Loading...
HomeMy WebLinkAboutDowntown SB-821 Sidewalk Bid CITY OF LAKE ELSINORE CIP Project NO. Z10081 SECTION B INSTRUCTIONS TO BIDDERS B-1 CITY OF LAKE ELSINORE CIP Project NO. Z10081 INSTRUCTIONS TO BIDDERS A. QUALIFICATION OF BIDDERS 1. Competency of Bidders The Bidder shall be thoroughly competent and capable of satisfactorily performing the Work covered by the Bid. As specified in the Bid Documents, the Bidder shall furnish statements of previous experience on similar work. When requested, the Bidder shall also furnish the plan of procedure proposed; the organization, machinery, plant and other equipment available for the Work; evidence of its financial condition and resources; and any other such documentation as may be required by the City to determine if the Bidder is responsible. 2. Contractor's License At the time of submitting the Bid, the Bidder shall be licensed as a contractor in accordance with the provisions of Chapter 9, Division 3, of the California Business and Professions Code. The required prime contractor license class for the Work is shown in the project Notice Inviting Bids. However, the City reserves the right to award the Contract to a contractor with another class if the City determines that the license is proper for the Work. 3. Contractor Registration In compliance with SB 854, in order to bid on or enter into a contract for public work, all contractor and subcontractors must possess and maintain registration with the Department of Industrial Relations (DIR) at https://efiling.dir.ca.gov/PWCR/. Bidder and all designated subcontractors shall be registered with the Department of Industrial Relations at the time of submitting the bid pursuant to Labor Code Section 1725.5. This is a separate requirement from the Contractors State License Board licensing requirements. Bids failing to meet this requirement will be deemed nonresponsive. B. BIDDER RESPONSIBILITY A responsible Bidder is a Bidder who has demonstrated the attribute of trustworthiness, as well as ability, fitness, capacity and experience to satisfactorily perform the work. Bidders are notified that, in accordance these Contract Documents, the City Council may determine whether the Bidder is responsible based upon a review of the Bidder's performance on other contracts, both within the City of Lake Elsinore and other public agencies for which the contractor has performed similar work. If, based on the provisions and criteria in these Contract Documents, the City Engineer proposes not to recommend the award of contract to the apparent low bidder, the Director shall notify the Bidder in writing of the Director’s intention to recommend to the City Council that the Council award the contract to the second lowest responsible bidder. If the Bidder presents evidence in rebuttal to the recommendation, the Director shall evaluate the merits of such evidence, and based on that evaluation, make a recommendation to the City Council. B-2 CITY OF LAKE ELSINORE CIP Project NO. Z10081 C. ADDENDA TO THE CONTRACT DOCUMENTS The City may issue Addenda for any reason during the advertising period. The Bidder shall acknowledge the receipt of any Addendum in its Bid. Failure of the Bidder to do so may result in the rejection of its Bid. D. PREPARATION OF THE BID 1. Examination of Project Site, Plans and Specifications Prior to submitting a Bid, the Bidder shall examine the Project Improvement Plans and the site of proposed contract work, carefully read the Specifications and Special Provisions, and satisfy himself or herself that he or she has the abilities and resources to complete the Work. The Bidder agrees that if he or she is awarded the Contract, no claim will be made against the City based on ignorance or misunderstanding of the provisions of the Contract Documents, the nature and amount of the work, and the physical and climatic conditions of the work sites. 