HomeMy WebLinkAboutItem No. 13 - Professional Services Agreement With EGP Consulting, Inc.
Page 1 of 2
REPORT TO CITY COUNCIL
To: Honorable Mayor and Members of the City Council
From: Jason Simpson, City Manager
Prepared by: Remon Habib, City Engineer
Date: March 12, 2024
Subject: Professional Services Agreement With EGP Consulting, Inc., for
Environmental Services on the I-15 Main Street Interchange Landscape
Improvement Project
Recommendation
Approve and authorize the City Manager to execute an agreement with EGP Consulting, Inc., in
an amount not to exceed $39,673.60 for Environmental Services for the I-15 Main Street
Interchange Landscape Improvement Project in such final form as approved by the City Attorney
and authorize the City Manager to execute change orders not exceeding a 10% contingency of
$3,967.36 for uncertainties and adjustments.
Background
On October 25, 2022, Council approved a professional Services Agreement with David Evans
and Associates (DEA) for the purpose of producing a landscape design at I-15 Main Street
Interchange. David Evans and City staff have been working with Caltrans District 8 on landscape
design elements that match the City’s landscape requirements, Caltrans requirements and
conform to pallet already utilized at the I-15 Railroad Canyon Road Interchange. DEA has
completed the design and the team submitted an application for a Caltrans Encroachment permit.
Discussion
Caltrans review team requested the design team provide:
• Environmental Summary that includes Biological Resource Assessment, Cultural
studies.
• Air, Noise, and Paleo: write up stating that there are no impacts. This can also be
included in the summary prepared by a specialist within that field.
PSA EGP Consulting
Page 2 of 2
• For Hazardous Waste, Caltrans requires for the applicant to provide an Initial Site
Assessment (ISA) Checklist.
City staff reached out to EGP for scope and fee in order to fulfill Caltrans Environmental
comments/requirements in order to obtain the encroachment permit for the landscape
project. EGP’s proposal fee is in the amount of $39,673.60 which includes required
materials and professional support services to provide responses for feedback comments
from Caltrans review team.
Fiscal Impact
Fiscal impact is $39,673.60 plus an additional 10% contingency which is programmed in the City’s
CIP budget.
Attachments
Attachment 1- Agreement
Exhibit A- Proposal
Attachment 2 - Landscape Design Plans
Page 1
AGREEMENT FOR PROFESSIONAL SERVICES
EGP Consulting, Inc.
Environmental Services for I-15/Main Street Interchange Landscape Improvements
This Agreement for Professional Services (the “Agreement”) is made and entered into as
of March 12, 2024, by and between the City of Lake Elsinore, a municipal corporation (‘‘City") and
EGP Consulting, Inc., a Corporation ("Consultant").
RECITALS
A. The City has determined that it requires the following professional services:
Environmental Services for I-15/Main Street Interchange Landscape Improvements
B. Consultant has submitted to City a proposal, dated February 16, 2024, attached
hereto as Exhibit A (“Consultant’s Proposal”) and incorporated herein, to provide professional
services to City pursuant to the terms of this Agreement.
C. Consultant possesses the skill, experience, ability, background, certification and
knowledge to perform the services described in this Agreement on the terms and conditions
described herein.
D. City desires to retain Consultant to perform the services as provided herein and
Consultant desires to provide such professional services as set forth in this Agreement.
AGREEMENT
1. Scope of Services. Consultant shall perform the services described in
Consultant’s Proposal (Exhibit A). Consultant shall provide such services at the time, place, and
in the manner specified in Consultant’s Proposal, subject to the direction of the City through its
staff that it may provide from time to time.
2. Time of Performance.
a. Time of Essence. Time is of the essence in the performance of this
Agreement. The time for completion of the professional services to be performed by Consultant
is an essential condition of this Agreement. Consultant shall prosecute regularly and diligently
the professional services contemplated pursuant to this Agreement according to the agreed upon
performance schedule in Consultant’s Proposal (Exhibit A).
b. Performance Schedule. Consultant shall commence the services pursuant
to this Agreement upon receipt of a written notice to proceed and shall perform all services within
the time period(s) established in the Consultant’s Proposal (Exhibit A). When requested by
Consultant, extensions to the time period(s) specified may be approved in writing by the City
Manager.
Page 2
c. Term. The term of this Agreement shall commence upon execution of this
Agreement and shall continue until the services and related work are completed in accordance
with the Consultant’s Proposal (Exhibit A).
3. Compensation. Compensation to be paid to Consultant shall be in accordance
with the fees set forth in Consultants’ Proposal (Exhibit A), which is attached hereto and
incorporated herein by reference. In no event shall Consultant’s compensation exceed Thirty-
Nine Thousand Six Hundred Seventy-Three dollars and Sixty Cents ($39,673.60) without
additional written authorization from the City. Notwithstanding any provision of Consultant’s
Proposal to the contrary, out of pocket expenses set forth in Exhibit A shall be reimbursed at cost
without an inflator or administrative charge. Payment by City under this Agreement shall not be
deemed a waiver of defects, even if such defects were known to the City at the time of payment.
4. Method of Payment. Consultant shall promptly submit billings to the City
describing the services and related work performed during the preceding month to the extent that
such services and related work were performed. Consultant’s bills shall be segregated by project
task, if applicable, such that the City receives a separate accounting for work done on each
individual task for which Consultant provides services. Consultant’s bills shall include a brief
description of the services performed, the date the services were performed, the number of hours
spent and by whom, and a description of any reimbursable expenditures. City shall pay
Consultant no later than forty-five (45) days after receipt of the monthly invoice by City staff.
5. Background Checks. At any time during the term of this Agreement, the City
reserves the right to make an independent investigation into the background of Consultant’s
personnel who perform work required by this Agreement, including but not limited to their
references, character, address history, past employment, education, social security number
validation, and criminal or police records, for the purpose of confirming that such personnel are
lawfully employed, qualified to provide the subject service or pose a risk to the safety of persons
or property in and around the vicinity of where the services will be rendered or City Hall. If the City
makes a reasonable determination that any of Consultant’s prospective or then current personnel
is deemed objectionable, then the City may notify Consultant of the same. Consultant shall not
use that personnel to perform work required by this Agreement, and if necessary, shall replace
him or her with a suitable worker.
6. Suspension or Termination.
a. The City may at any time, for any reason, with or without cause, suspend
or terminate this Agreement, or any portion hereof, by serving upon the Consultant at least ten
(10) days prior written notice. Upon receipt of such notice, the Consultant shall immediately cease
all work under this Agreement, unless the notice provides otherwise. If the City suspends or
terminates a portion of this Agreement such suspension or termination shall not make void or
invalidate the remainder of this Agreement.
b. In the event this Agreement is terminated pursuant to this Section, the City
shall pay to Consultant the actual value of the work performed up to the time of termination,
provided that the work performed is of value to the City. Upon termination of the Agreement
pursuant to this Section, the Consultant will submit an invoice to the City, pursuant to Section
entitled “Method of Payment” herein.
Page 3
7. Plans, Studies, Documents.
a. Ownership of Documents. All plans, studies, documents and other writings
prepared by and for Consultant, its officers, employees and agents and subcontractors in the
course of implementing this Agreement, except working notepad internal documents, shall
become the property of the City upon payment to Consultant for such work, and the City shall
have the sole right to use such materials in its discretion without further compensation to
Consultant or to any other party. Consultant shall, at Consultant’s expense, provide such reports,
plans, studies, documents and other writings to City upon written request. City shall have sole
determination of the public’s rights to documents under the Public Records Act, and any third-
party requests of Consultant shall be immediately referred to City, without any other actions by
Consultant.
b. Licensing of Intellectual Property. This Agreement creates a nonexclusive
and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights,
designs, and other intellectual property embodied in plans, specifications, studies, drawings,
estimates, and other documents or works of authorship fixed in any tangible medium of
expression, including but not limited to, physical drawings or data magnetically or otherwise
recorded on computer diskettes, which are prepared or caused to be prepared by Consultant
under this Agreement ("Documents & Data"). Consultant shall require that all subcontractors
agree in writing that City is granted a nonexclusive and perpetual license for any Documents &
Data the subcontractor prepares under this Agreement. Consultant represents and warrants that
Consultant has the legal right to license any and all Documents & Data. Consultant makes no
such representation and warranty in regard to Documents & Data which were prepared by design
professionals other than Consultant or provided to Consultant by the City. City shall not be limited
in any way in its use of the Documents & Data at any time, provided that any such use not within
the purposes intended by this Agreement shall be at City’s sole risk.
c. Confidentiality. All ideas, memoranda, specifications, plans, procedures,
drawings, descriptions, computer program data, input record data, written information, and other
Documents & Data either created by or provided to Consultant in connection with the performance
of this Agreement shall be held confidential by Consultant. Such materials shall not, without the
prior written consent of City, be used by Consultant for any purposes other than the performance
of the services under this Agreement. Nor shall such materials be disclosed to any person or
entity not connected with the performance of the services under this Agreement. Nothing
furnished to Consultant which is otherwise known to Consultant or is generally known, or has
become known, to the related industry shall be deemed confidential. Consultant shall not use
City’s name or insignia, photographs relating to project for which Consultant’s services are
rendered, or any publicity pertaining to the Consultant’s services under this Agreement in any
magazine, trade paper, newspaper, television or radio production or other similar medium without
the prior written consent of City.
8. Consultant’s Books and Records.
a. Consultant shall maintain any and all ledgers, books of account, invoices,
vouchers, canceled checks, and other records or documents evidencing or relating to charges for
services, or expenditures and disbursements charged to City for a minimum period of three (3)
years, or for any longer period required by law, from the date of final payment to Consultant to
this Agreement.
Page 4
b. Consultant shall maintain all documents and records which demonstrate
performance under this Agreement for a minimum period of three (3) years, or for any longer
period required by law, from the date of termination or completion of this Agreement.
c. Any records or documents required to be maintained pursuant to this
Agreement shall be made available for inspection or audit, at any time during regular business
hours, upon written request by the City Manager, City Attorney, City Auditor or a designated
representative of these officers. Copies of such documents shall be provided to the City for
inspection at City Hall when it is practical to do so. Otherwise, unless an alternative is mutually
agreed upon, the records shall be available at Consultant’s address indicated for receipt of notices
in this Agreement.
d. Where City has reason to believe that such records or documents may be
lost or discarded due to dissolution, disbandment or termination of Consultant’s business, City
may, by written request by any of the above-named officers, require that custody of the records
be given to the City and that the records and documents be maintained in City Hall. Access to
such records and documents shall be granted to any party authorized by Consultant, Consultant’s
representatives, or Consultant’s successor-in-interest.
