Loading...
HomeMy WebLinkAboutSPRING ST N 501 (2)2 a 0 r~ rn00 N W te7 ABBREVIATIONS A.F.G. ABOVE FINISH GRADE DIA. DIAMETER DTL. DETAIL E.V.R. ENHANCED VAPOR RECOVERY F.E.V. FUEL EQUIPMENT VENDER F.R.P. FIBERGLASS REINFORCED PIPE GAL. GALLONS G.C. GENERAL CONTRACTOR MIN. MINIMUM MAX. MAXIMUM MPD'S MULTIPLE PRODUCT DISPENSER O.C. ON CENTER O.R.V.R. ONBOARD REFUEUNG VAPOR RECOVERY TLM TANK LEVEL MONITORING TYP. TYPICAL V.R. VEEDER -ROOT W/ WITH DOWNS ENERGY FUELING FACNLITY FUEL SYSTEM IMPROVEMENT SET SCOPE OF WORK: 1. INSTALL NEW HEALY CLEAN AIR SEPARATOR (C.A.S.). 2. INSTALL NEW C.A.S. ENCLOSURE. 3. INSTALL NEW HEALY HANGING HARDWARE ON EXISTING GASOUNE DISPENSERS. 4. INSTALL NEW HEALY VACUUM PUMP ON EXISTING GASOUNE DISPENSERS. 5. INSTALL NEW IN- STATION DIAGNOSTIC (ISD) COMPONENTS. FUELING POSITIONS: 6 FUELING NOZZELS: 6 DISPENSER MAKE: TOKHEIM DISPENSER MODEL: H422C NOTE: FUEL SYSTEM TO COMPLY WITH EXECUTIVE ORDERS: VR -102 (OPW PHASE I -w EXISTING) VR -202 -G (HEALY PHASE 11 W/ ISD COMPONENTS) PHASE 11 EVR UPGRADE 501 N. SPRING STREET LAKE ELSINORE, CA 92530 GENERAL NOTES: 1. CONTRACTOR SHALL FURNISH ALL LABOR AND EQUIPMENT AND PERMITS TO PERFORM THE WORK AS INDICATED ON THIS SHEET. CONTRACTOR SHALL VISIT THE SITE TO VERIFY ALL CONDITIONS THAT MAY AFFECT THIS PROJECT. ALL WORK IS TO BE DONE IN ACCORDANCE WITH LOCAL CODES AND PER MANUFACTURER'S RECOMMENDATIONS. 2. INSTALL ALL PIPING, DISPENSERS, EQUIPMENT, ELECTRONICS, ELECTRICAL CONTROLS, ETC. PER MANUFACTURER'S RECOMMENDATIONS AND PROCEDURES. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO NEW AND /OR EXISTING EQUIPMENT ABOVE OR BELOW GRADE. THE PRESENCE OF THE MANUFACTURER OR OBSERVER AT AN INSTALLATION SITE DOES NOT REUEVE THE CONTRACTOR OF HIS RESPONSIBILITY FOR THE PROPER INSTALLATION OF THE TANKS, PIPING AND /OR EQUIPMENT. 3. CONTRACTOR SHALL WARRANTY ALL WORK AND MATERIALS FOR (1) YEAR FROM TIME OF ACEPTANCE FROM OWNER. 4. ANY CONTRADICTIONS TO THESE PLANS SHALL BE REPORTED TO TRAVIS COMPANIES, INC AT (714) 693 -9388 IMMEDIATELY. CONTRACTOR CERTIFICATION REQUIREMENTS_ 1. ALL CONTRACTORS AND SUB - CONTRACTORS RESPONSIBLE FOR THE INSTALLATION AND HOOKUP OF THE FUEL SYSTEM EQUIPMENT AND ASSEMBLY SHALL POSSESS ALL REQUIRED AND PROPER UCENSES AND CERTIFICATIONS TO WORK AND INSTALL SAID EQUIPMENT. IT SHALL BE. THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO VERIFY AND OBTAIN LICENSES AND CERTIFICATIONS FROM ALL SUB - CONTRACTORS WORKING ON SAID EQUIPMENT. THE GENERAL CONTRACTOR SHALL PROVIDE PROOF OF LICENSES AND CERTIFICATIONS IN HIS BID PACKAGE. FAILURE TO PROVIDE PROOF OF UCENSES AND CERTIFICATIONS SHALL BE GROUNDS FOR BID DISMISSAL AND WILL NOT BE PERMITTED TO WORK ON THIS PROJECT. THE REQUIRED LICENSES AND CERTIFICATIONS (AT A MINIMUM) ARE AS FOLLOWS: 1.1. CONTRACTORS STATE UCENSE CERTIFICATE 1.2. CERTIFICATE OF LIABILITY & WORKMEN'S COMP. INSURANCE 1.3. INTERNATIONAL CODE COUNCIL (ICC) CERTIFICATIONS: 1.3.1. UST INSTALLATION - RETROFITTING CERTIFICATE 1.3.2. UST SERVICE TECHNICIAN CERTIFICATE 1.3.3. VAPOR RECOVERY SYSTEM INSTALLATION AND REPAIR CERTIFICATE 1.4. MANUFACTURER'S CERTIFICATION FROM THE FOLLOWING MANUFACTURERS: 1.4.1. INCON CERTIFICATIONS: 1.4.1.1. LEVEL 3 CERTIFICATE (REQUIRED