CONDITIONS OF APPROVAL
PROJECT: PA 2021-43/TTM 34249R1/RDR 2022-06
PROJECT NAME:Canyon Hills Estates
PROJECT LOCATION:APNs: 365-230-005, 006, 009, 011, and 012
APPROVAL DATE:
EXPIRATION DATE:
EXPIRATION DATE:
GENERAL CONDITIONS
1.Revision No. 1 to Tentative Tract Map (TTM) No. 34249 proposes to subdivide the 81.32-
acre site into 133 single-family lots ranging in size from 3,206 sq. ft. to 15,747 sq. ft., three
(3) open space lots, two (2) water quality/detention basins, and one (1) 5.82-acre park. The
project also includes Residential Design Review No. 2022-06 for the design and
construction of 133 single-family residences, preliminary plotting, conceptual wall and fence
plan, conceptual landscaping, and related site improvements. The project proposes six (6)
floor plans ranging in size from 2,314 sq. ft. to 4,225 sq. ft. and three (3) architectural styles
(Santa Barbara, Napa, and California Craftsman). The site is located south of Canyon Hills
Road and west of Cottonwood Canyon Road within the Canyon Hills Estates Specific Plan
(APNs: 365-230-005, 006, 009, 011, and 012). TTM 34249 was previously approved for the
subdivision of 246.41 acres into 302 single family residential lots, 12 open space lots, one
(1) Public Park, and two (2) tank sites.
2.The applicant shall defend (with counsel acceptable to the City), indemnify, and hold
harmless the City, its Officials, Officers, Employees, Agents, and its Consultants
(Indemnitees) from any claim, action, or proceeding against the Indemnitees to attack, set
aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or
legislative body concerning approval, implementation and construction of TTM 34249R1
and RDR 2022-06, which action is bought within the time period provided for in California
Government Code Sections 65009 and/or 66499.37, and Public Resources Code Section
21167, including the approval, extension or modification of TTM 34249R1 and RDR 2022-
06 or any of the proceedings, acts or determinations taken, done, or made prior to the
decision, or to determine the reasonableness, legality or validity of any condition attached
thereto. The Applicant's indemnification is intended to include, but not be limited to,
damages, fees and/or costs awarded against or incurred by Indemnitees and costs of suit,
claim or litigation, including without limitation attorneys' fees, penalties and other costs,
liabilities and expenses incurred by Indemnitees in connection with such proceeding. The
City will promptly notify the applicant of any such claim, action, or proceeding against the
City. If the project is challenged in court, the City and the applicant shall enter into formal
defense and indemnity agreement, consistent with this condition
3.Within 30 days of project approval, the applicant shall sign and complete an
"Acknowledgment of Conditions" and shall return the executed original to the Community
Development Department for inclusion in the case records.
PLANNING DIVISION
4.Tentative Tract Map No. 34249R1 shall comply with the State of California Subdivision Map
Act, the Canyon Hills Estates Specific Plan, and applicable requirements set forth in the
Lake Elsinore Municipal Code (LEMC), unless modified by approved Conditions of Approval.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 2 of 22
5.Residential Design Review No. 2022-04 shall lapse and become void two years following
the date on which the design review became effective, unless one of the following: (1) prior
to the expiration of two years, a building permit related to the design review is issued and
construction commenced and diligently pursued toward completion; or (2) prior to the
expiration of two years, the applicant has applied for and has been granted an extension of
the design review approval pursuant to subsections (1) and (2) of Lake Elsinore Municipal
Code (LEMC) Section 17.415.050.I.1. Notwithstanding conditions to the contrary, a design
review granted pursuant to LEMC Section 17.415.050.I.2 shall run with the land for this two-
year period, subject to any approved extensions, and shall continue to be valid upon a
change of ownership of the site, which was the subject of the design review application.
6.The applicant shall comply with the provisions of the Canyon Hills Estates Specific Plan, the
Conditions of Approval for Tentative Tract Map No. 34249, and the Development Agreement
by and between City of Lake Elsinore and Tri Pointe Homes IE-SD, Inc. recorded on August
29, 2022.
7.The applicant shall provide all project-related on-site and off-site improvements as shown
on the Tentative Tract Map and these Conditions of Approval.
8.Future development shall comply with these Conditions of Approval and provisions and the
balance of the requirements contained in the Canyon Hills Specific Plan document.
9.All future development proposals shall be reviewed by the City on a project-by-project basis.
If determined necessary by the Community Development Director or designee, additional
environmental analysis may be required.
10.If any of the conditions of approval set forth herein fail to occur, or if they are, by their terms,
to be implemented and maintained over time, if any of such conditions fail to be so
implemented and maintained according to their terms, the City shall have the right to revoke
or modify all approvals herein granted, deny or further condition issuance of all future
building permits, deny revoke, or further condition all certificates of occupancy issued under
the authority of approvals herein granted; record a notice of violation on the property title;
institute and prosecute litigation to compel their compliance with said conditions or seek
damages for their violation.
Prior to Recordation of Final Tract Map(s)
11.All residential lots shall comply with minimum standards contained in the Development
Standards for Single Family Residential-1 (SF-1) and Single Family Residential-2 (SF-2)
detailed in Section 4.3 of the Canyon Hills Estates Specific Plan.
12.A precise survey with closures for boundaries and all lots shall be provided per the LEMC.
13.Street names within the subdivision shall be approved by the Community Development
Director or Designee.
14.All of the improvements shall be designed by the applicant's Civil Engineer to the
specifications of the City of Lake Elsinore.
15.The applicant shall meet all requirements of Elsinore Valley Municipal Water District
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 3 of 22
(EVMWD).