2. Estimated Quantities The quantities shown in the Bid Schedule are approximate only. The Contractor will be paid for the actual quantities of work installed based on field measurements. The City reserves the right to increase or decrease the amount of any item or portion of work to be performed or materials furnished, or to delete any item, in accordance with the specifications. Should the actual quantity of an item of work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications be less than 75 percent or more than 125% of the Bid quantity, no adjustment to the Contract Unit Price, shall be made therefor. 3. Interpretation of the Documents Discrepancies in and omissions from the Special Provisions, the project Plans or other Contract documents, or questions as to their meaning shall, at once, be brought to the attention of the City. Any interpretation of the documents will be made only by Addenda dully issued, and a copy of such Addenda will be mailed or delivered to each person or firm who is listed by the City as having received a set of such documents. The City will not be responsible for any other explanations or interpretations. No oral agreement or conversation with any officers, employees, or agents of the City, either before or after execution of the Contract, shall affect or modify any of the terms of obligations contained in any of the documents comprising said Contract. 4. Bid Instructions and Submissions The Bid shall be submitted on the Bid Proposal forms included with the Specifications. All Bid Documents must be completed, executed and submitted with the Bid by the Bidder. It is the sole responsibility of the bidder to ensure that the bid is received in proper time through PlanetBids by the date and time hereinabove set forth. The electronic bid management system will not accept late bids. B-3 CITY OF LAKE ELSINORE CIP Project NO. Z10081 Required eight (8) Bid Proposal Documents: 1) Bidder's Proposal 2) Addenda Acknowledgment 3) Contractor's Affidavit 4) Bid Bond (10%) 5) List of Subcontractors 6) References (2 pages) – Will be contacted 7) Violations of Federal or State Law 8) Disqualification or Debarment All prices submitted will be considered as including any and all sales or use taxes. In the case of discrepancy between unit bid price and total bid, the unit prices shall prevail. E. BID BOND The Bid must be accompanied by either cash, a certified or cashier's check or a surety bond (bid bond) payable to the City of Lake Elsinore. Bids must be submitted on the proposal forms furnished with these specifications. The Bid Guaranty shall be in an amount equivalent to at least 10% of the Total Contract Bid Price including any additive bid. F. NONRESPONSIVE BIDS AND BID REJECTION 1. A Bid in which the required eight (8) proposal documents are not completed, executed and submitted may be considered non-responsive and be rejected. 2. A Bid in which the Contract Unit Prices are unbalanced, which is incomplete, or which shows alteration of form or irregularities of any kind, or which contains any additions or conditional or alternate Bids that are not called for, may be considered non-responsive and be rejected. G. LIMITED NOTICE TO PROCEED WITH CONSTRUCTION Upon completion of the evaluation of Bids received (including references verified for responsiveness) and determination of lowest responsive Bidder (Contractor), the City Engineer will issue a “Limited Notice to Proceed” to Contractor with the council action of approval of intention to award. The intent of “Limited Notice to Proceed” is to allow the Contractor time to order long lead items. Upon receipt of said Notice, Contractor shall submit the items listed below in full compliance with the requirements of these specifications, within five (5) calendar days of the date of said Notice: 1) Agreement for Public Works Construction executed by Contractor 2) Faithful Performance Bond (100% of Bid) B-4 CITY OF LAKE ELSINORE CIP Project NO. Z10081 3) Labor and Material Bond (100% of Bid) 4) Verification of Insurance Coverage (Certificates and Endorsements) 5) Construction or Service Contract Endorsement 6) Workers' Compensation Insurance Certificate 7) Construction-Excavation Permit Application Form (No fee is assessed for public works projects) 8) Proof of a City of Lake