HomeMy WebLinkAboutSupplemental Information Infrastructure Projects7 1-15/Franklin Street
Interchange Project
8 Railroad Canyon Road
Local Road Safety Plan
8 1-15/Railroad Canyon Road
Interchange
9 1-15 HOV Lanes
Beginning design early 2024
0.22 miles north of existing
Franklin Street Overcrossing
Study complete, most of the recommendations have Railroad Canyon Road from Grap
been implemented St to City of Canyon Lake
Construction completed
Few years off still, but likely to be complete by GP 1-15 From Central Ave to 1 -15/1 -
Horizon year 215 Split near Temecula
Add new full interchange at I-
15/Franklin St. Widen Main St
& realign/widen ramps.
Construction of frontage road
on east side of 1-15. New local
roadway connections.
Local Road Safety
improvements including
signing, striping, and
pavement improvements
1 HOV lane in each direction
https://www.lake-elsinore.ocq/l 94Interstate-15-1---15-
Franklin-interchana
https://www.lake-
elsinore.org/DocurnentCenter/View/956/Railroad-Canyon-
LRSP-PDF
https://www.rctc.org/pro;ects/il 5-rallroad-canyon-
interchange- project)
Previous GP lots of Retail West of Summerhill Drive, and
https://www.lake-
Use South of SR -74
10 N/A Lots of topography in this area elsinore.org/D6cumentCenter/View/2244/Chapter-20---
Community -Form -PDF
Location A.
Description IL
Notes
Website
1 I-15 Express Lanes
EIR in next —6 months.
I-15 from Corona to SR -74
Dual express lanes in each
htts: www.rctc.or ropects 5 -ex ress-southern-
Southern Extension
Begin construction as early as 2026
direction.
extension/
2 1-15/Lake Street
Unknown
Alberhill development occurring that will likely require
Interchange
improvements at the Lake St. Interchanqe
Widening of Nichols Road
I-15/Nichols Road
3
Unknown
Nichols Road at I-15
and other interchange
Also looking to straighten Nichols Rd to better
See link for Ethanac Expressway (Item #4)
Interchange PID
improvements as part of
accommodate future industrial use south of Nichols
Ethanac Expressway
Nichols Road in Lake Elsinore to
4 Ethanac Expressway
Menifee Rd in and eventually
Connecting interstates I-15
https.//rcRroiects.org/ethanac-expressway+
and 1-215
Hemet/San Jacinto
Currently in the Alternatives
1-15/Central Ave
5
Draft EIR currently in circulation with Caltrans
Analysis and Environmental
Interchange improvements
http�www.lake-efsinore.org(19$Ilnterstate-] 5-58---74-
Interchange
Document Review phase, which is
Central -Avenue -Int
expected to be complete by 2024.
Widening of Main St, new
6 1-15/Main St Interchange
Construction currently ongoing
Main Street at 1-15
traffic signals, on-ramp
teet-Iwww.Iake-el_sinoCe.�rg/i 9211nterstate-l5-I---15-Main
meters
Snterch
Street- I
7 1-15/Franklin Street
Interchange Project
8 Railroad Canyon Road
Local Road Safety Plan
8 1-15/Railroad Canyon Road
Interchange
9 1-15 HOV Lanes
Beginning design early 2024
0.22 miles north of existing
Franklin Street Overcrossing
Study complete, most of the recommendations have Railroad Canyon Road from Grap
been implemented St to City of Canyon Lake
Construction completed
Few years off still, but likely to be complete by GP 1-15 From Central Ave to 1 -15/1 -
Horizon year 215 Split near Temecula
Add new full interchange at I-
15/Franklin St. Widen Main St
& realign/widen ramps.
Construction of frontage road
on east side of 1-15. New local
roadway connections.
Local Road Safety
improvements including
signing, striping, and
pavement improvements
1 HOV lane in each direction
https://www.lake-elsinore.ocq/l 94Interstate-15-1---15-
Franklin-interchana
https://www.lake-
elsinore.org/DocurnentCenter/View/956/Railroad-Canyon-
LRSP-PDF
https://www.rctc.org/pro;ects/il 5-rallroad-canyon-
interchange- project)
Previous GP lots of Retail West of Summerhill Drive, and
https://www.lake-
Use South of SR -74
10 N/A Lots of topography in this area elsinore.org/D6cumentCenter/View/2244/Chapter-20---
Community -Form -PDF
Tr iror_a
1
L EE LA KL
BOSLEYLN f�
= I
0
m
m
z
m
m
O I
Base Map Features
--------- City Boundary
- _ Sphere of Influence
Highways
Major Arterials
Street Network
Waterbodies
Parks & Open Space
CLEVELAND
NATIONAL
FOREST
I"I'mF..-IDE S -n
PERRIS
I
MENIFEE
I
f -
�I CANYON
! LAKE
E LAKESHORE DR A� L
' I
1 �
WILDOMAR
To 1-215 Split
LAKE ELSINORE
INFRASTRUCTURE PROJECTS
dlmmmmmw�--�.,Corridor
Interchange
1) 1-15 Express Lanes Southern Extension
2) 1-15/1-ake Street Interchange
3) 1-15/Nichols Road Interchange PID
4) Ethanac Expressway
5) 1-15/Central Ave Interchange
6) 1-15/Main St Interchange
7) 1-15/Franklin Street Interchange Project
8) Railroad Canyon Road Local Road
Safety Plan
8) 1-15/Railroad Canyon Road Interchange
9) 1-15 HOV Lanes
Miles
0 '/4 '/z 1 11,/2 2