9. Independent Contractor.
a. Consultant is and shall at all times remain as to the City a wholly
independent contractor pursuant to California Labor Code Section 3353. The personnel
performing the services under this Agreement on behalf of Consultant shall at all times be under
Consultant’s exclusive direction and control. Neither City nor any of its officers, employees, or
agents shall have control over the conduct of Consultant or any of Consultant’s officers,
employees, or agents, except as set forth in this Agreement. Consultant shall not at any time or
in any manner represent that it or any of its officers, employees, or agents are in any manner
officers, employees, or agents of the City. Consultant shall not incur or have the power to incur
any debt, obligation, or liability whatsoever against City, or bind City in any manner.
b. Notwithstanding any other federal, state and local laws, codes, ordinances
and regulations to the contrary and except for the fees paid to Consultant as provided in the
Agreement, Consultant and any of its employees, agents, and subcontractors providing service
under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any
claims to, any compensation, benefit, or any incident of employment by City, including but not
limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution
to be paid by City for employer contribution and/or employee contributions for PERS benefits.
10. PERS Eligibility Indemnification. In the event that Consultant or any employee,
agent, or subcontractor of Consultant providing services under this Agreement claims or is
determined by a court of competent jurisdiction or the California Public Employees Retirement
System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall
indemnify, defend, and hold harmless City for the payment of any employee and/or employer
contributions for PERS benefits on behalf of Consultant or its employees, agents, or
subcontractors, as well as for the payment of any penalties and interest on such contributions,
which would otherwise be the responsibility of City.
11. Interests of Consultant. Consultant (including principals, associates and
professional employees) covenants and represents that it does not now have any investment or
interest in real property and shall not acquire any interest, direct or indirect, in the area covered
Page 5
by this Agreement or any other source of income, interest in real property or investment which
would be affected in any manner or degree by the performance of Consultant’s services
hereunder. Consultant further covenants and represents that in the performance of its duties
hereunder no person having any such interest shall perform any services under this Agreement.
Consultant is not a designated employee within the meaning of the Political Reform Act
because Consultant:
a. will conduct research and arrive at conclusions with respect to his/her
rendition of information, advice, recommendation or counsel independent of the control and
direction of the City or of any City official, other than normal agreement monitoring; and
b. possesses no authority with respect to any City decision beyond rendition
of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).)
12. Professional Ability of Consultant. City has relied upon the professional training
and ability of Consultant to perform the services hereunder as a material inducement to enter into
this Agreement. Consultant shall therefore provide properly skilled professional and technical
personnel to perform all services under this Agreement. All work performed by Consultant under
this Agreement shall be in accordance with applicable legal requirements and shall meet the
standard of quality ordinarily to be expected of competent professionals in Consultant’s field of
expertise.
13. Compliance with Laws.
a. Consultant shall comply with all local, state and federal laws and
regulations applicable to the services required hereunder, including any rule, regulation or bylaw
governing the conduct or performance of Consultant and/or its employees, officers, or board
members.
b. Consultant represents that it has obtained and will maintain at all times
during the term of this Agreement all professional and/or business licenses, certifications and/or
permits necessary for performing the services described in this Agreement, including a City
business license.
14. Licenses. Consultant represents and warrants to City that it has the licenses,
permits, qualifications, insurance and approvals of whatsoever nature which are legally required
of Consultant to practice its profession. Consultant represents and warrants to City that
Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term
of this Agreement, any licenses, permits, insurance and approvals which are legally required of
Consultant to practice its profession. Consultant shall maintain a City of Lake Elsinore business
license.
15. Indemnity. Consultant shall indemnify, defend, and hold harmless the City and all
of its officials, officers, employees, agents, and volunteers from and against any and all losses,
liability, damages, claims, suits, actions, costs and expenses including attorney’s fees, and
causes of action arising out of any personal injury, bodily injury, loss of life, or damage to property,
or any violation of any federal, state, or municipal law or ordinance, to the extent caused, in whole
or in part, by the willful misconduct or negligent acts or omissions of Consultant or its employees,
subcontractors, or agents, by acts for which they could be held strictly liable, or by the quality or
character of their work. The foregoing obligation of Consultant shall not apply when (1) the injury,
Page 6
loss of life, damage to property, or violation of law arises from the sole negligence or willful
misconduct of the City or its officers, employees, agents, or volunteers and (2) the actions of
Consultant or its employees, subcontractor, or agents have contributed in no part to the injury,
loss of life, damage to property, or violation of law. It is understood that the duty of Consultant to
indemnify and hold harmless includes the duty to defend as set forth in Section 2778 of the
California Civil Code. Acceptance by City of insurance certificates and endorsements required
under this Agreement does not relieve Consultant from liability under this indemnification and hold
harmless clause. This indemnification and hold harmless clause shall apply to any damages or
claims for damages whether or not such insurance policies shall have been determined to apply.
By execution of this Agreement, Consultant acknowledges and agrees to the provisions of this
Section and that it is a material element of consideration.
16. Insurance Requirements.
a. Insurance. Consultant, at Consultant’s own cost and expense, shall
procure and maintain, for the duration of the contract, unless modified by the City’s Risk Manager,
the following insurance policies.
i. Workers’ Compensation Coverage. Consultant shall maintain
Workers’ Compensation Insurance and Employer’s Liability Insurance for his/her
employees in accordance with the laws of the State of California. In addition, Consultant
shall require each subcontractor to similarly maintain Workers’ Compensation Insurance
and Employer’s Liability Insurance in accordance with the laws of the State of California
for all of the subcontractor’s employees. Any notice of cancellation or non-renewal of all
Workers’ Compensation policies must be received by the City at least thirty (30) days prior
to such change. The insurer shall agree to waive all rights of subrogation against City, its
officers, agents, employees and volunteers for losses arising from work performed by
Consultant for City. In the event that Consultant is exempt from Worker’s Compensation
Insurance and Employer’s Liability Insurance for his/her employees in accordance with
the laws of the State of California, Consultant shall submit to the City a Certificate of
Exemption from Workers Compensation Insurance in a form approved by the City
Attorney.
ii. General Liability Coverage. Consultant shall maintain commercial
general liability insurance in an amount not less than one million dollars ($1,000,000) per
occurrence for bodily injury, personal injury and property damage. If a commercial general
liability insurance form or other form with a general aggregate limit is used, either the
general aggregate limit shall apply separately to the work to be performed under this
Agreement or the general aggregate limit shall be at least twice the required occurrence
limit. Required commercial general liability coverage shall be at least as broad as
Insurance Services Office Commercial General Liability occurrence form CG 0001 (ed.
11/88) or Insurance Services Office form number GL 0002 (ed. 1/73) covering
comprehensive General Liability and Insurance Services Office form number GL 0404
covering Broad Form Comprehensive General Liability. No endorsement may be attached
limiting the coverage.
Page 7
iii. Automobile Liability Coverage. Consultant shall maintain
automobile liability insurance covering bodily injury and property damage for all activities
of the Consultant arising out of or in connection with the work to be performed under this
Agreement, including coverage for owned, hired and non-owned vehicles, in an amount
of not less than one million dollars ($1,000,000) combined single limit for each occurrence.
Automobile liability coverage must be at least as broad as Insurance Services Office
Automobile Liability form CA 0001 (ed. 12/90) Code 1 (“any auto”). No endorsement may
be attached limiting the coverage.
iv. Professional Liability Coverage. Consultant shall maintain
professional errors and omissions liability insurance appropriate for Consultant’s
profession for protection against claims alleging negligent acts, errors or omissions which
may arise from Consultant’s services under this Agreement, whether such services are
provided by the Consultant or by its employees, subcontractors, or sub consultants. The
amount of this insurance shall not be less than one million dollars ($1,000,000) on a
claims-made annual aggregate basis, or a combined single limit per occurrence basis.
b. Endorsements. Each general liability and automobile liability insurance
policy shall be with insurers possessing a Best’s rating of no less than A:VII and shall be endorsed
with the following specific language:
i. Notwithstanding any inconsistent statement in any required
insurance policies or any subsequent endorsements attached thereto, the protection
offered by all policies, except for Workers’ Compensation, shall bear an endorsement
whereby it is provided that, the City and its officers, employees, servants, volunteers and
agents and independent contractors, including without limitation, the City Manager and
City Attorney, are named as additional insureds. Additional insureds shall be entitled to
the full benefit of all insurance policies in the same manner and to the same extent as any
other insureds and there shall be no limitation to the benefits conferred upon them other
than policy limits to coverages.
ii. This policy shall be considered primary insurance as respects the
City, its elected or appointed officers, officials, employees, agents and volunteers.
Any insurance maintained by the City, including any self-insured retention the City may
have, shall be considered excess insurance only and shall not contribute with it.
iii. This insurance shall act for each insured and additional insured as
though a separate policy had been written for each, except with respect to the limits of
liability of the insuring company.
iv. The insurer waives all rights of subrogation against the City, its
elected or appointed officers, officials, employees or agents.
v. Any failure to comply with reporting provisions of the policies shall
not affect coverage provided to the City, its elected or appointed officers, officials,
employees, agents or volunteers.
vi. The insurance provided by this Policy shall not be suspended,
voided, canceled, or reduced in coverage or in limits except after thirty (30) days written
notice has been received by the City.
Page 8
c. Deductibles and Self-Insured Retentions. Any deductibles or self-insured
retentions must be declared to and approved by the City. At the City’s option, Consultant shall
demonstrate financial capability for payment of such deductibles or self-insured retentions.
d. Certificates of Insurance. Consultant shall provide certificates of insurance
with original endorsements to City as evidence of the insurance coverage required herein.
Certificates of such insurance shall be filed with the City on or before commencement of
performance of this Agreement. Current certification of insurance shall be kept on file with the
City at all times during the term of this Agreement.
17. Notices. Any notice required to be given under this Agreement shall be in writing
and either served personally or sent prepaid, first class mail. Any such notice shall be addressed
to the other party at the address set forth below. Notice shall be deemed communicated within
48 hours from the time of mailing if mailed as provided in this section.
If to City: City of Lake Elsinore
Attn: City Manager
130 South Main Street
Lake Elsinore, CA 92530
With a copy to: City of Lake Elsinore
Attn: City Clerk
130 South Main Street
Lake Elsinore, CA 92530
If to Consultant: EGP Consulting, Inc.
Attn: Angie Kung
313 Berkshire
Irvine, CA 92620
18. Assignment and Subcontracting. The parties recognize that a substantial
inducement to City for entering into this Agreement is the professional reputation, experience and
competence of Consultant and the subcontractors listed in Exhibit B. Consultant shall be fully
responsible to City for all acts or omissions of any subcontractors. Assignments of any or all
rights, duties or obligations of the Consultant under this Agreement will be permitted only with the
express consent of the City. Consultant shall not subcontract any portion of the work to be
performed under this Agreement except as provided in Exhibit B without the written authorization
of the City. If City consents to such subcontract, Consultant shall be fully responsible to City for
all acts or omissions of those subcontractors. Nothing in this Agreement shall create any
contractual relationship between City and any subcontractor nor shall it create any obligation on
the part of the City to pay or to see to the payment of any monies due to any such subcontractor
other than as otherwise is required by law.
19. Waiver. Waiver of a breach or default under this Agreement shall not constitute a
continuing waiver of a subsequent breach of the same or any other provision under this
Agreement.
