Approve and authorize the City Manager to execute a Rental Agreement with Rain For Rent
for the Summerly 70-acre Flood Storage Site Dewatering in an amount not to exceed
$120,000.00 in such final form as approved by the City Attorney and authorize the City
Manager to execute change orders not to exceed a 10% contingency of $12,000.00 for
unanticipated costs.
Page 1 of 2
REPORT TO CITY COUNCIL
To:Honorable Mayor and Members of the City Council
From:Jason Simpson, City Manager
Prepared by:Rick De Santiago, Public Works Manager
Date:May 14, 2024
Subject:Rental Agreement with Rain For Rent for Summerly 70-Acre Flood Storage
Site Dewatering
Recommendation
Approve and authorize the City Manager to execute a Rental Agreement with Rain For Rent for
the Summerly 70-acre Flood Storage Site Dewatering in an amount not to exceed $120,000.00
in such final form as approved by the City Attorney and authorize the City Manager to execute
change orders not to exceed a 10% contingency of $12,000.00 for unanticipated costs.
Background
Summerly Park and Parking Lot is experiencing flooding due to high water levels at the golf course
surcharging out of park drains. The excess water has caused inconvenience and potential
damage to these areas. The standing water has created a mosquito infestation within the
Summerly community, which Vector Control has reported. The only way to alleviate this issue is
to pump out the 70-acre flood storage site and into the wetlands. Pumping out this site will alleviate
water levels at the golf course and restore proper drainage at the park.
Discussion
The Rental Agreement with Rain For Rent involves renting a dual pump system to transfer water
from permanent basins to an existing 12-inch HDPE line located approximately 200 feet away
from Summerly. The City will manually operate the pumps and effectively manage and distribute
water resources as required.
The quote provided by Rain For Rent includes the following items:
· (2) 12-inch diesel-driven pumps
Rental Agreement with Rain For Rent
Page 2 of 2
· 80 feet of 12-inch suction hose
· 400 feet of 12-inch HDPE pipe
· (2) suction screens
· (1) 12-inch x 6-inch HDPE saddle
The rental cost for this dual pump system is as follows:
· Week rate: $27,157.46
Staff received two (2) quotes from reputable companies for the pricing on pond dewatering at
Summerly. The amounts of each proposal are listed below:
Rain For Rent $27,157.46 (per week)
Sunbelt Rentals $29,635.46
Fiscal Impact
Funds are available in the Fiscal Year 23-24 Annual Operating Budget.
Attachments
Attachment 1- Rental Agreement
Rain For Rent
6400 Fischer Rd
Riverside, CA,92507
951.-653-2L7L
ra i nforrent.com
I MATTSON @ rainforrent.com
CITY OF I.AKE ELSINORE
Account: 7O707O
130 S MAIN STREET
LAKE ELSINORE, CA, 92530
Chris Erickson
951-674-51.70
Cerickson @ lake-elsinore.or
Dear Chris Erickson,
Thank you for your inquiry. As requested, please find attached our proposal 1036-lND-2119254 for Summerly Ponds Dewater. We
value this opportunity to provide a solution for your liquid handling need and we are committed to partnering with you to ensure
your project's safe execution and completion.
To convert this proposal into a confirmed order WITHOUT ANY CHANGES, please click the "Start Signing" button to begin the
electron ic signature process.
lf you would like to CHANGE anything in this proposal or discuss anything further, please call Jeremy Mattson at 951-653-2171.
Thank you, and I look forward to working with you.
