Loading...
HomeMy WebLinkAboutItem No. 12 - Notice of Decision – Planning Commission Approval of Planning Application No. 2012)Notice of Decision – Planning Commission Approval of Planning Application No. 2020-92 (Riverside & Lincoln Commercial) Proposing to Establish a New Commercial Center with Six (6) Buildings (approximately 51,101 Sq. Ft. in Total) on an approximately 6.36-acre Site Located at the Southwest Corner of Lincoln Street and Riverside Drive Receive and File the Notice of Decision for Planning Application No. PA 2020-92, approved by the Planning Commission on April 16, 2024. Page 1 of 3 REPORT TO CITY COUNCIL To:Honorable Mayor and Members of the City Council From:Jason Simpson, City Manager Prepared by:Damaris Abraham, Community Development Director Date:May 14, 2024 Subject:Notice of Decision – Planning Commission Approval of Planning Application No. 2020-92 (Riverside & Lincoln Commercial) Proposing to Establish a New Commercial Center with Six (6) Buildings (approximately 51,101 Sq. Ft. in Total) on an approximately 6.36-acre Site Located at the Southwest Corner of Lincoln Street and Riverside Drive Applicant:Ilan Golcheh, Golcheh Group Recommendation Receive and File the Notice of Decision for Planning Application No. PA 2020-92, approved by the Planning Commission on April 16, 2024. Background On April 13, 2021, the City Council adopted and approved the following applications for the Riverside/Lincoln Commercial Project which was to establish a new commercial center with six new buildings on an approximately 6.36-acre parcel: •Mitigated Negative Declaration (MND; ER 2020-05; SCH No. 2021010316); •General Plan Amendment (GPA) No. 2020-02 to change the land use designation from Residential Mixed Use (RMU) to General Commercial (GC); •Zone Change (ZC) No. 2020-01 to change the zone from Residential Mixed Use (RMU) to General Commercial (GC); •Tentative Parcel Map (TPM) No. 37958 to subdivide the 6.36‐acre parcel into four parcels ranging in size from 0.93 acres to 2.88 acres; •Conditional Use Permit (CUP) No. 2020-09 to allow a gas station use with a convenience store including beer and wine sales (Type 20), drive-through restaurant, self-storage facility, and self-serve carwash; and •Commercial Design Review (CDR) No. 2020-08 to construct six new commercial buildings totaling 51,101 square feet (sq. ft.) with 221 parking spaces, landscaping, and related site improvements. PA 2020-92 (CUP 2023-16 and CDR 2023-06) Page 2 of 3 1 1 6 1 The subject property is currently vacant and is located at the southwest corner of Lincoln Street and Riverside Drive. The project encompasses Assessor Parcel Numbers (APNs) 379-111-017, 018, 019, and 020 (Previous APN: 379-111-014). On March 3, 2022, Parcel Map No. 37958 was finalized and recorded. However, on April 13, 2023, the CUP and CDR applications expired. As such, on January 17, 2024, the applicant submitted a new CUP (CUP No. 2023-16) and CDR applications (CDR No. 2023-06) with the same configuration and layout as the original applications previously reviewed and approved by City Council which includes the following: •4,291 sq. ft. canopy for a new gas station with 16 fueling stations; •4,650 sq. ft. convenience store with a concurrent beer and wine sales (Type 20); •38,016 sq. ft. self-storage facility with three new buildings; •4,456 sq. ft. drive-through restaurant; •3,979 sq. ft. self-serve carwash; and •221 parking stalls, landscaping, and related site improvements. On April 16, 2024, the Planning Commission reviewed the new CUP and CDR applications and voted 4-1 to take the following actions: 1. Found that pursuant to the California Environmental Quality Act (CEQA) Guidelines Section 15162, the project would not have a significant effect on the environment and no new environmental documentation is necessary because all potentially significant effects have been adequately analyzed in a previously adopted Mitigated Negative Declaration (ER 2020-05) (SCH No. 2021010316); 2. Adopted A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, FINDING THAT PLANNING APPLICATION NO 2020-92 (CONDITIONAL USE PERMIT NO. 2023-16 AND COMMERCIAL DESIGN REVIEW NO. 2023-06) IS CONSISTENT WITH THE WESTERN RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP); 3. Adopted A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT NO. 2023-16 TO ESTABLISH A GASOLINE DISPENSING STATION WITH A 4,291 SQUARE FOOT CANOPY, BEER AND WINE SALES (TYPE 20), SELF-STORAGE FACILITY (THREE (3) BUILDINGS 38,016 SQUARE FEET IN TOTAL), 3,979 SQUARE FOOT SELF-SERVE CARWASH, AND 4,456 SQUARE FOOT DRIVE-THRU RESTAURANT LOCATED AT APNS: 379‐111-017, 018, 019, AND 020; and PA 2020-92 (CUP 2023-16 and CDR 2023-06) Page 3 of 3 1 1 6 1 4. Adopted A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING COMMERCIAL DESIGN REVIEW NO. 2023-06 FOR BUILDING DESIGN AND CONSTRUCTION OF A 4,650 SQ. FT. CONVENIENCE STORE, 4,291 SQ. FT. CANOPY, 38,016 SQ. FT. SELF‐STORAGE FACILITY, 3,979 SQ. FT. SELF-SERVE CARWASH, 4,456 SQ. FT. DRIVE‐THRU RESTAURANT, AND RELATED SITE IMPROVEMENTS LOCATED AT APNS: 379‐111-017, 018, 019, AND 020. Discussion The Planning Commission heard the project at its regular meeting on April 16, 2024. No members of the public attended the meeting in person, but the Planning Commission accepted thirteen (13) written public comments in opposition to the project before the April 16, 2024 hearing date. The Planning Commission discussed the concerns and issues raised in the written public comments which include over-saturation of gas stations, convenience stores, and car washes, as well as the potential impacts of increased activity of unhoused individuals, and the negative impact on parking on Lincoln Street. The Planning Commission voted 4-1 to approve the project. The Planning Division has received four (4) additional written comments in opposition of the project since the April 16, 2024, Planning Commission hearing, bringing the total to seventeen (17) written comments in opposition to the project. All written comments received are included to this staff report as Attachment 2. The Planning Commission’s decision is final, and no action by the City Council is required unless the City Council, by majority vote, elects to review and reconsider the Planning Commission’s decision by ordering the matter set for a future noticed public hearing according to Section 17.410.110.F of the Lake Elsinore Municipal Code (LEMC), or the applicant or an interested person files a complete appeal application within 15 days of this notice appearing on the City Council’s Agenda. Fiscal Impact The time and costs related to processing this application have been covered by fees paid for by the applicant. No General Fund budgets have been allocated or used in the processing of this application. Attachments Attachment 1 – Planning Commission Staff Report Attachment 2 – Public Comments Page 1 of 7 REPORT TO PLANNING COMMISSION To:Honorable Chair and Members of the Planning Commission From:Damaris Abraham, Community Development Director Prepared by:Joey Mendoza, Associate Planner Date:April 16, 2024 Subject:Planning Application No. 2020-92 (Riverside/Lincoln Commercial) proposing to establish a new commercial center with six (6) buildings (approximately 51,101 sq. ft. in total) on an approximately 6.36‐acre site located at the southwest corner of Lincoln Street and Riverside Drive Applicant:Ilan Golcheh, Golcheh Group Recommendation 1. Find that pursuant to the California Environmental Quality Act (CEQA) Guidelines Section 15162, the project would not have a significant effect on the environment and no new environmental documentation is necessary because all potentially significant effects have been adequately analyzed in a previously adopted Mitigated Negative Declaration (ER 2020-05) (SCH No. 2021010316); 2. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, FINDING THAT PLANNING APPLICATION NO 2020-92 (CONDITIONAL USE PERMIT NO. 2023-16 AND COMMERCIAL DESIGN REVIEW NO. 2023-06) IS CONSISTENT WITH THE WESTERN RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP); 3. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT NO. 2023-16 TO ESTABLISH A GASOLINE DISPENSING STATION WITH A 4,291 SQUARE FOOT CANOPY, BEER AND WINE SALES (TYPE 20), SELF-STORAGE FACILITY (THREE (3) BUILDINGS 38,016 SQUARE FEET IN TOTAL), 3,979 SQUARE FOOT SELF-SERVE CARWASH, AND 4,456 SQUARE FOOT DRIVE-THRU RESTAURANT LOCATED AT APNS: 379‐111-017, 018, 019, AND 020; and 4. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING COMMERCIAL DESIGN REVIEW NO. 2023-06 PA 2020-92 (CUP 2023-16 and CDR-2023-06) Page 2 of 7 1 1 1 9 FOR BUILDING DESIGN AND CONSTRUCTION OF A 4,650 SQ. FT. CONVENIENCE STORE, 4,291 SQ. FT. CANOPY, 38,016 SQ. FT. SELF‐STORAGE FACILITY, 3,979 SQ. FT. SELF-SERVE CARWASH, 4,456 SQ. FT. DRIVE‐THRU RESTAURANT, AND RELATED SITE IMPROVEMENTS LOCATED AT APNS: 379‐111-017, 018, 019, AND 020. Project Location The project consists of a 6.36-acre site that is currently vacant. The project is located at the southwest corner of Lincoln Street and Riverside Drive. The project encompasses Assessor Parcel Numbers (APNs) 379-111-017, 018, 019, and 020 (Previous APN: 379-111-014). Environmental Setting EXISTING LAND USE GENERAL PLAN ZONING Project Site Vacant General Commercial (GC)General Commercial (C-2) North Commercial General Commercial (GC)General Commercial (C-2) East Recreational Recreational (R)Recreational (R) West Residential High-Density Residential (HDR)High-Density Residential (R-3) South Residential High-Density Residential (HDR)High-Density Residential (R-3) Table 1: Environmental Setting Background On April 13, 2021, the City Council adopted Mitigated Negative Declaration (MND) (ER 2020-05) (SCH No. 2021010316) and approved General Plan Amendment (GPA) No. 2020-02, Zone Change (ZC) No. 2020-01, Tentative Parcel Map (TPM) No. 37958, Conditional Use Permit (CUP) No. 2020-09, and Commercial Design Review (CDR) No. 2020-08. Tentative Parcel Map No. 37958 included a subdivision of the 6.36‐acre parcel into four parcels ranging in size from 0.93 acres to 2.88 acres. CUP No. 2020-09, and CDR No. 2020-08 included a proposal to develop a commercial project consisting of a 4,291 sq. ft. convenience store, 16 gasoline‐dispensing stations with a 4,291 sq. ft. canopy, beer and wine sales (Type 20), self‐storage facility (three (3) buildings that are 38,016 sq. ft. in total), 3,979 sq. ft. self-serve carwash, and 4,456 sq. ft. drive‐thru restaurant 221 parking stalls, landscaping, and related site improvements. Parcel Map No. 37958 was finalized and recorded on March 3, 2022. CUP No. 2020-09 and CDR No. 2020-08 expired on April 13, 2023. On January 17, 2024, the applicant submitted the subject application (CUP No. 2023-16 and CDR No. 2023-06) with the same configuration and layout as the original application for review. Detailed project description of the proposal is provided below. PA 2020-92 (CUP 2023-16 and CDR-2023-06) Page 3 of 7 1 1 1 9 Project Description The Riverside/Lincoln Commercial Project consists of applications for a Conditional Use Permit (CUP No. 2023-16) and a Commercial Design Review (CDR No. 2023-06), which are collectively being processed under Planning Application No. 2020-92. CUP No. 2023-16 proposes to establish a gas station with a 4,291 sq. ft. canopy with a concurrent beer and wine sales (Type 20), self‐storage facility (three (3) buildings 38,016 sq. ft. in total), a 3,979 sq. ft. self-serve carwash, and a 4,456 sq. ft. drive‐thru restaurant. CDR No. 2023-06 proposes the building design and construction of a 4,650 sq. ft. convenience store, a 4,291 sq. ft. canopy, a 38,016 sq. ft. self-storage facility (three (3) buildings), 4,456 sq. ft. drive-thru restaurant, 221 parking stalls, landscaping, and related site improvements. Individual project components are discussed in more detail below: Convenience Store/Gas Station – will include a 4,650 sq. ft. convenience store (7‐Eleven) with a gas station. The gas station area will have eight pumps with 16 fueling stations under a 4,291 sq. ft. canopy. Anticipated throughput at the gas station is 1.5 million to 1.7 million gallons of fuel in the first year. The convenience market will be open 24 hours per day, seven days a week, and the gas pumps will also be accessible 24 hours per day, seven days a week. Fast Food Drive‐Thru Restaurant – will include a 4,456 sq. ft. fast food restaurant (McDonald’s) with a drive‐thru with two lanes for queueing of 12 vehicles and ordering that will lead to two pick windows. The drive‐thru will be open 24 hours a day, seven days a week. Car Wash – will include a 3,979 sq. ft. self‐serve car wash with a single‐lane car wash tunnel. Two queueing lanes are proposed to allow for more vehicle stacking. The car wash operation hours will be 9:00 AM to 8:00 PM, seven days a week. Self‐Storage – will include three (3) buildings totaling 38,016 sq. ft. in size. One along the western project boundary (21,377 sq. ft.), which includes office space, one along the southern boundary (10,558 sq. ft.), and one in the interior portion of the project site (6,081 sq. ft.). A total of 286 storage units will be available in seven different sizes ranging from 5 feet by 5 feet up to 10 feet by 30 feet. Some units will be accessed from the exterior, and others will be accessed via interior hallways. All units will be accessible 24 hours a day, seven days a week. Architecture and Treatments The proposed commercial buildings will vary in height and exterior treatment. The convenience store will be 15 feet high with parapets extending to approximately 22.5 feet. The building finishes will be cement plaster stucco in a four‐color theme with stone accents and mission-style clay roof tiling. The metal canopy over the gas pumps will be 20 feet tall and be painted a color to complement the convenience store. The fast-food restaurant will be a maximum of 20 feet in height. Architectural treatments will be used to break up the bulk of the building and include stucco, aluminum batten, and metal paneling. The car wash tunnel will be approximately 15 feet PA 2020-92 (CUP 2023-16 and CDR-2023-06) Page 4 of 7 1 1 1 9 high with a white stucco exterior with blue and orange accenting architectural features. Canopies, parapets, and a 31.5-foot tower sign are also incorporated into the car wash design. The underside of the building canopies will have blue light emitting diode (LED) strip lighting to provide a faux neon aesthetic. The self‐storage buildings would be constructed of concrete masonry with rolling metal access doors. Landscaping The proposed landscaping plan includes a mix of trees and shrubs emphasizing low-water-use species. Landscaping will cover approximately 16 percent of the project site. 28 trees will be planted around the project perimeter, including a mix of red crape myrtle, Canary Island date palm, and African sumac. Various shrub species will be planted along the project frontages and internally within the site. Access, Circulation, and Parking Vehicular access to the project site is proposed via one full-access driveway at Lincoln Street and two right-turn-in/out-only driveways at Riverside Drive. Fuel deliveries to the station would be via truck/trailer combination, and the site has been designed to accommodate the necessary turning radii for the fuel delivery vehicles' entrance and exit. The project proposes 221 parking spaces distributed throughout the site. This includes 12 ADA‐compliant spaces and four (4) spaces oversized to accommodate boat trailers or recreational vehicles (RVs). Discussion General Plan Consistency The project site has a General Plan Land Use Designation of General Commercial (GC). The GC Land Use Designation provides for retail, services, restaurants, professional and administrative offices, hotels and motels, mixed-use projects, public and quasi-public projects, and similar and compatible uses with a maximum 0.40 floor area ratio (FAR). The project proposes a self-serve car wash, self-storage facility, drive-thru restaurant, gasoline dispensing station, and canopy with a 0.20 FAR. The project is consistent with the General Commercial General Plan Land Use Designation. The project site is located within the General Plan Lake View District Plan (LVDP). Per Section 9.0, Lake View District Plan, of the General Plan, the main focus of the Lake View District is to “integrate new and existing residential communities and supporting uses while maintaining a high quality of life.” The project would be consistent with the goals of the Lakeview District Plan, including the goal to provide a revitalized and healthy mixed‐use corridor along Riverside Drive. The project will develop commercial uses, including a convenience store with gas station, a drive‐thru restaurant, a car wash, and self‐storage, which will contribute to the commercial vitality along Riverside Drive. The proposed uses would meet the needs of existing residents in the project vicinity. PA 2020-92 (CUP 2023-16 and CDR-2023-06) Page 5 of 7 1 1 1 9 Municipal Code Consistency The project site has a zoning designation of General