20. Litigation Expenses and Attorneys’ Fees. If either party to this Agreement
commences any legal action against the other party arising out of this Agreement, the prevailing
party shall be entitled to recover its reasonable litigation expenses, including court costs, expert
witness fees, discovery expenses, and attorneys’ fees.
Page 9
21. Mediation. The parties agree to make a good faith attempt to resolve any disputes
arising out of this Agreement through mediation prior to commencing litigation. The parties shall
mutually agree upon the mediator and share the costs of mediation equally. If the parties are
unable to agree upon a mediator, the dispute shall be submitted to JAMS or its successor in
interest. JAMS shall provide the parties with the names of five qualified mediators. Each party
shall have the option to strike two of the five mediators selected by JAMS and thereafter the
mediator remaining shall hear the dispute. If the dispute remains unresolved after mediation,
either party may commence litigation.
22. Prohibited Interests. Consultant maintains and warrants that it has not employed
nor retained any company or person, other than a bona fide employee working solely for
Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid
nor has it agreed to pay any company or person, other than a bona fide employee working solely
for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration
contingent upon or resulting from the award or making of this Agreement. For breach or violation
of this warranty, City shall have the right to rescind this Agreement without liability. For the term
of this Agreement, no member, officer or employee of City, during the term of his or her service
with City, shall have any direct interest in this Agreement, or obtain any present or anticipated
material benefit arising therefrom.
23. Equal Opportunity Employment. Consultant represents that it is an equal
opportunity employer and it shall not discriminate against any subcontractor, employee or
applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex
or age. Such non-discrimination shall include, but not be limited to, all activities related to initial
employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or
termination.
24. Prevailing Wages. Consultant is aware of the requirements of California Labor
Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8,
Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage
rates and the performance of other requirements on "public works" and "maintenance" projects.
Consultant agrees to fully comply with all applicable federal and state labor laws (including,
without limitation, if applicable, the Prevailing Wage Laws). It is agreed by the parties that, in
connection with the Work or Services provided pursuant to this Agreement, Consultant shall bear
all risks of payment or non-payment of prevailing wages under California law, and Consultant
hereby agrees to defend, indemnify, and hold the City, and its officials, officers, employees,
agents, and volunteers, free and harmless from any claim or liability arising out of any failure or
alleged failure to comply with the Prevailing Wage Laws. The foregoing indemnity shall survive
termination of this Agreement.
25. Severability. If any term or portion of this Agreement is held to be invalid, illegal,
or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this
Agreement shall continue in full force and effect.
26. Controlling Law Venue. This Agreement and all matters relating to it shall be
governed by the laws of the State of California and any action brought relating to this Agreement
shall be held exclusively in a state court in the County of Riverside.
27. Authority to Enter Agreement. Consultant has all requisite power and authority to
conduct its business and to execute, deliver, and perform the Agreement. Each party warrants
that the individuals who have signed this Agreement have the legal power, right, and authority to
Page 10
make this Agreement and to bind each respective party. The City Manager is authorized to enter
into an amendment or otherwise take action on behalf of the City to make the following
modifications to the Agreement: (a) a name change; (b) grant extensions of time; (c) non-
monetary changes in the scope of services; and/or (d) suspend or terminate the Agreement.
28. Counterparts. This Agreement may be executed in several counterparts, each of
which shall constitute one and the same instrument and shall become binding upon the parties
when at least one copy hereof shall have been signed by both parties hereto. In approving this
Agreement, it shall not be necessary to produce or account for more than one such counterpart.
29. Entire Agreement; Incorporation; Conflict. This Agreement contains the entire
understanding between the parties relating to the obligations described herein. All prior or
contemporaneous understandings, agreements, representations and statements, oral or written,
are superseded in total by this Agreement and shall be of no further force or effect. Consultant’s
Proposal is incorporated only for the description of the scope of services and/or the schedule of
performance and no other terms and conditions from such proposal shall apply to this Agreement
unless specifically agreed to in writing. In the event of conflict, this Agreement shall take
precedence over those contained in the Consultant’s Proposal.
30. Amendments. This Agreement may be modified or amended only by a written
document executed by both Consultant and City and approved as to form by the City Attorney.
[Signatures on next page]
Page 11
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the
date first written above.
Click or tap here to enter text.
“CITY”
CITY OF LAKE ELSINORE, a municipal
corporation
City Manager
ATTEST:
City Clerk
APPROVED AS TO FORM:
City Attorney
Assistant City Manager
“CONSULTANT”
EGP Consulting, Inc., a Corporation
By: Angie Kung
Its: CEO
Attachments: Exhibit A – Consultant’s Proposal
Exhibit B – List of Subcontractors
EXHIBIT A
EXHIBIT A
CONSULTANT’S PROPOSAL
[ATTACHED]
EXHIBIT B
EXHIBIT B
LIST OF SUBCONTRACTORS
[ATTACHED]
313 Berkshire, Irvine, CA 92620
714.248.6006
Remon Habib
City Engineer
130 S Main Street
Lake Elsinore, CA 92530
Date: Friday, February 16, 2024
Dear Mr. Habib,
On behalf of EGP ConsulƟng, Inc. (EGP), we appreciate the opportunity to support the City of Lake Elsinore
(City) on the I-15/Main Street Interchange Landscape Improvements Project (Project), located in Lake
Elsinore, California.
In addiƟon to the environmental services that EGP will provide in-house, ERP, Inc. (ERP) will provide air
quality, greenhouse gas/climate change, noise, and vibraƟon support services.
Per your request, we have provided a proposed scope and fee to provide environmental support for the
Project. Please find the scope of work in AƩachment A and corresponding fee esƟmate in AƩachment B.
Please feel free to contact me by email at angie@egpconsult.com or by telephone at 626-660-9230 if you
have any quesƟons regarding this scope and fee esƟmate.
We thank you for your conƟnued interest in working with EGP.
Warm regards,
CEO|Principal Environmental Planner
AƩachment A – Scope
EGP ConsulƟng, Inc. (EGP) will prepare a California Environmental Quality (CEQA) Checklist (Environmental
Checklist) with select supporƟng technical studies consistent with the requirements idenƟfied by Caltrans
District 8. Although Caltrans is anƟcipaƟng that the project could be processed as a ministerial project, which
would be exempt from CEQA enƟrely; in order to obtain an encroachment permit for the proposed Project,
they have recommended that a CEQA Checklist be prepared to idenƟfy potenƟal impacts associated with the
Project. Furthermore, the proposed Project proposes landscape improvements to an area that has been
previously disturbed as part of the I-15/Main Street Interchange Project (EA 1G7204).
Based on the review of available informaƟon provided by the City of Lake Elsinore (City), EGP recommends
the following scope of work.
Task 1.0 Project Management/Invoicing/CoordinaƟon
This task includes all coordinaƟon with the City and their designated contractors, up to 4 meeƟngs with City
staff and/or Caltrans District 8, and monthly invoicing and project management.
Task 2.0 Technical Studies
Task 2.1 Natural Environment Study Minimal Impact (NESMI)/ No Effects Memorandum
The NESMI will be prepared according to Caltrans Standard Environmental Reference (SER) requirements and
guidelines. EGP will review the findings and recommendaƟons from the 2016 NESMI prepared for the I-
15/Main Street Interchange Project, which evaluates the same area of the proposed Project. EGP will conduct
a literature review consisƟng of all Caltrans-required biological resources databases and request a United
States Fish and Wildlife Service (USFWS) species list using their online InformaƟon for Planning and
ConservaƟon (IPaC) Species List tool. EGP will also conduct a field survey to verify the exisƟng condiƟons
within the Project Study Area.
The NESMI will include a descripƟon of the field methods used and the results of the biological verificaƟon
field survey. The report will include a list of plant and animal species observed within the Project Study Area
and a general descripƟon of the plant communiƟes occurring. Tables describing sensiƟve species and their
habitats that are present or potenƟally present will also be provided in the report. The NESMI will also
idenƟfy and assess project impacts on the exisƟng biological resources in the Project Study Area. Due to the
developed state of the Project Study Area, it is not anƟcipated that any addiƟonal surveys for special status
biological resources (e.g. focused plant or wildlife species surveys, jurisdicƟonal/wetland delineaƟon) will be
required; and thus, these are not included in this scope of services. AddiƟonally, due to the developed nature
of the Project Study Area and the isolated areas of naƟve vegetaƟon, if the field visit indicates that there is no
suitable habitat for listed species, a No Effects Memorandum could be prepared in lieu of an NESMI, upon
Caltrans’ approval. The findings of the NESMI or the No Effects Memo will be summarized in the CEQA
Checklist findings.
DELIVERABLES:
DraŌ and Final NESMI/No Effects Memo (1 electronic copy)
A-2
Task 2.2 Initial Site Assessment (ISA) Checklist and Memorandum
EGP will prepare an Initial Site Assessment (ISA) Checklist and Memorandum (ISA Checklist and Memo) to
identify recognized environmental conditions (RECs) that may have an impact to the Project Study Area. The
ISA Checklist and Memorandum would entail conducting an environmental database search; site
reconnaissance; and online agency records review. The ISA will be prepared in accordance with NEPA and
CEQA requirements and Caltrans SER Guidelines. The findings of the ISA Checklist and Memo will be
summarized in the CEQA Checklist findings.
DELIVERABLES:
Draft and Final ISA Checklist and Memorandum (1 electronic copy)
Task 2.3: Air Quality/Greenhouse Gas Emissions Technical Memorandum (AQ/GHG Tech Memo)
The purpose of the AQ/GHG Tech Memo will be to quanƟfy air quality impacts and to idenƟfy regulatory
requirements pursuant to Federal and California Clean Air Acts, Federal Planning regulaƟons and enabling
legislaƟon, US EPA conformity regulaƟons, as well as City of Lake Elsinore and South Coast Air Quality
Management District ordinances and regulaƟons related to transportaƟon construcƟon acƟviƟes.
The primary guidance for this technical memorandum will be Chapter 11 "Air Quality" of Volume 1 of the
Caltrans SER. The technical memorandum will also conform to the South Coast Air Quality Management
District's CEQA Air Quality Analysis Handbook.
The discussion of regulatory seƫng will include descripƟons of Air Quality-related regulatory requirements,
which may include:
Dust Control Plan;
NoƟficaƟon of presence of state-registered (PERP) portable equipment
The discussion of impacts will include:
EsƟmates of temporary direct and indirect construcƟon emissions prepared using the CalEEMod
Computer Model;
EsƟmates of temporary increased traffic emissions, if needed, will be prepared using EMFAC
Computer Model emission factors;
If indicated by the traffic analysis, results of a CO Hotspots analysis prepared using the CALINE4
computer model
The discussions of impacts and avoidance will compare impacts and proposed miƟgaƟon measures with
criteria set forth in the South Coast Air Quality Management District's CEQA Air Quality Analysis Handbook.
The Air Quality Analysis Handbook provides analyses guidance and significance thresholds for greenhouse
gases, PM2.5, toxics, and ozone precursors. The findings of the AQ/GHG Tech Memo will be summarized in
the CEQA Checklist findings.