16.Prior to recordation of a Final Tract Map, the applicant shall initiate and complete the
annexation of this project to the Homeowner’s Association (HOA), which shall be approved
by the City, recorded, and in place. All Association documents shall be submitted for review
and approval by City Planning, Engineering and the City Attorney and upon City approval
shall be recorded. Such documents shall include the Articles of Incorporation for the
Association and Covenants, Conditions and Restrictions (CC&Rs).
a. At a minimum, all recreation and park areas (except public parks), all natural slopes and
open space, all graded slopes abutting public street rights-of-way which are not part of
residential lots, up slopes from public rights-of-way within private lots and all private
streets, and all drainage basins shall be maintained by the Homeowner’s Association
(HOA).
Prior to Issuance of Grading Permits/Building Permits
17.The following architectural details shall be provided:
a. All front fence returns will be decorative masonry walls. Vinyl or steel (tubular steel)
gates are allowed in order to allow access to rear yards.
b. The applicant shall provide four-sided articulation. Architectural enhancements and
treatments shall be provided all residential elevations (front, rear and side) visible from
streets on Railroad Canyon Road and Tassel Way and other public views.
18.Signs are not part of this project approval. All signage shall be subject to Planning Division
or Planning Commission review and approval prior to installation.
19.The applicant shall pay school fees to the Lake Elsinore Unified School District prior to
issuance of each building permit.
20.Prior to the issuance of a building permit, the applicant shall pay all applicable City fees,
including but not limited to Development Impact Fees (DIF) and MSHCP Fees per LEMC
Section 16.85, Development Agreement (DAG) Fee, at the rate in effect at the time of
payment.
21.The project shall connect to water and sewer and meet all requirements of the Elsinore
Valley Municipal Water District (EVMWD). The applicant shall submit water and sewer plans
to the EVMWD and shall incorporate all district conditions and standards.
22.Provisions of the City's Noise Ordinance (LEMC Chapter 17.176) shall be satisfied during
all site preparation and construction activity.
23.Prior to the commencing of grading activities, the applicant shall place a weatherproof 3’ X
3’ sign at the entrance to the project site identifying the approved days and hours of
construction activity. Site preparation activity and construction shall not commence before
7:00 AM and shall cease no later than 5:00 PM, Monday through Friday. Only finish work
and similar interior construction may be conducted on Saturdays and may commence no
earlier than 8:00 am and shall cease no later than 4:00 p.m. Construction activity shall not
take place on Sunday, or any Legal Holidays. The sign shall identify the name and phone
number of the development manager to address any complaints.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 4 of 22
24.Prior to issuance of a building permit, the applicant shall submit a Final Wall and Fence Plan
for review and approval by the Community Development Director or designee showing the
following:
a. Show the location of all vinyl or steel (tubular steel) gates placed within the front return
walls.
b. Show that sidewalls for corner lots shall be decorative masonry block walls with
pilasters.
c. Show that those materials provided along the front elevations (i.e. brick, stone, etc.) will
wrap around the side elevation and be flush with the front return walls.
d. Show decorative masonry fencing at tract edges and adjacent to the public right-of-way
with a decorative pilaster at every 30 feet.
e. Nonvisible fencing between the homes and in the backyard, will be vinyl or tubular steel
where views make that an appropriate option.
25.Prior to issuance of a model home permit, building plans for the Model Home Complex shall
comply with all American Disabilities Act (ADA) requirements, including provision of a
handicapped-accessible bathroom.
26.A Construction Phasing shall be prepared for this project that avoids construction traffic from
entering occupied neighborhoods within the tract. The Phasing Plan shall be reviewed and
approved by the Engineering Department.
27.A cash bond in the amount of $1,000 shall be required for the Model Home Complex. This
bond is to guarantee removal of the temporary fencing material, parking lot, etc. that have
been placed onsite for the Model Home Complex. The bond will be released after removal
of the materials and the site is adequately restored, subject to the approval of the
Community Development Director or designee.
28.A cash bond in the amount of $1,000 shall be required for any garage conversion of the
model(s). Bonds will be released after removal of all temporary materials and the site is
adequately restored, subject to the approval of the Community Development Director or
designee.
29.A cash bond in the amount of $1,000 shall be required for any construction trailers used
during construction. Bonds will be released after removal of trailers, subject to the approval
of the Community Development Director or designee.
30.All mechanical and electrical equipment associated with the residences shall be ground
mounted. All outdoor ground or wall mounted utility equipment shall be consolidated in a
central location and architecturally screened behind fence returns, subject to the approval
of the Community Development Director, prior to issuance of building permit.
31.Prior to issuance of a building permit, Final Landscaping / Irrigation Detail Plans (one full
size set along with a PDF copy) consistent with the Canyon Hills Estates Specific Plan and
LEMC requirements shall be submitted along with appropriate fees for review and approval
by the Community Development Director or designee. All front yards and side yards on
corner lots shall be properly landscaped with automatic (manual or electric) irrigation
systems to provide 100 percent planting coverage using a combination of drip and
conventional irrigation methods.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 5 of 22
a. The applicant shall replace any street trees harmed during construction, in conformance
with the City's Street Tree List, at a maximum of 30 feet apart and at least 24-inch box
in size.
b. Perimeter walls shall be protected by shrubs and other plantings that discourage graffiti.
c. The applicant shall ensure a clear line of sight at ingress/egress points by providing
plantings within 15 feet of ingress/egress points whose height does not exceed two (2)
feet and whose canopy does not fall below six feet.
d. The landscape plan shall provide for California native drought-tolerant ground cover,
shrubs, and trees. Special attention shall be given to use of Xeriscape or drought
resistant plantings with combination drip irrigation system to prevent excessive watering.
e. No front-yard shall be landscaped with grass turf.
f. All landscape improvements shall be bonded with a ten percent (10%) Faithful
Performance Bond of the approved estimated labor and materials cost for all planting.