Regards,
Jeremy Mattson
J MATTSON @ rainforrent.com
Mobile: 909-332-0316
Branch: 957-653-2171
5400 Fischer Rd
Riverside, CA,92507
Llquld ln$enulty"
Rain For Rent
Sales Rep: Jeremy Mattson
CITY OF I.AKE EI.SINORE
Account: LO7O7O
Proposal : 103GlND-2119254
Diamond Lane
Lake Elsinore , ca
PROJECT DESCRIPTION
Quote includes
(21 12in diesel driven pumps
80ft 12in suction hose
400ft 12in HDPE
(2) suction screens
(1) 12in x 6in HDPE saddle
Misc. Elbows
Misc. HDPE fittings
Quoted as one week rental
Cycle rate 572,734.05
week rate s6,367.16
Does not include applicable sales tax or services
PROJEST OVERVIEW
Customer has requested a dual pump system to transfer water from permanent basins to existing 12in HDPE line approx 200ft away
Suction lift is 15-20ft. Discharge flow is TBD. Pumps to be operated manually by city. 2 days install.
Quote for one week rental.
RFR Responsibilities & Scope of Work
Rain for Rent (RFR) will provide delivery, installation, removal, pickup of all quoted materials/equipment
Customer requires a two pump system to move water from onsite basins to existing 12in HDPE discharge line approximately 2OOft away.
One pump will be placed on either side of existing pump station
Suction lift is between 15-22ft
Flow is TBD
Quote for one week rental
Sales tax is not included
Quote includes
(2) 12in diesel driven pumps
80ft 12in suction hose
400ft 1.2in HDPE
(2) suction screens
(1) 12in x 5in HDPE saddle
Misc. Elbows
Misc. HDPE fittings
Rain for Rent Responsibilities
Rain for Rent to deliver and pickup quoted equipment
Rain for Rentto install and remove quoted equipment (2 days install, l day removal)
Rain for Rent to provide one 12k reach lift
Western oilfields Supply Company dba/Rain for Rent. lf you have recerved this information rn error, please immediately contact us at info@rainforrent.com.
Page 2 of 6
)8IIII-Eo!0
E
-EII-JtIIJ
Project Location
Project Description and Overview
OF WORK
Project Name
Date Prepared
Prevailing Wage
Summerly Ponds Dewater Jobsite
Est. Delivery Date
Est. Completion Date
Summer y Ponds Dewater
4/25/2024 4130/2024
Yes s/t 12024
Rain For Rent
Sales Rep: .leremy Mattson
CITY OF LAKE ELSINORE
Account: 707070
Proposal : 1035-lND-2119254
Rain for Rent to provide one 12in hdpe fusion machine
Rain for Rent Exclusions
Rain for Rent is not responsible for any discharge permits
Rain for Rent is not responsible for any spills or leaks
Rain for Rent is not responsible for operation of temporary system
Rain for Rent is not responsible for fueling of temporary system
Rain for Rent is not responsible for any erosion control or repair
Rain for Rent is not responsible for placing dirt over top of piping
Due to the multitude of economic factors, materials, labor, hauling and freight are currently in a period of above average volatility. lf, during the
performance of work, the price of materials, labor, hauling or freight increases by 5% or greater through no fault of Rain for Rent, the contract
price shall be equitably adjusted by an amount reasonably necessary to cover any such price increases. Equipment subject to availability at time
of project.
Reference Materials
Project is quoted based on applicable/customer provided reference materials noted below:
Site visit with Chris and team
Customer Responsibilities
It is the customer's responsibility to inform RFR about prevailing wage at time of proposal. tf RFR is informed after the quote is issued that
certified payroll is required, quote will be subject to additional charges.
lobsite:
Customer is responsible for:
1. lnforming RFR of any jobsite or general requirement(s) to perform work on location.
2. Securing permits, fees, bonding, right of ways, vehicular/pedestrian traffic control, and security.
3. Providing safe, secure access and egress to an adequate staging area throughout the job which could include brush clearing, grading, and
removal or replacement of any landscape or hardscape in the temporary right of way for the equipment.
4. Any damage to the environment including trees, vegetation, stream banks, or any other part of the site caused by the installation, removal,
construction, pulling or dragging of equipment, or operation of the equipment that would require site restoration or environmental
countermeasu res.