DELIVERABLES:
Draft and Final AQ/GHG Memo (1 electronic copy)
A-3
Task 2.4: Noise Technical Memorandum
EGP will conduct an assessment of construcƟon noise associated with the proposed landscaping
improvements at the I-15/Main Street Interchange. The project does not propose to increase traffic
(capacity) as the improvements are limited to landscaping elements in areas adjacent to the exisƟng highway;
and thus, traffic noise is not expected to increase on an operaƟonal level and no operaƟonal traffic noise
analysis is required. In addiƟon, since pile driving is not expected to be used, ground- borne vibraƟon analysis
is not anƟcipated to be necessary.
Based on the Caltrans Technical Noise Supplement (September 2013) guidance to assess construcƟon noise,
EGP shall assess the loudest construcƟon equipment uƟlized during construcƟon acƟviƟes in order to
evaluate compliance with the Caltrans noise limit of 86 dBA at 50 feet. Methods used and results of this
assessment will be presented in a brief technical memorandum. The findings of the Noise and VibraƟon
Technical Memorandum (Noise Tech Memo) will be summarized in the CEQA Checklist findings.
DELIVERABLES:
Draft and Final Noise Tech Memo (1 electronic copy)
Task 3.0 CEQA Checklist Memorandum/Environmental Re-ValidaƟon
EGP will prepare a CEQA Checklist and an Environmental Commitments Record (ECR) pursuant to the
California Environmental Quality Act (CEQA) guidelines to document impacts from the proposed Project. In
the event that Caltrans District 8 requires that the Project be cleared as a design change under the I-15/Main
Street Improvements Project (1G7204) EGP will repackage the information from the CEQA Checklist into the
format of an Environmental Re-Validation.
Available technical studies and the CEQA Categorical Exemption/National Environmental Policy Act (NEPA)
Categorical Exclusion will be reviewed, and applicable information summarized in the CEQA Checklist or Re-
Validation document.
DELIVERABLES:
Draft and Final CEQA Checklist and Memo/Environmental Re-Validation (1 electronic copy)
C-1
AƩachment B – Fee EsƟmate
City of Lake ElsinoreI-15/Main Street Interchange Landscape Improvements ProjectEnvironmental Services Fee EstimatePrincipal Environmental PlannerSenior Biologist/Field SurveyorSenior Environmental Planner/GIS SpecialistProject Coordinator/EditorAir Quality/Noise Prinicipal (Keith Cooper)Senior Noise Specialist (Blake Barroso)199.65$ 134.79$ 130.87$ 93.17$ $ 215.00 $ 165.00 Task 1.0 Task 1.0 Project Management/Meetings and Coordination6 6 1,756.92$ 1,756.92$ Task 2.0 Task 2.0 Technical Studies-$ -$ 2.1 Task 2.1 NESMI/No Effects Memo 4 40 24 2 9,517.67$ 9,517.67$ 2.2 Task 2.2 ISA Checklist and Memorandum 8 8 50 2 9,405.57$ 9,405.57$ 2.3 Task 2.3 AQ/GHG Memorandum 2 399.30$ 3 10 2,295.00$ 2,694.30$ 2.4 Task 2.4 Noise and Vibration Technical Memorandum2 399.30$ 3 10 2,295.00$ 2,694.30$ 3.1Task 3.0 CEQA Checklist/Environmental Re-Validation16 4 64 8 12,854.85$ 12,854.85$ Total Hours by Staff38 52 138 18 246 6 20 26Total Labor7,586.70$ 7,009.29$ 18,060.56$ 1,677.06$ 34,333.60$ 1,290.00$ 3,300.00$ 4,590.00$ 38,923.60$ Overhead/Other Direct Costs (ODC)750.00$ 750.00$ TOTAL FEE35,083.60$ 4,590.00$ 39,673.60$ TOTAL FEETask No. TaskEGP FEEEGP ConsultingERP FEEFebruary 2024
KIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024PLANS APPROVAL DATExxxxxLAST REVISION DEPARTMENT OF TRANSPORTATIONPROJECT PLANS FOR CONSTRUCTION ONSTATE HIGHWAYSHEETDEL NORTESISKIYOUMODOCHUMBOLDTTRINITYSHASTALASSENTEHAMAMENDOCINOGLENNBUTTEPLUMASSIERRANEVADAPLACERYUBACOLUSALAKEYOLONAPASONOMAEL DORADOMARINAMADORALPINECALAVERASCONTRACOSTATUOLUMNEMONOSANTACLARASANTACRUZST
A
NISL
A
US
MARIPOSAMERCEDMA
DE
R
AFRESNOMONTEREY
INYOTULAREKINGSOBISPOKERNSANTABARBARAVENTURALOSANGELESIMPERIALSAN DIEGOORANGESOLANOALAMEDAM
ENTOSACRA-
J
O
A
Q
UI
N
S
A
NSANBENITO
SAN LUISSUTTERSAN FRANCISCOSAN MATEODistCOUNTYROUTETOTALSHEETSTOTAL PROJECTLOCATION MAPPOST MILESNo.LICENSE Exp DATE DATE SIGNEDOF LICENSE AS SPECIFIED IN THE "NOTICE TO BIDDERS."INDEX OF PLANSSTATE STANDARDS AND PRACTICES AND THAT TECHNICAL OVERSIGHT WAS PERFORMED.APPROVED AS TO IMPACT ON STATE FACILITIES AND CONFORMANCE WITH APPLICABLE LICENSED LANDSCAPE ARCHITECTLICENSE No.CALTRANS DESIGN OVERSIGHT APPROVAL
TIME PLOTTED =>
DATE PLOTTED =>
08:14
19-DEC-2023
CONSULTANT SENIOR LANDSCAPE ARCHITECT
RCOMPLETENESS OF SCANNED COPIES OF THIS PLAN SHEET.RESPONSIBLE FOR THE ACCURACY OR OFFICERS OR AGENTS SHALL NOT BETHE STATE OF CALIFORNIA OR ITSRTHE CONTRACTOR SHALL POSSESS THE CLASS (OR CLASSES)CONTRACT No.PROJECT IDPROJECT NUMBER & PHASEXXXXXXXXXUNIT1G7204ab.dgnRmweUSERNAME =>DGN FILE =>RELATIVE BORDER SCALEIS IN INCHES0231CALTRANS WEB SITE IS: HTTP//WWW.DOT.CA.GOV/TO BE SUPPLEMENTED BY STANDARD PLANS DATED 2022BORDER LAST REVISED 8/1/2016STATE OF CALIFORNIASAN BERNARDINO02-04-20NO SCALE0812272ONTARIO, CA 917644141 E. INLAND EMPIRE BL. SUITE 250DAVID EVANS AND ASSOCIATES, INC. RIVERSIDEROUTE
1
5 BEGIN HIGHWAY PLANTING2615Riv20.5 / 21.5INCLUDED IN THE NOTICE TO BIDDERS AND SPECIAL PROVISIONS BOOK.THE STANDARD PLANS LIST APPLICABLE TO THIS CONTRACT IS PLANTING QUANTITIES26PLANTING PLAN23-25PLANTING LEGEND22WATER EFFICIENT LANDSCAPE CALCULATION18-21IRRIGATION QUANTITIES16-17IRRIGATION DETAILS15IRRIGATION PLAN12-14IRRIGATION SPRINKLER SCHEDULE11LANDSCAPE QUANTITIES09-10LANDSCAPE DETAILS08LANDSCAPE LAYOUT PLAN05-07ROADSIDE CLEARING LAYOUT PLAN02-04TITLE AND LOCATION MAP01 No. DESCRIPTIONSHEETTO SOUTH OF WASSON CANYON WASHFROM NORTH OF FRANKLIN STREET OVERCROSSINGIN THE CITY OF LAKE ELSINOREIN RIVERSIDE COUNTY08-1G7204XXXXXXX XLAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINOREPM 20.5Sta "A1" 1095+00END HIGHWAY PLANTINGPM 21.5Sta "A1" 1120+00LAKE ELSINOREFRANKLIN STREET
WASSON CANYON WASHMAIN STREET
ROUTE 15CoronaToMurrietaTo 12/18/2023
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:16
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sd001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26CI
TY R/WASPH1110011001ROUTE 15CAMI
NO DEL NORTESOUTHBOUNDNORTHBOUNDCHP ENFORCEMENT AREACITY R/WSTATE R/W67891090123410956789ASPHCONCASPHDIRT
DI
RTPOSTSIGNASPHASPHASPHCONCASPHCONCINT - 15DIRT CONC ASPHCONCCONCCCONCCONCCONCPPOSTPOSTPOSTPOSTC
O
NC DIRTDIRTDI
RTDI
RTCCAMINODELNORTEPOSTPOST78910901234109567891100341095678961
2
34109567891100SB ON-RAMPNB OFF-RAMP1R/WR/WR/WCI
T
Y R/WR/WSCALE: 1" = 50'RC-1ROADSIDE CLEARING PLANAPPROVED FOR ROADSIDE CLEARING ONLY2MATCH LINE (RC-2)NOTE:FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.LEGEND:EXISTING ROCK BLANKET(INCLUDES GRAVEL MULCHED AREAS)MAINTAIN EXISTING PLANTED AREAREMOVE 1 TREEROADSIDE CLEARING23,057 SQFTROADSIDE CLEARINGROADSIDE CLEARING *51,362 SQFTROADSIDE CLEARING20,853 SQFTROADSIDE CLEARING23,724 SQFTROADSIDE CLEARINGROADSIDE CLEARING - TREE REMOVALEXISTING TREE - PROTECT IN PLACE TREEEXISTING PLANTS AS DESCRIBED UNDER SPECIAL PROVISION 20-1.03C* INCLUDES REMOVAL OF WOOD MULCH, GRASSES, WEEDS, AND
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:17
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sd002.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE269 1110
D IRT
CONC
A SP H
ASPH
CONC
ASPH
ASPH
DEL NORTE
99 1110
8
9
11109MAINSTREETSOUTHBOUND
NORTH BOUND
CAMINO DEL NORTE ROUTE 15 CITY R/WCITY R/WC
ITY
R
/W
CITY R/W
ASPH
DIRT ASPHCONC
CONC
INT - 15
INT - 15
ASPH
ASPH
ASPH
ASPH
POST
CO N CCONC ASPH C O N CCONCCONC B/BDIRT ASPH C O N C TA N KPOSTS SIGNSIGNB/B
DIKE
DIKE
ELLISST
2214 15 16 17