The bond shall remain in effect for one year from Certificate of Occupancy.
g. All landscaping and irrigation shall be installed within an affected portion of any phase
at the time a certificate of occupancy is requested for any building.
h. All Model Homes shall be Xeriscaped and signage provided identifying Xeriscape
landscaping. Xeriscape is a method of landscape design that minimizes water use by:
1) Implementing hydrozones;
2) Eliminating high and medium water-use plant material as identified by Water Use
Classifications of Landscape Species (WUCOLS) (such as turf) and incorporates
low to very low water-efficient (“drought-tolerant” / climate-appropriate) plants;
3) Requires an efficient irrigation system that includes:
a. ET-Based (“Smart irrigation”) controller(s) with weather-sensing, automatic shut-
off and seasonal adjustment capabilities;
b. Efficient irrigation water application through use of:
i. Low-volume point-source irrigation (such as drip irrigation and bubblers) for
all shrub planter areas (maximum of 3:1 slope) with a minimum irrigation
efficiency of 0.90 ; and/or
ii. Rotor-type nozzles for areas greater than ten (10) feet wide, for slopes 3:1
and greater, AND with a minimum irrigation efficiency of 0.71.
4) Improvement of soil structure for better water retention; and
5) Application of mulch to hinder evaporation.
i. The Final landscape plan shall be consistent with any approved site and/or plot plan.
j. The Final landscape plan shall include planting and irrigation details and shall include
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 6 of 22
one (1) street tree per lot.
k. All exposed slopes in excess of three feet in height within the subject tract and within
private lots shall have a permanent irrigation system and erosion control vegetation
installed, as approved by the Planning Division, prior to issuance of certificate of
occupancy.
l. All landscaping and irrigation shall comply with the water-efficient landscaping
requirements set forth in LEMC Chapter 19.08 (Water Efficient Landscape
Requirements), as adopted and any amendments thereto.
32.Landscaping installed for the project shall be continuously maintained to the reasonable
satisfaction of the Community Development Director. If it is determined that the landscaping
is not being maintained, the Director of Community Development shall have the authority to
require the property owner to bring the landscaping into conformance with the approved
landscape plan. The continued maintenance of all landscaped areas shall be the
responsibility of the developer or any successors in interest.
BUILDING DIVISION
General Conditions
33.Final Building and Safety Conditions. Final Building and Safety Conditions will be addressed
when building construction plans are submitted to Building and Safety for review. These
conditions will be based on occupancy, use, the California Building Code (CBC), and related
codes which are enforced at the time of building plan submittal.
34.Compliance with Code. All design components shall comply with applicable provisions of
the 2022 edition of the California Building, Plumbing and Mechanical Codes: 2022 California
Electrical Code; California Administrative Code, 2022 California Energy Codes, 2022
California Green Building Standards, California Title 24 Disabled Access Regulations, and
Lake Elsinore Municipal Code.
35.Street Addressing. Applicant must obtain street addressing for all proposed buildings by
requesting street addressing and submitting a site plan for commercial or multi-family
residential projects or a recorded final map for single- family residential projects. It takes 10
days to issue address and notify other agencies. Please contact Sonia Salazar at
ssalazar@lake-elsinore.org or 951-674-3124 X 277.
36.Clearance from LEUSD. A receipt or clearance letter from the Lake Elsinore School District
shall be submitted to the Building and Safety Department evidencing the payment or
exemption from School Mitigation Fees.
37.Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit
approvals prior to commencement of any construction work.
38.Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light standards,
and any block walls will require separate approvals and permits.
39.Sewer and Water Plan Approvals. On-site sewer and water plans will require separate
approvals and permits.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 7 of 22
40.House Electrical Meter. Applicant shall provide a house electrical meter to provide power
for the operation of exterior lighting, irrigation pedestals and fire alarm systems for each
building on the site. Developments with single user buildings shall clearly show on the plans
how the operation of exterior lighting and fire alarm systems when a house meter is not
specifically proposed.
At Plan Review Submittal
41.Submitting Plans and Calculations. Applicant must submit to Building and Safety four (4)
complete sets of plans and two (2) sets of supporting calculations for review and approval
including:
a. An electrical plan including load calculations and panel schedule, plumbing schematic,
and mechanical plan applicable to scope of work.
b. A Sound Transmission Control Study in accordance with the provisions of Section 5.507
of the 2022 edition of the California Building Code.
c. Truss calculations that have been stamped by the engineer of record of the building and
the truss manufacturer engineer.
Prior to Issuance of Grading Permit(s)
42.Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted separately from
the building plans, shall be submitted to Building and Safety for review and approval.
43.Demolition Permits. A demolition permit shall be obtained if there is an existing structure to
be removed as part of the project.
Prior to Issuance of Building Permit(s)
44.Plans Require Stamp of Registered Professional. Applicant shall provide appropriate stamp
of a registered professional with original signature on the plans. Provide C.D. of approved
plans to the Building Division.
Prior to Beginning of Construction
45.Pre-Construction Meeting. A pre-construction meeting is required with the building inspector
prior to the start of the building construction.
ENGINEERING DEPARTMENT
General
46.All new submittals for plan check or permit shall be made using the City’s online Citizen
Self-Service Portal (CSSP).
47.All engineering plans shall be prepared by a licensed California Civil Engineer using the
City’s standard title block.
48.All required soils, geology, seismic, and hydrology and hydraulic reports shall be prepared
by a registered California licensed Civil Engineer and Soils Engineer, as applicable.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 8 of 22
49.All slopes and landscaping within the public right-of-way shall be maintained by the property
owner, owner’s association, firms contracted by the property owner’s association, or another
maintenance entity approved by the City Council.
50.All open space and slopes except for public parks and schools and flood control district
facilities, outside the public right-of-way shall be owned and maintained by the property
owner or property owner’s association.
51.Any portion of a drainage system that conveys runoff from open space shall be installed
within a drainage easement.
52.Water quality facilities that are constructed across lots shall be installed within a dedicated
drainage easement.
53.Any grading that affects “waters of the United States”, wetlands or jurisdictional streambeds,
shall require approval and necessary permits from respective Federal and/or State
Agencies.