Elsinore Business License Should the City Council not award a contract to Contractor, Contractor shall be entitled to reimbursement for the premiums of said insurances and bonds plus a 10% administrative fee on said premiums, the payment of which by City to Contractor shall constitute full compensation for Contractor’s compliance with this section. H. AWARD OF CONTRACT The City reserves the right to reject any and all bids received and to re-advertise for bids. Further, the City Council reserves the right to take all bids under advisement for a period not-to-exceed sixty (60) days after date of opening thereof, to waive any informality or irregularity in the Bid, and to be the sole judge of the merits of material included in the respective bids received. I. Termination. City may cancel this Agreement at any time upon seven (7) days written notice to Contractor. Contractor agrees to cease all work under this Agreement on or before the effective date of such notice. In the event of termination or cancellation of this Agreement by City, due to no fault or failure of performance by Contractor, Contractor shall be paid full compensation for all services performed by Contractor, in an amount to be determined as follows: For work done in accordance with all of the terms and provisions of this Agreement, Contractor shall be paid an amount equal to the amount of services performed prior to the effective date of termination or cancellation; provided, in no event shall the amount of money paid under the foregoing provisions of this paragraph exceed the amount which would be paid Contractor for the full performance of the services required by this Agreement. J. NOTICE TO PROCEED WITH CONSTRUCTION Within fifteen (15) calendar days of award of the contract by the City Council, the City shall schedule a mandatory pre-construction meeting. During this meeting a date of the start of work will be established. This date will take into account the expected delivery date of long lead items, if any. A Notice to Proceed with Construction will then be issued directing the Contractor to commence contract work. Contractor must complete all work within forty (40) Working Days from the date of commencement of work specified in the Notice to Proceed and shall complete all contract items. Contractor shall order the long lead items immediately upon award of Contract. K. APPRENTICESHIP EMPLOYMENT STANDARDS The Contractor is directed to the provisions in Sections 1776, 1777.5 and 1777.6 of the California Labor Code concerning the employment of apprentices by the contractor or any subcontractor under them. B-5 CITY OF LAKE ELSINORE CIP Project NO. Z10081 L. PERMITS AND LICENSES The Contractor shall procure and execute all required permits, licenses, pay all charges and fees, and give all notices necessary and incidental to the completion of the Work. No fee is charged for a Construction-Excavation Permit issued by the City of Lake Elsinore for a public works project. The Contractor shall pay for and obtain a City of Lake Elsinore Business License. M. INSURANCE The Contractor shall maintain Automobile Liability, General Liability, and Workers’ Compensation Insurance as specified in the Agreement for Public Works Construction, included in the Project Specifications. N. PRE-BID INQUIRIES All questions technical, commercial, or contractual in nature shall be directed to the Q&A section on the e-Procurement System PlanetBids. No Phone Calls. Contacting the City of Lake Elsinore personnel directly regarding this bid is prohibited and may be grounds for elimination from the selection process. All questions regarding this bid must be put in writing and submitted through the e- Procurement system PlanetBids no later than 3:00 pm, May 16, 2023. B-6 CITY OF LAKE ELSINORE CIP Project NO. Z10081 SECTION C BID DOCUMENTS C-1 CITY OF LAKE ELSINORE CIP Project NO. Z10081 BIDDER’S PROPOSAL DOWNTOWN SB-821 CURB, GUTTER AND SIDEWALK AND SUMNER AVENUE SIGNING AND STRIPING PROJECT CIP PROJECT NO. Z10081 Company: _________________________________________________ Honorable Mayor, Members