AS A MINIMUM) 1.4.1.2. IN- STATION DIAGNOSTICS (ISD) CERTIFICATE 1.4.2. HEALY SYSTEMS, INC. 4-ii. VICINITY MAP c iii•_;, , CJ I»= Si UrJ Nc;A v.,Ak-r ! Gt RIVERSIDE COUNTY FIRE DEPT. NOTES: 1. PIPING SYSTEM SHALL BE PNEUMATICALLY TESTED TO 75 PSIG. TEST PRESSURE SHALL BE MAINTAINED FOR AT LEAST 30 MINUTES, WITH THE SYSTEM SEALED AND WITH A PRESSURE LOSS NOT TO EXCEED 3 PSIG. SHEETINDEX FT1.0 I TITLE SHEET F1.0 I PHASE II EVR UPGRADE PLAN CODE SUMMARY: 2007 2007 2007 2007 2007 2005 T -24 CBC CMC CPC CEC CFC ENERGY STD. t A a °oWQ O g Jb .. .. . d -:J z t0 IL 9'.A W co wow I I N co r- y In mo v 4 L) m omLT co 0) 0 L L' - m ° M U oN a o 00 V 6m n m N N d i Flo rNGI Ia M C Lu L.L u) Cpl ("7 0 W cw d, w C SI 0 Ci O F— 0 • 0 F— zz co O Liz W W Q J DRAWING NUMBER F 1 0 LC) N 67 Q F.. W Z . or_ W LV c cn 0. LL W z V W z W z n LLi ; F— 0 • 0 F— zz co O Liz W W Q J DRAWING NUMBER F 1 PRESSURE VACUUM VALVE VENT CAP I o I I EXISTING VENT RISER I ASSEMBLY SLOPE FLOAT CHECK VALVE OVERFILL PROTECTION MINIMUM SLOPE 1/8" PER FOOT AIR BREATHER ASSEMBLY W24 AIR NOTES: 1. CONTRACTOR SHALL CONTACT THE FIRE DEPARTMENT FOR THE REQUIRED C.A.S. SIGNAGE. 2. CONTRACTOR SHALL FURNISH AND INSTALL THE REQUIRED C.A.S. (HEALY) SIGNAGE: 2.1. "NO SMOKING / FLAMMABLE VAPORS" SIGN. SIGN SHALL BE A MINIMUM OF 3" HIGH LETTERS ON CONTRASTING BACKGROUND. 2.2. NFPA PLACARD 3. ANY MANIFOLDING OF VENT PIPING FROM RISERS TO THE HEALY TANK SHALL BE A MINIMUM OF 8' -0" ABOVE GRADE. 4. CONTRACTOR SHALL FIELD VERIFY LOCATION OF LOW GRADE RISER. KEY NOTES: BALL VALVE — LOCKED "OPEN" IN NORMAL OPERATION. BALL VALVE — LOCKED "CLOSED" IN NORMAL2OPERATION. CLEAN AIR SEPARATOR 36" O.D. x 93" LONG 800 LBS. SYPHON TUBE p a. a °. .. , .' r.p. •. 1 •, ,' . .. 2 1" CONDENSATE DRAIN 400 GALLON BLADDER F— DETL- 14F.DWGI24 OCLEAN AIR SEPARATOR ASSEMBLY ELEVATION c SECTION @ TANK SLAB F— DM- 24.0WGp6 1 S TYPICAL CLEAN AIR TANK MOUNTING SLAB DETAILS MOUNT SENSOR TO DISPENSERS INNER FRAME WITH SUPPLIED BRACKET PRESSURE SENSING PORT 1/4" OD COPPER TUBING. AVOID ANY TRAPS! (BY CONTRACTOR) CABLE TO JUNCTION BOX VAPOR PRESSURE SENSOR 21 1/4" OD COPPER TUBING TO CAP O STREET TEE 2 -WAY CALIBRATION VALVE NOTE: 1. ONLY ONE (1) VAPOR PRESSURE SENSING DEVICE REQUIRED PER SITE. SENSOR SHALL BE MOUNTED AT ONLY ONE (1) DISPENSER LOCATED CLOSEST TO TANKS. 2. CONTRACTOR SHALL PITCH ALL 1/4" TUBING AS REQUIRED TO AVOID ANY LIQUID TRAPS F— DELL- 448.DWG124 3 ISD VAPOR PRESSURE SENSOR DETAIL NO SCALE DISPENSER c w ut MU.um4x4 NO SCALE ISD VAPOR FLOW METER DETAILG) i r I -0w F— DETL- 19.M124 13 PROTECTIVE BARRIER POST 4 GRADE ®u EXISTING DISPENSER in CLR - HEALY VACUUM PUMP OOa k= I WAY TYP. ® 8" O.C. F- DM-20.D" NO SCALE is EXISTING DISPENSER ELEVATION NEW HEALY PUMP PUMP MOUNTING PLATE OR BRACKET FLANGE W/ 1" NPT THREADED INLET CABLE TO JUNCTION BOX OUTLET O—RING FLANGE W/ 1" NPT THREADED OUTLET EXISTING VAPOR SHEAR VALVE RADIUSED SMOOTH CONC. CAP 8" DIA. STL SCH. 40 PIPE FILLED W/ CONCRETE SLURRY, PRIMED AND PAINTED "SAFETY RED" EXPANSION JOINT W/ SILICONE SEALANT. PAVING CONCRETE FOOTING NO SCALE 1/ 2w = 1' -0" WHIP 4 HOSE BREAKAWAY 2 DISPENSER HOSE ( DISPENSER NOZZLE 1 EXISTING DISPENSER BASE NO SCALE O EXISTING EXISTING ACKNOWLEDGEMENT