54.In accordance with the City’s Franchise Agreement for waste disposal & recycling, the
applicant shall be required to contract with CR&R, Inc. for removal and disposal of all waste
material, debris, vegetation, and other rubbish generated both during cleaning, demolition,
clear and grubbing or all other phases of construction and during occupancy.
55.Applicant shall submit a detailed hydrology and hydraulic study for review for the sufficient
containment and conveyance of the storm water to a safe and adequate point as approved
by the City Engineer.
56.The site will accommodate all construction activity, building activity, vehicles, etc. No staging
on public streets, or private property belonging to others shall be conducted without the
written permission of the property owner.
57.Minimum good housekeeping and erosion and sediment control Best Management
Practices (BMPs) as identified by the City shall be implemented.
58.Applicant shall install permanent benchmarks to Riverside County Standards and at
locations to be determined by the City Engineer.
FEES
59.Applicant shall pay all applicable permit application and Engineering assessed fees,
including without limitation plan check and construction inspection fees, at the prevalent rate
at time of payment in full.
60.Applicant shall pay all applicable Mitigation and Development Impact Fees at the prevalent
rate at time of payment in full. Fees are subject to change. Mitigation and Development
Impact Fees include without limitation:
Master Plan of Drainage Fee – Due prior to Final Map approval or grading permit
issuance, whichever is first.
Traffic Infrastructure Fee (TIF) – Due prior to building permit issuance.
Transportation Uniform Mitigation Fee (TUMF) – Due prior to occupancy.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 9 of 22
Stephens’ Kangaroo Rat Mitigation Fee (K-Rat) – Due prior to grading permit issuance.
FINAL TRACT MAP
61.Applicant shall submit for plan check review and approval for final Tract Map.
62.Street names within the subdivision shall be established and approved by the Community
Development Director or designee.
63.Applicant shall make an offer of dedication for all public streets and easements required by
these conditions or shown on the Tentative Map. All land so offered shall be granted to the
City, free and clear of all liens and encumbrances and without cost to the City.
64.Underground water rights shall be dedicated to the City pursuant to the provisions of Section
16.52.030 in the Lake Elsinore Municipal Code (LEMC), and consistent with the City’s
agreement with the Elsinore Valley Municipal Water District.
65.Prior to scheduling City Council approval of the final Tract Map, the applicant shall, in
accordance with Government Code, have constructed all improvements or have
improvement plans submitted and approved, agreements executed, and securities posted.
Securities posted include but are not limited to the off-site improvements.
66.Monumentation shall be in accordance with LEMC Section 16.32 and Subdivision Map Act.
67.Security and inspection fee for monumentation shall be paid and two contiguous monuments
shall be inspected prior to scheduling City Council approval of final map.
68.Covenants, Conditions and Restrictions (CC&Rs) shall be submitted to the City for review
approval. Recordation shall be with final Tract Map.
STORM WATER MANAGEMENT / POLLUTION PREVENTION / NPDES
Design
69.The project is responsible for complying with the latest Santa Ana Region National Pollutant
Discharge Elimination System (NPDES) Permits as warranted based on the nature of
development and/or activity.
70.A Final Water Quality Management Plan (WQMP) shall be prepared using the Santa Ana
Region of Riverside County guidance document and template. The Final WQMP shall be
approved by the City prior to scheduling City Council for final map approval, grading plan
approval and issuance of any permit for construction, whichever is first.
71.The Final WQMP shall document the following:
Detailed site and project description.
Potential stormwater pollutants.
Post-development drainage characteristics.
Low Impact Development (LID) BMP selection and analysis.
Structural and non-structural source control BMPs.
Treatment Control BMPs.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 10 of 22
Site design and drainage plan (BMP Exhibit).
Documentation of how vector issues are addressed in the BMP design, operation and
maintenance.
GIS Decimal Minute Longitude and Latitude coordinates for all LID and Treatment
Control BMP locations.
Hydraulic Conditions of Concern (HCOC) – demonstrate that discharge flow rates,
velocities, duration and volume for the post construction condition from a 2-year, 24-
hour rainfall event will not cause adverse impacts on downstream erosion and receiving
waters, or measures are implemented to mitigate significant adverse impacts
downstream public facilities and water bodies. Evaluation documentation shall include
pre- and post-development hydrograph volumes, time of concentration and peak
discharge velocities, construction of sediment budgets, and a sediment transport
analysis. If HCOC applies, the project shall implement measures to limit disturbance of
natural water bodies and drainage impacts from urban runoff (Note the facilities may
need to be larger due to flood mitigation for the 10-year, 6- and 24-hour rain events).
Operations and Maintenance (O&M) Plan and Agreement (using City approved form
and/or CC&Rs) as well as documentation of formation of funding district for long term
maintenance costs.
72.Water quality facilities that service more than one parcel shall be placed in an easement to
provide for maintenance and prevent obstruction.
73.Parking lot landscaping shall be designed to provide for treatment, retention, or infiltration
of runoff.
74.Project hardscape areas shall be designed and constructed to provide for drainage into
adjacent landscape and permeable surfaces in low traffic roads and parking lots.
75.Project trash enclosure shall be covered, bermed, and designed to divert drainage from
adjoining paved areas and regularly maintained.
76.If CEQA identifies resources requiring Clean Water Act Section 401 Permitting, the applicant
shall obtain certification through the Santa Ana Regional Water Quality Control Board and
provide a copy to the Engineering Department.
77.The project site shall implement full trash capture methods/devices approved by the
Regional Water Quality Control Board. This shall include installation of connector pipe
screens on all onsite and offsite catch basins to which the project discharges.
Construction
78.A Storm Water Pollution Prevention Plan (SWPPP) (as required by the NPDES General
Construction Permit). A copy of the current SWPPP shall be kept at the project site and be
available for review upon request.