Commercial (C-2). Per the Lake Elsinore Municipal Code (LEMC) Section 17.124.020, all permitted uses of the Commercial Office (C-O) and the Neighborhood Commercial (C-1) district as contained within LEMC Section 17.116.020 and Section 17.120.020 are also permitted uses within the C-2 zone. Food stores; including markets, bakeries, health food establishments, and candy stores are permitted uses. Per LEMC Section 17.124.030, uses permitted subject to a use permit in the C-1 district as contained in LEMC Section17.120.030 are also permitted in the C-2 zone subject to a Conditional Use Permit. Per LEMC Section17.120.030, drive-thru establishments and gasoline dispensing establishments are permitted uses subject to a Conditional Use Permit. Per the LEMC Section 17.124.030, car washes are a permitted use subject to a Conditional Use Permit. Per LEMC Section 17.112.090.O (Gasoline dispensing establishments), establishments engaged in the concurrent sale of motor vehicle fuel with alcoholic beverages are subject to its provisions and must obtain a Conditional Use Permit pursuant to LEMC Section 17.415.070. Staff has reviewed the proposed project with respect to the relevant development standards as identified in the C-2 zone and LEMC Section 17.112.090 (Gasoline dispensing establishments) and has detailed the requirements and the proposed development standards as follows: Development Standard Required Proposed Front yard Setback •Convenience Store 15 ft.175 ft. •Fast Food Restaurant 15 ft.103 ft. •Carwash 15 ft.76 ft. •Self-Storage 15 ft.15 ft. & 65 ft. Side yard Setback (ROW) •Convenience Store 15 ft.60 ft. •Self-Storage 15 ft.15 ft. Canopy Setback 20ft.67 ft. Building Height •Convenience Store 45 ft.23 ft. •Fast Food Restaurant 45 ft.20 ft. •Carwash 45 ft.31.5 ft. •Self-Storage 45 ft.12 ft. Landscape improvements •Adjacent to Street 15 ft.15 ft. •Landscape coverage 15%16.1% Table 2: Development Standards The project complies with the onsite parking standards listed in LEMC Chapter 17.148 (Parking Requirements). LEMC Section 17.148.030.A requires one (1) parking space for each 250 square feet of retail floor area. LEMC Section 17.148.030.E.13 requires one (1) parking space for each 45 square feet of customer area, plus one space for each 200 square feet of noncustomer area for food establishments. The project will provide 221 parking spaces, including 12 accessible PA 2020-92 (CUP 2023-16 and CDR-2023-06) Page 6 of 7 1 1 1 9 spaces and four (4) oversized spaces to accommodate boat trailers or recreational vehicles (RVs). The project will be required to install electric vehicle charging stations for at least six (6) percent of all onsite parking spaces per CalGreen 2022 requirements. The proposed parking would exceed the minimum 170 parking spaces required for the site per the LEMC. The project also complies with the non-residential development standards outlined in LEMC Chapter 17.112. The Project provides a variety of building design features and forms by employing treatments, such as articulated planes along the exterior walls, attractive storefront window system, recessed suite entries and a variety of rooflines, which will create depth and shadow. The project has also been designed to be compatible with surrounding commercial buildings located near the project vicinity. The proposed landscaping improvements will serve to enhance the building designs and soften portions of building elevations, provide shade and break- up expanses of pavement. The Design Review Committee, which includes staff from Planning, Building and Safety, Fire, and Engineering, has reviewed the proposed project and has conditioned the project to ensure compliance with the general plan, the LEMC, and the related environmental document. Environmental Determination Pursuant to CEQA Guidelines Section 15162, staff recommends that the Planning Commission find that no new environmental documentation is necessary because all potentially significant effects have been adequately analyzed in an earlier Mitigated Negative Declaration (MND). All potentially significant impacts have been avoided or mitigated pursuant to the earlier MND and none of the conditions described in Section 15162 exist. 1. MND (ER 2020-05) (SCH No. 2021010316) was adopted by the City Council on April 13, 2021, for the Riverside/Lincoln Commercial Center Project. The MND analyzed the potential impact that could result from the development of the previous Conditional Use Permit and Commercial Design Review (CUP No. 2020-09 and CDR No. 2020-08) applications. 2. The new Conditional Use Permit and Commercial Design Review (CUP No. 2023-16 and CDR No. 2023-06) applications have the same configuration and layout as the previously analyzed project. Additionally, the new applications propose the same uses (a convenience store with a gas station, a fast-food drive‐thru restaurant, a self‐serve drive‐thru car wash and a self‐storage facility). There will be no increase in the intensity of use. 3. No substantial changes that require major revisions to the MND exist, and no new information of substantial importance that requires revisions to the earlier MND exist. MSHCP Consistency The project is consistent with the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP). The project site is not located in a Criteria Cell and was not required PA 2020-92 (CUP 2023-16 and CDR-2023-06) Page 7 of 7 1 1 1 9 to be processed through the Lake Elsinore Acquisition Process (LEAP) and Joint Project Review (JPR) processes. The project complies with all other applicable requirements of the MSHCP. Public Notice Notice of the hearing for this application has been published in the Press-Enterprise newspaper and mailed to property owners within 300 feet of the subject property. As of the writing of this report, no written comments concerning this application have been received by staff. Attachments Attachment 1 – MSHCP Resolution Attachment 2 – CUP Resolution Attachment 3 – RDR Resolution Attachment 4 – Conditions of Approval Attachment 5 – GIS Exhibits Attachment 6 – Design Review Package Attachment 7 – Public Notice Materials RESOLUTION NO. 2024-__ A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, FINDING THAT PLANNING APPLICATION NO. 2020-92 (CONDITIONAL USE PERMIT NO. 2023-16 AND COMMERCIAL DESIGN REVIEW NO. 2023-06) IS CONSISTENT WITH THE WESTERN RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP) Whereas, Ilan Golcheh - Golcheh Group has filed an application with the City of Lake Elsinore (City) requesting approval of Planning Application No. 2020-92 (Conditional Use Permit No. 2023-16 and Commercial Design Review No. 2023-06) to construct a commercial project consisting of a 4,650 sq. ft. convenience store, 4,291 sq. ft. canopy, 38,016 sq. ft. self-storage facility, 4,456 sq. ft. drive-thru restaurant, 3,979 sq. ft. self-serve carwash, 221 parking stalls, and landscaping and related site improvements on a 6.36-acre site. The project is located at the southwest corner of Lincoln Street and Riverside Drive (APNs: 379‐111-017, 018, 019, and 020 (Previous APN: 379-111-014)); Whereas, Section 6.0 of the Multiple Species Habitat Conservation Plan (MSHCP) requires that all discretionary projects within a MSHCP Criteria Cell undergo the Lake Elsinore Acquisition Process (LEAP) and the Joint Project Review (JPR) to analyze the scope of the proposed development and establish a building envelope that is consistent with the MSHCP criteria; Whereas, Section 6.0 of the MSHCP further requires that the City adopt consistency findings demonstrating that the proposed discretionary entitlement complies with the MSHCP Criteria Cell, and the MSHCP goals and objectives; Whereas, pursuant Section 17.415.070.B (Conditional Use Permit) and Section 17.415.050.E (Major Design Review) of the Lake Elsinore Municipal Code (LEMC), the Planning Commission (Commission) has the responsibility of reviewing and approving, conditionally approving, or denying Conditional Use Permits and Design Review applications; and Whereas, on April 16, 2024, at a duly noticed Public Hearing the Commission has considered evidence presented by the Community Development Department and other interested parties with respect to this item. NOW THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1. The Commission has considered the Project and its consistency with the MSHCP prior to adopting Findings of Consistency with the MSHCP. Section 2: That in accordance with the MSHCP, the Commission makes the following findings for MSHCP consistency: 1. The Project is a project under the City’s MSHCP Resolution, and the City must make an MSHCP Consistency finding before approval. Pursuant to the City’s MSHCP Resolution, the Project is required to be reviewed for MSHCP consistency, including consistency with other “Plan Wide Requirements.” The Project site is not located within a MSHCP Criteria Cell. Based upon the site reconnaissance survey there PC Reso. No. 2024-____ Page 2 of 4 3 7 2 8 0 are no issues regarding consistency with the MSHCP’s other “Plan Wide Requirements.” The only requirements potentially applicable to the Project were the Protection of Species Associated with Riparian/Riverine Areas and Vernal Pool Guidelines (Section 6.1.2 of the MSHCP) 6.1.3 (Protection of Narrow Endemic Plant Species), 6.1.4 (Urban Wildlands Interface), 6.3.2 (Additional Survey Needs and Procedures), Appendix C (Standard Best Management Practices), and 7.5.3 (Construction Guidelines), and payment of the MSHCP Local Development Mitigation Fee (Section 4 of the MSHCP Ordinance). The Project site is located in a previously disturbed site, and has no habitat, including riparian/riverine areas or vernal pools, present on site. 2. The Project is subject to the City’s LEAP and the Western Riverside County Regional Conservation Authority’s (RCA) Joint Project Review processes. As stated above, the Project is not located within a Criteria Cell and therefore was not required to go through the LEAP and JPR processes. 3. The Project is consistent with the Riparian/Riverine Areas and Vernal Pools Guidelines. According to a Biological Resources and MSHCP Compliance Report prepared by HDR, Inc. dated May 1, 2020, there are no areas that meet the MSHCP’s definition of riparian/riverine areas or vernal pools that occur on the project site. As such, the Riparian/Riverine Areas and Vernal Pool Guidelines as set forth in Section 6.1.2 of the MSHCP are not applicable. 4. The Project is consistent with the Protection of Narrow Endemic Plant Species Guidelines. The Project site is not located within the Narrow Endemic Plant Species Survey Areas as shown on Figure 6-1 of the MSHCP. The Project is consistent with the Protection of Narrow Endemic Plant Species Guidelines as set forth in Section 6.1.3 of the MSHCP 5. The Project is consistent with the Additional Survey Needs and Procedures. The Property is not subject to any of the Critical Area Species Survey Area Guidelines as set forth in Section 6.3.2 of the MSHCP. Therefore, the Project is consistent with MSHCP Section 6.3.2. 6. The Project is consistent with the Urban/Wildlands Interface Guidelines. The Project is not located adjacent to any Criteria Cells or Public/Quasi-Public Lands and implementation of MSHCP Section 6.1.4 Guidelines is not required. 7. The Project is consistent with the Vegetation Mapping requirements. There are no resources located on the Project site requiring mapping as set forth in MSHCP Section 6.3.1. 8. The Project is consistent with the Fuels Management Guidelines. As stated above, the Property is surrounded by existing and planned development. Therefore, the Fuels Management Guidelines as set forth in Section 6.4 of the MSHCP are not applicable. PC Reso. No. 2024-____ Page 3 of 4 3 7 2 8 0 9. The Project will be conditioned to pay the City’s MSHCP Local Development Mitigation Fee. As a condition of approval, the Project will be required to pay the City’s MSHCP Local Development Mitigation Fee at the time of issuance of building permits. 10. The Project is consistent with the MSHCP. The Project site is not within or adjacent to any MSHCP Criteria Cell or conservation areas. As described above, the Project complies with all applicable MSHCP requirements. Section 4: Based upon the evidence presented, both written and testimonial, and the above findings, the Commission hereby finds that the Project is consistent with the MSHCP. Section 5: This Resolution shall take effect immediately upon its adoption. Passed and Adopted on this 16th day of April, 2024. Jodi Peters, Chair Attest: ___________________________________ Damaris Abraham, Community Development Director STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF LAKE ELSINORE ) I, Damaris Abraham, Community Development Director of the City of Lake Elsinore, California, hereby certify that Resolution No. 2024-__ was adopted by the Planning Commission of the City of Lake Elsinore, California, at a regular meeting held on April 16, 2024, and that the same was adopted by the following vote: PC Reso. No. 2024-____ Page 4 of 4 3 7 2 8 0 AYES NOES: ABSTAIN: ABSENT: Damaris Abraham, Community Development Director RESOLUTION NO. 2024- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT NO. 2023-16 TO ESTABLISH A GASOLINE DISPENSING STATION WITH A 4,291 SQUARE FOOT CANOPY, BEER AND WINE SALES (TYPE 20), A SELF-STORAGE FACILITY (THREE (3) BUILDINGS 38,016 SQUARE FEET IN TOTAL), A 3,979 SQUARE FOOT SELF-SERVE CARWASH, AND A 4,456 SQUARE FOOT DRIVE- THRU RESTAURANT LOCATED AT APNS: 379‐111-017, 018, 019, AND 020 Whereas, Ilan Golcheh - Golcheh Group has filed an application with the City of Lake Elsinore (City) requesting approval of Planning Application No. 2020-92 (Conditional Use Permit No. 2023-16 and Commercial Design Review No. 2023-06) to construct a commercial project consisting of a 4,650 sq. ft. convenience store, 4,291 sq. ft. canopy, 38,016 sq. ft. self-storage facility, 4,456 sq. ft. drive-thru restaurant, 3,979 sq. ft. self-serve carwash, 221 parking stalls, and landscaping and related site improvements on a 6.36-acre site. The project is located at the southwest corner of Lincoln Street and Riverside Drive (APNs: 379‐111-017, 018, 019, and 020 (Previous APN: 379-111-014)); Whereas, Conditional Use Permit (CUP) No. 2023-16 proposes to establish 16 gasoline‐dispensing stations with a 4,291 sq. ft. canopy, beer and wine sales (Type 20), a self‐storage facility (three (3) buildings that are 38,016 sq. ft. in total), a 3,939 sq. ft. self-serve carwash, and a 4,456 sq. ft. drive‐thru restaurant; Whereas, Section 17.415.070 of the Lake Elsinore Municipal Code (LEMC) provides that certain uses are desirable but may have operational characteristics that disproportionately impact adjoining properties, businesses, or residents. Accordingly, such uses require a more comprehensive review and approval procedure, including the ability to condition the project in order to mitigate significant impact; Whereas, pursuant Section 17.415.070.B (Conditional Use Permit) of the LEMC, the Planning Commission (Commission) has the responsibility of reviewing and approving, conditionally approving, or denying Conditional Use Permits; and Whereas, on April 16, 2024, at a duly noticed Public Hearing the Commission has considered evidence presented by the Community Development Department and other interested parties with respect to this item. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1: The Commission has reviewed and analyzed the proposed project pursuant to the California Planning and Zoning Laws (Cal. Gov. Code §§ 59000 et seq.), the Lake Elsinore General Plan (GP) and the LEMC and finds and determines that the proposed project is consistent with the requirements of California Planning and Zoning Law and with the goals and policies of the GP and the LEMC. Section 2: The Commission finds and determines that and no new environmental documentation is necessary because all potentially significant effects have been adequately analyzed in an earlier Mitigated Negative Declaration (MND) and none of the conditions described PC Reso. No. 2024-____ Page 2 of 4 3 7 2 7 9 in Section 15162 exist. MND (ER 2020-05) (SCH No. 2021010316) was adopted by the City Council on April 13, 2021 for the Riverside/Lincoln Commercial Center project. The MND analyzed the potential impact that could result from the development of the previous Conditional Use Permit and Commercial Design Review (CUP No. 2020-09 and CDR No. 2020-08) applications. The new Conditional Use Permit and Commercial Design Review (CUP No. 2023- 16 and CDR No. 2023-06) applications have the same configuration and layout as the previously analyzed project. Additionally, the new applications propose the same uses (a convenience store with a gas station, a fast food drive‐thru restaurant, a self‐serve drive‐thru car wash and a self‐storage facility). There will be no increase in the intensity of use. No substantial changes that require major revisions to the MND exist and no new information of substantial importance that require revisions to the earlier MND exist. Section 3. That in accordance with LEMC Section 17.415.070.C. Findings, the Commission makes the following findings regarding CUP No. 2023-16: 1. That the proposed use, on its own merits and within the context of its setting, is in accord with the objectives of the General Plan and the purpose of the planning district in which the site is located. The proposed project, development of a commercial project consisting of a 4,650 sq. ft. convenience store, 4,291 sq. ft. canopy, 38,016 sq. ft. self-storage facility, 4,456 sq. ft. drive-thru restaurant, 3,979 sq. ft. self-serve carwash, is consistent with the proposed General Plan Land Use designation of General Commercial (GC). The GC Land Use designation provides for retail, services, restaurants, professional and administrative offices, hotels and motels, mixed-use projects, public and quasi-public uses, and similar and compatible uses with a maximum 0.40 Floor Area Ratio (FAR). The Project is proposing to develop a commercial project with 0.2 FAR. The project site is within the Lake View District of the General Plan. Per Section 9.0, Lake View District Plan, of the General Plan, the main focus of the Lake View District is to “integrate new and existing residential communities and supporting uses while maintaining a high quality of life.” The Project would be consistent with the goals of the Lakeview District Plan, including the goal to provide a revitalized and healthy mixed‐use corridor along Riverside Drive. The proposed uses would meet the needs of existing residents in the project vicinity. 