VEEDER —ROOT SWITCH AND CONSOLE OVERFILL ALARM EXISTING ESO I 10 00 1 r 1 L-- - --- -J 10 00 1 10 00 1 o2'8 10 O° I .' _ EXISTING FIRE 0 4 — — -- — -- — "`' '' y EXIINGUISHER I 5.0 x EXISTING FIRE EXISTING ESO I 1 3 6 EXTINGUISHER J Iff I 1 EXISTING ESO 1 o 7 po ® o o n o I VENT RISERS T _ a--o — — — * — ° 1 3 ® 1 x 1 I I x I Q I O0O) o o- O O KEY NOTES: DEW OIMYEMY Da81M0 p01EMY 1/2" THREA1 DISPENSER NOZZELS (900 SERIES) FLINT STREET ITEM 1/2" UNION W 9 En 1/2 "x1 "R o ADAPTOR W VAPOR FLOW G.C. 1" SHORT NII 12 EXISTING STS 13 ASSEMBLY w ut MU.um4x4 NO SCALE ISD VAPOR FLOW METER DETAILG) i r I -0w F— DETL- 19.M124 13 PROTECTIVE BARRIER POST 4 GRADE ®u EXISTING DISPENSER in CLR - HEALY VACUUM PUMP OOa k= I WAY TYP. ® 8" O.C. F- DM-20.D" NO SCALE is EXISTING DISPENSER ELEVATION NEW HEALY PUMP PUMP MOUNTING PLATE OR BRACKET FLANGE W/ 1" NPT THREADED INLET CABLE TO JUNCTION BOX OUTLET O—RING FLANGE W/ 1" NPT THREADED OUTLET EXISTING VAPOR SHEAR VALVE RADIUSED SMOOTH CONC. CAP 8" DIA. STL SCH. 40 PIPE FILLED W/ CONCRETE SLURRY, PRIMED AND PAINTED "SAFETY RED" EXPANSION JOINT W/ SILICONE SEALANT. PAVING CONCRETE FOOTING NO SCALE 1/ 2w = 1' -0" WHIP 4 HOSE BREAKAWAY 2 DISPENSER HOSE ( DISPENSER NOZZLE 1 EXISTING DISPENSER BASE NO SCALE O EXISTING EXISTING ACKNOWLEDGEMENT VEEDER —ROOT SWITCH AND CONSOLE OVERFILL ALARM EXISTING ESO I 10 00 1 r 1 L-- - --- -J 10 00 1 10 00 1 o2'8 10 O° I .' _ EXISTING FIRE 0 4 — — -- — -- — "`' '' y EXIINGUISHER I 5.0 x EXISTING FIRE EXISTING ESO I 1 3 6 EXTINGUISHER J Iff I 1 EXISTING ESO 1 o 7 po ® o o n o I VENT RISERS T _ a--o — — — * — ° 1 3 ® 1 x 1 I I x I Q I O0O) o o- O O KEY NOTES: DEW OIMYEMY Da81M0 p01EMY ITEM I DESCRIPTION DISPENSER FURN. DISPENSER NOZZELS (900 SERIES) FLINT STREET ITEM PROV. INST. NO: BY: BY: OWNER 1 OWNER G.C. INSTALL NEW DISPENSER HOSE, NOZZEL, BREAKAWAY, AND 12 8701 VV 13 HEALY VACUUM PUMP SYSTEM COMPONENTS. REFER TO ISD COMPONENTS 20 VAPOR FLOW METER EQUIPMENT SCEDULE FOR ADDITIONAL INFORMATION. Efl OWNER G.C. INSTALL NEW ISD PRESSURE SENSOR, ONLY AT THIS DISPENSER. CABLE KIT: DIM MODULE 24 12 INPUT AC INPUT MODULE REFER TO DETAIL 16/171.0. El OWNER G.C. INSTALL NEW ISD VAPOR FLOWMETER AT EACH DISPENSER. REFER OWNER G.C. I.L Z Q` 3: C/) TO DETAIL 17/F1.0. 47 OWNER G.C. INSTALL NEW CLEAN AIR SEPARATOR, REFER TO DETAIL 6 /F1.0 G.C. 0 W C) Z Z Cif VP1000H FIELD VERIFY EXACT LOCATION. G.C. G.C. G.C. INSTALL (4) NEW 8" DIA. PROTECTIVE BARRIER POSTS ® 4' -0" OWNER G.C. MAX., REFER TO DETAIL 13/F1.0. 6 Y G.C. G.C. INSTALL NEW 8" THICK CONCRETE SLAB W/ (7) #4 REBAR BOTH WAYS AT 2,500 P.S.I. — 28 DAYS. COLOR STANDARD GREY. G.C. G.C. CONSTRUCT NEW -0" HIGH CMU BLOCK ENCLO=PERCITY G.C. J a LAKE ELSINORE BUILDING DEPARTMENT STANDARD OWNER G.C. BE PAINTED TO MATCH BUILDING (4 HR. RATED 2 El G.C. G.C. INSTALL NEW G.C. N -0" WIDE GATE. 3 ITEM I DESCRIPTION DISPENSER FURN. DISPENSER NOZZELS (900 SERIES) D VAPOR ASSIST BREAKAWAY p8' 0" COAX DISPENSER HOSE 1' -0" COAX DISPENSER HOSE (PIGTAIL) VAPOR AND ELECTRICAL INSTALL KIT OWNER DISPENSER MOUNTED VACUUM PUMP VENT 11 VERTICLE CLEAN AIR SEPARATOR (C.A.S.) 12 8701 VV 13 PRESSURE VACUUM VENT VALVE ISD COMPONENTS 20 VAPOR FLOW METER 21 VAPOR PRESSURE SENSOR 22 TS -EMS CONSOLE W/ DISPLAY AND PRINTER 23 CABLE KIT: DIM MODULE 24 12 INPUT AC INPUT MODULE EQUIPMENT SCHEDULE QTY. MANUFACTURER 6 1 HEALY 6 HEALY 6 HEALY 6 HEALY 3 HEALY 3 HEALY 1 1 HEALY m MIS, NjRm 1 INCON 1 INCON INCON INCON I --1oo Q ^ 4c ^I O W Y 6 i ^ W a a V m ino0 A 0. iu 2 F $_g Sig w W lz m N a F zr, V `° °w Z CL N mfr 4 0) mom= co :;t7 Ff m `Q L ° c- E N Q o c Vc' 0 6 U) ` m E cQ m E8 o ro N N 0 20 30 40 SCALE 1 " - 20' 1. NO CONCRETE BREAKOUT REQUIRED. ............ : : :: : :::: .:: . Z a o J L0 i W Q MODEL NUMBER FURN. INST. LJJ Z m OWNER G.C. y N 8701 VV OWNER y > ; IV w I.V Z Z Q z 758- 080 -S2S2 OWNER G.C. w _ V Gi iv 6 75B- 010 -S4F2 OWNER G.C. I.L Z Q` 3: C/) MODEL NUMBER FURN. INST. LJJ Z 900- EVR -FS OWNER G.C. o F-- Q Lj 8701 VV OWNER G.C. I.V Z Z Q 758- 080 -S2S2 OWNER G.C. w _ V 75B- 010 -S4F2 OWNER G.C. I.L Z Q` 3: C/) Z070E & Z071V OWNER G.C. 0 W C) Z Z Cif VP1000H OWNER G.C. O CD J W W 9961 OWNER G.C. Y Q 5885 OWNER G.C. J a TS -VFM OWNER G.C. TS -VPS OWNER G.C. RAWING NUMBER TEMSDPI /V OWNER G.C. Fl OTSP -TDCBL OWNER G.C. TS -ACI OWNER G.C. APPROVED FOR PERMIT ISSUANCE COVER SHEET SCOTT FAZEKAS & ASSOCIATES, INC. BY __ _ _ DATE z =- L -` LCULATIONS These plans i, een reviewred for adherence to the applicable codes and ordinar,CF?. j ulhorizatlon is hereby ;.;::anted to i, ue a bUilding 'FR'ANKL11N FUELING SYSTEMS approval ",v all applicable City agenc,ias. The issuance or granting of a permit sed on approval of these plans shall not be cots AIR SEPARATOR permit or approve any violation of the codes or ordinance. I•ae ,,)w-mjt presumed to give authority to violate or cancel the provisions of such codes shall be valid. CONCRETE FOUNDATION CONTENTS: 1. C1 Calculation sheet 2. C2 Calculation sheet 3. Franklin Fueling Dwg. 9900 -9945H Mounting Slab Details 4. CA State Fire Marshal CODE INTERPRETATION 06 -124 By James H. Ray ZVLpFESNO\ 0 0 ES H. q ` Civil Engineer 9` Santa Rosa, CA NO. 4,518 n 3169 707 -480 -8115 `dig CIVIL of cap F)ZAN1•CL) ii FL Cc- , j=coir.N' CAL C.LlLt - -r coo S ) S H,Rk-`i ClvrLF_Nr1 J 11V D 3-als or- r f! C A C(1cbj If S a I r\ goon J 52 Q) I V rt j • A #Y picas J o,- i` " V F ) J 5 I vi r:. rig u rc, (3 t~ i ; 'o n ji C Z c.. it, -• I r C 51,rati U. V•'3 ffd' nfi ;_r v c -rS = C >`'-j - ~ s• Pc 2 ,. s,°a , T 7z yo p C% U111se- 2,v x - C 2..15 5u, >C r rj. Tr) c -r i c- %.j I Iy aaFFssro ! °, —_ / i1J ( ~'7 ,_7 5 (1 -33) a S H. Rq y' -! U U U r : ! • ? • 'I .. ' 2. t . /!' , 0 I r /-_ r 1 ` A i Q'r r U 2 F j. 1 J f r C ,(` ( .7• s 1 CIVIL t m(q) CL %7j i> OF CA, rJChORS -oL'IS 5/ SS41n e5! S i °P.C tUC fY/ 4i}nenfi %1 - D.fi{37 fi it rt 1 w1 'o.-r T2 Stn,,rrfSfiee ` "ad - i.+y)(`f.`4 (•a7 v G(ArQF,L\N F u s L t FOUmJ(, CALCU,LF1TiOIJ$ jFI"_S S tSt1 =M,S C L) Co -DC-S: IQC20o6 C3C 2a r SCE'U per 3Ic -- i Z 1 =0'7- -- S t Tasks T essei5- T,Is u!p9flcotv, has G\ }Ch ee ,F, C ae r'!f -I+ - erpl- ?C;ai'1 " ?f- •!2t't`) ZO, Stite. Clasrl ca(uh p 1 l.' e sr>11c Ci ulhc 1 1,1vr s Ill.Ll.j- CIy 1 e 2Z f SS= 2 Fa Ta' 'ofe Ir-LI'^ Sins - (S` = C!•v)(2)= , •li.,.! -I. 5 h I F-v 55l t I r co: 11. Sns 2 / 3 3 ? j t2 " QQ. 2- W -8vo V CC>.tl JG l h rOV'Ce I 'rO C':G1 U,'rl R -S P/I SA 12.S. C W v- v.yL!8W= > >2 Pow os; j ISMIC Kzi k, kZ K3 2 =0 o i- n --o)L 1K = 0,G', (Tc,.SIc -9) JL = IoUz_ IG OcIU 1rJU H rn i asE-D Psi 1 Li L( C -r C Q p• SH k N0. 