79.Prior to grading or building permit for construction or demolition and/or weed abatement
activity, projects subject to coverage under the NPDES General Construction Permit shall
demonstrate that compliance with the permit has been obtained by providing a copy of the
Notice of Intent (NOI) submitted to the State Water Resources Control Board and a copy of
the notification of the issuance of a Waste Discharge Identification (WDID) Number or other
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 11 of 22
proof of filing to the satisfaction of the City Engineer.
80.Erosion & Sediment Control – Prior to the issuance of any grading or building permit for
construction or demolition, the applicant shall submit for review and approval by the City
Engineer, an Erosion and Sediment Control Plan as a separate sheet of the grading plan
submittal to demonstrate compliance with the City’s NPDES Program, California Building
Code and state water quality regulations for grading and construction activities. The Erosion
and Sediment Control Plan shall identify how all construction materials, wastes, grading or
demolition debris, and stockpiles of soil, aggregates, soil amendments, etc. shall be properly
covered, stored and secured to prevent transport into local drainages or waters by wind,
rain tracking, or dispersion. The plan shall also describe how the project will ensure that all
BMPs will be maintained during construction of any future right of ways.
Post-Construction
81.All storm drain inlet facilities shall be appropriately marked “Only Rain in the Storm Drain”
using the City authorized marker.
82.Prior to the issuance of a certificate of use and/or occupancy, the applicant shall
demonstrate compliance with applicable NPDES permits for construction,
industrial/commercial, MS4, etc. to include:
Demonstrate that the project has compiled with all non-structural BMPs described in the
project’s WQMP.
Provide signed, notarized certification from the Engineer of Work that the structural
BMPs identified in the project’s WQMP are installed in conformance with approved plans
and specifications and operational.
Submit a copy of the fully executed, recorded City approved Operations and
Maintenance (O&M) Plan and Agreement for all structural BMPs or a copy of the
recorded City approved CC&R.
The Operation and Maintenance (O&M) Plan and Agreement and/or CC&R’s shall: (1)
describe the long-term operation and maintenance requirements for BMPs identified in
the BMP Exhibit; (2) identify the entity that will be responsible for long-term operation
and maintenance of the referenced BMPs; (3) describe the mechanism for funding the
long-term operation and maintenance of the referenced BMPs; and (4) provide for
annual certification for water quality facilities by a Registered Civil Engineer. The City
format shall be used.
Provide documentation of annexation into a CFD for funding facilities to be maintained
by the City.
Demonstrate that copies of the project’s approved WQMP (with recorded O&M Plan or
CC&R’s attached) are available for each of the initial occupants.
Agree to pay for a Special Investigation from the City of Lake Elsinore for a date twelve
(12) months after the issuance of a Certificate of Use and/or Occupancy for the project
to verify compliance with the approved WQMP and O&M Plan. A signed/sealed
certification from the Engineer of Work dated 12 months after the Certificate of
Occupancy will be considered in lieu of a Special Investigation by the City.
Provide the City with a digital .pdf copy of the Final WQMP.
UTILITIES
83.All arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 12 of 22
the roadway shall be the responsibility of the applicant, property owner, and/or his agent.
Overhead utilities (34.5 kV or lower) shall be undergrounded (LEMC Section 16.64).
84.Applicant shall apply for, obtain and submit to the City Engineering Department a letter from
Southern California Edison (SCE) indicating that the construction activity will not interfere
with existing SCE facilities. Non-Interference Letter (NIL) shall be provided prior to issuance
of grading permit.
85.Submit a “Will Serve” letter to the City Engineering Department from the applicable water
agency stating that water and sewer arrangements have been made for this project and
specify the technical data for the water service at the location, such as water pressure,
volume, etc. Will Serve letters shall be provided prior to issuance of grading permit.
IMPROVEMENTS
86.Project will be responsible for the following improvements:
Construction of full 40-foot street section on 60-feet of dedicated right of way for project
site internal public streets.
Modified Cottonwood Canyon Road shall be constructed with varying width from 40’ to
48’ from curb to curb and varying locations for the sidewalk as indicated on TTM with a
dedicated right of way of 70-feet.
Modification of existing and installation of new signing striping for required
improvements. The project shall be responsible for any additional paving and/or striping
removal causing by the striping plan.
Construct a minimum 36-foot section with rolled curbs constructed on a 46-foot
easement for internal private local streets.
87.Sight distance into and out and throughout the project location shall comply with City or
Caltrans standards. Project shall ensure facilities are installed outside the line of sight of
drivers.
88.Applicant shall comply with access requirements from the Fire Department.
89.Onsite circulation of the project shall be completed to the satisfaction of the Fire Department.
90.Project will be responsible to design and install streetlights Streetlight system shall be
designed as LS-2B system. Streetlight plans shall include but are not limited to details such
as location, pole and luminaire type, and pull box design. Streetlight plans may be included
as part of the Street Improvement plan set.
91.10-year storm runoff shall be contained within the curb and the 100-year storm runoff shall
be contained within the street right-of-way. When either of these criteria are exceeded,
drainage facilities shall be provided.
92.Applicant shall provide for the detention of storm water increases due to the project as
increased from historic flow volumes. Basins shall be designed consistent with Riverside
County Flood Control District standards.
93.All drainage facilities in this project shall be constructed to Riverside County Flood Control
District Standards.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 13 of 22
94.A drainage study shall be provided. The study shall identify the following: identify storm
water runoff from and upstream of the site; show existing and proposed off-site and on-site
drainage facilities; and include a capacity analysis verifying the adequacy of the facilities.
95.All natural drainage traversing the site shall be conveyed through the site, or shall be
collected and conveyed by a method approved by the City Engineer. All off-site drainage, if
different from historic flow, shall be conveyed to a public facility.
96.Roof drains shall not be allowed to outlet directly through coring in the street curb. Roofs
should drain across a minimum of 20-feet of landscaped area.