2. The proposed use will not be detrimental to the general health, safety, comfort or general welfare of persons residing or working within the neighborhood of the proposed use or the City, or injurious to property or improvements in the neighborhood or the City. The proposed use does not propose either directly or indirectly any detrimental effects to the existing surrounding community. The Project has been conditioned as such to avoid any possible negative impacts associated with the proposed use. 3. The Site for the intended use is adequate in size and shape to accommodate the use, and for all the yards, setbacks, walls or fences, landscaping, buffers and other features required by this title. The proposed use has been analyzed and staff has determined that the proposed use meets all applicable sections of the LEMC and will complement the existing uses, based on the submitted plans and the conditions of approval imposed on the project. PC Reso. No. 2024-____ Page 3 of 4 3 7 2 7 9 4. The Site for the proposed use relates to streets and highways with proper design both as to width and type of pavement to carry the type and quantity of traffic generated by the subject use. The project would include dedication on Riverside Drive to the ultimate half‐section width and would construct frontage improvements in accordance with City’s Engineering Department and California Department of Transportation (Caltrans). These improvements will be sufficient for the type and quantity of traffic generated by the proposed use. 5. In approving the subject use at the specific location, there will be no adverse effect on abutting properties or the permitted and normal use thereof. The Conditional Use Permit has been thoroughly reviewed and conditioned by all applicable City departments thereby eliminating the potential for any adverse effects. 6. Adequate conditions and safeguards pursuant to LEMC 17.415.070.B, including guarantees and evidence of compliance with conditions, have been incorporated into the approval of the subject project to ensure development of the property in accordance with the objectives of this chapter and the planning district in which the site is located. Pursuant to Section 17.415.070.B of the LEMC, the project was considered by the Planning Commission at a duly noticed Public Hearing on April 16, 2024, appropriate and applicable conditions of approval have been included to protect the public health, safety and general welfare. Section 4: Based upon the evidence presented, the above findings, and the Conditions of Approval imposed upon the project, the Commission hereby approves Conditional Use Permit No. 2023-16. Section 5: This Resolution shall take effect immediately upon its adoption. Passed and Adopted on this 16th day of April, 2024. Jodi Peters, Chair Attest: ___________________________________ Damaris Abraham, Community Development Director STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF LAKE ELSINORE ) I, Damaris Abraham, Community Development Director of the City of Lake Elsinore, California, hereby certify that Resolution No. 2024-__ was adopted by the Planning Commission of the City PC Reso. No. 2024-____ Page 4 of 4 3 7 2 7 9 of Lake Elsinore, California, at a regular meeting held on April 16, 2024 and that the same was adopted by the following vote: AYES NOES: ABSTAIN: ABSENT: Damaris Abraham, Community Development Director RESOLUTION NO. 2024-___ A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING COMMERCIAL DESIGN REVIEW NO. 2023-06 FOR BUILDING DESIGN AND CONSTRUCTION OF A 4,650 SQ. FT. CONVENIENCE STORE, 4,291 SQ. FT. CANOPY, 38,016 SQ. FT. SELF‐STORAGE FACILITY, 3,979 SQ. FT. SELF-SERVE CARWASH, 4,456 SQ. FT. DRIVE‐THRU RESTAURANT, AND RELATED SITE IMPROVEMENTS LOCATED AT APNS: 379‐111-017, 018, 019, AND 020 Whereas, Ilan Golcheh - Golcheh Group has filed an application with the City of Lake Elsinore (City) requesting approval of Planning Application No. 2020-92 (Conditional Use Permit No. 2023-16 and Commercial Design Review No. 2023-06) to construct a commercial project consisting of a 4,650 sq. ft. convenience store, 4,291 sq. ft. canopy, 38,016 sq. ft. self-storage facility, 4,456 sq. ft. drive-thru restaurant, 3,979 sq. ft. self-serve carwash, 221 parking stalls, and landscaping and related site improvements on a 6.36-acre site. The project is located at the southwest corner of Lincoln Street and Riverside Drive (APNs: 379‐111-017, 018, 019, and 020 (Previous APN: 379-111-014)); Whereas, Commercial Design Review (CDR) No. 2023-06 proposes the building and design of 4,650 sq. ft. convenience store, 4,291 sq. ft. canopy, 38,016 sq. ft. self‐storage facility, 3,979 sq. ft. self-serve carwash, 4,456 sq. ft. drive‐thru restaurant, 221 parking stalls, landscaping, and related site improvements; Whereas, pursuant Section 17.415.050.E (Major Design Review) of the Lake Elsinore Municipal Code (LEMC), the Planning Commission (Commission) has the responsibility of reviewing and approving, conditionally approving, or denying and Design Review applications; and Whereas, on April 16, 2024 at a duly noticed Public Hearing the Commission has considered evidence presented by the Community Development Department and other interested parties with respect to this item. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1: The Commission has reviewed and analyzed the proposed project pursuant to the California Planning and Zoning Laws (Cal. Gov. Code §§ 59000 et seq.), the Lake Elsinore General Plan (GP) and the LEMC and finds and determines that the proposed project is consistent with the requirements of California Planning and Zoning Law and with the goals and policies of the GP and the LEMC. Section 2: The Commission finds and determines that and no new environmental documentation is necessary because all potentially significant effects have been adequately analyzed in an earlier Mitigated Negative Declaration (MND) and none of the conditions described in Section 15162 exist. MND (ER 2020-05) (SCH No. 2021010316) was adopted by the City Council on April 13, 2021 for the Riverside/Lincoln Commercial Center project. The MND analyzed the potential impact that could result from the development of the previous Conditional Use Permit and Commercial Design Review (CUP No. 2020-09 and CDR No. 2020-08) applications. The new Conditional Use Permit and Commercial Design Review (CUP No. 2023- 16 and CDR No. 2023-06) applications have the same configuration and layout as the previously PC Reso. No. 2024-____ Page 2 of 3 3 7 2 8 1 analyzed project. Additionally, the new applications propose the same uses (a convenience store with a gas station, a fast food drive‐thru restaurant, a self‐serve drive‐thru car wash and a self‐storage facility). There will be no increase in the intensity of use. No substantial changes that require major revisions to the MND exist and no new information of substantial importance that require revisions to the earlier MND exist. Section 3: That in accordance with Section 17.415.050.G of the LEMC, the Commission makes the following findings regarding CDR No. 2023-06: 1. The Project, as approved, will comply with the goals and objectives of the General Plan, Specific Plan and the Zoning District in which the Project is located. The proposed project, the development of a commercial project consisting of a 4,650 sq. ft. convenience store, 4,291 sq. ft. canopy, 38,016 sq. ft. self-storage facility, 4,456 sq. ft. drive- thru restaurant, 3,979 sq. ft. self-serve carwash, is consistent with the General Plan Land Use designation of General Commercial (GC). The GC Land Use designation provides for retail, services, restaurants, professional and administrative offices, hotels and motels, mixed-use projects, public and quasi-public uses, and similar and compatible uses with a maximum 0.40 Floor Area Ratio (FAR). The project proposes to develop a commercial project with 0.2 FAR. The project site is within the Lake View District of the General Plan. Per Section 9.0, Lake View District Plan, of the General Plan, the main focus of the Lake View District is to “integrate new and existing residential communities and supporting uses while maintaining a high quality of life.” The project is consistent with the goals of the Lakeview District Plan, including the goal to provide a revitalized and healthy mixed‐use corridor along Riverside Drive. The zoning for the subject site General Commercial (C-2). The proposed use is identified as a permitted use subject to the approval of a Conditional Use Permit within the C-2 zone. Further, the proposed commercial project will assist in achieving the development of a well-balanced and functional mix of residential, commercial, industrial, open space, recreational and institutional land uses. 2. The Project complies with the design directives contained in the LEMC and all applicable provisions of the LEMC. The project is appropriate to the site and surrounding developments. The architectural design of the proposed building complies with the Nonresidential Development Standards (Chapter 17.112) of the LEMC. Sufficient setbacks and enhanced onsite landscaping have been provided thereby creating interest and varying vistas as a person moves along abutting streets and within the park. The project will create a visually pleasing, non-detractive relationship between the proposed development and existing projects through the use of a ‘Contemporary’ architectural design that is similar to existing developments in the vicinity. In addition, safe and efficient circulation has been achieved onsite. 3. Conditions and safeguards pursuant to Section 17.415.050.G.3 of the LEMC, including guarantees and evidence of compliance with conditions, have been incorporated into the approval of the Project to ensure development of the property in accordance with the objectives of Section 17.415.050. Pursuant to Section 17.415.050.E of the LEMC, the project was considered by the Planning Commission at a duly noticed Public Hearing held on April 16, 2024. The Project, as reviewed and conditioned by all applicable City divisions, departments and agencies, will not have a significant effect on the environment. PC Reso. No. 2024-____ Page 3 of 3 3 7 2 8 1 Section 4: Based upon all of the evidence presented, the above findings, and the conditions of approval imposed upon the project, the Commission hereby approves CDR No. 2023-06. Section 5: This Resolution shall take effect immediately upon its adoption. Passed and Adopted on this 16th day of April 2024. Jodi Peters, Chair Attest: ___________________________________ Damaris Abraham, Community Development Director STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF LAKE ELSINORE ) I, Damaris Abraham, Community Development Director of the City of Lake Elsinore, California, hereby certify that Resolution No. 2024-__ was adopted by the Planning Commission of the City of Lake Elsinore, California, at a regular meeting held on April 16, 2024, and that the same was adopted by the following vote: AYES NOES: ABSTAIN: ABSENT: Damaris Abraham, Community Development Director Applicant’s Initials: _____ Page 1 of 18 CONDITIONS OF APPROVAL PROJECT: PA 2020-92/CUP 2023-16/CDR 2023-06 PROJECT NAME:Riverside/Lincoln Commercial PROJECT LOCATION:APNs: 379-111-017, 018, 019, and 020 (Previous APN: 379-111-014) APPROVAL DATE: EFFECTIVE DATE: EXPIRATION DATE: GENERAL 1.Conditional Use Permit (CUP) No. 2023-16 proposes to establish a 16-pump gasoline- dispensing station (with anticipated throughput of 1.5 million to 1.7 million gallons of fuel per year) with a 4,291 square foot sq. ft. canopy, beer and wine sales (Type 20), self-storage facility (three (3) buildings 38,016 sq. ft. in total) and a 4,456 sq. ft. drive thru-restaurant. Commercial Design Review (CDR) No. 2023-06 proposes building design and construction of a 4,650 sq. ft. convenience store, 4,291 sq. ft. canopy, 38,016 sq. ft. self-storage facility, 4,456 sq. ft. drive-thru restaurant, 3,979 sq. ft. self-serve carwash, 221 parking stalls, and landscaping and related site improvements on an approximately 6.36‐acre site. The project site is located at the southwest corner of Lincoln Street and Riverside Drive (APNs: 379‐111- 017, 018, 019, and 020 (Previous APN: 379-111-014)). 2.The applicant shall defend (with counsel acceptable to the City), indemnify, and hold harmless the City, its Officials, Officers, Employees, Agents, and its Consultants (Indemnitees) from any claim, action, or proceeding against the Indemnitees to attack, set aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or legislative body concerning the approval, implementation, and construction of CUP 2023- 16, and CDR 2023-06, which action is bought within the time period provided for in California Government Code Sections 65009 and/or 66499.37, and Public Resources Code Section 21167, including the approval, extension, or modification of CUP 2023-16, and CDR 2023- 06 or any of the proceedings, acts or determinations taken, done, or made prior to the decision, or to determine the reasonableness, legality or validity of any condition attached thereto. The Applicant's indemnification is intended to include, but not be limited to, damages, fees and/or costs awarded against or incurred by Indemnitees and costs of suit, claim or litigation, including without limitation attorneys' fees, penalties and other costs, liabilities and expenses incurred by Indemnitees in connection with such proceeding. The City will promptly notify the applicant of any such claim, action, or proceeding against the City. If the project is challenged in court, the City and the applicant shall enter into formal defense and indemnity agreement, consistent with this condition. 3.Within 30 days of project approval, the applicant shall sign and complete an "Acknowledgment of Conditions" and shall return the executed original to the Community Development Department for inclusion in the case records. PLANNING DIVISION 4.Conditional Use Permit No. 2023-16 shall lapse and become void two years following the Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 2 of 18 date on which the conditional use permit became effective, unless one of the following: (1) prior to the expiration of two years, a building permit related to the conditional use permit is issued and construction commenced and diligently pursued toward completion; or (2) prior to the expiration of two years, the applicant has applied for and has been granted an extension of the conditional use permit approval pursuant to subsections (a), (b), and (c) of Lake Elsinore Municipal Code (LEMC) Section 17.415.070.D.2. Subject to the provisions of LEMC Section 17.415.070.I, a conditional use permit granted pursuant to the provisions of this section shall run with the land and shall continue to be valid upon a change of ownership of the site or structure, which was the subject of the Conditional Use Permit application. 5.Commercial Design Review No. 2023-06 shall lapse and become void two years following the date on which the design review became effective, unless one of the following: (1) prior to the expiration of two years, a building permit related to the design review is issued and construction commenced and diligently pursued toward completion; or (2) prior to the expiration of two years, the applicant has applied for and has been granted an extension of the design review approval pursuant to subsections (1) and (2) of Lake Elsinore Municipal Code (LEMC) Section 17.415.050.I.1. Notwithstanding conditions to the contrary, a design review granted pursuant to LEMC Section 17.415.050.I.2 shall run with the land for this two- year period, subject to any approved extensions, and shall continue to be valid upon a change of ownership of the site, which was the subject of the design review application. 