7,5125 WV V 2 -31- 0 OF 9 -a9 W1ND 5 CAS VESSEL g BY OTHERS Toc 3/4' CHAMFER r MAX— UNSTABLE OR- COMPACTED MATERIAL PER CEOTECHNICAL REPORT. R I I I J DRW NO: 9900 -9945H V -10 3 4' ' -2 1/r b}---- — - — - -- 1 1 t I I I 1 1 I I I I t I t FINISH GRADE — — — -- OLR 0 4' E' wLR M BOLT P STNUi roc STEEL04' EwBEDwO1T w9L (4- PLACES). QRD•'iT/(, (MEETS 10C-ES ACCEPTANCE CRITERIA PER ESR -1917 REPORT). OR aR OW.) BASE PLAN No. 2 .518 4 EACH WAY TIP. O 8' O.C. Eo 2 -3/ _ D 9 SECTION Q CAS SLAB CRITERIA SOIL BEARING 1000 psi BASIC WIND SPEED 100mph SEISMIC S' =2g Sn =ig MIN. CONCRETE COMP STRENGTH, f, = 2500 psi MIN. REINF. YIELD STRENGTH, fy = 40000 psi The Information disclosed hereon MAT REAL Includes proprietary rights of Franklin Fueling Systems, Inc. Neither this drawing nor the information disclosed thereon may be reproduced or DO NOT SCALE DRAWING transferred to other documents, or STANDARD INCH TOLERANCESusedordisclosedtoothersforany purpose, except as specifically (UNLESS OTHERWISE SPECIFlED) authorized In writing by Franklin Fueling Systems. This drawing must SPECIAL DIST: be returned to Franklin Fueling Systems upon request CIVIL N41E e5/8' ICC -ES ACCEPTANCE IS NOT A, C OF CAD 0 4' T MIN. m, 5/8" % 8' MITI WINK BOLT ] O 4" EMBEDMENT MW. CAN BE USED (PER ESR -1385 REPORT. ISSUED 09/01/04). 5 ADDED CAS D(MEN9oNS, REVISED CRITERIA LIST — T Me 1/02/08 4 KB—TZ SS WAS K83, ESR -1917 WAS ESR -1385, ADDED NOTE 1 — TF M9 2/21/07 REV DESCRIPTION ECN NO BY DATE Franklin Fueling Systems., Madison, W 53718 AX t .02 TITLE: W ±.005 CLEAN AIR SEPARATOR HORIZONTAL MOUNTING SLAB DETAILS ANGULAR, t 1/2* DRAWN: TF APPRVL• MDB DATE: 05/22/07 DATE: 06/05/07 DRW NO: 9900-99451 SUfFlX: H ISCALE. 3/4 " =1 SHEET 1 OF 1 California State Fire Marshal CODE INTERPRETATION Date Issued July 27, 2007 Interpretation 06 -124 Topic Healy Clean Air Separator (CAS) Tank as a "Vapor Processing Unit' Code Section(s) CFC 5202.13.3.9 Requested by Don Foster Gettler -Ryan Inc. 1364 N. McDowell Blvd, Suite B2 Petaluma, CA 95954 The California State Fire Marshal has accepted the UL certification of the Healy Clean Air Separator (CAS) Tank as a "Vapor Processing Unit ". 2001 CFC Section 5202.13.3.9 indicates that the vent termination from vapor processing units shall be not less than 8 feet above the processing unit itself. All of the Healy Installation materials and the California Air Resources Board Executive Order VR -202 A exhibits indicate that the underground storage tank pressure vacuum vent valve termination need only be located 12 feet above grade. No reference is made to the 8 foot separation requirement. We have two Questions for your consideration and interpretation: 1. Does the UST pressure vacuum vent valve need to be located 8 feet above the CAS Tank as indicated on the attached Detail 1? No. The design of the CAS is such that all vapors from the UST are completely trapped within the "bladder" contained in the CAS. The vent coming from the CAS is to vent the interstitial space between the bladder and the outside wall of the CAS. (See footnote below) 2. Is the Healy CAS Air Breather