5. Any excavation, saw cutting, trench plating for the purpose of road crossings, backfilling, restoration, modification, or alteration of any
permanent structure or site element including changes to pump pad preparation, suction, or discharge chambers during duration of job
(including installation and removal).
System:
1. RFR will provide dedicated equipment with operator and fuel to perform all needed unloading, testing, operations, maintenance, relocating,
cleaning, and reloading of provided equipment/system. Equipment must be capable of lifting 120001bs.
2. lf installation provided by RFR and Customer is operating system, this Transfer of Operation form will need to be reviewed and signed by both
parties upon completlon of setup.
3. Customer will provide fueling.
4. Customer will provide preventative maintenance as recommended by manufacturer or per the Rental Agreement.
5. Customer will supply all needed water for the commissioning, startup, and system testing. Pro.iect-specific criteria for hydrotesting can be
provided at an additional charge.
6. By accepting this quotation, the customer has acknowledged that the equipment proposed herein is suitable for its intended application and
accepts all liabilities associated with its use. Customer is responsible for compliance with appropriate liquid/material quality standards,
regulations, and testing protocols to meet all federal, state, local and job location specific requirements. Customer is responsible for all
waste materials associated with this equipment/system.
Customer is responsible for:
1-. Any work in confined spaces.
2. Protecting system from damage. Equipment stays on rent until it can be returned.
3. Using equipment in a safe and proper manner in accordance with manufacturers' recommendations, regulatory standards, and industry best
practices. lmproper usage may cause equipment/system failure, damage, possible incidents, injuries, and spills.
4. Customer is responsible for any discharge permits
5. Customer is responsible for any spills or leaks
6. Customer is responsible for operation of temporary system
7. Customer is responsible for fueling of temporary system
8. Customer is responsible for any erosion control or repair
Western Oilfields Supply Company dba/Rain for Rent. lf you have received th s informatron In error, please mmediately contact us at info@ra nforrent.com.
t'aII3-Lo!0E
I
1tTII-rIIJ
Rain For Rent
Sales Rep: Jeremy Mattson
CITY OF I.AKE ELSINORE
Account: 107070
Proposal : 1036-lND-2119254
9. Customer is responsible for placing dirt over top of piping
Upon Pickup:
Contact the RFR office at 95L-553-2\77 to schedule pickup when equipment/system is cleaned and ready to be released.
Flushing and cleaning of equipment must be performed to RFR's standards prior to being called off rent. RFR personnel will perform a visual
inspection. lt is recommended to have a customer representative on-site during inspection. Equipment found not to be in "delivered
condition" will not be picked up.
Project Scheduling & Billing
This quote is valid for 30 days. For the quoted items, RFR requires a signed quote not less than 3 days prior to delivery.
Estimated schedule durations:
Mobilization: 2 days
lnstallation: 2 days
Operation: by customer
Removal: l day
Demobilization: 1 day
System Rental Duration: Quote for one week rental
Customer acknowledges that availability of equipment/system and/or media will be confirmed at time of order. Additional freight charges may
apply subject to mutually agreed upon change order.
Rain for Rent's standard hours of operation are 7:30am - 4:00pm Monday - Friday. Time outside of normal business hours will be billed at 1.5x
the base rate for Transportation and Service
Safety
Each employee is expected to adhere to the RFR Environmental, Health and Safety programs, which will protect the environment, the health and
safety of the customer, employees, and others. RFR asks for your full cooperation to succeed in this expected outcome.
Western Oilfields Supply Company dba/Rain for Rent. lf you have received this information in error, please immediately contact us at rnfo@rainforrent.com-
,8a.I
IJ-Lo!0
Er
Etr
I)EIIJ
Rain For Rent
Sales Rep: Jeremy Mattson
CITY OF IAKE ELSINORE
Account: t07O7O
Proposal : 1035-lND-2119254
Estimated Rental Total
Estimated Environmental Recovery Fees
Estimated Air Quality Fees
-Estimated costs do not include taxes
-Recurring rental project costs will be on a cycle/week/day basis+ tax
Engine driven equipment will be delivered with at least 50% fuel. A Fuel Convenience Charge will be implemented on a per gallon basis up to the
delivered fuel level. Customer acknowledges that the Fuel Convenience Charge is not a retail sale of fuel. Customer may avoid the Fuel
Convenience Charge if the Customer returns the Equipment at delivered level. The fuel convenience fee will be charged per gallon. No refunds
will be given for a higher level of fuel upon return.