181920212313
1
2
3
4 1105 6 7
+88
2
3
4
1105 6
7
7
8
621341105
+1 2 3 4
1105
86
NB OFF-RAMP
SB OFF-RAMP NB ON-RAMP
SB O N -R A M P
R/W R/WR/W
R/W
R/W
SCALE: 1" = 50'RC-2ROADSIDE CLEARING PLANAPPROVED FOR ROADSIDE CLEARING ONLY3MATCH LINE (RC-1)MATCH LINE (RC-3)NOTE:FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.2,246 SQFTGRAVEL MULCH TYPE 122,655 SQFTROADSIDE CLEARING41,307 SQFTCLEARING AND GRUBBING28,374 SQFTROADSIDE CLEARINGREMOVE 1 TREEROADSIDE CLEARINGPROTECT IN PLACE3 TREESPROTECT IN PLACE5 TREESPROTECT IN PLACE2 TREESPROTECT IN PLACE1 TREEPROTECT IN PLACE1 TREE11,792 SQFTROADSIDE CLEARINGPROTECT IN PLACE7 TREESPROTECT IN PLACE1 TREEPROTECT IN PLACE1 TREEREMOVE 1 TREEROADSIDE CLEARINGREMOVE 2 TREESROADSIDE CLEARING33,378 SQFTROADSIDE CLEARING40,483 SQFTROADSIDE CLEARING85,243 SQFTROADSIDE CLEARING31,772 SQFTROADSIDE CLEARING17,932 SQFTROADSIDE CLEARING8,874 SQFTROADSIDE CLEARING
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:18
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sd003.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26NORTHBOUNDROUTE 15CITY R/W1110123411156789112012+ASPHASPHASPHCCONCDIRTASPHASPHCONCASPHINT - 15INT - 15CONCASPHCONCCONCASPHASPHASPHCONCASPHASPHDIRTCOLLIER AVECAMINO DEL NORTECONC111011223344111511156677889911201122311101241115678911201111012341115678911202..............................................................................................................SB OFF-RAMP NB ON-RAMPSOUTHBOUNDCAMINO DEL NORTER/WR/WSCALE: 1" = 50'RC-3ROADSIDE CLEARING PLAN4MATCH LINE (RC-2)APPROVED FOR ROADSIDE CLEARING ONLYFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.(1"-3") (APPLY AT 4" DEPTH)GRAVEL MULCH (TYPE 1)PLANTED AREAMAINTAIN EXISTINGNOTE:37,310 SQFTROADSIDE CLEARINGPROTECT IN PLACE11 TREESPROTECT IN PLACE1 TREEPROTECT IN PLACE1 TREEPROTECT IN PLACE2 TREESPROTECT IN PLACE2 TREES26,698 SQFTROADSIDE CLEARING48,670 SQFTROADSIDE CLEARING23,002 SQFTROADSIDE CLEARING
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:19
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sj001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26CI
TY R/WASPH1110011001ROUTE 15CAMI
NO DEL NORTESOUTHBOUNDNORTHBOUNDCHP ENFORCEMENT AREACITY R/WSTATE R/W67891090123410956789ASPHCONCASPHDIRT
DI
RTPOSTSIGNASPHASPHASPHCONCASPHCONCINT - 15DIRT CONC ASPHCONCCONCCCONCCONCCONCPPOSTPOSTPOSTPOSTC
O
NC DIRTDIRTDI
RTDI
RTCCAMINODELNORTEPOSTPOST78910901234109567891100341095678961
2
34109567891100SB ON-RAMPNB OFF-RAMP1R/WR/WR/WCI
T
Y R/WR/WSCALE: 1" = 50'LL-1LANDSCAPE LAYOUT PLAN5MATCH LINE (LL-2)APPROVED FOR LAYOUT WORK ONLYNOTE:FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.LEGEND:22,574 SQFTEROSION CONTROL50,964 SQFTEROSION CONTROL398 SQFTWOOD MULCH483 SQFTWOOD MULCH17,727 SQFTEROSION CONTROL3,126 SQFTWOOD MULCHROCK BLANKET(APPLY AT 3" DEPTH)WOOD MULCH (SEE LANDSCAPE DETAILS)MINOR CONCRETE (CONCRETE MOW STRIP) (SEE LANDSCAPE DETAILS)HDPE EDGING(SEE SHEET ECL-1)EROSION CONTROL23,724 SQFTEROSION CONTROL0.78 CY(CONCRETE MOW STRIP)MINOR CONCRETE0.71 CY(CONCRETE MOW STRIP)MINOR CONCRETE2.87 CY(CONCRETE MOW STRIP)MINOR CONCRETE
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:20
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sj002.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE269 1110
D IRT
CONC
A SP H
ASPH
CONC
ASPH
ASPH
DEL NORTE
99 1110
8
9
11109MAINSTREETSOUTHBOUND
NORTH BOUND
CAMINO DEL NORTE ROUTE 15 CITY R/WCITY R/WC
ITY
R
/W
CITY R/W
ASPH
DIRT ASPHCONC
CONC
INT - 15
INT - 15
ASPH
ASPH
ASPH
ASPH
POST
CO N CCONC ASPH C O N CCONCCONC B/BDIRT ASPH C O N C TA N KPOSTS SIGNSIGNB/B
DIKE
DIKE
ELLISST
2214 15 16 17
181920212313
1
2
3
4 1105 6 7
+88
2
3
4
1105 6
7
7
8
621341105
+1 2 3 4
1105
86
NB OFF-RAMP
SB OFF-RAMP NB ON-RAMP
SB O N -R A M P
R/W R/WR/W
R/W
R/W
SCALE: 1" = 50'LL-2LANDSCAPE LAYOUT PLAN6MATCH LINE (LL-1)MATCH LINE (LL-3)APPROVED FOR LAYOUT WORK ONLYNOTE:FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.2,246 SQFTGRAVEL MULCH TYPE 122,655 SQFTROADSIDE CLEARING41,307 SQFTCLEARING AND GRUBBING869 SQFTROCK BLANKET8,005 SQFTWOOD MULCH769 SQFTROCK BLANKET27,997 SQFTWOOD MULCH16,966 SQFTWOOD MULCH966 SQFTROCK BLANKET571 SQFTROCK BLANKET2,468 SQFTROCK BLANKET2,172 SQFTROCK BLANKET846 SQFTROCK BLANKET75,345 SQFTWOOD MULCH29,304 SQFTWOOD MULCH11,792 SQFTWOOD MULCH39,505 SQFTWOOD MULCH566 SQFTEROSION CONTROL9,052 SQFTEROSION CONTROL4,612 SQFTEROSION CONTROL407 SQFTEROSION CONTROL25,636 SQFTWOOD MULCH0.90 CY(CONCRETE MOW STRIP)MINOR CONCRETE3.32 CY(CONCRETE MOW STRIP)MINOR CONCRETE0.70 CY(CONCRETE MOW STRIP)MINOR CONCRETE2.01 CY(CONCRETE MOW STRIP)MINOR CONCRETE
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:21
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sj003.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26NORTHBOUNDROUTE 15CITY R/W1110123411156789112012+ASPHASPHASPHCCONCDIRTASPHASPHCONCASPHINT - 15INT - 15CONCASPHCONCCONCASPHASPHASPHCONCASPHASPHDIRTCOLLIER AVECAMINO DEL NORTECONC111011223344111511156677889911201122311101241115678911201111012341115678911202..............................................................................................................SB OFF-RAMP NB ON-RAMPSOUTHBOUNDCAMINO DEL NORTER/WR/WSCALE: 1" = 50'LL-3LANDSCAPE LAYOUT PLAN7MATCH LINE (LL-2)APPROVED FOR LAYOUT WORK ONLYFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.(1"-3") (APPLY AT 4" DEPTH)GRAVEL MULCH (TYPE 1)PLANTED AREAMAINTAIN EXISTINGNOTE:29,910 SQFTEROSION CONTROL29,850 SQFTEROSION CONTROL7,460 SQFTWOOD MULCH18,760 SQFTWOOD MULCH6,870 SQFTWOOD MULCH19,828 SQFTEROSION CONTROL12,367 SQFTEROSION CONTROL10,635 SQFTWOOD MULCH1.90 CY(CONCRETE MOW STRIP)MINOR CONCRETE2.92 CY(CONCRETE MOW STRIP)MINOR CONCRETE2.93 CY(CONCRETE MOW STRIP)MINOR CONCRETE1.83 CY(CONCRETE MOW STRIP)MINOR CONCRETE
LD-1LANDSCAPE DETAILS8SECTIONNO SCALE90% COMPACTED SUBGRADE3'GRADEFINISHORIGINAL3'6"12"
1"
3"OR FENCESCURBS, DIKES, ROCK BLANKETS,INCLUDING PAVED SURFACES,EDGE OF EXISTING FACILITIES EXCAVATION1 LIMIT OF EXCAVATION1 LIMIT OF3"3"MOWSTRIP) PER PLANMINOR CONCRETE (CONCRETETHROUGHOUT CONCRETE MOWSTRIPTWO CONTINUOUS REBARS TROWEL FINISHMORTAR IS APPLIEDUNLESS OTHERWISE SHOWNTOP OF FINISHED6" CONCRETE BANDGRADE 1" BELOW ADJACENT ROCK BLANKETTHE TOP OF ROCK 1" MAXIMUM BETWEEN WHEN ROCK BLANKET IS*ADJACENT TO A CURBOMIT 6" CONCRETE BAND NOTE:MATERIAL. STRAIGHT AND VERTICAL AND REMOVE EXTRANEOUSVERTICAL, SAW CUT OR GRIND THE PAVEMENT2 IF EXISTING PAVEMENT EDGE IS NOT STRAIGHT ANDEDGE OF EXISTING FACILITIES.1 TAPER 3" OF SHOVEL CUT EDGE 3 FEET FROMNOTE:2GRADIENTS, AND CONTOURS OF THE JOB SITEMAINTAIN THE ORIGINAL FLOW LINES, SLOPEROCK BLANKET TROWEL FINISHROCK(PLACE FLAT SIDE UP) THE TOP OF ADJACENT ROCK SURFACESSURFACE AND THE TOP OF MORTARTOP OF ROCK SURFACE AND CONCRETE SET FLUSH ADJACENT TO TOP OF PAVEMENT,CURB OR DIKETOP OF EXISTINGPAVEMENT,CURBOR DIKECONCRETE BASE BOTTOM OF ROCKBETWEEN EXPOSED ROCK SURFACES AFTER1" MAXIMUM SEPARATION BETWEENSECTION4" MINIMUM BELOW 6" CONCRETE BANDDEPTH EXCAVATION10" MINIMUM *WOOD MULCH TOP OF ADJACENT SURFACEFINISHED GRADE OR1‚" MAXIMUM SEPARATION MORTAR1" MINIMUM, 1‚" MAXIMUM WOOD MULCH AND MINOR CONCRETE (CONCRETE MOW STRIP)xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:22
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sk001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