6.An application for modification, expansion or other change in a Conditional Use Permit shall be reviewed according to the provisions of the Section 17.415.070 of the LEMC, in a similar manner as a new application. 7.If operation of this use triggers concerns related to parking, noise, traffic, or other impacts, at the discretion of the Community Development Director, this Conditional Use Permit may be referred back to the Planning Commission for subsequent review at a Public Hearing. If necessary, the Commission may modify or add conditions of approval to mitigate such impacts, or may revoke said Conditional Use Permit. 8.The applicant shall provide all project-related on-site and off-site improvements as required by these Conditions of Approval. 9.All Conditions of Approval shall be reproduced on page one of building plans prior to their acceptance by the Building and Safety Division, Community Development Department. All Conditions of Approval shall be met prior to the issuance of a Certificate of Occupancy. 10.All future development proposals shall be reviewed by the City on a project-by-project basis. If determined necessary by the Community Development Director or designee, additional environmental analysis will be required. 11.Any proposed minor revisions to approved plans shall be reviewed and approved by the Community Development Director or designee. Any proposed substantial revisions to the approved plans shall be reviewed according to the provisions of the Municipal Code in a similar manner as a new application. 12.Provisions of the City's Noise Ordinance (LEMC Chapter 17.176) shall be satisfied during all site preparation and construction activity. Site preparation activity and construction shall not commence before 7:00 AM and shall cease no later than 5:00 PM, Monday through Friday. Only finish work and similar interior construction may be conducted on Saturdays Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 3 of 18 and may commence no earlier than 8:00 am and shall cease no later than 4:00 p.m. Construction activity shall not take place on Sunday, or any Legal Holidays. 13.No individual signs are approved as part of this approval. The applicant or designee shall submit an application for a sign permit, pay appropriate fees and receive approval from the Community Development Department for any sign(s) installed at the project site. OR The applicant shall submit a sign program for review and approval of the Planning Commission prior to installation. Sign plans submitted to the City for review shall incorporate City identification signs. 14.In accordance with Section 17.112.090.O. of the LEMC, establishments engaged in the concurrent sale of motor vehicle fuel with alcoholic beverages shall abide by the following requirements: a. No beer or wine shall be displayed within five feet of the cash register or the front door. b. No advertisement of alcoholic beverages shall be displayed at motor fuel islands. c. No sale of alcoholic beverages shall be made from a drive-in window. d. No display or sale of beer or wine shall be made from an ice tub. e. No beer or wine advertising shall be located on motor fuel islands and no self-illuminated advertising for beer or wine shall be located on buildings or windows. f. Employees on duty between the hours of 10:00 p.m. and 2:00 a.m. shall be at least 21 years of age to sell beer and wine. 15.Graffiti shall be removed within 24 hours. 16.The entire site shall be kept free from trash and debris at all times and in no event shall trash and debris remain for more than 24 hours. 17.No outside overnight storage of inoperable vehicles shall occur at the site. 18.Since the project is proposed to be completed in phases, unimproved portions of the property should be maintained and kept in good repair as noted on the phasing plan exhibit. 19.All roof mounted or ground support air conditioning units or other mechanical equipment incidental to development shall be architecturally screened or shielded by landscaping so that they are not visible from neighboring property or public streets. Any roof mounted central swamp coolers shall also be screened, and the Community Development Director, prior to issuance of building permit shall approve screening plan. 20.The property address (in numerals at least six inches high) shall be displayed near the entrance and be easily visible from the front of the subject property and public right-of-way. 21.The applicant shall construct trash enclosure(s) with a decorative roof to match the colors, materials and design of the project architecture. 22.If any of the conditions of approval set forth herein fail to occur, or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City shall have the right to revoke or modify all approvals herein granted, deny or further condition issuance of all future building permits, deny revoke, or further condition all certificates of occupancy issued under the authority of approvals herein granted; record a notice of violation on the property title; Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 4 of 18 institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. Prior to Issuance of Grading Permits/Building Permits 23.The applicant shall pay all applicable City fees, including but not limited to Development Impact Fees (DIF) and MSHCP Fees per LEMC Section 16.85, at the rate in effect at the time of payment. 24.All roof mounted or ground support air conditioning units or other mechanical equipment incidental to development shall be architecturally screened or shielded by landscaping so that they are not visible from neighboring property or public streets. Any roof mounted central swamp coolers shall also be screened, and the Community Development Director, prior to issuance of building permit shall approve screening plan. 25.Prior to issuance of Building Permit, the Applicant shall submit a photometric study to the Community Development Department for review and approval. The plan shall ensure that all exterior on-site lighting are shielded and directed on-site so as not to create glare onto neighboring properties and streets or allow illumination above the horizontal plane of the fixture. 26.Prior to the issuance of a Building Permit, all exterior wall mounted and freestanding light fixtures shall be submitted for review and approval by the Director of Community Development, or their designee. Light fixtures shall compliment the architectural style of the buildings onsite. 27.Prior to the issuance of a Building Permit, the color, finish and pattern of all decorative paving onsite shall be submitted for review and approval by the Director of Community Development, or their designee. 28.Prior to issuance of a building permit, Final Landscaping / Irrigation Detail Plans shall be submitted along with appropriate fees for review and approval by the Community Development Director or designee. a. All planting areas shall have permanent and automatic sprinkler system with 50% plant coverage using a drip irrigation method. b. Mature specimen trees shall be planted on locations visible from public views. c. All planting areas shall be separated from paved areas with a six inch (6”) high and six inch (6”) wide concrete curb. Runoff shall be allowed from paved areas into landscape areas. d. Planting within fifteen feet (15’) of ingress/egress points shall be no higher than twenty- four inches (24”). e. Landscape planters shall be planted with an appropriate parking lot shade tree pursuant to the LEMC and Landscape Design Guidelines. f. No required tree planting bed shall be less than 5 feet wide. g. Root barriers shall be installed for all trees planted within 10 feet of hardscape areas to include sidewalks. h. Any transformers and mechanical or electrical equipment shall be indicated on landscape plan and screened as part of the landscaping plan. i. The landscape plan shall provide for ground cover, shrubs, and trees and meet all requirements of the City’s adopted Landscape Guidelines. Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 5 of 18 j. All landscape improvements shall be bonded 100% for material and labor for two years from installation sign-off by the City. Release of the landscaping bond shall be requested by the applicant at the end of the required two years with approval/acceptance reviewed by the Landscape Consultant and approved by the Community Development Director or Designee. k. All landscaping and irrigation shall be installed within affected portion of any phase at the time a Certificate of Occupancy is requested for any building. l. Final landscape plan must be consistent with approved site plan. m. Final landscape plans to include planting and irrigation details. n. Final landscape plans shall include drought tolerant planting consistent with Elsinore Valley Municipal Water District standards subject to plan check and approval by the City’s landscape plan check consultant. o. No turf shall be permitted. p. Final landscape plans shall include plant palate selection that will complement adjacent properties such as the Launch Pointe. 29.Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Community Development Director. If it is determined that the landscaping is not being maintained, the Director of Community Development shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. 30.The proposed location of on-site construction trailers shall be approved by the Community Development Director or designee. A cash bond of $1,000 shall be required for any construction trailers placed on the site and used during construction. Bonds will be released after removal of trailers and restoration of the site to an acceptable state, subject to approval of the Community Development Director or designee. Such trailer(s) shall be fully on private property and outside the public right of way. 31.Prior to building permit issuance, the applicant shall initiate and complete Covenants, Conditions and Restrictions (CC&Rs) which shall be approved by the City. All CC&R documents that address including, but not limited to, reciprocal easements, shall be submitted for review and approval by City Planning, Engineering and the City Attorney and upon City approval shall be recorded. Such documents shall include Covenants, Conditions and Restrictions (CC&Rs). All landscaping, all drainage basins, and common areas including but not limited to parking areas and drive aisles, shall be maintained in accordance with the CC&Rs. Provisions to restrict parking upon other than approved and developed parking spaces shall be written into the CC&Rs for the project. BUILDING DIVISION General Conditions 32.Final Building and Safety Conditions. Final Building and Safety Conditions will be addressed when building construction plans are submitted to Building and Safety for review. These conditions will be based on occupancy, use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal. Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 6 of 18 33.Compliance with Code. All design components shall comply with applicable provisions of the 2022 edition of the California Building, Plumbing and Mechanical Codes: 2022 California Electrical Code; California Administrative Code, 2022 California Energy Codes, 2022 California Green Building Standards, California Title 24 Disabled Access Regulations, and Lake Elsinore Municipal Code. 34.Disabled Access. Applicant shall provide details of all applicable disabled access provisions and building setbacks on plans to include: a. All ground floor units to be adaptable. b. Disabled access from the public way to the entrance of the building. c. Van accessible parking located as close as possible to the main entry. d. Path of accessibility from parking to furthest point of improvement. e. Path of travel from public right-of-way to all public areas on site, such as clubhouse, trach enclosure tot lots and picnic areas. 35.Street Addressing. Applicant must obtain street addressing for all proposed buildings by requesting street addressing and submitting a site plan for commercial or multi-family residential projects or a recorded final map for single- family residential projects. It takes 10 days to issue address and notify other agencies. Please contact Sonia Salazar at ssalazar@lake-elsinore.org or 951-674-3124 X 277. 36.Clearance from LEUSD. A receipt or clearance letter from the Lake Elsinore School District shall be submitted to the Building and Safety Department evidencing the payment or exemption from School Mitigation Fees. 37.Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit approvals prior to commencement of any construction work. 38.Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light standards, and any block walls will require separate approvals and permits. 39.Sewer and Water Plan Approvals. On-site sewer and water plans will require separate approvals and permits. Septic systems will need to be approved from Riverside County Environmental Health Department before permit issuance. 40.House Electrical Meter. Applicant shall provide a house electrical meter to provide power for the operation of exterior lighting, irrigation pedestals and fire alarm systems for each building on the site. Developments with single user buildings shall clearly show on the plans how the operation of exterior lighting and fire alarm systems when a house meter is not specifically proposed. At Plan Review Submittal 41.Submitting Plans and Calculations. Applicant must submit to Building and Safety four (4) complete sets of plans and two (2) sets of supporting calculations for review and approval including: a. An electrical plan including load calculations and panel schedule, plumbing schematic, and mechanical plan applicable to scope of work. b. A Sound Transmission Control Study in accordance with the provisions of Section 5.507 Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 7 of 18 of the 2022 edition of the California Building Code. c. A precise grading plan to verify accessibility for the persons with disabilities. d. Truss calculations that have been stamped by the engineer of record of the building and the truss manufacturer engineer. Prior to Issuance of Grading Permit(s) 42.Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted separately from the building plans, shall be submitted to Building and Safety for review and approval. 43.Demolition Permits. A demolition permit shall be obtained if there is an existing structure to be removed as part of the project. Prior to Issuance of Building Permit(s) 44.Plans Require Stamp of Registered Professional. Applicant shall provide appropriate stamp of a registered professional with original signature on the plans. Provide C.D. of approved plans to the Building Division. Prior to Beginning of Construction 45.Pre-Construction Meeting. A pre-construction meeting is required with the building inspector prior to the start of the building construction. ENGINEERING DEPARTMENT GENERAL 46.All new submittals for plan check or permit shall be made using the City’s online Citizen Self-Service Portal (CSSP). 47.All engineering plans shall be prepared by a Registered Civil Engineer using the City’s standard title block, Design Manual guidance, Lake Elsinore Municipal Code, California Building Code, Riverside County Flood Control Standards, and City and Caltrans Standards unless otherwise noted or approved by City staff. 48.All required soils, geotechnical, hydrology/hydraulic, and seismic reports shall be prepared by a Registered Civil Engineer and Soils Engineer, as applicable. 49.In accordance with the City’s Franchise Agreement for waste disposal and recycling, the developer shall be required to contract with CR&R Inc. for removal and disposal of all waste material, debris, vegetation and other rubbish generated during cleaning, demolition, clear and grubbing or all other phases of construction. 50.All open space landscaping, and slopes except for public parks and schools and flood control district facilities, outside the public right-of-way shall be owned and maintained by the property owner or property owner’s association. Documentation of maintenance responsibility shall be recorded prior to occupancy. 51.Applicant shall submit a detailed hydrology and hydraulic study for review for the sufficient Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 8 of 18 containment and conveyance of the storm water to a safe and adequate point as approved by the City Engineer. 52.All Public Works requirements shall be complied with as a condition of development as specified in the Lake Elsinore Municipal Code (LEMC) and Lake Elsinore Public Works Standard Plans. 53.Phasing plan, if any, shall be approved by the City Engineer prior to issuance of any permits. 