97.The site shall be planned and developed to keep surface water from entering buildings
(California Green Building Standards Code 4.106.3).
98.All existing storm drain inlet facilities adjacent to the subject properties shall be retrofitted
with a storm drain filter; all new storm drain inlet facilities constructed by this project shall
include a storm drain filter.
99.A California licensed Civil Engineer shall prepare the improvement (for public and private),
signing and striping, and traffic signal plans required for this project. Improvements shall be
designed and constructed to City Standards and Codes (LEMC 12.04 and 16.34).
Permitting/Construction
100.An Encroachment Permit shall be obtained prior to any work on City right-of-way. The
developer shall submit the permit application, required fees, and executed agreements,
security and other required documentation prior to issuance.
101.All compaction reports, grade certification, monument certification (with tie notes delineated
on 8 ½ X 11” Mylar) shall be submitted to the Engineering Department before final inspection
of public works improvements will be scheduled and approved.
PRIOR TO GRADING PERMIT
102.A grading plan signed and stamped by a registered Civil Engineer shall be submitted for
City review and approval for all addition and/or movement of soil (grading) on site. The plan
shall include separate sheets for erosion control, haul route and traffic control. The grading
submittal shall include all supporting documentation and be prepared using City standard
title block, standard drawings, and design manual.
103.The grading plan shall show conveyance of any storm water historically traversing the
project site. The storm drain design shall convey, at a minimum, the 100-year storm event
detailing overland release of any supplemental water volume.
104.Applicant shall provide soils, geology and seismic report for plan check review and approval.
Provide final soils report showing compliance with recommendations.
105.Applicant shall obtain all necessary off-site easements and/or permits for off-site grading
and the applicant shall accept drainage from the adjacent property owners.
106.Applicant shall mitigate to prevent any flooding and/or erosion downstream caused by
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 14 of 22
development of the site and/or diversion of drainage.
107.All natural drainage traversing the site (historic flow) shall be conveyed through the site in a
manner consistent with the historic flow or to one or a combination of the following: to a
public facility; accepted by adjacent property owners by a letter of drainage acceptance; or
conveyed to a drainage easement as approved by the City Engineer.
Permitting/Construction
108.Applicant shall execute and submit grading and erosion control agreement, post grading
security and pay permit fees as a condition of grading permit issuance.
109.Any grading that affects “waters of the United States”, wetlands or jurisdictional streambeds
require approval and necessary permits from respective Federal and/or State Agencies.
110.No grading shall be performed without first having obtained a grading permit. A grading
permit does not include the construction of retaining walls or other structures for which a
Building Permit is required.
111.A preconstruction meeting with the City Engineering Inspector (Engineering Department) is
required prior to commencement of any grading activity.
112.Hauling in excess of 5,000 cubic yards shall be approved by the City Council (LEMC
15.72.065). Prior to commencement of grading operations, applicant shall provide to the
City a map of all proposed haul routes to be used for movement of export material. All such
routes shall be subject to the review and approval of the City Engineer. Haul route shall be
submitted prior to issuance of a grading permit.
113.All grading shall be done under the supervision of a geotechnical engineer. Slopes steeper
than 2 to 1 shall be evaluated for stability and proper erosion control and approved by the
City.
114.Review and approval of the project sediment and erosion control plan shall be completed.
As warranted, a copy of the current SWPPP shall be kept at the project site and be available
for review upon request.
115.Approval of the project Final Water Quality Management Plan (WQMP) for post construction
shall be received prior to issuance of a grading permit.
116.Applicant shall obtain applicable environmental clearance from the Planning Department
and submit applicable clearance document to the Engineering Department. This approval
shall specify that the project complies with all required environmental mitigation triggered by
the proposed grading activity.
PRIOR TO BUILDING PERMIT
117.All Public Works requirements shall be complied with as a condition of development as
specified in the Lake Elsinore Municipal Code prior to issuance of a building permit.
118.Applicant shall provide soils, geology and seismic report, including recommendations for
parameters for seismic design of buildings, and walls prior to building permit.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 15 of 22
119.All public improvement plans shall be completed and approved by the City Engineer.
120.Applicant shall submit an owner-signed copy Operations and Maintenance (O&M) Plan and
Agreement for all structural BMPs for approval and execution.
121.Any dedications and easements not identified on the final Tract Map shall be recorded with
the recorded copy provided to the City prior to issuance of the building permit.
122.The Final Tract Map shall be recorded.
PRIOR TO OCCUPANCY / FINAL APPROVAL / PROJECT CLOSEOUT
123.All public improvements shall be constructed in accordance with the approved plans or as
condition of this development to the satisfaction of the City Engineer prior to issuance of first
occupancy.
124.Proof of acceptance of maintenance responsibility of slopes, open spaces, landscape areas,
and drainage facilities shall be provided.
125.Applicant shall provide a digital copy of the recorded Covenants, Conditions, and
Restrictions (CC&Rs) to the Engineering Department prior to first occupancy.
126.In the event of damage to City roads from hauling or other construction related activity,
applicant shall pay full cost of restoring public roads to the baseline condition.
127.All final studies and reports shall be submitted in .tif format on a USB flash drive or
electronically to the Engineering Department before final inspection will be scheduled.
128.All required public right-of-way dedications, easements, vacations and easement
agreement(s) shall be recorded with a recorded copy provided to the City prior to first
occupancy.
129.Applicant shall pay all outstanding applicable processing and development fees prior to
occupancy and/or final approval.
130.Applicant shall submit documentation pursuant to City’s Security Release handout.
131.Applicant shall submit as-built all Engineering Department approved project plan sets. After
City approval of paper copy, applicant is responsible for revising the original mylar plans.
Once the original mylars have been approved, the developer shall provide the City with a
digital copy of the “as-built” plans in .tif format.
132.Applicant shall provide AutoCAD and GIS Shape files of all Street and Storm Drain plans.