LQ-1LANDSCAPE QUANTITIES9LOCATIONTOTALROCK BLANKETNO.SHEETSQFTLL-21,3401,835 LL-2LL-2 QUANTITIES PER SHEETBID ITEMLL-1LL-2LL-3TOTAL WOOD MULCHLL-22,4683,01843,725282,282 SQFT(2,614 CY)8,661LOCATION(CONCRETE MOW STRIP)MINOR CONCRETE NO.SHEETLL-1LL-2LL-1LL-1LL-22.870.713.32CYNB ROUTE 15, STA. 1095+94SB ROUTE 15, STA. 1100+080.78SB ROUTE 15, STA. 1100+08NB ROUTE 15, STA. 1100+100.70NB ROUTE 15, STA. 1100+132.01LL-2SB ROUTE 15, STA. 1100+10LL-2LL-30.90NB ROUTE 15, STA. 1110+032.93TOTALSB ROUTE 15, STA. 1100+10 20.871.83LL-3LL-3LL-32.921.90NB ROUTE 15, STA. 1110+15SB ROUTE 15, STA. 1110+10SB ROUTE 15, STA. 1110+15MAIN STREET NB EXIT RAMPMAIN STREET NB ENTRANCE RAMPMAIN STREET SB EXIT RAMPMAIN STREET SB ENTRANCE RAMP4,007234,550xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:23
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sl001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
10DESCRIPTIONSEED EROSION CONTROL QUANTITIES15,2504551.01.540351.0402.030454.0251.54.022.60TOTAL0.5300.45(DEERWEED)LOTUS SCOPARIUS (ACMISPON GLABER)(CALIFORNIA BUCKWHEAT)ERIOGONUM FASCICULATUM(SLOPE MEASUREMENT)SEED PER ACREPOUNDS PURE LIVE (MINIMUM)PERCENT GERMINATION(COMMON NAME)BOTANICAL NAME(CALIFORNIA POPPY)ESCHSCHOLZIA CALIFORNICAEROSION CONTROL SEED MIX0.225TACKIFIER
EROSION CONTROL LEGENDECL-1SEQUENCESTEP 1ITEM RATEAPPLICATIONSYMBOLMATERIALTYPEMATERIALSEED MIX3,000 LB/ACRE150 LB/ACRECOMPOSTCOMPOSTFINEDEPTHSTEP 2MATERIALSINCORPORATE4"STEP 3HYDROSEEDSEEDMIX 1FIBERWOODSTEP 4HYDROMULCHFIBERTACKIFIERWOODPSYLLIUM500 LB/ACRECOMPOST
FIBER
FIBEREC TYPE 125(BRITTLEBUSH)ENCELIA FARINOSA30(BLACK SAGE)SALVIA MELLIFERA1.522.60 LBS/ACREMATERIALS (N)HYDROSEEDMATERIALS (N)HYDROMULCH(N) - NOT A SEPARATE BID ITEMCYLBLBLBLBMATERIALS
INCORPORATESQFT221,581115.02,543763268.9 CY/ACRE(CATTLE SPINACH)ATRIPLEX POLYCARPA(CALIFORNIA SAGEBRUSH)ARTEMISIA CALIFORNICA(SQUIRRELTAIL)ELYMUS ELYMOIDES(GOLDEN YARROWERIOPHYLLUM CONFERTIFLORUM(THREE WEEKS FESCUE)VULPIA (FESTUCA) MICROSTACHYS1.5(CALIFORNIA BLUE BELLS)PHACELIA CAMPANULARIA(NODDING STIPA)NASSELLA (STIPA) CERNUA(FASCICLED TARWEED)HEMIZONIA (DEINANDRA) FASCICULATA350.45352.75(LOW BARLEY)HORDEUM DEPRESSUM250.25(DWARF GOLDFIELDS)LASTHENIA CALIFORNICA (CHRYSOSTOMA)EROSION CONTROL SEQUENCELOCATIONEROSION CONTROL QUANTITIESNO.SHEETSQFTLL-150,964 SB ROUTE 15, STA 1095+80 TO 1101+00TOTALLL-122,574SB ROUTE 15 ENTRANCE RAMP, STA 1096+50 TO 1101+00NB ROUTE 15, STA 1096+40 TO 1101+0017,727LL-1LL-123,724NB ROUTE 15 EXIT RAMP, STA 1096+80 TO 1101+00SB ROUTE 15 ENTRANCE RAMP, STA 1101+00 TO 1101+90LL-25669,052SB ROUTE 15, STA 1101+00 TO 1102+40LL-2LL-2NB ROUTE 15 EXIT RAMP, STA 1101+00 TO 1101+20LL-2407NB ROUTE 15, STA 1101+00 TO 1102+004,612LL-329,850SB ROUTE 15 EXIT RAMP, STA 1111+40 TO 1117+00SB ROUTE 15, STA 1111+00 TO 1117+20LL-329,910NB ROUTE 15, STA 1110+60 TO 1114+50LL-312,367NB ROUTE 15 ENTRANCE RAMP, STA 1110+20 TO 1116+60LL-319,828221,5812"1,368xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:24
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sl002.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
ISS-1IRRIGATION SPRINKLER SCHEDULENOTES: APPLICABLE WHERE CIRCLED1ADJACENT TO ROADWAYINSTALL SPRINKLER PROTECTOR (TYPE 1) IF HEAD IS LOCATED 231166FP77FP2INSTALL TWO (2) BUBBLERS FOR EACH TREE28PSTANDARD RISERSTANDARD RISERSTANDARD RISERSTANDARD RISERSTANDARD RISER8STANDARD RISER34344040FFINSTALL ONE (1) BUBBLERS PER SHRUBSYMBOL ITEM DESCRIPTIONSPRAY PATTERN
RADIUS
PRESSURE
OPERATING
(+/- 5%)
DISCHARGE RATE
(+/- 5%)
PRECIPITATION RATE
DIAMETER
INLET CONNECTION
SWING JOINT TYPE
ASSEMBLYSPRINKLER RISER ASSEMBLYSPRINKLER POP-UPDRAINPIPE LENGTH
TREE WELL
REMARKSTYPE
HEIGHT
MATERIAL
PROTECTOR TYPE
SPRINKLERftpsiGPMINCH/hrINCHINCHINCHIRRIGATION SPRINKLER SCHEDULE31314545454530301.52.02.04.04.00.250.250.150.300.160.330.241.201.200.48F3/43/43/43/43/41/21/23/4IIIIIIIIIIIIIVIVIVIVIVIV181818181818PLPLPLPLPLPLPLPL1212II88TREE WELL SPRINKLER ASSEMBLYTREE WELL SPRINKLER ASSEMBLYRISER SPRINKLER ASSEMBLY (GEAR DRIVEN)RISER SPRINKLER ASSEMBLY (GEAR DRIVEN)RISER SPRINKLER ASSEMBLY (GEAR DRIVEN)RISER SPRINKLER ASSEMBLY (GEAR DRIVEN)RISER SPRINKLER ASSEMBLY (GEAR DRIVEN)RISER SPRINKLER ASSEMBLY (GEAR DRIVEN)RISER SPRINKLER ASSEMBLY (GEAR DRIVEN)INSTALL CHECK VALVE TO AVOID LOW HEAD DRAINAGESEE TREE WELL SPRINKLER ASSEMBLY STANDARD PLAN RSP H4.3323123123123123123145451.5xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:25
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sm001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:27
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sp001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26CI
TY R/WASPH1110011001ROUTE 15CAMI
NO DEL NORTESOUTHBOUNDNORTHBOUNDCHP ENFORCEMENT AREACITY R/WSTATE R/W67891090123410956789ASPHCONCASPHDIRT
DI
RTPOSTSIGNASPHASPHASPHCONCASPHCONCINT - 15DIRT CONC ASPHCONCCCONCCONCCONCPPOSTPOSTPOSTPOSTC
O
NC DIRTDIRTDI
RTDI
RTCCAMINODELNORTEPOSTPOST78910901234109567891100341095678961
2
34109567891100SB ON-RAMPNB OFF-RAMP1R/WR/WR/WCI
T
Y R/WR/W888888888888888888888888888888888888888888888888888888888888888877777777777777888888888888888888888888888888888888888888888886866666666666661"-B-19 -9.0- 182"-B-20 -54.0- 142"-B-21 -52.0- 14QUANTITY OF SPRINKLERSA-6TYPE A-6TYPE A-7TYPE A-7TYPE C-2TYPE C-2TYPE 66772•"2"1•"1‚"1"ƒ"46332014851401006044241614010060442416ON PLANOR AS SHOWN SIZE OF PIPEA-8TYPE A-8TYPE 884633201485352515116435251511641712753217127532SIZE(GPM)MAX 75503022128SCALE: 1" = 50'IP-112MATCH LINE (IP-2)IRRIGATION PLANAPPROVED FOR IRRIGATION WORK ONLYNOTE:FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:29
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sp002.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE269 1110
D IRT
CONC
A SP H
ASPH
CONC
ASPH
ASPH
DEL NORTE
99 1110
8
9
11109MAINSTREETSOUTHBOUND
NORTH BOUND
CAMINO DEL NORTE ROUTE 15 CITY R/WCITY R/WC
ITY
R
/W
CITY R/W
ASPH
DIRT ASPHCONC
CONC
INT - 15
INT - 15
ASPH
ASPH
ASPH
ASPH
POST
CO N CCONC ASPH C O N CCONCCONC B/BDIRT ASPH C O N C TA N KPOSTS SIGNSIGNB/B
DIKE
DIKE
ELLISST
2214 15 16 17
181920212313
1
2
3
4 1105 6 7
+88
2
3
4
1105 6
7
7
8
621341105
+1 2 3 4
1105
86
NB OFF-RAMP
SB OFF-RAMP NB ON-RAMP
SB O N -R A M P
R/W R/WR/W
R/W
R/W
2" FS2" RCVMEXIST, 2.5" BPA/EEXIST. 2" WM26 STATIONS USED40 STATIONICC 'A'28 STATIONS USED40 STATIONICC 'B'3"GV3"GV3"GV3"GV3"GV 3"GV3"GV8888888888
777888 8" CSPEXIST.3"GV 8" CSPEXIST. 8" CSPEXIST. 8" CSP
EXIST.1.5"-B-2 -46.0- 121.5"-B-10 -34.0- 91.5"-B-11 -30.0- 81.5"-B-12 -20.0- 51.5"-B-13 -36.0- 91.5"-B-14 -32.0- 81.5"-B-16 -34.0- 92"-B-3 -50.0- 16788761.5"-B-27 -30.0- 81.5"-B-26 -34.0- 9FSFS2"BV2"BV2"BV2"BV10" CSPEXIST. 3"GVDETAIL.SECURITY HASP PER ENCLOSURE TO HAVE CONTROLLER CABINET IRRIGATION DETAIL.SECURITY HASP PER ENCLOSURE TO HAVE CONTROLLER CABINET IRRIGATION 8" CSPEXIST. 8" CSPEXIST. 1"-A-9 -14.0- 281"-A-1 -6.0- 241"-A-2 -8.0- 168" CSPEXIST. 1.5"-B-15 -34.0- 91.5"-B-9 -18.0- 361"-B-5 -14.0- 281"-B-6 -15.0- 302"BV1"-B-4 -17.0- 348" CSPEXIST. 2"BV
1"-B-19 -9.0- 181"-B-28 -9.0- 182"BV1"-A-8 -8.0- 321"-A-18 -8.8- 351"-A-22 -5.0- 202"BV
2"BV1"-B-7 -16.8- 671"-B-8 -5.0- 201"-B-23 -6.8- 271"-B-17 -11.0- 221"-B-18 -11.0- 442"-B-20 -54.0- 142"-B-21 -52.0- 141"-B-22 -12.0- 242"-B-24 -52.0- 141.5"-B-25 -21.0- 141"-A-10 -10.3- 411"-A-17 -10.0- 201"-B-1 -60- 242" FS2" RCVMBOOST.PUMP2.5" BPA/E2.5"WSAEXIST. 2" WMSCALE: 1" = 50'IP-213MATCH LINE (IP-1)MATCH LINE (IP-3)IRRIGATION PLANAPPROVED FOR IRRIGATION WORK ONLYNOTE:FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.2,246 SQFTGRAVEL MULCH TYPE 122,655 SQFTROADSIDE CLEARING41,307 SQFTCLEARING AND GRUBBING
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:30