54.The site will accommodate all construction activity, building activity, vehicles, etc. No staging on public streets, or private property belonging to others shall be conducted without the written permission of the property owner. 55.Minimum good housekeeping and erosion and sediment control Best Management Practices (BMPs) as identified by the City shall be implemented by all projects. FEES 56.Applicant shall pay all applicable permit application and Engineering assessed fees, including without limitation plan check and construction inspection fees, at the prevalent rate at time of payment in full. 57.Applicant shall pay all applicable Mitigation and Development Impact Fees at the prevalent rate at time of payment in full. Fees are subject to change. Mitigation and Development Impact Fees include without limitation: a. Master Drainage Plan Fee – Due prior to Grading Permit issuance. b. Traffic Infrastructure Fee (TIF) – Due prior to Building Permit issuance c. Transportation Uniform Mitigation Fee (TUMF) – Due prior to Occupancy d. Fair Share/In-Lieu Fees calculated on a project basis. STORM WATER MANAGEMENT / POLLUTION PREVENTION / NPDES Design 58.The project is responsible for complying with the latest Santa Ana Region National Pollutant Discharge Elimination System (NPDES) Permits as warranted based on the nature of development and/or activity. 59.A Final Water Quality Management Plan (WQMP) will be required and shall be prepared using the Santa Ana Region of Riverside County Guidance Document and approved template and submitted for review and approval to the City. The Final WQMP shall be approved by the City prior rough grading plan approval or issuance of any permit for construction. 60.The Final WQMP shall document the following: Detailed site and project description. Potential stormwater pollutants. Post-development drainage characteristics. Low Impact Development (LID) BMP selection and analysis. Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 9 of 18 Structural and non-structural source control BMPs. Treatment Control BMPs. Site design and drainage plan (BMP Exhibit). Documentation of how vector issues are addressed in the BMP design, operation and maintenance. GIS Decimal Minute Longitude and Latitude coordinates for all LID and Treatment Control BMP locations. Hydraulic Conditions of Concern (HCOC) – demonstrate that discharge flow rates, velocities, duration and volume for the post construction condition from a 2-year, 24- hour rainfall event will not cause adverse impacts on downstream erosion and receiving waters, or measures are implemented to mitigate significant adverse impacts downstream public facilities and water bodies. Evaluation documentation shall include pre- and post-development hydrograph volumes, time of concentration and peak discharge velocities, construction of sediment budgets, and a sediment transport analysis. If HCOC applies, the project shall implement measures to limit disturbance of natural water bodies and drainage systems; conserve natural areas; protect slopes and channels; and minimize significant impacts from urban runoff. (Note the facilities may need to be larger due to flood mitigation for the 10-year, 6- and 24-hour rain events). Operations and Maintenance (O&M) Plan and Agreement (using City approved form and/or CC&Rs) as well as documentation of formation of funding district for long term maintenance costs. 61.The existing Final WQMP shall be resubmitted for plan check and approval through the CSSP. 62.Parking lot landscaping areas shall be designed to provide for treatment, retention or infiltration of runoff. 63.Project hardscape areas shall be designed and constructed to provide for drainage into adjacent landscape. 64.Project trash enclosure shall be covered, bermed, and designed to divert drainage from adjoining paved areas and regularly maintained. 65.If CEQA identifies resources requiring Clean Water Act Section 401 Permitting, the applicant shall obtain certification through the Santa Ana Regional Water Quality Control Board and provide a copy to the Engineering Department. 66.All storm drain inlet facilities shall be appropriately marked “Only Rain in the Storm Drain” using the City authorized marker. 67.All restaurants and commercial food handling facilities must provide an area for the washing/steam cleaning of equipment and accessories. The area must be self-contained, equipped with a grease trap, and properly connected to a sanitary sewer. If the wash area is located outdoors, it must be covered, paved have secondary containment, and be connected to the sanitary sewer or other appropriately permitted disposal facility. Plan Requirements: The Owner/Applicant shall incorporate these food facility requirements into project design and depict on plans, including detail plans as needed. Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 10 of 18 Construction 68.A Storm Water Pollution Prevention Plan (SWPPP) (as required by the NPDES General Construction Permit) and compliance with the Green Building Code for sediment and erosion control are required for this project. 69.Prior to grading or building permit for construction or demolition and/or weed abatement activity, projects subject to coverage under the NPDES General Construction Permit shall demonstrate that compliance with the permit has been obtained by providing a copy of the Notice of Intent (NOI) submitted to the State Water Resources Control Board and a copy of the notification of the issuance of a Waste Discharge Identification (WDID) Number or other proof of filing to the satisfaction of the City Engineer. A copy of the SWPPP shall be kept at the project site, updated, and be available for review upon request. 70.Erosion & Sediment Control – Prior to the issuance of any grading or building permit for construction or demolition, the applicant shall submit for review and approval by the City Engineer, an Erosion and Sediment Control Plan as a separate sheet(s) of the grading plan submittal to demonstrate compliance with the City’s NPDES Program and state water quality regulations for grading and construction activities. A copy of the plan shall be incorporated into the SWPPP, kept updated as needed to address changing circumstances of the project site, be kept at the project site, and available for review upon request. Post-Construction 71.Prior to the issuance of a certificate of use and/or occupancy, the applicant shall demonstrate compliance with applicable NPDES permits for construction, industrial/commercial, MS4, etc. to include: Demonstrate that the project has compiled with all non-structural BMPs described in the project’s WQMP. Provide signed, notarized certification from the Engineer of Work that the structural BMPs identified in the project’s WQMP are installed in conformance with approved plans and specifications and operational. Submit a copy of the fully executed, recorded City approved Operations and Maintenance (O&M) Plan and Agreement for all structural BMPs or a copy of the recorded City approved CC&R. The Operation and Maintenance (O&M) Plan and Agreement and/or CC&R’s shall: (1) describe the long-term operation and maintenance requirements for BMPs identified in the BMP Exhibit; (2) identify the entity that will be responsible for long-term operation and maintenance of the referenced BMPs; (3) describe the mechanism for funding the long-term operation and maintenance of the referenced BMPs; and (4) provide for annual certification for water quality facilities by a Registered Civil Engineer. The City format shall be used. Provide documentation of annexation into a CFD for funding facilities to be maintained by the City. Demonstrate that copies of the project’s approved WQMP (with recorded O&M Plan or CC&R’s attached) are available for each of the initial occupants. Agree to pay for a Special Investigation from the City of Lake Elsinore for a date twelve (12) months after the issuance of a Certificate of Use and/or Occupancy for the project to verify compliance with the approved WQMP and O&M Plan. A signed/sealed Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 11 of 18 certification from the Engineer of Work dated 12 months after the Certificate of Occupancy will be considered in lieu of a Special Investigation by the City. Provide the City with a digital .pdf copy of the Final WQMP. 72.Chemical Management – Prior to the issuance of building permits for any tank or pipeline, the uses of said tank or pipeline shall be identified and the developer shall submit a Chemical Management Plan in addition to a WQMP with all appropriate measures for chemical management (including, but not limited to, storage emergency response, employee training, spill contingencies and disposal) in a manner meeting the satisfaction of the Manager, Permit Intake, in consultation with the Riverside County Fire Department and wastewater agencies, as appropriate, to ensure implementation of each agency’s respective requirements. A copy of the approved “Chemical Management Plans” shall be furnished to the Fire Marshal prior to the issuance of any Certificates of Use and Occupancy. UTILITIES 73.All arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of the roadway shall be the responsibility of the applicant, property owner, and/or his agent. Overhead utilities (34.5 kV or lower) shall be undergrounded (LEMC Section 16.64). 74.Applicant shall apply for, obtain and submit to the City Engineering Department a letter from Southern California Edison (SCE) indicating that the construction activity will not interfere with existing SCE facilities. Non-Interference Letter (NIL) shall be provided prior to issuance of a grading permit. 75.Submit a “Will Serve” letter to the City Engineering Department from the applicable water agency stating that water and sewer arrangements have been made for this project and specify the technical data for the water service at the location, such as water pressure, volume, etc. Will Serve letters shall be provided prior to issuance of Grading Permit. IMPROVEMENTS 76.Project will be responsible for the following improvements prior to the issuance of a certificate of use and/or occupancy: a. The developer shall implement the project design features and mitigation measures identified in Section 10 of the Traffic Impact Analysis dated September 17, 2020, to the satisfaction of the City Engineer: 1.Restripe median to provide two-way left turn lane on Lincoln Street between the project driveway and Flannery Street/Robin Drive. 2.Construct the northbound approach to consist of one through lane and one two-way left turn lane on Lincoln Street at project driveway. 3.Construct the southbound approach to consist of one shared through/right turn lane on Lincoln Street at project driveway. 4.Construct the eastbound approach (project driveway) to consist of one inbound lane and one shared left/right turn lane with stop-control on Lincoln Street at project driveway. 5.Construct the southbound approach (project driveway) to consist of one right turn only lane with stop-control at project driveway at Riverside Drive. Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 12 of 18 6.Construct eastbound approach to consist of one through lane at project driveway at Riverside Drive. 7.Construct westbound approach to consist of one shared through/right turn lane at project driveway at Riverside Drive. 8.Restripe the southbound approach to consist of two left turn lanes and one shared through/right turn lane at Lincoln Street and Riverside Drive. 9.Construct a northbound left turn lane and restripe shared left/through/right turn lane to a shared through/right turn lane at Lincoln Street and Riverside Drive. 10.Convert north-south traffic signal phasing from permitted to protected at Lincoln Street and Riverside Drive. 11.Construct a second receiving lane on the east leg of the intersection at Lincoln Street and Riverside Drive. b. Developer shall construct ultimate half-width street improvements on Lincoln Street in conformance to the City General Plan Roadway Cross Sections for a Collector Highway. 1.Note that the sidewalks are required to be 5 feet minimum with a landscape area 5 feet in width consistent with the City’s General Plan roadway cross section. c. Developer shall construct ultimate half-width street improvements on Riverside Drive in conformance to the City General Plan Roadway Cross Sections for an Urban Arterial Highway. Encroachment Permit from Caltrans will be required prior to any work done in the State right-of-way along Riverside Drive (State Route 74). 1.Note that the sidewalks are required to be 6 feet minimum with the landscape area 6 feet in width consistent with the City’s General Plan roadway cross section. d. Developer shall construct the half-width street improvements for the cul-de-sac on Flannery Street. e. Developer shall construct only one commercial driveway along Riverside Drive in accordance with Caltrans requirements unless otherwise approved by Caltrans and at the discretion of the City of Lake Elsinore. f. Developer shall provide public street lighting consistent with the City Standards. Streetlight system shall be designed as an LS-2B system. Streetlight plans shall be submitted for City review and approval through CSSP. 77.Developer shall submit traffic signal, signing and striping plans for City review and approval through CSSP. 78.Improvements shall be designed and constructed to City and Caltrans Standards and City Codes (LEMC 12.04, 16.34), or as directed or approved by the City Engineer. 79.If existing improvements are to be modified, the existing improvement plans on file shall be revised accordingly and approved by the City Engineer prior to issuance of a building permit. 80.Sight distance into and out of the project location shall comply with City of Lake Elsinore and Caltrans Standards. 81.An Encroachment Permit is required for all work to be done in the public right-of-way. Upon approval of engineered plans, the requirements outlined in these COAs and the permit issue Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 13 of 18 letter shall be met prior to Encroachment Permit issuance. 82.10-year storm runoff shall be contained within the curb and the 100-year storm runoff shall be contained within the street right-of-way. When either of these criteria are exceeded, drainage facilities shall be provided. 83.A drainage study shall be provided. The study shall identify the following: identify storm water runoff from and upstream of the site, show existing and proposed off-site and on-site drainage facilities, and include a capacity analysis verifying the adequacy of the facilities. The drainage system shall be designed to ensure that runoff from a 10-year storm of 6- hours or 24-hours duration under developed condition is equal or less than the runoff under existing conditions of the same storm frequency. Both 6-hour and 24-hour storm duration shall be analyzed to determine the detention basin capacities necessary to accomplish the desired results. 84.All natural drainage traversing the site shall be conveyed through the site, or shall be collected and conveyed by a method approved by the City Engineer. All off-site drainage, if different from historic flow, shall be conveyed to a public facility. 85.Roof drains shall not be allowed to outlet directly through coring in the street curb. Roofs should drain to a landscaped area. 86.The site shall be planned and developed to keep surface water from entering buildings (California Green Building Standards Code 4.106.3). 87.Developer shall mitigate to prevent any flooding and/or erosion downstream caused by the development of the site and/or diversion of drainage. 88.All existing and new storm drain inlet facilities to which the project discharges shall be fitted with full trash capture devices. The device selected shall be approved by the State of California and City of Lake Elsinore. Off-site facilities shall be maintained by the City with maintenance funded through a CFD or other City authorized assessment. Permitting/Construction 89.An encroachment permit shall be obtained prior to any work on City right-of-way. The developer shall submit the permit application, required fees, and executed agreements, security and other required documentation prior to issuance. 90.All compaction reports, grade certification, monument certification (with tie notes delineated on 8 ½ X 11” Mylar) shall be submitted to the Engineering Department before final inspection of public works improvements will be scheduled and approved. PRIOR TO GRADING PERMIT Design 91.A grading plan signed and stamped by a California licensed Civil Engineer shall be submitted for City review and approval for all addition and/or movement of soil (grading) on site. The plan shall include separate sheets for erosion control, haul route and traffic control as applicable. Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 14 of 18 92.If the grading plan identifies alterations in the existing drainage patterns as they exit the site, a Hydrology and Hydraulic Report for review and approval by City Engineer shall be required prior to issuance of grading permits. All grading that modifies the existing flow patterns and/or topography shall be in compliance with Federal, State and Local law and be approved by the City Engineer. 