1 of 1 Permit Type BUILDING Project: Work Class: ELECTRICAL District: Status: ISSUED Square Feet: Description: ELECTRICAL PERMIT IS FOR UNDERGROUI Valuation: WORK, CONDUIT INSTALLETION, WIRING AND TERMINATION ONLY, ALL CONSTRUCTION AND CIVIL WORK WILL BE ON A SEPERATE PERMIT BY OTHERS. THE ORTEGA GRID PROJECT IS A 20 MW BATTERY ENERGY STORAGE SYSTEM (BESS) CONNECTING DIRECTLY TO SCE's KV ELECTRICAL DISTRIBUTION SYSTEM. TI PROJECT CONSISTS OF LI -ION LFP BATTEI CELLS, MODULES, AND STRINGS CONNECTED TO POWER CONVERSION SYSTEM UNITS WHICH CONVERT THE DC BATTERY POWER TO AC POWER. MEDIUM -VOLTAGE TRANSFORMERS ARE USED TO CONNECT THE NATIVE VOLTAGE OF THE BESS POWER CONVERSION SYSTI UNITS TO THE INTERCONNECTING GRID VOLTAGE. THE BATTERIES AND POWER CONVERSION SYSTEM UNITS TOGETHER WITH THE BATTERY MANAGEMENT SYSTE CONTROLS, CLEAN AGENT FIRE SUPPRESSION SYSTEM, AND BESS LOADS SUCH AS HVAC SYSTEM ARE INCLUDED IN CONTAINERS THAT ARE SHIPPED AND INSTALLED AT SITE AS INTEGRATED BESS UNITS. Parcel: 377200045 377200047 377200046 APPLICANT Benny Afuta 13351 D Riverside Dr , D 450 Sherman Oaks, CA 91423 Home: Business: Mobile: OWNER Andrew Riebel Home: Business: (630) 200-7952 Mobile: BATTERY ENERGY STORAGE S' App Date: 03/14/2023 NA Issue Date: 07/19/2023 0.00 Exp Date: 07/25/2024 $300,000.00 Final Date: NOT FINALED Main Address: 29970 Camino Del Norte Main Lake Elsinore, CA CONTRACTOR Benny Afuta 13351 D Riverside Dr , D 450 Sherman Oaks, CA 91423 Home: Business: Mobile: OWNER Herman Brumme Home: Business: (832) 338-9367 Mobile: ( CONTRACTOR Ernest Padilla 2915 Alamitos PI. Escondido, CA 92027 Home: Business: Mobile: CONTRACTOR Ned Escalente Home: Business: (818) 919-5342 Mobile: May 15, 2024 2160 Satelite Blvd NW Suite 300 Duluth, GA 30097 Page 1 of 2 Note Created By 1. EMAILED THE CONTACT FOR PERMIT BLDG -2023-00329 TO SEE IF T CRISSY MIRABELLA WAS SUPPOSED TO BE THEIR RESUBMITTAL. THEY PAID PLAN CHE FEES ON PERMIT BLDG -2023-00329 ALREADY. 2. THE APPLICANT HERMAN CALLED AND STATED THAT THIS IS FOR CRISSY MIRABELLA ELECTRICAL PORTION ONLY AND PERMIT BLDG -2023-00329 IS FOR THE STORAGE SYSTEM ITSELF. HE SAID THERE NEEDS TO BE TWC PERMITS BECUASE THEY ARE TIEING INTO SCE GRID. HE REQUES- TO SPEAK TO BILL TO EXPLAIN MORE OF WHY SINCE THIS IS NEW ' EVERYONE. TRANSFERED HIM TO BILL. 3. THE APPLICANT IS MEETING WITH BILL ON 3/16 AT 9 TO DISCUSS TI CRISSY MIRABELLA ELECTRICAL. 4, BB 880-877-010 TO BAB Sonia Salazar 5. EMAIL TO CORY ASKING FOR APPLICATION AND LOG IN TO CSS Sonia Salazar PORTAL TO ADD TO PERMIT Invoice No. Fee INV -00039212 ELECTRICAL SERVICES UP TO 600 VOLTS (<200 AMPS) BASE BUILDING PERMIT FEE GREEN BUILDING FEE PROFESSIONAL DEVELOPMENT FEE ELECTRICAL SERVICE (>200 AMPS) PERMIT ISSUANCE FEE Total for Invoice INV -00039212 Grand Total for Permit Date and Time Created March 15, 2023 9:06 am March 15, 2023 9:17 am March 15, 2023 9:28 am April 17, 2023 5:03 pm January 5, 2024 2:50 pm Fee Amount $327.00 $1,895.00 $12.00 $10.00 $55.50 $30.00 $2,329.50 $2,329.50 Amount Paid $327.00 $1,895.00 $12.00 $10.00 $55.50 $30.00 $2,329.50 $2,329.50 May 15, 2024 2160 Satelite Blvd NW Suite 300 Duluth, GA 30097 Page 2 of 2