All data must be in projected coordinate system: NAD 83 State Plane California Zone VI
U.S. Fleet. All parts and elements of the designed system shall be represented discretely.
Include in the attribute table basic data for each feature, such as diameter and length, as
applicable, and for pipes include material (PVC, RCP, etc.) and slope.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 16 of 22
COMMUNITY SERVICES DEPARTMENT
133.The 5.4 acre public park (Lot 136) shall be conveyed to the City and shall be included in the
Community Facility District for maintenance and renovation cost.
134.The design of the public park (Lot 136) shall provide for pedestrian circulation and access
for the disabled throughout the park.
135.Prior to recordation of the final map, the developer shall meet with the Directors of
Community Services and Community Development to determine the location and
specifications of the park amenities that need to be provided.
136.Prior to the issuance of the first building permit, construction plans and specifications for the
park shall be reviewed and approved by the Community Development Department.
137.The developer shall post security and enter into an agreement to improve the public park
prior to issuance of the first building permit.
138.Construction of the park shall commence pursuant to a pre-construction meeting with the
developer, the developer’s construction contractor and City representatives. Failure to
comply with the City’s review and inspection process may preclude acceptance of the park
by the City.
139.The developer, the developer’s successor or assignee, shall be responsible for all
maintenance of the public park site (Lot 136) until such time as those responsibilities are
accepted by the City of Lake Elsinore.
140.The 5.4-acre public park site (Lot 136) shall be improved and dedicated to the City free and
clear of any liens, assessment fees, or easements that would preclude the City from utilizing
the property for public purposes. A policy of title insurance and a soils assessment report
shall be provided with the conveyance of the property.
141.All open space areas and trails will be maintained by the HOA or other maintenance entity
approved by the City.
142.No park credits shall be given for open space areas.
143.Developer shall dedicate 5.4 acres for a public park and pay for park improvements.
Construction of the park improvements shall be in lieu of payment of park fees.
144.Construction of the park site (Lot 136) shall be completed prior to the 100th building permit.
CITY OF LAKE ELSINORE FIRE MARSHAL
145.The applicant/operator shall comply with all requirements of the Riverside County Fire
Department Lake Elsinore Office of the Fire Marshal. Questions should be directed to the
Riverside County Fire Department, Lake Elsinore Office of the Fire Marshal at 130 S. Main
St., Lake Elsinore, CA 92530. Phone: (951) 671-3124 Ext. 225.
146.This project is in a Very High Fire Hazard Severity Zone of Riverside County as shown on
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 17 of 22
a map on file with the Clerk of the Board of Supervisors. Any building constructed within this
project shall comply with special construction provisions contained in the California Building
Code.
147.The Riverside County Fire Department approves the subdivision of 81.32 acres into 133
single family residential lots, 10 open space lots, one detention basin and one park as shown
on the development proposal from December 23, 2021 for Revision No. 1 of the tentative
map utilizing Canyon Hills Road for primary and secondary access/egress. Development
beyond the above description for the remainder portion of the previously approved tentative
map will need further review for conformance with City of Lake Elsinore and Fire Department
requirements.
148.The applicant or developer shall provide fire hydrants in accordance with the following:
a.Prior to placing any combustibles on site, provide an approved water source for
firefighting purposes. Prior to building permit issuance, submit plans to the water district
for a water system capable of delivering fire flow as required by the California Fire Code
and Fire Department standards. Fire hydrants shall be spaced in accordance with the
California Fire Code. Hydrants must produce the required fire flow per the California Fire
Code.
b.Prior to building permit issuance, install the approved water system, approved access
roads, and contact the Fire Department for a verification inspection.
149.Gates must meet Fire Department standards at the time of building permit application.
Current standards require that gates have a Knox rapid entry system, an infrared gate
opener, and be set back up to 35 feet allow emergency vehicles to safely stop away from
traffic flow.
150.If the project is phased, each phase of development shall independently meet all applicable
fire department requirements, including water supply, emergency vehicle access and
circulation, and High Fire Area risk mitigations. Primary and Secondary access shall provide
independent ingress and egress to a County or City maintained circulating element. A
phasing map shall be provided and primary and secondary access from the project
boundary to the circulating element shall be noted on the plan and on the Vicinity Map
151.These comments are preliminary; further review will occur upon receiving building plans.
Additional conditions may be necessary at that time.
DEPARTMENT OF ADMINISTRATIVE SERVICES
Annex into CFD 2015-1 (Safety) Law Enforcement, Fire and Paramedic Services CFD
152.Prior to approval of the Final Map or issuance of a grading permit (whichever comes first),
the applicant shall submit an application to the Department of Administrative Services to
initiate the annexation process into Community Facilities District No. 2015-1 (Safety) the
Law Enforcement, Fire and Paramedic Services Mello-Roos Community Facilities District to
offset the annual negative fiscal impacts of the project on public safety operations and
maintenance issues in the City. The annexation process shall be completed prior to
issuance of the first certificate of occupancy for the project. Alternatively, the applicant may
propose alternative financing mechanisms to fund the annual negative fiscal impacts of the
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 18 of 22
project with respect to Public Safety services. Applicant shall make a non-refundable deposit
of $15,000, or at the current rate in place at the time of annexation toward the cost of
annexation, formation or other mitigation process, as applicable.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 19 of 22
Annex into the City of Lake Elsinore Community Facilities District No. 2015-2 (Maintenance
Services)
153.Prior to approval of the Final Map or issuance of a grading permit (whichever comes first),
the applicant shall submit an application to the Department of Administrative Services to
initiate the annexation process into the Community Facilities District No. 2015-2
(Maintenance Services) or current Community Facilities District in place at the time of
annexation to fund the on-going operation and maintenance of the public right-of-way
landscaped areas and neighborhood parks to be maintained by the City and for street lights
in the public right-of-way for which the City will pay for electricity and a maintenance fee to
Southern California Edison, including parkways, street maintenance, open space and public
storm drains constructed within the development and federal NPDES requirements to offset
the annual negative fiscal impacts of the project. The annexation process shall be completed
prior to issuance of the first certificate of occupancy for the project. Alternatively, the
applicant may propose alternative financing mechanisms to fund the annual negative fiscal
impacts of the project with respect to Maintenance Services. Applicant shall make a non-
refundable deposit of $15,000 or at the current rate in place at the time of annexation toward
the cost of annexation, formation or other mitigation process, as applicable..