93.The applicant shall obtain all necessary off-site easements and/or permits for off-site grading and the applicant shall accept drainage from the adjacent property owners. 94.All natural drainage traversing the site (historic flow) shall be conveyed through the site in a manner consistent with the historic flow or to one or a combination of the following: to a public facility; accepted by adjacent property owners by a letter of drainage acceptance; or conveyed to a drainage easement as approved by the City Engineer. 95.A Soil/Geotechnical Report is required for any land disturbance. In conjunction, a seismic study shall be submitted to identify earthquake faults, liquefaction and/or subsidence zones present on-site. A certified letter from a Registered Geologist or Geotechnical Engineer shall be submitted confirming the absence of this hazard prior to grading permit. Permitting/Construction 96.A preconstruction meeting with the City Engineering Inspector (Engineering Department) is required prior to commencement of any grading activity. 97.All grading shall be done under the supervision of a licensed geotechnical engineer. Slopes steeper than 2 to 1 shall be evaluated for stability and proper erosion control and approved by the City. 98.Applicant shall execute and submit grading and erosion control agreement, post grading security, and pay permit fees as a condition of grading permit issuance. 99.No grading shall be performed without obtaining a grading permit. A grading permit does not include the construction of retaining walls or other structures for which a building permit is required. 100.Hauling in excess of 5,000 cubic yards shall be approved by the City Council (LEMC 15.72.065). Prior to commencement of grading operations, a haul route shall be approved prior to issuance of a grading permit. 101.Approval of the project Final Water Quality Management Plan (WQMP) for post construction shall be received prior to issuance of a grading permit. 102.Applicant shall obtain applicable environmental clearance from the Planning Department and submit applicable clearance document to the Engineering Department. This approval shall specify that the project complies with any and all required environmental mitigation triggered by the proposed grading activity. PRIOR TO BUILDING PERMIT 103.Applicant shall provide soils, geology and seismic report, including recommendations for Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 15 of 18 parameters for seismic design of buildings, and walls prior to building permit. 104.All public improvement, traffic signal, signing and striping plans shall be completed and approved by the City Engineer. 105.All required public right-of-way dedications and easements prepared by separate instruments shall be prepared by the applicant or his agent and shall be submitted to the Engineering Department for review and approval prior to issuance of the building permit. PRIOR TO OCCUPANCY / FINAL APPROVAL 106.All public improvements shall be constructed in accordance with the approved plans or as condition of this development to the satisfaction of the City Engineer prior to first occupancy. 107.All required signing, striping and traffic control devices on-site and off-site shall be installed. 108.In the event of damage to City roads from hauling or other construction related activity, applicant shall repair or pay the cost of restoring the public roads to the baseline condition. 109.Proof of acceptance of maintenance responsibility of slopes, open spaces, landscape areas, and drainage facilities shall be provided. 110.Final soil report showing compliance with recommendations, compaction reports, grade certifications, monument certification (with tie notes delineated on 8 ½” X 11” mylar) shall be submitted in .tif format on USB flash drive or electronically to the Engineering Department before final inspection will be scheduled. 111.As-built plans for all approved plan sets shall be submitted for review and approval by the City. The Developer is responsible for revising the original mylar plans. Once the original mylars have been approved, the applicant shall provide the City an electronic copy of the “as-built” plans in .tif format. 112.All final studies and reports shall be submitted in .tif format on a flash drive or delivered electronically. Studies and reports include, soils, seismic, hydrology, grading, WQMP, etc. 113.Applicant shall pay all outstanding applicable processing and development fees prior to occupancy and/or final approval. 114.Applicant shall submit documentation pursuant to City’s Security Release handout. CITY OF LAKE ELSINORE FIRE MARSHAL 115.The applicant/operator shall comply with all requirements of the Riverside County Fire Department Lake Elsinore Office of the Fire Marshal. Questions should be directed to the Riverside County Fire Department, Lake Elsinore Office of the Fire Marshal at 130 S. Main St., Lake Elsinore, CA 92530. Phone: (951) 671-3124 Ext. 225. 116.Deferred submittals, for any fire systems, shall be identified on all subsequent plans. 117.If applicable, gates must meet Fire Department Standards at the time of building permit application. Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 16 of 18 118.The applicant or developer shall provide fire hydrants in accordance with the following: Prior to placing any combustibles on site, provide an approved water source for firefighting purposes. Required fire flow is estimated to be 2375 GPM at 20 PSI for a 2-hour duration based on 2022 California Fire Code and 31,935 square foot building area with Type V=B construction and buildings having a fire sprinkler system. The minimum fire flow shall be based on the largest single structure on the parcel and the verified construction type. Fire flow shall be determined by the building of the single largest square footage. The minimum fire flow will be 1500 GPM at 20 PSI for a 2-hour duration, per the 2022 California Fire Code. 119.In all new buildings and structures which are 5,000 square feet or greater, an approved automatic sprinkler system shall be provided regardless of occupancy classification. Where Sections 903.2.1 – 903.2.21 of the California Fire Code have more restrictive requirements than those listed below, the more restrictive requirements shall take precedence. 120.Prior to issuance of Building Permits, the applicant/developer shall provide the Office of the Fire Marshal with an approved site plan for Fire Lanes and signage. (CFC 501.3) 121.Each parcel shall have independent access to the circulating roadway. Shared access shall be documented, and reciprocal access agreements or dedicated access shall be established. 122.The fire apparatus access road shall be (all weather surface) capable of sustaining an imposed load of 80,000 lbs. GVW. The fire apparatus access road or temporary access road shall be reviewed and approved by the Office of the Fire Marshal and in place during the time of construction. (CFC 501.4) 123.The minimum inside turning radius for an access road shall be 24 feet. The minimum outside turning radius shall be 45 feet. As fire apparatus are unable to negotiate tight “S” curves, a 60-foot straight leg must be provided between these types of compound-turns or the radii and/or road width must be increased accordingly. 124.Prior to building permit issuance, install the approved water system, approved access roads, and contact the Fire Department for a verification inspection. DEPARTMENT OF ADMINISTRATIVE SERVICES Annex into the City of Lake Elsinore Community Facilities District No. 2015-2 (Maintenance Services) 125.Prior to issuance of a grading permit, the applicant shall submit an application to the Department of Administrative Services to initiate the annexation process into the Community Facilities District No. 2015-2 (Maintenance Services) or current Community Facilities District in place at the time of annexation to fund the on-going operation and maintenance of the public right-of-way landscaped areas and neighborhood parks to be maintained by the City and for street lights in the public right-of-way for which the City will pay for electricity and a maintenance fee to Southern California Edison, including parkways, street maintenance, open space and public storm drains constructed within the development and federal NPDES Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 17 of 18 requirements to offset the annual negative fiscal impacts of the project. The annexation process shall be completed prior to issuance of the first certificate of occupancy for the project. Alternatively, the applicant may propose alternative financing mechanisms to fund the annual negative fiscal impacts of the project with respect to Maintenance Services. Applicant shall make a non-refundable deposit of $15,000 or at the current rate in place at the time of annexation toward the cost of annexation, formation or other mitigation process, as applicable. MITIGATION MONITORING AND REPORTING PROGRAM 126.The applicant shall comply with all mitigation measures identified in the Mitigation Monitoring & Reporting Program for the Mitigated Negative Declaration (Environmental Review No. 2020-05; SCH # 2021010316) prepared for the Project. Conditions of Approval PC: April 16, 2024 PA 2020-92/CUP 2023-16/CDR 2023-06 Applicant’s Initials: _____ Page 18 of 18 I hereby state that I acknowledge receipt of the approved Conditions of Approval for the above named project and do hereby agree to accept and abide by all Conditions of Approval as approved by the City Council of the City of Lake Elsinore on TBD. I also acknowledge that all Conditions shall be met as indicated. Date: Applicant’s Signature: Print Name:______ Address: _______________________ Phone Number: _______ 59%2$73.*59%2$73.*59%2$73.*0&'21$/' 6“6) 35272    72&2'   (/(9(1&6725( 6)&<'80367(53529,'('%<27+(56&<'80367(53529,'('%<27+(566(/)6725$*( 6)6(/)6725$*(6)6(/)6725$*(6)59%2$73.*0(&+$1,&$/5220&$5:$6+7811(/9$&880(4075220&< '80367(53529,'(' %<27+( 5 6 &< '80367(53529,'(' % <27+( 5 6 &<'80367(53529,'('%<27+(56&<'80367(53529,'('%<27+(56 6,7(3/$1 $ 6FDOH &KHFNHGE\ 'UDZQE\ 'DWH 3URMHFWQXPEHU $VLQGLFDWHG  (/(9(1 5$3,'6&$5:$6+ /,1&2/1675((7 /$.((/6,125(&$  1R 'HVFULSWLRQ 'DWH 6%(9(5/<'5 /26$1*(/(6&$  ^,d/Ey Z,/ddhZ /s/> >E^W >dZ/> %105647%6+10016'5 s//E/dzDW 241,'%6+0(14/#6+10 1 67;+)4- )'0'4#.016'5  352326(' :(7/$1'602'   Job#:2019111.68Scale:Date:Drawn By:Checked By:Rev. #Date Description3/17/20AS NOTEDDES IG N DEV ELO P MENTDRAWINGSPRELIMINARYNO T FO R C O NS TRUC TIO NSHEET:7-11 #1045395RIVERSIDE DR & LINCOLN STLAKE ELSINORE, CA7-ELEVEN, INC. 3200 Hackberry Rd, Irving, Texas 75063Documents prepared by GPD Groupare to be used only for the specificproject and specific use for whichthey are intended. Any extension ofuse to other projects, by owner orany other party, without theexpressed, written consent of GPDGroup is done at the user's own risk.If used in a way other than thatspecifically intended, user will holdGPD Group harmless from all claimsand losses.520 South Main Street, Suite 2531 Akron, OH 44311 330.572.2100 Fax: 330.572.2102 1045395 - LAKE ELSINORE, CA - FP2 LAYOUT 1 RIVERSIDE DR & LINCOLN ST LAKE ELSINORE, CA SCALE: 14"=1'-0" 03/17/20 APPROVED: YES NO 00/00/20N OCCUPANCY CALCULATION MERCHANDISE 2363 SF / 60 = 40 PEOPLE KITCHEN / SALES 320 SF / 200 = 2 PEOPLE STORAGE/ BACK ROOM 1483 SF / 300 = 5 PEOPLE OFFICE 57 SF / 100 = 1 PERSON RESTROOM 427 SF / N/A = 0 PEOPLE TOTAL = 48 PEOPLE WALL TYPE LEGEND EXISTING WALL EXISTING COLUMN NEW WALL NEW PARTIAL HEIGHT WALL NEW COOLER WALL LAYOUT INFORMATION ROLLER GRILLS 2 (SELF SERVE) SANDWICH CASE 9' NON ALC. VAULT DRS 11 LOW TEMP DOORS 2 ICE MERCH. DOORS 2 NOVELTY CASE 1 BAKERY CASE 1 (LG) SLURPEE BARRELS 8 TOTAL 44 TOTAL SQ FT = 4,650 SF SALES FLOOR AREA = 2,683 SF OCCUPANCY LOAD (>49) = 48 TRAVEL DISTANCE (<200) = 94' RESTROOMS REQUIRED = 2 EXITS REQUIRED = 2 OVERHEAD SHELVES = 34 FT FLOOR SHELVES = 65 FT COMMON PATH OF TRAVEL (<75) = 57' GAS: YES LIQUOR: NO BEER: YES WINE: YES GONDOLA UNITS (60"H) 34 END CAPS (60"H)10 HIGH WALLS (72"H)00 POWER WINGS (02) - NOT IN TOTAL LOW WALLS (36"H) 00 ALC. VAULT DRS 4 92'-8"49'-8"476 475477 479 479 476 475 477 914915 16 220 220 479 479 475477 220 220 220 856 600 656841395656651655 654 394 3'-0"5'-2"WOMEN'S MEN'S 106105 475477 434 434 118 532 533 688 220 220 534 220220 220 4'-9" 535 688 535 117 382 OFFICE 103 839 37 551534 602 839 839 145 9'-2" 839 839 145 145 144 713 7278 902901 380 5'-0" 120 535 535119 4'-4"3'-4"4'-0" 5'-8"3'-4"145 145 144 BACKROOM 104 21 21 21 21 21 21 13 33 530 148 16 10 844 179159 159 161 161 161 164 886 876 79 871 76 17 845 843 28 66 886 4' CANDY RACK891 2' CANDY RACK884 4' CANDY RACK891 842 16 148 843 FUTURE POS3161 844161 4' CANDY RACK891 61616161616161616161 855 49 49 7'-6"4'-8" 84.1 911 82 906291 234234234234234234235237238239245246 146 84 247 CIG'S CIG'S ITP OTP 221 484485486486 649 162 58 162 45 10624 173 173179 60 927 927 392162 927 393 161 886 SALES 102 3'-0" 45 449 463 ICE 6'-5"5'-2"4'-8"4'-6"XX1 4'-1"102 176 339 174 LOW TEMP 799267 292 5'-0"3'-10" 391 389 391 389 372 79930970 307 377 267 292 29730970 307 377 295329330 69172376 71 113 22 105112174112 378379 169 373374374 143 333167 168 124 799 267 143399398 399397264 332 399398 399397 77 799 851 266 273287 187 327 276275 288288288288 331 65 65 360 11 BUN DRAWER 917 74 68 WASTE 916 269 293 275 268 290 290290 923 7373 466467467 327 327 288288288288 288288288288 368369 327 289 303 341341 342342349359359364364364364364364364364365366367 135 366366366366 823131823133 826825 ICE 21 3 47 642 40 41 404140 852 6'-0" FLOORSPINNER:SUNGLASSESGLOVESUMBRELLAS 3050 3049 3049 3049 3049 3049 ADA TRASH 30463047 3047 4'-6"BEER or 4-WAY MERCHANDISER (depending on store type) 3032 3048 30463047 3047 30463047 3047 283 282 285 284 PRE-BOOKS/ PROMOS PRE-BOOKS/ PROMOS/ NRIs 3050 TRASH SEATING AREA 745 6'-10" 511 5113'-10"534 23 37 602 926 5'-1" 5'-1" 5'-1"29'-2"STORAGE BEER CAVE 839 839 145 144 BEER CAVE BACKSTOCK STORAGE 15'-3"4'-10" 5'-3" 11'-2" 16'-5" 864865866867 STORAGE 925 840 840 839 840 840 10'-5" 961 3'-7"343630 343630 343630 343630 3'-8" 838 838 962 965 961 973 973 973 973 965 343630 343630 343630 343630 343630 343630 343630 343630 343630 343630 343630 839 839 839 839 839 839 838 839 839 3'-7"405 529 627 529 529 529 529 529 529 529 529 529 529 529 529 529 529529 944 944944 935 950 839 551 3'-11" ELECTRICAL 107 COOLER VAULT 110 868 868 281281281 281281281 282 283 4'-1"4'-1"3'-1"4'-3"3'-7"4'-3"282 283 282 283 4'-5"6'-5" 281282 283 281281281 4'-4"4'-6"282 283 191 280 FEM - CHIPS281281281282 283 281 281 282 283 282 283 6'-5" 4'-0" 3'-11" 281 281 598 598 598 598 MERCHANDISE 101 4'-0"5'-3"2014 ALTO SHAAM VECTORWITH CART2065 83 921 A1.00 REST- ROOMBOOTH OFFICE BREAK ROOM CAR WASH TUNNEL MECHANICAL ROOM ELEC. 15209 LINCOLN STREET LAKE ELSINORE, CALIFORNIA FLOOR PLAN Scale: 1/8" = 1'-0" July 13, 2020 F:\20\20160 - Lake Elsinore, Riverside Dr Googie Wash\Design\Floor Plan\x20160 - Floor Plan.dwg B I C K E L G R O U P A R C H I T E C T U R E BI C K E L GR O U P I N C O RP O R A T E D 3600 B I R C H S T R EE T , S U IT E 120 N E W P O R T B E A C H , C A 9 2 6 6 0 P: 949.757.0411 F: 949.757.0511 w w w .b i c k e l g r p .c o m NORTHA1.20 SWITCHGEAR FIRE RISER DINING KITCHEN ORDER PRESENTER PRESENTER CUSTOMER SERVICE J.C. SUPPORT WOMEN'S MEN'S FREEZER/ COOLER CREW ROOM CHANGING ROOM CU 4 (O.A.) RTU 3 (ON ROOF) 1330 CFM (O.A.) RTU 1 (ON ROOF) 1300 CFM (O.A.) RTU 2 (ON ROOF) 400 CFM EF 2 (ON ROOF) EF 3 (ON ROOF) EF 1 (ON ROOF) CU 1 CU 2 CU 3 SWC LINCOLN STREET & RIVERSIDE DRIVE LAKE ELSINORE, CALIFORNIA FLOOR & ROOF PLANS Scale: 1/8" = 1'-0" May 20, 2020 F:\19\19790 - McD Lake Elsinore, SWC Lincoln St & Riverside Dr\Design\Floor Plan\x19790 - Floor Plan.dwg B I C K E L G R O U P A R C H I T E C T U R E BI C K E L GR O U P I N C O R PO R AT E D 3600 B I R C H S T R EE T , S U I TE 120 N E W P O R T B E A C H , C A 9 2 6 6 0 P: 949.757.0411 F: 949 .757.0511 w w w .b i c k e l g r p .c o m FLOOR PLAN ROOF PLAN NOTES: ALL ROOFTOP MOUNTED EQUIPMENT TO BE SCREENED FROM VIEW, LOCATIONS OF ALL EQUIPMENT TO BE CONFIRMED DURING CD PHASE MCDONALD'S ••••••••• (4597 PROTO) A1.30 SWITCHGEAR FIRE RISER DINING KITCHEN ORDER PRESENTER PRESENTER CUSTOMER SERVICE J.C. SUPPORT WOMEN'S MEN'S FREEZER/ COOLER CREW ROOM CHANGING ROOM SWC LINCOLN STREET & RIVERSIDE DRIVE LAKE ELSINORE, CALIFORNIA FLOOR PLAN Scale: 1/8" = 1'-0" May 20, 2020 F:\19\19790 - McD Lake Elsinore, SWC Lincoln St & Riverside Dr\Design\Floor Plan\x19790 - Floor Plan.dwg B I C K E L G R O U P A R C H I T E C T U R E B I C K E L G R O U P I N C O R P O R A T E D 3600 B I R C H S T R EE T , S U I T E 120 N E W P O R T B E A C H , C A 9 2 6 6 0 P : 949 .757 .0411 F : 949 .757 .0511 w w w .b i c k e l g r p .c o m MCDONALD'S ••••••••• (4597 PROTO) A1.31 2 A1.40 A1.40 3 A1.40 4 A1.40 7 A1.40 9 A1.40 5 A1.40 10 A1.40 8 A1.40 11 Storage Unit Color Legend 5x5 5x7 5x10 5x15 10x10 10x20 10x30 7' - 0"6' - 8"12' - 0"6 A1.40 1180 S. BEVERLY DR # 300 LOS