Customer Name Customer Signature Date
Proposal Acknowledgement
By signing this proposal, customer represents that he/she has read and agreed to both the Statement of Work and Quote Agreement sections, and
is also agreeing to the grand total amount listed above, plus any recommended optional items if accepted and initialed. lf customer requires a
Purchase Order number to process and submit payment, it must be supplied to Rain for Rent at the time of acceptance of this proposal.
PO Number:
Rental Protection Plan
I have received and reviewed the Rental Protection Plan Agreement incorporated as the last page of this estimate. By initialing this paragraph, I
understand that I am agreeing to enter into and be bound by the terms of the Rental Protection Plan Program Agreement and that I am authorized
to enter into this Agreement on behalf of Customer. FOR ALL RENTALS OF EQUIPMENT, EXCEPT THOSE SPECIFICALLY EXCLUDED, YOU MAY EITHER
SHOW PROOF OF PROPERTY INSURANCE IN ACCORDANCE WITH INSURANCE REQUIREMENTS AND RENTAL AGREEMENT OR PURCHASE THE
RENTAL PROTECTION. THE PURCHASE OF THE RENTAL PROTECTION PLAN FOR RENTALS OF EQUIPMENT IS NOT MANDATORY AND MAY BE
DECLINED IF YOU HAVE PROOF OF ALL RISK PROPERTY INSURANCE AS REQUIRED BY CONTRACT,
s9ss.07 Accept Decline
Western Oilfields Supply Company dba/Rain for Rent. lf you have received this information n error, please mmediately contact us at info@rainforrent.com.
Created Date: 4 126/2024
)8j
IIIJ
Eo
EO-L
-E.I
I-E!IJ
PROJECT COSTS
5G,367.1.e
S2oG.93
s147.8s
Total Estimated Recurring Charges 56,72L.94
SERVICES
Estimated Delivery 52,4s3.4c
!stimated lnstallation S7,703.oo
astimated Removal s3,281.0C
Estimated Pickup s1,s43.os
Estimated Services S4,soo.oo
GRAND TOTAL I S26,202.3s
RPP
INITIAL
Rain For Rent
Sales Rep: Jeremy Mattson
CITY OF LAKE ElsINORE
Account: 1O7O7O
P roposa I : 1035-l ND-2119254
Quote Agreement
jobsite has tested positive and provide a list of actions taken to protect Rain for Rent personnel.
Rental Protection Plan Program Agreement
deductible. The maximum coverage available under the RPP Program is 5150,000 per Covered Occurrence, whether or not there is more than one piece of equipment involved in the
the time of loss.
Western Oilfields Supply Company dba/Rain for Rent. if you have received this information in error, please immedialely contact us at info@rarnforrent..om.
)8aII---Lo
EO
E
I
E.I3rIIJ
Pump locations 1 &2
Fump 'l to HDFE loranon 1t10ft
Fump 2 tE HDFE locatr,rn 20lttt
(E{dS.
\"
;
t"
i
I
\\'{Google Earth
ffi
Approx area of HDPE Tee
HOPE Line Location Approx
I
;,
:
\
L@
t:3*el'I
!
H
.
.,.
l,
X
at
,
:
t',
n
\.?
+'{
@2014 Atrbus
Earth
'trt l,i
-_
,t
h,=-E!oilr E
= ITI
(z'
,u
l(
g
'rc
',!_f
-ri
a
't
-l
I
il
.{;,f
;
S:,i.ffri'
; .'..