MITIGATION MONITORING AND REPORTING PROGRAM
154.The applicant shall comply with the Mitigation Monitoring & Reporting Program (MMRP) for
the Canyon Hills Estates Specific Plan, Final Environmental Impact Report (FEIR) No. 2006-
04 (SCH # 2006051073), which was adopted for this project.
155.The following mitigation measures related to the protection of Cultural Resources shall be
implemented as described below:
• TS-01 shall be avoided and preserved where feasible including a 10-meter buffer
surrounding the boundaries of TS-01 to protect the delineated site area and any
associated subsurface components. Protective fencing during construction shall be
provided to protect TS-01 where feasible.
• Prior to the issuance of any grading permits, a Phase II cultural resources testing and
evaluation program shall be conducted for TS-01 and TS-02. The Phase II evaluation
plan shall contain a research design and field methodology designed to evaluate the
significance of the sites pursuant to applicable law and in accordance with general
archaeological reporting standards for such. If Phase II testing determines the
presence of a "unique archaeological resource" under Public Resources Code
Section 21083.2, the report shall include recommended measures to avoid or mitigate
impacts to the sites. Where avoidance of significant resources is not feasible, Phase
Ill investigations (data recovery) shall be completed.
• All testing and evaluation shall be supervised by an individual or individuals meeting
the Secretary of the Interior's Professional Qualifications Standards as a qualified
prehistoric archaeologist for Site TS-01 and as an historic archaeologist for Site TS-
02 and/or a Registered Professional Archaeologist (RPA) with similar qualifications.
• If the Phase II cultural resources evaluation program determines that a given resource
is eligible for listing on the California Registry of Historic Resources (CRHR) and/or
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 20 of 22
local listings and therefore meets the definition of a "historical resource," or if there is
a determination by the City in consultation with the Pechanga Tribe that a resource is
"unique" pursuant to applicable law, an impact determination shall be made prior to
issuance of grading permits. If the impacts are determined to be significant,
appropriate mitigation measures shall be designed in consultation with the Pechanga
Tribe to mitigate impacts to below a level of significance with preservation as the
preferred mitigation if feasible. If preservation is not the chosen alternative, a data
recovery program shall be implemented. The data recovery program shall entail, at a
minimum, the collection of surface materials and a sufficient sample of buried
materials, analysis, and reporting of recovered materials consistent with the Cultural
Resources Treatment and Monitoring Agreement by and between the Project
Applicant and the Pechanga Tribe.
• Prior to issuance of grading permit(s) for the Project, the Project Applicant shall retain
an archaeological monitor to monitor all ground-disturbing activities with special
emphasis on the vicinity of TS-01 and TS-02 in an effort to identify any unknown
archaeological resources. Any newly discovered cultural resource deposits shall be
subject to a cultural resources evaluation.
• At least 30 days prior to seeking a grading permit, the project applicant shall contact
the Pechanga Band of Luiseño Indians for the purpose of notifying the Tribe of the
grading, excavation and monitoring program, and to coordinate with the City of Lake
Elsinore and the Pechanga Band of Luiseño Indians to develop a Cultural Resources
Treatment and Monitoring Agreement. The Agreement shall address the treatment of
known cultural resources, the designation, responsibilities, and participation of Native
American monitors during grading, excavation and ground disturbing activities;
project grading and development scheduling; terms of compensation; and treatment
and final disposition of any cultural resources, sacred sites, and human remains
discovered on the site. The City of Lake Elsinore shall be the final arbiter of any
disputes concerning the conditions included in the Agreement.
• Prior to issuance of any grading permit, the project archaeologist shall file a pre-
grading report with the City and County (if required) to document the proposed
methodology for grading activity observation. Said methodology shall include the
requirement for a qualified archaeological monitor to be present and to have the
authority to stop and redirect grading activities. In accordance with the Treatment
Agreement, the archaeological monitor's authority to stop and redirect grading shall
be exercised in consultation with the Pechanga Band of Luiseño Indians in order to
evaluate the significance of any archaeological resources discovered on the property.
Tribal monitors from the Pechanga Band of Luiseño Indians shall be allowed to
monitor all grading, excavation and groundbreaking activities, and shall also have the
authority to stop and redirect grading activities in consultation with the project
archaeologist.
• If human remains are encountered, State Health and Safety Code Section 7050.5
shall apply and no further disturbance shall occur until the County Coroner has made
a determination of origin and disposition pursuant to Public Resources Code Section
5097.98. The Riverside County Coroner shall be notified of the find immediately. If
the remains are determined to be prehistoric, the Coroner will notify the Native
American Heritage Commission (NAHC), which will determine and notify a Most
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 21 of 22
Likely Descendant (MLD). With the permission of the landowner or his/her authorized
representative, the MLD may inspect the site of discovery. The MLD shall complete
the inspection and provide its recommendations pursuant to Public Resources Code
5097.98.
PA 2021-43/TTM 34249R1/RDR 2022-06 PC: February 20, 2024
Conditions of Approval CC: TBD
Applicant’s Initials: _____Page 22 of 22
I hereby state that I acknowledge receipt of the approved Conditions of Approval for the above
named project and do hereby agree to accept and abide by all Conditions of Approval as approved
by the City Council of the City of Lake Elsinore on _________ . I also acknowledge that all
Conditions shall be met as indicated.