ANGELES, CA 90035 424.241.2256 7-ELEVEN RAPIDS CAR WASH 15209 LINCOLN STREET, LAKE ELSINORE, CA 2020-06-08 Scale Checked by Drawn by Date Project number As indicated A1.40 STORAGE FLOOR PLAN/ UNIT PLAN 0711-10 Issue Date CV JU 1/32" = 1'-0"1 Level 1 3/16" = 1'-0"2 Typical Elevation View 1/2" = 1'-0"3 5x7 Unit 1/4" = 1'-0"4 5x15 Unit 1/8" = 1'-0"5 Main Office 1/4" = 1'-0"6 Main Office Elevation Unit Totals Name Count 5x5 31 5x7 82 5x10 27 5x15 39 10x10 43 10x20 54 10x30 10 Grand total: 286 1/8" = 1'-0"8 10x30 Unit 1/4" = 1'-0"7 10x10 Unit 1/8" = 1'-0"9 10x20 Unit 1/2" = 1'-0"10 5x5 Unit 1/4" = 1'-0"11 5x10 Unit MATERIALS BOARD COLOR:NEW ENGLAND BRICK-CHARLESTON MFR:CORONADO STONE MATERIAL: BRICK BR-1 No.Description Date 15209 LINCOLN STREET LAKE ELSINORE, CALIFORNIA ELEVATIONS Scale: 1/8" = 1'-0" July 13, 2020 F:\20\20160 - Lake Elsinore, Riverside Dr Googie Wash\Design\Elevations\x20160 - Elevation.dwg B I C K E L G R O U P A R C H I T E C T U R E BI C K E L GR O U P I N C O RP O R A T E D 3600 B I R C H S T R EE T , S U IT E 120 N E W P O R T B E A C H , C A 9 2 6 6 0 P: 949.757.0411 F: 949.757.0511 w w w .b i c k e l g r p .c o m NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION SIGNAGE UNDER SEPARATE REVIEW SIGNAGE UNDER SEPARATE REVIEW STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "SYMPHONY BLUE"TRIM BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" DOOR BENJAMIN MOORE "WHITE WISP", TYP. RADIAL LED WALL SCONCE, TYP. COLOR: SILVER AWNING BENJAMIN MOORE "SYMPHONY BLUE" TRIM BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "WHITE WISP" CANOPY BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "SYMPHONY BLUE" SIGNAGE UNDER SEPARATE REVIEW STUCCO BENJAMIN MOORE "WHITE WISP" TRIM BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "SYMPHONY BLUE" CANOPY BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" UNDERSIDE OF CANOPIES LED STRIP LIGHTING, FAUX NEON COLOR: BLUE UNDERSIDE OF CANOPIES LED STRIP LIGHTING, FAUX NEON COLOR: BLUE UNDERSIDE OF CANOPIES LED STRIP LIGHTING, FAUX NEON COLOR: BLUE UNDERSIDE OF CANOPIES LED STRIP LIGHTING, FAUX NEON COLOR: BLUE SIGNAGE UNDER SEPARATE REVIEW CANOPY BENJAMIN MOORE "SYMPHONY BLUE" GLAZING/ WINDOW STUCCO BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" CANOPY BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" GLAZING/ WINDOW TRIM BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" CANOPY BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" SIGNAGE UNDER SEPARATE REVIEW SIGNAGE UNDER SEPARATE REVIEW TRIM BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "WHITE WISP" AWNING BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" AWNING BENJAMIN MOORE "SYMPHONY BLUE" A3.20 NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION SIGNAGE UNDER SEPARATE REVIEW SIGNAGE UNDER SEPARATE REVIEW STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "SYMPHONY BLUE"TRIM BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" DOOR BENJAMIN MOORE "WHITE WISP", TYP. RADIAL LED WALL SCONCE, TYP. COLOR: SILVER AWNING BENJAMIN MOORE "SYMPHONY BLUE" TRIM BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "WHITE WISP" CANOPY BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "SYMPHONY BLUE" SIGNAGE UNDER SEPARATE REVIEW STUCCO BENJAMIN MOORE "WHITE WISP" TRIM BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "SYMPHONY BLUE" CANOPY BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" UNDERSIDE OF CANOPIES LED STRIP LIGHTING, FAUX NEON COLOR: BLUE UNDERSIDE OF CANOPIES LED STRIP LIGHTING, FAUX NEON COLOR: BLUE UNDERSIDE OF CANOPIES LED STRIP LIGHTING, FAUX NEON COLOR: BLUE UNDERSIDE OF CANOPIES LED STRIP LIGHTING, FAUX NEON COLOR: BLUE SIGNAGE UNDER SEPARATE REVIEW CANOPY BENJAMIN MOORE "SYMPHONY BLUE" GLAZING/ WINDOW STUCCO BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" CANOPY BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" GLAZING/ WINDOW TRIM BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" CANOPY BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "ELECTRIC ORANGE" SIGNAGE UNDER SEPARATE REVIEW SIGNAGE UNDER SEPARATE REVIEW TRIM BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "WHITE WISP" STUCCO BENJAMIN MOORE "WHITE WISP" AWNING BENJAMIN MOORE "SYMPHONY BLUE" STUCCO BENJAMIN MOORE "WHITE WISP" AWNING BENJAMIN MOORE "SYMPHONY BLUE" CAR WASH VACUUM CANOPY LED STRIP LIGHTING, FAUX NEON COLOR: BLUE 6” RECESSED LED DOWNLIGHT, OR SIMILAR COLOR: SILVER RADIAL LED WALL SCONCE COLOR: SILVER GOOGIE CAR WASH - LAKE ELSINORE , CA - LIGHTING DESIGN A3.21 A3.30 BB20 Design Elements – In Depth // LIGHTING RADIAL LED WALL SCONCE BY SECURITY LIGHTING COLOR: SILVER ARCHITECTURAL LED FLOOD LIGHT BY SECURITY LIGHTING COLOR: RAL 7022 6” LED DOWNLIGHT BY SECURITY LIGHTING COLOR: WHITE BACK OF HOUSE DRIVE THRU WHITE CANOPY (ABOVE)DRIVE THRU CANOPIES CUSTOMER ENTRIES AT GOLD UNDERSCORE RADIAL LED WALL SCONCE BY SECURITY LIGHTING COLOR: WHITE WHITE CANOPY LINEAR LED ACCENT FIXTURE BY SECURITY LIGHTING COLOR: RAL 7022 BATTEN AREAS A3.31 DETAILS A5.00 Scale Checked by Drawn by Date Project number As indicated 0711-10 15209 LINCOLN STREET, LAKE ELSINORE, CA 2020-07-15 No.Description Date 6%(9(5/<'5 /26$1*(/(6&$  DETAILS A5.01 Scale Checked by Drawn by Date Project number As indicated 0711-10 15209 LINCOLN STREET, LAKE ELSINORE, CA 2020-07-15 No.Description Date 6%(9(5/<'5 /26$1*(/(6&$  A7.00 SURVEY (FOR REFERENCE ONLY) C1.00 Scale Checked by Drawn by Date Project number As indicated 0711-10 15209 LINCOLN STREET, LAKE ELSINORE, CA 2020-07-15 No.Description Date 6%(9(5/<'5 /26$1*(/(6&$  FOR REFERENCE ONLY - NOT TO SCALE /(*$/'(6&5,37,21 )RU$313DUFHO,' V  
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF LAKE ELSINORE, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA AND IS DESCRIBED AS FOLLOWS: THAT PORTION OF LOT 24 IN BLOCK B OF ELSINORE, IN THE CITY OF LAKE ELSINORE, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 8, PAGE 377 OF MAPS, RECORDS OF SAN DIEGO COUNTY, CALIFORNIA, DESCRIBED AS FOLLOWS: BEGINNING AT THE MOST EASTERLY CORNER OF SAID LOT, BEING THE INTERSECTION OF THE NORTHWESTERLY LINE OF RIVERSIDE STREET WITH THE SOUTHWESTERLY LINE OF LINCOLN STREET; THENCE NORTHWEST, 420.00 FEET ON THE NORTHEAST LINE OF SAID LOT; THENCE SOUTHEAST, 693.00 FEET, PARALLEL WITH THE SOUTHEAST LINE OF SAID LOT; THENCE SOUTHEAST, 420.00 FEET, PARALLEL WITH THE NORTHEAST LINE THEREOF TO THE SOUTHEAST LINE OF SAID LOT; THENCE NORTHEAST, 693.00 FEET ON SAID SOUTHEAST LINE TO THE POINT OF BEGINNING. EXCEPTING ANY PORTION LYING WITHIN THE FOLLOWING DESCRIBED PROPERTY: ALL THAT PORTION OF LOT 24 IN BLOCK B OF ELSINORE, AS SHOWN BY MAP ON FILE IN BOOK 8, PAGE 377 OF MAPS, RECORDS OF SAN DIEGO COUNTY, CALIFORNIA, PARTICULARLY AS FOLLOWS: BEGINNING AT THE SOUTHWESTERLY CORNER TO SAID LOT; THENCE NORTHEASTERLY ON THE SOUTHEASTERLY LINE OF SAID LOT, 330.00 FEET TO THE TRUE POINT OF BEGINNING OF THE PARCEL HEREIN TO BE DESCRIBED; THENCE NORTHWESTERLY AND PARALLEL WITH THE SOUTHWESTERLY LINE OF SAID LOT, 1,320.00 FEET TO THE NORTHWESTERLY LINE THEREOF; THENCE NORTHEASTERLY ON SAID NORTHWESTERLY LINE, 297.00 FEET; THENCE SOUTHEASTERLY AND PARALLEL WITH THE SOUTHWESTERLY LINE OF SAID LOT, 1,320.00 FEET TO THE SOUTHEASTERLY LINE THEREOF; THENCE SOUTHWESTERLY ON THE SOUTHEASTERLY LINE, 297.00 FEET TO THE TRUE POINT OF BEGINNING. ALSO EXCEPT THAT PORTION OF SAID LAND CONVEYED TO THE CITY OF LAKE ELSINORE BY DEED RECORDED AUGUST 5, 1982 AS INSTRUMENT NO. 134704 OF OFFICIAL RECORDS. SURVEY PARCEL MAP (FOR REFERENCE ONLY) C1.01 Scale Checked by Drawn by Date Project number As indicated 0711-10 15209 LINCOLN STREET, LAKE ELSINORE, CA 2020-07-15 No.Description Date 6%(9(5/<'5 /26$1*(/(6&$  FOR REFERENCE ONLY - NOT TO SCALE RV/BOAT PKG RV/BOAT PKG RV/BOAT PKG0&'21$/' 6“6) 35272    72&2'   7-ELEVENC STORE 4,650 SF4 C.Y. DUMPSTERPROVIDED BYOTHERS4 C.Y. DUMPSTERPROVIDED BYOTHERSSELF STORAGE 21,377 SF SELF STORAGE6,081 SFSELF STORAGE10,558 SFRV/BOAT PKG0(&+$1,&$/5220&$5:$6+7811(/VACUUM/EQMTROOM4 C .Y . DUMP S TER PR O VIDED BYOTHERS4 C .Y . DUMP S TER PRO V IDED BYOTHERS 4 C.Y. DUMPSTERPROVIDED BYOTHERS4 C.Y. DUMPSTERPROVIDED BYOTHERS FUEL CANOPY (8 MPD'S) 4,291 SFCAR WASH3,979 SFž FLANNERY STREET (LOCAL PRIVATE STREET)LINCOLN STREET(COLLECTOR STREET)RIVERSIDE DR. NFC PRELIMINARY GRADING AND DRAINAGE PLAN C1.30 Scale Checked by Drawn by Date Project number As indicated 0711-10 15209 LINCOLN STREET, LAKE ELSINORE, CA 2020-07-15 No.Description Date 6%(9(5/<'5 /26$1*(/(6&$ ROBERT T RUS SELLJU RR RV/BOAT PKG RV/BOAT PKG RV/BOAT PKG0&'21$/' 6“6) 35272    72&2'   7-ELEVENC STORE 4,650 SF4 C.Y. DUMPSTERPROVIDED BYOTHERS4 C.Y. DUMPSTERPROVIDED BYOTHERSSELF STORAGE 21,377 SF SELF STORAGE6,081 SFSELF STORAGE10,558 SFRV/BOAT PKG0(&+$1,&$/5220&$5:$6+7811(/VACUUM/EQMTROOM4 C.Y . DUMPSTERPROVIDED BYOTHERS4 C.Y . D UM P STERPROVIDED BYOTHERS 4 C.Y. DUMPSTERPROVIDED BYOTHERS4 C.Y. DUMPSTERPROVIDED BYOTHERS FUEL CANOPY (8 MPD'S) 4,291 SFCAR WASH3,979 SFž9/9/9/9/9/9/9/ 9/ 9/ %10(+4/+(5'9'4 5'48+%'4'37+4'& ITGCUG YCUVG ' %#6%*$#5+0 %74$&4#+0 ':+56+0)5'9'4 #2241:ž5>1%. ':+56+0)9#6'4 #2241:ž0>1%. '8/9& #4'#&4#+0(146*'(7'.2#& 01&+4'%64#+0(#.. ' 5/* ' *;&4#06 ':+56+0)5'9'4 #2241:ž'>1%. '8/9& ' 5/* ':+56+0)9#6'4 #2241:ž9>1%. '8/9& ' 5/* ' 5/* ' %#6%*$#5+0 ' *;&4#06 ':+56+0)9#6'4 #2241:ž9>1%. '8/9& ((8#4+'5 #.10)$7+.&+0) ((8#4+'5 #.10)$7+.&+0) (( (( ':  4%2ž912. 5''&9)01Ä ':ž&4#+0#)''#5'/'06 5''&9)01Ä ':%.'#0Ä176 ,70%6+105647%674' 5''&9)01Ä ':  4%2ž912. 5''&9)01Ä ':ž&4#+0#)''#5'/'06 5''&9)01Ä FLANNERY STREET (LOCAL PRIVATE STREET)LINCOLN STREET(COLLECTOR STREET)%10(+4/+(&1/'56+% 5'48+%'+54'37+4'& RIVERSIDE DRIVE PRELIMINARY UTILITY PLAN C1.50 Scale Checked by Drawn by Date Project number As indicated 0711-10 15209 LINCOLN STREET, LAKE ELSINORE, CA 2020-07-15 No.Description Date 6%(9(5/<'5 /26$1*(/(6&$  5#0+6#4;5'9'4 $7+.&+0)5'9'421+061(%100'%6+10 28%5'9'42+2'%.'#017654'37+4'&2'4%1&'/+05.12'70.'55 #22418'&$;'0)+0''4+0) 5#0&1+.5'2#4#614'8/9&56&&9)015Ä# )4'#5'+06'4%'2614'8/9&56&&9)015Ä# 5'9'4.#6'4#.%100'%6+10'8/9&56&&9)015Ä 5 5614/&4#+0 +0(+.64#6+10$/2(1493/25''5'%6+1010%&%85614'&#0&+0(+.64#6'&18'4(.1961 %74$&4#+001*;&41/1&4'37+4'& $/218'4(.1961%74$2#4-9#;&4#+0 64#((+%4#6'&64'0%*&4#+0&+5%*#4)'6*47#&,#%'06%74$&4#+0#5'.'8#6+10#..195 64#((+%4#6'&#4'#&4#+0 & & 5 ':+56+0))#5 241215'&5'9'4 ':+56+0)5'9'4 241215'&5614/&4#+0 ':+56+0)5614/&4#+0 241215'&9#6'4 ':+56+0)9#6'4 241215'&(+4'9#6'4 241215'&+44+)#6+10 5 5 & (+4'9#6'4 $7+.&+0)(+4'524+0-.'49#6'421+061(%100'%6+10 5+6'(+4'9#6'42+2'5+<'#0&/#6'4+#.6$& (+4'&17$.'&'6'%614%*'%-/'6'4+056#..#6+10'8/9&56&&9)019Ä (+4'*;&4#06#55'/$.;'8/9&56&&9)019Ä%10(+4/4'37+4'& *;&4#06 5 #0&.1%#6+10 5 9+6*(+4'&'2#46/'06 %100'%661':+56+0)/#+0'8/9&56&&9)019Ä ( ( &1/'56+%9#6'4 $7+.&+0)&1/'56+%9#6'421+061(%100'%6+10 5+6'9#6'42+2'5+<'#0&/#6'4+#.6$& &1/'56+%9#6'45'48+%'%100'%6+105+<'6$&'8/9&56&&9)019Ä 9#6'4/'6'4$1:'8/9&56&&9)019Ä 9 9 9 5 & ( ( ( 9 $#%-(.19#55'/$.;'8/9&56&&9)019Ä# 9Ä$9 +44+)#6+10 +44+)#6+10/'6'4$1:'8/9&56&&9)019Ä $#%-(.19#55'/$.;'8/9&56&&9)019Ä# 9Ä$ +4 +4 /+5%76+.+6+'5 18'4*'#&219'4.+0'55*#..$'70&'4)4170&'&21.'54'/18'&7 NFC ROBERT T RUS SELLJU RR RV/BOAT PKG RV/BOAT PKG RV/BOAT PKG0&'21$/' 6“6) 35272    72&2'   7-ELEVENC STORE 4,650 SF4 C.Y. DUMPSTERPROVIDED BYOTHERS4 C.Y. DUMPSTERPROVIDED BYOTHERSSELF STORAGE 21,377 SF SELF STORAGE6,081 SFSELF STORAGE10,558 SFRV/BOAT PKG0(&+$1,&$/5220&$5:$6+7811(/VACUUM/EQMTROOM4 C .Y . DUMPS TER PR O V IDED BYOTHERS4 C .Y . DUMPS TER PR O V IDED BYOTHERS 4 C.Y. DUMPSTERPROVIDED BYOTHERS4 C.Y. DUMPSTERPROVIDED BYOTHERS FUEL CANOPY (8 MPD'S) 4,291 SFCAR WASH3,979 SFž PRELIMINARY LIGHTING PLAN E1.00 Scale Checked by Drawn by Date Project number As indicated 0711-10 15209 LINCOLN STREET, LAKE ELSINORE, CA 2020-07-15 No.Description Date 6%(9(5/<'5 /26$1*(/(6&$  xx CLR I V E R S I D E D R.L I N C O L N S T R E E TRV/BOAT PKG RV/BOAT PKG RV/BOAT PKG0&'21$/' 6“6) 35272    72&2'   7-ELEVENC STORE 4,650 SF4 C.Y. DUMPSTERPROVIDED BYOTHERS4 C.Y. DUMPSTERPROVIDED BYOTHERSSELF STORAGE21,377 SF SELF STORAGE6,081 SFSELF STORAGE10,558 SFRV/BOAT PKG0(&+$1,&$/5220&$5:$6+7811(/VACUUM/EQMTROOM4 C .Y . D UMP S TER PRO VIDED BYOTHERS4 C .Y . D UMP S TER PRO VIDED BYOTHERS 4 C.Y. DUMPSTERPROVIDED BYOTHERS4 C.Y. DUMPSTERPROVIDED BYOTHERS FUEL CANOPY (8 MPD'S) 4,291 SFCAR WASH3,979 SFž PRELIMINARY LANDSCAPE PLAN L1.00 Scale Checked by Drawn by Date Project number As indicated 0711-10 15209 LINCOLN STREET, LAKE ELSINORE, CA 2020-07-15 No.Description Date 6%(9(5/<'5 /26$1*(/(6&$  $16#0+%#.0#/' %1//100#/' 36;          5;/$1. 415#(ž+%'$'4)ž 9*+6'(.14+$70&#415' 5#.8+#.'7%#06*# /':+%#0$75*5#)' 9'564+0)+#(ž5/1-';ž %1#56415'/#4; 8+0'5 2#46*'01%+557564+%752+&#6# $15610+8; 64''5 .#)'45641'/+#ž675%#414# 4'&%4#2'/;46.' 2*1'0+:%#0#4+'05+5 %#0#4;+5.#0&&#6'2#./ 4*75.#0%+# #(4+%#057/#% 5*47$5 %#..+56'/10ž.+66.',1*0ž %1/2#%6$166.'$475* '.#')0752ž(47+6.#0&++ž 5+.8'4$'44; *'/'41%#..+5ž56'..#&ž141ž ;'..19&#;.+.; .'26152'4/7/5ž50199*+6'ž 0'9<'#.#0&6'#64'' /7*.'0$'4)+#4+)'05 &''4)4#55 2*14+7/6ž#/#<+0)4'&ž 0'9<'#.#0&(.#: %106#+0'45+<' /#674'*:9 $1: ž:ž ž$6* ž:ž $1: ž:ž )#..10 : )#..10 ž:ž )#..10 : )#..10 ž:ž )#..10 : )#..10 ž:ž 9#6'475' %1//'065 /1&'4#6' .19 %+6;564''664''1416*'452'%+'5 #22418'&$;6*'%1//70+6; &'8'.12/'06&+4'%614 .19 .19 .19 /1&'4#6' .19 .19 .19 $16#0+%#.0#/' %1//100#/' 5;/$1.36;     %106#+0'45+<' /#674'*:9 )#..10 : )#..10 ž:ž )#..10 ž:ž )#..10 9#6'475' %1//'065 /1&'4#6' .19 .19 /1&'4#6' 616#.#4'#5( 616#..#0&5%#2'#4'#5( 4'37+4'&.#0&5%#2' 616#..#0&5%#2' NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN that the Planning Commission of the City of Lake Elsinore, California, will hold a Public Hearing on April 16, 2024, at the Lake Elsinore Cultural Center, 183 North Main Street, Lake Elsinore, California, 92530, at 6:00 p.m., or as soon thereafter as the matter may be heard, to consider the following: Planning Application No. 2020-92 (Riverside/Lincoln Commercial): A request by Ilan Golcheh, Golcheh Group, for a Conditional Use Permit to establish a 16-pump gasoline-dispensing station with a 4,291 square foot sq. ft. canopy and concurrent beer and wine sales (Type 20), self-storage facility (three (3) buildings 38,016 sq. ft. in total), 3,979 sq. ft. self-serve carwash, and a 4,456 sq. ft. drive thru-restaurant. The project also includes a Commercial Design Review proposing building design and construction of a 4,650 sq. ft. convenience store, 4,291 sq. ft. canopy, 38,016 sq. ft. self-storage facility, 4,456 sq. ft. drive-thru restaurant, 3,979 sq. ft. self-serve carwash, 221 parking stalls, landscaping, and related site improvements on an approximately 6.36‐acre site. The project site is located at the southwest corner of Lincoln Street and Riverside Drive (APNs: 379‐111-017, 018, 019, and 020). Pursuant to CEQA Guidelines Section 15162, no new environmental documentation is necessary because all potentially significant effects have been adequately analyzed in an earlier Mitigated Negative Declaration (MND) and none of the conditions described in Section 15162 exist. MND (ER 2020-05) (SCH No. 2021010316) was adopted by the City Council on April 13, 2021 for the Riverside/Lincoln Commercial Center project. No substantial changes that require major revisions to the MND exist and no new information of substantial importance that require revisions to the earlier MND exist. ALL INTERESTED PERSONS are invited to submit written information, express opinions, or otherwise submit written evidence by email to jmendoza@lake-elsinore.org. If you wish to legally challenge any action taken by the City on the above matter, you may be limited to raising only those issues you or someone else at the Public Hearing described in this notice or in written correspondence delivered to the City prior to or at the Public Hearing. If you require an accommodation to participate in a Public Hearing, please contact the Administrative Secretary at (951) 674-3124, ext. 297. All agenda materials are available for review on the city’s website at www.lake-elsinore.org on the Friday before the public hearing. FURTHER INFORMATION on this item may be obtained by contacting Joey Mendoza, Associate Planner in the Planning Division, at jmendoza@lake-elsinore.org or (951) 674 -3124, ext. 273 . Damaris Abraham, Community Development Director Prism Lake 15197 Lincoln st. Lake Elsinore, CA 92530 Sanches Wilfredo 3500 Lake Crest dr. Lake Elsinore, CA 92530 Cavallucci Joseph H 3512 Lake Crest dr. Lake Elsinore, CA 92530 Prism Lake 15195 Lincoln st. Lake Elsinore, CA 92530 Delapena, Adam 3502 Lake Crest dr. Lake Elsinore, CA 92530 Arrenquin Eladio R 3514 Lake Crest dr Lake Elsinore, CA 92530 LMV Affordable; AHA Riverside West MGP LLC 32209 Riverside Dr. Lake Elsinore, CA 92530 Garcia Juan Carlos; Garcia Maria 3504 Lake Crest dr. Lake Elsinore, CA 92530 Huerta Sergio 3516 Lake Crest dr. Lake Elsinore, CA 92530 LMV Affordable; AHA Riverside West MGP LLC 32221 Riverside Dr. Lake Elsinore, CA 92530 Nicholas James L 3506 Lake Crest dr. Lake Elsinore, CA 92530 Hernandez Family Trust 3518 Lake Crest dr. Lake Elsinore, CA 92530 Hicks David R 3496 Lake Crest dr. Lake Elsinore, CA 92530 Guild Richard J; Guild Shawna K 3508 Lake Crest dr. Lake