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sp003.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26NORTHBOUNDROUTE 15CITY R/W1110123411156789112012+ASPHASPHASPHCCONCDIRTASPHASPHCONCASPHINT - 15INT - 15CONCASPHCONCCONCASPHASPHASPHCONCASPHASPHDIRTCOLLIER AVECAMINO DEL NORTECONC111011223344111511156677889911201122311101241115678911201111012341115678911202..............................................................................................................SB OFF-RAMP NB ON-RAMPSOUTHBOUNDCAMINO DEL NORTER/WR/W2" FS2" RCVMEXIST, 2.5" BPA/EEXIST. 2" WM7777888888888888866666688888888888888887777777776666666666666677777888888888888888888888888888877788888666667788888888888888888888888888866666666666666666661.5"-A-5 -31.5- 111.5"-A-6 -21.0- 141.5"-A-4 -32.0- 82"-A-3 -56.0- 151.5"-A-12 -34.0- 91.5"-A-15 -32.0- 81.5"-A-16 -34.0- 91"-A-20 -10.5- 71.5"-A-24 -28.0- 81.5"-A-26 -24.0- 72"BV3"3"3"3"1.5"-A-7 -20.0- 402"BV1"-A-22 -5.0- 201"-A-10 -10.3- 411"-A-11 -12.0- 241.5"-A-13 -32.0- 101.5"-A-14 -27.5- 102"-A-19 -57.5- 161.5"-A-21 -44.0- 161.5"-A-23 -16.0- 321"-A-25 -9.0- 6SCALE: 1" = 50'IP-314MATCH LINE (IP-2)IRRIGATION PLANAPPROVED FOR IRRIGATION WORK ONLYFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.(1"-3") (APPLY AT 4" DEPTH)GRAVEL MULCH (TYPE 1)PLANTED AREAMAINTAIN EXISTINGNOTE:
ID-1IRRIGATION DETAILS153"SEE DETAIL AEXISTING ICC CABINETCABINET SECURITY HASPSIDE VIEWFRONT VIEWIRRIGATION CONTROL CABINETNOTES (THIS SHEET ONLY):1. ROUND "HOCKEY PUCK" LOCK MUST BE KEYED TO CALTRANS STANDARD KEY.ROUND "PUCK" TYPE LOCKDETAIL AFOR EXISTING AND NEWxxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:31
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sq001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
IQ-1IRRIGATION QUANTITIES16IRRIGATION QUANTITY (LATERAL SUPPLY SIDE OF CONTROL VALVE)CHECK VALVE
SPRINKLER ASSEMBLYTREE WELL
(GEAR DRIVEN)
RISER
(GEAR DRIVEN)
POP-UP
RISER
POP-UPLFLFLFLFEAEAEAEAEAEAA123456789101112131415161718192021222324(SUPPLY LINE)(SCHEDULE 40)PLASTIC PIPELETTERCONTOLLER NUMBERVALVE SUBTOTALA1"ƒ"--80---------35-16-716-20-32-84124910108920811144032282416152526272829302"1•"1‚"LFLFCHECK VALVE
SPRINKLER ASSEMBLYTREE WELL
(GEAR DRIVEN)
RISER
(GEAR DRIVEN)
POP-UP
RISER
POP-UPLFLFLFLFEAEAEAEAEAEAB123456789101112131415161718192021222324(SUPPLY LINE)
(SCHEDULE 40)
PLASTIC PIPE
LETTER
CONTOLLER
NUMBER
VALVE SUBTOTALB1"ƒ"441814142427149859899223428306720362412162526272829302"1•"1‚"LFLFSUBTOTALATOTAL67149818--------------------------------------------------3121543921583121541080808080-40406080806080802020808010-80-8060-60--4040404040----4080--------------80----10-------------------8080808080808080408080808080404080808040-80204040-8040604040408030--808030-80-40------40-40-40------------80-40----80804040--40-7043125504001602•"2•"-------------------------------------------------1602002405203205106104801602002201601804005202401503204208002001601601202401201601603002001601601602402401205004801404701201802403608,4401,7101,5401,0001,9706008,4401,7101,5401,0001,970600---68020016088070082052056082016016016024016016016060074045016016068061016024020016058016012010016016024012028032020012020012024032026018040052018038032030026011,2801,9401,8201,1602,48088019,7203,6503,3602,1604,4501,480xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:32
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sr001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
IQ-2IRRIGATION QUANTITIES17IRRIGATION QUANTITY (MAIN SUPPLY SIDE OF CONTROL VALVE)CONTROLLERIRRIGATION ASSEMBLY
BACKFLOW PREVENTER
FLOW SENSOR
ASSEMBLY
WYE STRAINER
(SUPPLY LINE)(WALL MOUNTED)
24-32 STATION
(CLASS 315)
PLASTIC PIPE2"3"3"EAEAEAEAEAEAEAEALFNo.SHEETEACONTROL VALVE
REMOTE
(MASTER)
CONTROL VALVE
ELECTRIC REMOTE
BALL VALVE
GATE VALVE1"1•"TOTALIP-1IP-2IP-32•"2•"1•"1•"--------2220122----214-222226216PUMP
BOOSTEREA-2-2REGULATING VALVE
PRESSURE 1•"EA----7803,6004,3809--4122"EA-42692222-xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:33
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sr002.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
WELCP-1SECTION A: HYDROZONE INFORMATION TABLECALCULATION PLANWATER EFFICIENT LANDSCAPE18 Name:Signature COMPLETE LANDSCAPE DOCUMENTATION PACKAGEWATER EFFICIENCY LANDSCAPE ORDINANCE AND SUBMIT AI AGREE TO COMPLY WITH THE REQUIREMENTS OF THE MODELxxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:34
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sr003.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
WELCP-2CALCULATION PLANWATER EFFICIENT LANDSCAPE19 Name:Signature COMPLETE LANDSCAPE DOCUMENTATION PACKAGEWATER EFFICIENCY LANDSCAPE ORDINANCE AND SUBMIT AI AGREE TO COMPLY WITH THE REQUIREMENTS OF THE MODELxxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:35
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sr004.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
WELCP-3CALCULATION PLANWATER EFFICIENT LANDSCAPE20 Name:Signature COMPLETE LANDSCAPE DOCUMENTATION PACKAGEWATER EFFICIENCY LANDSCAPE ORDINANCE AND SUBMIT AI AGREE TO COMPLY WITH THE REQUIREMENTS OF THE MODELxxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:36
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sr005.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
PROJECT INFORMATIONWATER SUPPLY TYPE: TOTAL IRRIGATED LANDSCAPE AREA: PROJECT TYPE: PROJECT LOCATION: PROJECT APPLICANT: DATE: 08/17/2023DOMESTIC WATERRUN TIMECYCLE/DAYDAYS/WEEKSOAK TIMECONTROLLER IDTYPESPRINKLERJANFEBMARAPRMAYJUNJULAUGSEPOCTNOVTIMESRUNSEASONALOPERATION DURATIONRUN TIMECYCLE/DAYDAYS/WEEKSOAK TIME6011560212602111603156051860219603146021960314603115605186021960314602111603156031156051860115602126021118.060311560315(TREE)BUBBLERDEC6011560212NOTES:LEGEND:XXXXXXXXXXXX- RUN TIME (MINUTES)- SOAK TIME (MINUTES)- CYCLES PER DAY (EA)- DAYS PER WEEK (EA)1.2.3.4.TIME (UP TO 4 VALVES)MULTIPLE VALVES RUNNING AT THE SAME OPERATION DURATION IS BASED ON BY THE ENGINEER.PLANTING, IF APPROVED IN WRITINGWATER IS APPLIED TO MAINTAINBE ADJUSTED TO ENSURE ADEQUATEIRRIGATION SYSTEM OPERATION MAYESTABLISHMENT PERIOD.PER WEEK BY 1 DURING PLANT INCREASE RUN TIME BY 40% AND DAYS 7-DAYS PER WEEK.8-HOUR WATERING WINDOWIRRIGATION SCHEDULE BASED ON FREEWAY LANDSCAPE IMPROVEMENTCALCULATION PLANWATER EFFICIENT LANDSCAPEWELCP-421(SHRUB)BUBBLER Name:Signature COMPLETE LANDSCAPE DOCUMENTATION PACKAGEWATER EFFICIENCY LANDSCAPE ORDINANCE AND SUBMIT AI AGREE TO COMPLY WITH THE REQUIREMENTS OF THE MODEL(APPROXIMATE HOUR PER DAY)(CONTROLLER SEQUENCING)'A' AND 'B'RECOMMENDED IRRIGATION SCHEDULERUN TIMECYCLE/DAYDAYS/WEEKSOAK TIME602186031156051246031126031126051246031126031156051246021860311560218(SHRUB)ROTOR8.08.08.08.08.08.08.08.08.08.08.0I-15 AT MAIN STREETCITY OF LAKE ELSINORExxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:37
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sr006.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
NOTE:1QUANTITIES SHOWN ARE "PER PLANT" UNLESSSHOWN AS SQFT OR SQYD APPLICATION RATESPLANT LEGEND NOTES:APPROVED FOR PLANTING WORK ONLY234AS SHOWN ON PROJECT PLANS5SHOWN ON MATERIALS CHARTBASIN MULCH IS INCLUDED WITH MULCH QUANTITIES HOLE SIZE DEPTH TO BE SUFFICIENT TO RECEIVE ROOT BALLHOLE SIZE DIAMETER TO BE 2X ROOTBALL WIDTHPLANT LEGENDSYMBOL BOTANICAL NAMECOMMON NAMEHOLE SIZESPACING
ON CENTER
BASIN TYPE
MINIMUM PLANTING DISTANCE FROM:REMARKSDIAMETER
DEPTH
AMENDMENT
SOIL
FERTILIZER
PACKET
ETW
EP
FENCE
WALL
DITCH
PAVED