Assembly considered an underground tank vent in the context of NEC Article 514, Group D, Division 1 and 2 Hazardous Locations? As described in the above, the UST is "vented" to the bladder contained within the CAS and by design, no vapors are emitted to atmosphere. (See footnote below) Foot note: The intent of this footnote is for reference only and to provide clarification. It is not the intent of the State Fire Marshal to endorse any one specific product, device or methodology. Description of Operation of the Healy Clean Air SeparatorTA°: The Healy Systems, Inc., Model 9961 Healy Clean Air Separator'rm is a stand - alone, completely mechanical device that assists in controlling the gasoline vapor emissions from a gasoline dispensing facility. It consists of a 400 - gallon storage vessel with integral bladder and associated valving. It is connected to the ullage space of the GDF storage tanks via the venting system of the under ground storage tanks. During normal operation of the GDF, with today's concentration of ORVR vehicles approximating 20 %, the storage tank ullage space will usually operate in the "0" to negative (up to 8" WC PN cracking pressure) pressure range. During" closed" periods of the GDF, the ullage pressure will usually begin to increase due to vapor growth inherent in the process of introducing air into the UST's. If the pressure goes slightly above atmospheric the vapor from the UST's will flow into the internal bladder. Conversely, when ORVR refueling begins and the UST pressure falls below atmospheric, the vapor internal to the bladder will be drawn back into the UST until the bladder is fully collapsed waiting for the next cycle. The Clean Air SeparatorTm in over two and one half years (installed late September of 2002) of being in operation at our C.A.R.B. test site in Sacramento has been evaluated repeatedly to see if there is any liquid condensation in either the bladder or the space between the inner wall of the vessel and outer wall of the bladder. To date there has been no liquid found in either area. Downs Energy - Lake Elsinore Thu Feb 05 15:44:14 PST 2009 Conterminous 48 States 2003 NEHRP Seismic Design Provisions Latitude = 33.67547 Longitude = - 117.326208 Spectral Response Accelerations Ss and S1 Ss and S1 = Mapped Spectral Acceleration Values Site Class B - Fa = 1.0 ,Fv = 1.0 Data are based on a 0.01 deg grid spacing Period Sa sec) (g) 0.2 1.600 (Ss, Site Class B) 1.0 0.600 (S1, Site Class B) Conterminous 48 States 2003 NEHRP Seismic Design Provisions Latitude = 33.67547 Longitude = - 117.326208 Spectral Response Accelerations SMs and SM1 SMs = Fa x Ss and SM1 = Fv x S1 Site Class D - Fa = 1.0 ,Fv = 1.5 Period Sa sec) (g) 0.2 1.600 (SMs, Site Class D) 1.0 0.900 (SM1, Site Class D) Conterminous 48 States 2003 NEHRP Seismic Design Provisions Latitude = 33.67547 Longitude = - 117.326208 Design Spectral Response Accelerations SDs and SD1 SDs = 2/3 x SMs and SD1 = 2/3 x SM1 Site Class D - Fa = 1.0 ,Fv = 1.5 Period Sa sec) (g) 0.2 1.067 (SDs, Site Class D) 1.0 0.600 (SD1, Site Class D) CITY OF LAKE ELSINORE CONDITIONS OF APPROVAL PROJECT NAME: COMMERCIAL DESIGN REVIEW; FOR THE INSTALLATION OF AN "EVR" PHASE II FUEL SYSTEM UPGRADE AND