Elsinore, CA 92530 Berrum Saul Gomez 3520 Lake Crest dr. Lake Elsinore, CA 92530 Hurtado Andrew R; Hurtado Audry L 3498 Lake Crest dr. Lake Elsinore, CA 92530 Hernandez Mario H; Herrera Patricia 3510 Lake Crest dr. Lake Elsinore, CA 92530 Solvey Cathy Lynn 3522 Lake Crest dr. Lake Elsinore, CA 92530 Varela Jerry M 3524 Lake Crest dr. Lake Elsinore, CA 92530 Armenta Elias, Armenta Belen 3526 Lake Crest dr Lake Elsinore, CA 92530 Hodges Joshua Edward, Hodges Grace Kelly 3528 Lake Crest dr. Lake Elsinore, CA 92530 Beltran Jose; Beltran Maria 3530 Lake Crest dr. Lake Elsinore, CA 92530 Risher Harry & Diana Revocable Living Trust 3532 Lake Crest dr. Lake Elsinore, CA 92530 Frankin Marie; Lewis Amber 3534 Lake Crest dr. Lake Elsinore, CA 92530 Hernandez Nathalia; Hernandez Luz E 3536 Lake Crest dr. Lake Elsinore, CA 92530 Radvansky Family Trust 3538 Lake Crest dr. Lake Elsinore, CA 92530 Routh Vivian M 3537 Lake Crest dr. Lake Elsinore, CA 92530 Oreck Robin; Orek Arlyne A 3535 Lake Crest dr. Lake Elsinore, CA 92530 Shirley Lopez 3533 Lake Crest dr. Lake Elsinore, CA 92530 Black Jennifer J 3531 Lake Crest dr. Lake Elsinore, CA 92530 Sway 2014-1 Borrower 3529 Lake Crest dr. Lake Elsinore, CA 92530 Carrizales Martha O 3527 Lake Crest dr. Lake Elsinore, CA 92530 Dominguez Pablo 3525 Lake Crest dr. Lake Elsinore, CA 92530 Moreno Margaret 3523 Lake Crest dr. Lake Elsinore, CA 92530 Oleson M Patrick; Oleson Lisa K 3521 Lake Crest dr. Lake Elsinore, CA 92530 Linn Ronald D; Linn Elyse 3519 Lake Crest dr. Lake Elsinore, CA 92530 Tokuishi Sachiko 3517 Lake Crest dr. Lake Elsinore, CA 92530 Coluna Arturo 3515 Lake Crest dr. Lake Elsinore, CA 92530 Miller Lorraine 3513 Lake Crest dr. Lake Elsinore, CA 92530 Aure Rodolfo F; Aure Federico F 3511 Lake Crest dr. Lake Elsinore, CA 92530 Contreras Demetrio; Contreras Mayte 3509 Lake Crest dr. Lake Elsinore, CA 92530 Bernal Arturo D; Bernal Laura Livier 3507 Lake Crest dr. Lake Elsinore, CA 92530 Delano Henry; Delano Maria 3505 Lake Crest dr. Lake Elsinore, CA 92530 Leas Anthony 3503 Lake Crest dr. Lake Elsinore, CA 92530 Vreeland Charles R; Tanji Grace Y 3501 Lake Crest dr. Lake Elsinore, CA 92530 Prado Steven W 3499 Lake Crest dr. Lake Elsinore, CA 92530 Sanchez Rogelio 3497 Lake Crest dr. Lake Elsinore, CA 92530 AM Proper�es and Services 894 Robin dr. Lake Elsinore, CA 92530 Ramos Judith D 892 Robin dr. Lake Elsinore, CA 92530 Monge Agus�n 884 Robin dr. Lake Elsinore, CA 92530 Naranjo Jose A 882 Robin dr. Lake Elsinore, CA 92530 Colula Verbara Emmanuel A; Colula Agus�na B 874 Robin dr. Lake Elsinore, CA 92530 Moreno Enrique 872 Robin dr. Lake Elsinore, CA 92530 Naetzel Ysabel 864 Robin dr. Lake Elsinore, CA 92530 Guzman Manuel Soto; Oceguera Maria Elena 862 Robin dr. Lake Elsinore, CA 92530 Gaddy Warren D; Gaddy Mary E 854 Robin dr. Lake Elsinore, CA 92530 Delatorre David 895 Robin dr. Lake Elsinore, CA 92530 Mitchell, Lauren 893 Robin dr. Lake Elsinore, CA 92530 Wise Aurelia 885 Robin dr. Lake Elsinore, CA 92530 Gu�errez Margie 883 Robin dr. Lake Elsinore, CA 92530 Cuevas Roberto; Delatorre Liliana 3561 Linnet dr. Lake Elsinore, CA 92530 Sijabat Jon V; Sijabat Myrriah A 3563 Linnet dr. Lake Elsinore, CA 92530 Mora Jaime 3571 Linnet dr. Lake Elsinore, CA 92530 Monge Ana M 3573 Linnet dr. Lake Elsinore, CA 92530 Alcala Jose Revocable Living Trust 3579 Linnet dr. Lake Elsinore, CA 92530 Alcaraz Miguel 3581 Linnet dr. Lake Elsinore, CA 92530 Knapp Richard L 3589 Linnet dr. Lake Elsinore, CA 92530 Kuriata Marek; Juriata Lidia 15224 Lincoln st. Lake Elsinore, CA 92530 From: perla yerena <perlayerena@gmail.com> Sent: Tuesday, April 16, 2024 4:12 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]Commercials building’s needed in Lake Elsinore Hello Council People, I’m writing this email to bring up my ideas for buildings that should be priority in Lake Elsino re. These plots should be utilized in a way that would make more jobs available for people and provide more parking spaces for everyone including disabled people. We should also develop nursing homes and a DMV that would help create more city and nursing jobs for everyone in the town to avoid long commutes. By building nursing homes and senior living facilities people would be able to get vital and important job experience as well as visit their fam ilies more. The Lake Elsinore has a thriving community that could be even better if we worked towards providing more opport unities for us. Sincerely, Perla X Yerena Message from external sender. Use Caution. -----Original Message----- From: Carlos Cruz <carloszurc02@gmail.com> Sent: Tuesday, April 16, 2024 9:50 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]I Oppose the Commercial Lot Message from external sender. Use Caution. Having grown up in Lake Elsinore I have always recognized that the city has tremendous potential. Although we have recently started to prioritized the the health of the lake, the business ideas in the town is lacking. I am not alone when I say I oppose the building of the commercial lot on Lincoln and Riverside Dr. I understand allowing businesses into Lake Elsinore can be beneficial for the vision of the city, but a gas station, McDonald’s, and yet another storage center will not fulfill that vision. Maybe one day Lake Elsinore will adopt an identity for itself like other lake towns, such as Big Bear or Lake Arrowhead. But un<l then, the poor foresight and bad planning reminds me that I will have to keep saying, “Lake Elsinore will be great one day”. And that too, is a sentiment shared by many members of this town. -----Original Message----- From: Karen Brisley <kkb07@msn.com> Sent: Tuesday, April 16, 2024 8:14 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]Building more gas stations, car washes, storage Message from external sender. Use Caution. Good evening We don’t need more gas stations, car washes and storage, what we need are nice restaurants (not fast food), stores like Kohls, Sprouts so we don’t have to go to murrieta or Temecula. Let’s bring up the image of Lake Elsinore! Karen Brisley Sent from my iPhone -----Original Message----- From: Adriana <adriana.deleon@yahoo.com> Sent: Tuesday, April 16, 2024 7:14 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]51,100 commercial building plan Message from external sender. Use Caution. Good evening. I write to you with the best of interested for the future development for this building. I'd like to agree with the rest of the community on how we don't need another car wash, gas station or self storage. We recently moved to lake Elsinore and had high hopes for the community but quite frankly those hopes are vanishing. There is def room for improvement and it all starts with the city. We'd like to see more of nice sit down restaurants, family friendly joints, fun activities more shopping retail options. -Thank you, Adriana De León -----Original Message----- From: harold depew <offroadfabricator@yahoo.com> Sent: Tuesday, April 16, 2024 6:23 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]Riverside dr and Lincoln building complex Message from external sender. Use Cau8on. I am against this new construc8on building and businesses being put on this loca8on at Riverside dr. and Lincoln, or our city all together. I am opposed to any of these new businesses like this. No car wash. No storage units. No 7 eleven’s. No more McDonald’s. No more. Sincerely Harold -----Original Message----- From: harold depew <offroadfabricator@yahoo.com> Sent: Tuesday, April 16, 2024 6:23 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]Riverside dr and Lincoln building complex Message from external sender. Use Cau8on. I am against this new construc8on building and businesses being put on this location at Riverside dr. and Lincoln, or our city all together. I am opposed to any of these new businesses like this. No car wash. No storage units. No 7 eleven’s. No more McDonald’s. No more. Sincerely Harold From: stacienickole <stacienickole@gmail.com> Sent: Tuesday, April 16, 2024 5:24 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]New storage development There is ABSOLUTELY NO NEED for another storage unit and empty store fronts or crackhead hangout in this town. This area would be better as a wonderful.park area with a beautiful view of the lake and lake access, free to the public. We have so many car washes in that area already, empty store fronts, laundromats....it's ridiculous. Please consider doing something to actually beautify our town. Thank you. Stacie Gendreaux Message from external sender. Use Caution. From: Umair Khan <khanumairasif@gmail.com> Sent: Tuesday, April 16, 2024 4:42 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]Lake Elsinore We do not want more gas stations or car washes. Please prioritize retail stores to bring in more tax revenue for the city. Umair A. Khan University of California, Los Angeles (UCLA) Certified Public Accountant (CPA) Message from external sender. Use Caution. From: Denise Marie <martinez143denise@gmail.com> Sent: Tuesday, April 16, 2024 4:24 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]Riverside Dr/Lincoln Planning Hello my name is Denise and I am a resident here in the city of Lake Elsinore. I am concerned about the planning for the empty lot on Riverside and Lincoln. I'd like to know the reasoning behind this proposal? We have so many car washes, gas stations and storage units. I was disappointed to see via the Patch (online news source) that these were selected choices. Is there something else that can be placed here? Maybe something that can better attract the consumer. Thanks for your time. -Denise Message from external sender. Use Caution. From: a1231231@msn.com <a1231231@msn.com> Sent: Tuesday, April 16, 2024 3:57 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]read tonight Lincoln and riverside drive --Lake Elsinore Planning Commission meeting at the Cultural Center, TONIGHT 4/16/24 6:00 p.m. 183 N. Main Street Plans on that storage unit, gas station, car wash, and McDonald's on the corner of Riverside Dr./Lincoln! Candice, this is my comment please read... "I'm not opposed to the project if the following conditions are added. 1. Need parking. All the apartments are high density and the parking is non-existent. 2. Rvs and trucks with trailers need to be able to fuel and pull through safely. 3. Eliminate storage facility and allow more parking" regards ace vallejos Message from external sender. Use Caution. From: Kristine Finley <kristiinefinley@gmail.com> Sent: Tuesday, April 16, 2024 3:55 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]Plans for more car washes and storage units? Hello, I am writing to you because I just found out about new plans to add another center with a McDonald’s, car wash, and storage unit!? Quite frankly at this point our city is laughable! What on earth do we need a car wash and storage unit on every corner of this city for? Why doesn’t the city make plans for things that people of the community would actually enjoy!? This is embarrassing to be honest and I sure hope someone speaks up about this! City planners need to be more creative and stop wasting space and keeping our city looking like junk! Let’s bring somet hing desirable to our city for once! And who the heck is still eating McDonald’s these days!? Thank you Message from external sender. Use Caution. From: Debra Stephens <debras308@gmail.com> Sent: Tuesday, April 16, 2024 3:05 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]Stop the project at Riverside/Lincoln A project this size with the 12 pump gas station, storage units & a McDonald's is not good for this location. It is too near the lake, campground and high school. Debra Stephens Message from external sender. Use Caution. From: Celina Johnson <celinakcjracing@hotmail.com> Sent: Tuesday, April 16, 2024 3:18 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]Lincoln and Riverside Dr project To whom it may concern, I am writing to oppose the Riverside Dr. and Lincoln permitting. There's already so much traffic getting in and out of that intersection during high traffic times, not to mention the transients another gas station/7-11 would bring. All the extra transient activity definitely makes me and other locals feel unsafe. I've never done this before so I don't know if there's anything else I can do to try and have any say in the matter, but hopefully this helps. Sincerely, Celina Johnson Message from external sender. Use Caution. From: Amaya Bedolla <amayabedolla8@gmail.com> Sent: Tuesday, April 16, 2024 12:45 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]Car wash by Lincoln st Hello,I’m here to file a complaint about the new car wash u guys want to build. I feel very disappointed all the land we have but the city keeps using it for car washes and fast food instead of places of entertainment for kids, families and our other local residents. I feel also that will be an inconvenience to have another car wash so close by when we have about 3 other car washes not even half the rode down by four corners. The McDonalds and 7/11 does sound nice but please also think about your city and the traffic it will cause but of course it seems our communities voices are always left unheard.. it would be nice to see u guys build a fair or rolling skating rink I’ve heard lots of locals in this specific area get upset that we don’t have much places to take our families except for the parks because everything else is on the other side of the town. Anyways please do better for our community we know u can do it if u tried, thank you for your time! Message from external sender. Use Caution. From: ruby bridgman <ruby_bridgman@yahoo.com> Sent: Tuesday, April 16, 2024 12:14 PM To: Candice Alvarez <calvarez@Lake-Elsinore.org> Subject: [External]Riverside/Lincoln Commercial Project Hello, My name is Ruby Bridgman and I am a resident of Lake Elsinore. I'd like to oppose on this project on Riverside/Lincoln. There are already 3 gas stations, most surrounded by homeless individuals. The community has plenty of car washes as well as and storage facilities. As nice as it is to have a 24 hour McDonalds, all I can forsee is a place for the homeless community to gather and scare away customers. Our community would like to have nicer restaurants, places to eat dessert or nice shopping areas that aren't run down. I hope this is taken into consideration for our community. Thank you for your time. Sincerely, Ruby Bridgman Message from external sender. Use Caution. From: Loren Baker <lorenrbaker@yahoo.com> Sent: Tuesday, April 16, 2024 7:30 AM To: Carlos Serna <cserna@lake-elsinore.org> Subject: [External]Opposition Letter to Lake Elsinore City Plan for Commercial Center Loren Baker 45110 Quicksilver Road Lake Elsinore, Ca. 92532 Lorenrbaker@yahoo.c om 949-463-7137 4/16/2024 Planning Department Lake Elsinore City Council Dear Planning Department, I am writing to express my strong opposition to the proposed commercial center development in Lake Elsinore, as outlined in the city plan. This development, spanning 51,101 square feet, directly contradicts the visionary goals set forth in Lake Elsinore's Dream Extreme 2040 plan. As a resident deeply invested in the future of our city, I believe it is imperative to uphold the principles and aspirations outlined in our community's long- term vision. The Dream Extreme 2040 plan paints a vibrant picture of Lake Elsinore as the ultimate destination to live, work, play, build futures, and fulfill dreams. It envisions our city as a haven for action and adventure, attracting both visitors and residents alike. However, the proposed commercial center undermines this vision by failing to contribute positively to our city's unique identity and appeal. One of the key components of Lake Elsinore's allure lies in its natural beauty and recreational opportunities centered around the lake. Any development within our city should aim to enhance these assets, rather than detract from them. Unfortunately, the proposed commercial center does not align with this principle. Instead, it represents yet another generic addition to our cityscape, devoid of any distinguishing features or value. Furthermore, the commercial center fails to serve as a unique asset to Lake Elsinore. We do not need another convenience store, another car wash, or yet another fast-food restaurant. Such establishments do little to differentiate our city or elevate its standing as a destination for both leisure and business. I urge the Lake Elsinore City Council to reconsider the approval of this commercial center development. Instead, let us focus our efforts on projects that align with the spirit of the Dream Extreme 2040 plan and contribute meaningfully to the growth and prosperity of our community. Let us prioritize developments that enhance our natural environment, promote sustainable growth, and foster a sense of pride and identity among residents. Message from external sender. Use Caution. Thank you for considering my concerns regarding this matter. I look forward to a thoughtful and deliberative discussion on the future direction of our beloved city. Sincerely, Loren Baker