DITCH
EARTH BASINftCFCFEAftftftftftft2(No. 5)B 345610WUCOLLowLowLowLowModMod
222222IIIIIIIIIIIIACCENT51155TREE5Low2II1PLANT No.(SIZE)PLANT GROUP
ACCENT133333337923II5CRAPE MYRTLEWATERMELON RED5653066665557303032201515171315131315151012303030(24" BOX)K588---------MULCH
RATESAPPLICATIONPL-1NO SCALEPLANT LEGEND2II3Mod553030TREE15151517-15151517-55ROSENKA BOUGAINVILLEAHESPERALOE PARVIFLORAACCENTRED YUCCA40SEE STANDARD SPECIFICATIONS FOR ADDITIONAL PLANTING INFORMATION-RECOMENDATIONS.AND IRRIGATION TYPE IN BIOSWALES TO THE SOIL LAB FOR FOR ACCURATE SPECIFICALLY FOR THE BIOSWALES. PROVIDE PROPOSED PLANTING DESIGN ANALYSIS. CONTRACTOR TO ALSO PROVIDE AGRONOMIC SOIL ANALYSIS AND ADJUST PLANTING REQUIREMENTS APPROPRIATELY PER UPDATED SOIL CONTRACTOR TO PROVIDE AGRONOMIC SOILS ANALYSIS AFTER ROUGH GRADING -ABBREVIATION USED ON PLANTING PLAN.UNDERLINED PORTIONS OF BOTANICAL NAME INDICATE -221.31.31.31.751.752.5PISTACHIA CHINENSISCHINESE PISTACHECISTUS X PULVERULENTUS 'SUNSET'MAGENTA ROCKROSE12II13--1.3ACCENTLowLowLowLowACCENTACCENTACCENTTREEMULTI-TRUNK TREETREE2II13--1.32II13--1.32II1333333--1.31.751.751.751112151314Low2II351.755TREE1515151730-LowSTAKING666666
44444444444444-------6REQUIRED PER STANDARD PLAN H3, SEE PROJECT PLANSLow-AGAVE 'BLUE GLOW'BLUE GLOW AGAVE66666666666666666666LEUCOPHYLLUM CANDIDUM 'THUNDER CLOUD'TEXAS RANGERDESERT WILLOWCHILOPSIS LINEARISPROSOPIS GLANDULOSA 'AZT'THORNLESS HONEY MESQUITEDESERT MUSEUM PALO VERDEPARKINSONIA 'DESERT MUSEUM'TREELAGERSTROEMIA INDICA 'WATERMELON RED'6CALOCEDRUS DECURRENSINCENSE CEDARBOUGAINVILLEA 'ROSENKA'QUERCUS OBLONGIFOLIAMEXICAN BLUE OAKENCELIA FARINOSABRITTLEBUSHDESERT GLOBEMALLOWSPHAERALCEA AMBIGUA8ERIOGONUM FASCICULATUM 'DANA POINT'CALIFORNIA BUCKWHEATLowACCENT2II13--1.34-66666xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:39
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204st001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:40
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204su001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26CI
TY R/WASPH1110011001ROUTE 15CAMI
NO DEL NORTESOUTHBOUNDNORTHBOUNDCHP ENFORCEMENT AREACITY R/WSTATE R/W67891090123410956789ASPHCONCASPHDIRT
DI
RTPOSTSIGNASPHASPHASPHCONCASPHCONCINT - 15DIRT CONC ASPHCONCCONCCCONCCONCCONCPPOSTPOSTPOSTPOSTC
O
NC DIRTDIRTDI
RTDI
RTCCAMINODELNORTEPOSTPOST78910901234109567891100341095678961
2
34109567891100SB ON-RAMPNB OFF-RAMP1R/WR/WR/WCI
T
Y R/WR/WSCALE: 1" = 50'PP-123MATCH LINE (PP-2)APPROVED FOR PLANTING WORK ONLYPLANTING PLANNOTE:FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.5 CHI LIN3 PRO GLA2 PRO GLA3 PRO GLA2 CHI LIN1 QUE OBL5 PRO GLA3 PAR DES4 CHI LIN1 PIS CHI
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:42
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204su002.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE269 1110
D IRT
CONC
A SP H
ASPH
CONC
ASPH
ASPH
DEL NORTE
99 1110
8
9
11109MAINSTREETSOUTHBOUND
NORTH BOUND
CAMINO DEL NORTE ROUTE 15 CITY R/WCITY R/WC
ITY
R
/W
CITY R/W
ASPH
DIRT ASPHCONC
CONC
INT - 15
INT - 15
ASPH
ASPH
ASPH
ASPH
POST
CO N CCONC ASPH C O N CCONCCONC B/BDIRT ASPH C O N C TA N KPOSTS SIGNSIGNB/B
DIKE
DIKE
ELLISST
2214 15 16 17
181920212313
1
2
3
4 1105 6 7
+88
2
3
4
1105 6
7
7
8
621341105
+1 2 3 4
1105
86
NB OFF-RAMP
SB OFF-RAMP NB ON-RAMP
SB O N -R A M P
R/W R/WR/W
R/W
R/W
SCALE: 1" = 50'PP-224MATCH LINE (PP-1)MATCH LINE (PP-3)APPROVED FOR PLANTING WORK ONLYPLANTING PLANNOTE:FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.2,246 SQFTGRAVEL MULCH TYPE 122,655 SQFTROADSIDE CLEARING41,307 SQFTCLEARING AND GRUBBING2 PIS CHI2 CHI LIN4 CAL DEC2 LAG IND3 CHI LIN4 PIS CHI3 PIS CHI6 CIS SUN4 CAL DEC4 CHI LIN3 PRO GLA1 PRO GLA3 CAL DEC5 PIS CHI3 PAR DES3 LAG IND5 CIS SUN3 BOU ROS6 ENC FAR5 BOU ROS5 SPH AMB10 ENC FAR5 LEU CAN4 CIS SUN12 HES PAR6 BOU ROS5 AGA BLU3 LAG IND3 CHI LIN4 LEU CAN8 HES PAR8 AGA BLU4 ENC FAR8 CAL DEC7 PIS CHI1 PRO GLA16 ENC FAR5 CHI LIN1 QUE OBL17 ERI FAS11 SPH AMB3 LAG IND2 PAR DES13 CIS SUN13 HES PAR8 BOU ROS3 BOU ROS3 AGA BLU5 SPH AMB5 LEU CAN5 ENC FAR6 HES PAR4 AGA BLU5 LEU CAN6 SPH AMB5 BOU ROS7 ERI FAS3 PAR DES6 LEU CAN5 CIS SUN4 ENC FAR3 SPH AMB3 BOU ROS5 HES PAR3 CIS SUN6 HES PAR3 SPH AMB5 ENC FAR3 BOU ROS2 PIS CIH16 ERI FAS6 HES PAR3 SPH AMB7 ERI FAS5 ENC FAR9 LEU CAN
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:43
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204su003.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26NORTHBOUNDROUTE 15CITY R/W1110123411156789112012+ASPHASPHASPHCCONCDIRTASPHASPHCONCASPHINT - 15INT - 15CONCASPHCONCCONCASPHASPHASPHCONCASPHASPHDIRTCOLLIER AVECAMINO DEL NORTECONC111011223344111511156677889911201122311101241115678911201111012341115678911202..............................................................................................................SB OFF-RAMP NB ON-RAMPSOUTHBOUNDCAMINO DEL NORTER/WR/WSCALE: 1" = 50'PP-325MATCH LINE (PP-2)PLANTING PLANAPPROVED FOR PLANTING WORK ONLYFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.(1"-3") (APPLY AT 4" DEPTH)GRAVEL MULCH (TYPE 1)PLANTED AREAMAINTAIN EXISTINGNOTE:1 PAR DES3 SPH AMB3 CHI LIN3 QUE OBL1 QUE OBL3 PIS CHI5 LEU CAN2 ENC FAR3 PAR DES1 QUE OBL2 PRO GLA3 CHI LIN2 BOU ROS1 CHI LIN2 PIS CHI5 CHI LIN2 PAR DES5 PRO GLA
PQ-1PLANTING QUANTITIESNOTE:APPROVED FOR PLANTING WORK ONLYSEE STANDARD SPECIFICATIONS FOR ADDITIONAL PLANTING INFORMATION-RECOMENDATIONS.AND IRRIGATION TYPE IN BIOSWALES TO THE SOIL LAB FOR FOR ACCURATE SPECIFICALLY FOR THE BIOSWALES. PROVIDE PROPOSED PLANTING DESIGN ANALYSIS. CONTRACTOR TO ALSO PROVIDE AGRONOMIC SOIL ANALYSIS AND ADJUST PLANTING REQUIREMENTS APPROPRIATELY PER UPDATED SOIL CONTRACTOR TO PROVIDE AGRONOMIC SOILS ANALYSIS AFTER ROUGH GRADING -ABBREVIATION USED ON PLANTING PLAN.UNDERLINED PORTIONS OF BOTANICAL NAME INDICATE -26ROSENKA BOUGAINVILLEAHESPERALOE PARVIFLORARED YUCCACANARY ISLAND PINEPISTACHIA CHINENSISCHINESE PISTACHECISTUS X PULVERULENTUS 'SUNSET'MAGENTA ROCKROSEPLANT QUANTITIESBOTANICAL NAMECOMMON NAMEPLANT GROUPFERTILIZER
PACKET BK AMENDMENT
SOIL EAEAEACYTOTALSUBTOTAL----42565738---224011----BASINPLANT 1738363638175756421738551223323422235LAGERSTROEMIA INDICA 'WATERMELON RED'-253-31WATERMELON RED CRAPE MYRTLE1473311251,066351473311,066-291453AGAVE 'BLUE GLOW'BLUE GLOW AGAVELEUCOPHYLLUM CANDIDUM 'THUNDER CLOUD'TEXAS RANGERCHILOPSIS LINEARISDESERT WILLOWPARKINSONIA 'DESERT MUSEUM'PROSOPIS GLANDULOSA 'AZT'THORNLESS HONEY MESQUITE1102008515BOUGAINVILLEA 'ROSENKA'ENCELIA FARINOSABRITTLEBUSH47-472ERIOGONUM FASCICULATUM 'DANA POINT'CALIFORNIA BUCKWHEATSPHAERALCEA AMBIGUADESERT GLOBEMALLOWCALOCEDRUS DECURRENSINCENSE CEDARQUERCUS OBLONGIFOLIAMEXICAN BLUE OAKxxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
TIME PLOTTED =>
DATE PLOTTED =>
08:44
19-DEC-2023
CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED
PLANS APPROVAL DATECONSULTANT FUNCTIONAL SUPERVISORRR
00-00-00USERNAME =>RmweDGN FILE =>1G7204sw001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT2272PROJECT NUMBER & PHASEBORDER LAST REVISED 7/2/201008RivJON-SEN OENTODD D. HOLMES
LICENSED LANDSCAPE ARCHITECTKIM S. RHODES
ILACFO PSCNEIL
ETATS3867ACSDNAL
D
E
HF
EAINRO
TCTICRAESignatureRenewal DateDateKI
M
S
.
RHODES09/30/2024ONTARIO, CA 91764SUITE 2504141 E. INLAND EMPIRE BL.COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSDAVID EVANS AND ASSOCIATES, INC.LA N D S C A P E A R C H IT E C T U R E
0816000057112/18/20231520.5/21.5LAKE ELSINORE, CA 92530130 SOUTH MAIN STREETCITY OF LAKE ELSINORE26