INSTALLATION OF A "HEALY" CLEAN AIR SEPARATOR TANK, LOCATED AT 501 N. SPRING STREET (APN: 377 - 241 -004) PLANNING General Conditions 1. The applicant shall defend (with counsel acceptable to the City), indemnify, and hold harmless the City, its Officials, Officers, Employees, and Agents from any claim, action, or proceeding against the City, its Officials, Officers, Employees or Agents to attach, set aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or legislative body concerning the Commercial Design Review project attached hereto. 2. The applicant shall place a weatherproof 3' x 3' sign at the entrance to the project site identifying the approved days and hours of construction activity and a statement that complaints regarding the operation can be lodged with the City of Lake Elsinore Code Enforcement Division at 951) 674 -3124. 3. All Conditions of Approval shall be reproduced upon page one of building plans submitted to the Building and Safety Division for Plan Check. 4. Prior to issuance of any grading or building permits, the applicant shall sign and complete an "Acknowledgement of Conditions," and shall return the executed original to the Community Development Department for inclusion in the case records. 5. Construction generated dust and erosion shall be mitigated in accordance with the provisions of Municipal Code, Chapter 15.72 and using accepted control techniques. Interim erosion control measures shall be provided thirty (30) days after the site's rough grading, as approved by the City Engineer. 6. The Applicant shall comply with the City's Noise Ordinance. Construction activity shall be limited to the hours of 7:00 AM to 5:00 PM, Monday through Friday, and no construction activity shall occur on Saturdays, Sundays or legal holidays. 7. The proposed .location of any onsite construction trailers shall be approved by the Director of Community Development or Designee. A cash bond of $1,000.00 shall be required for any construction trailers placed on the site and used during construction. Bonds will be released after removal of trailers and restoration of the site to an acceptable state, subject to the approval of the Director of Community Development or designee. 8. Established vine pockets or other types of landscaping shall be provided for the exterior walls of the enclosure. This area shall be irrigated and maintained in good condition. Final landscaping materials shall be approved by the Community Development Director prior to installation. The applicant shall comply with all applicable City codes and ordinances 9. All planters and landscaping areas shall be maintained in good condition at all times. Any dead plants or missing landscaping shall be replaced. 10. Any graffiti on the property shall be removed within 72 hours. 11. All sections of the enclosure, including doors, shall be kept in good condition at all times. Any portion of damaged wall or doors shall be promptly replaced/repaired. 12.Permits /approvals from other agencies, including but not limited to, Southern California Edison, The Gas Company, Air Quality Management District, and the Water Quality Control Board, shall be obtained prior to final building permits being issued. I Commercial Design Review 13.Approval for Commercial Design Review will lapse and be void unless building permits are issued within one (1) year following the date of approval. 14.Any alteration or expansion of a project for which there has been an approval as well as all applications for modification or other change in the conditions of approval of a "Design Review" shall be reviewed according to the provisions of Chapter 17.82 in a similar manner as a new application. 15.No structure which has received a "Design Review" or "Minor Design Review" approval shall be occupied or used in any manner or receive a Certificate of Occupancy until the Director of Community Development has determined that all Conditions of Approval have been complied with. 16.All site improvements approved with this request shall be constructed as indicated on the approved site plan and elevations. Revisions to approved site plans or building elevations shall be subject to the review of the Director of Community Development. 17.Materials and colors depicted on the plans and materials board shall be used unless approved by the Director of Community Development or designee. The color of the oxidizer stack shall match that of the block enclosure. ENGINEERING DIVISION Engineering Conditions pending. FOOTING OPTION "A" 6' MAX FINISH GRADE RETAINED EARTH 2` MAX 3" MAX 16" 4" r 4 HORIZONTAL REBAR USE BOND BEAM BLOCK) 4 VERTICAL REBAR AT 24" MAX. SPACING REBAR IN CENTER OF CELL) 4 HORIZONTAL REBAR CONTINUOUS AT 32" MAX- ABOVE TOP OF RETAINING WALL USE BOND BEAM BLOCK) NOWRETAINING PORTION OF WALL 8" BLOCK GROUTON Y 1 WITHR BAR) 2)- #4 HORIZONTAL REBARS ATTOP OF-RETAINING WALL USE BOND BEAM BLOCK) RETAINING PORTION OF WALL B BLOCK SOLID GROUT ALL CELLS) OMIT HEAD JOINTS FOR DRAINAGE — FIRST COURSE ONLY) 3) - #4 HORIZONTAL REBARS 4" 12` 4 REBAR AT 24" SPACING WITH 6" MIN. HOOKS AT ENDS FOR OPTION "B ") THE FOL OWING INSPECTIONS ARE REQUIRED: 1) FOOTING; EXCAVATION TRENCH CLEAN WITH STEEL IN' PLACE AND SUPPORTED 3" ABOVE AND AWAY FROM THE SURROUNDING EARTH /DIRT. 2) REBAR /PRE - GROUT; BOND BEAM REBAR AND VERTICAL REBAR IN PLACE - INSPECTION PRIOR TO PLACING GROUT. 3) IFNAL; AFTER GROUT IS PLACED - PRIOR TO ANY DECORATIVE CAP PLACEMENT. NOTES: 1) FENCE HEIGHTS ARE REGULATED — CONSULT ZONING REGULATIONS BEFORE BEGINNING CONSTRUCTION. 2) NO WATER COURSE OR NATURAL DRAINAGE SHALL BE OBSTRUCTED. 3) ALL REBAR TO BE ASTM SPEC. A615. GRADE 40 MINIMUM. 4) ALL REBAR LAP SPLICES TO BE 24" MINIMUM. 5) ALL MASONRY UNITS TO BE ASTM C -90 GRADE N. WESTERN REV 6) NOT DESIGNEb FOR SURCHARGE LOADS 'FROM, VEHICLES OR STRUCTURES. DISCLAIMER: CITY or LFaU ejLslnon ALTERNATE DESIGNS MAY BE POSSIBLE p V40 DKIIAM tXrAXMt• WHEN PROVIDED WITH AN . ENGINEERED: ANALYSIS -. USE OF THIS STANDARD DESIGN IS AT THE USER'S RISK AND CARRIES NO IMPLIED. OR INFERRED GUARANTEE AGAINST I 951)674.3124 FAILURE OR DEFECTS; .. I EXT #224 FOOTING OPTION ".B" EARTH" 6' MAX 2' MAX 4" I.I 12" ALL FOOTINGS ADJACENT TO SLOPES TO BE AT LEAST 5' TO DAYLIGHT AS SHOWN BELOW. S o BOTTOM AF OF FOOTING SEE PAGE 2 FOR ADDITIONAL INFORMATION' CouNTr CODt C[TY or I 3U[LDfmG DEPARTM'ENl BLOCK WALL AToP 2r RETAINING WALL. 130 S. MAIN ST. COMBOFw,u.Vso I: - PAGE I OF2