of the Council: In accordance with the Notice Inviting Bids pertaining to the receiving of bid proposals by the City of Lake Elsinore for the above titled improvement, the undersigned hereby proposes to furnish all Work to be performed in accordance with the Specifications, Standard Drawings, and the Contract Documents, for the unit price or lump sum set forth in the following schedule: Time of Completion: Forty (40) Working Days from Issuance of Notice to Proceed (NTP) by City to Contractor. BID SCHEDULE A-CURB, GUTTER AND SIDEWALK ITEM NO. DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST 1 Mobilization And Project Information Sign LS 1 2 Traffic Control Plan & Implementation LS 1 3 Construction Survey And Staking LS 1 4 Storm/Non Storm Water Pollution Control And Implementation LS 1 5 Clearing & Grubbing LS 1 6 Minor/Grading Excavation LS 1 7 Sawcut And Remove Existing A.C. Pavement (8140 Sf) LF 3,766 8 Remove PCC Sidewalk SF 3,862 9 Remove AC Sidewalk SF 3,850 10 Relocate Sign EA 21 11 Relocate Mailbox EA 20 12 Relocate Chainlink Fence LF 60 13 Remove Tree Completely EA 10 14 Remove And Replace Existing 32' - CMP Storm Drain Pipe With City Provided Pipe, Connect To Existing Catch Basins LS 1 15 Sawcut & Remove Portion Of Existing Curb & Construct Gravel Pad, 3'x3' Min, W/#3 Backing LS 1 16 Construct Curb & Gutter (Type 6) 18" Wide LF 2,650 17 Construct Curb & Gutter (Type 6) 24" Wide LF 137 18 Construct Curb & Gutter (Type 6) 48" Wide LF 27 19 Construct Curb (Type 6a) And Per Plan LF 146 20 Construct Variable Height Curb 0" To 8" LF 24 21 Construct PCC Driveway Approach Per County Of Riverside Std. No. 207 SF 4,911 22 Construct Sidewalk Std. No. 210 & 213 SF 19,868 C-2 CITY OF LAKE ELSINORE CIP Project NO. Z10081 23 Construct Access Ramp And Truncated Domes Per Std. No. 214A EA 2 24 Reconstruct Access Ramp And Truncated Domes Per Std. No. 214a, Existing Curb To Remain EA 3 25 Construct Access Ramp And Truncated Domes Per County Of Riverside Std. No. 403 EA 5 26 Construct Access Ramp No. 7 Per Sheet 7 And 12 Of Plans LS 1 27 Construct Cross Gutter Per County Of Riverside Std. No. 209 (6' Wide) SF 452 28 Construct HMA Transition & Dike Per Caltrans Std. No. A87b Type E, Case F LF 58 29 Sawcut, Remove And Replace Portion Of PCC Driveway SF 1,775 30 Sawcut, Remove And Replace Portion Of AC Driveway SF 398 31 Remove And Replace PCC Walkway In Kind SF 65 32 Construct 4" Asphalt Concrete (8,790 Sf) TONS 205 33 Construct 6" Agg. Base Class Ii (8,790 Sf) CY 326 34 Adjust To Grade Sewer Cleanout EA 4 35 Adjust To Grade Water Valve EA 6 36 Adjust To Grade Communication Box EA 4 37 Adjust To Grade Gas Valve EA 1 38 Adjust To Grade Electrical Riser EA 2 39 Adjust To Grade Fire Hydrant EA 3 40 Adjust To Grade Water Meter EA 6 41 Adjust To Grade Air Vac. EA 1 42 Remove Existing Wall, And Construct Garden Wall From Salvage Blocks LF 8 Schedule A Bid Price Total Bid for Bid Schedule A: (Figures*) Total Bid for Bid Schedule A: (words*) C-3 CITY OF LAKE ELSINORE CIP Project NO. Z10081 BID SCHEDULE B- SUMNER AVENUE SIGNING AND STRIPING ITEM NO. DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST 1 Mobilization And Project Information Sign LS 1 2 Traffic Control Plan & Implementation LS 1 3 Furnish And Install Sign And Post (R4-11) EA 14 4 Furnish And Install 2 Signs And Post (R81 And R81A/R81B) EA 7 5 Install 6" Solid White Thermoplastic Striping Per Caltrans Detail 39 LF 4,135 6 Install 6" White Thermoplastic Intersection Striping Per Caltrans Detail 39A LF 700 7 Install Thermoplastic Bike Lane And Arrow Per MUTCD Figure 9C-3-C EA 8 8 Install Thermoplastic Shared Bike Lane And Arrow Per Caltrans Standard Plan A24C EA 24 Schedule B Bid Price Total Bid for Bid Schedule B: (Figures*) Total Bid for Bid Schedule B: (words*) TOTAL BID PRICE: Note: Estimated quantities are for the purpose of Bid comparison only; payments will be made on the basis of actual measurement of Work completed, except for lump sum (LS) and final pay (F) quantities. (S) denotes a specialty item. The Bid Price shall include, but not be limited to, sales tax and all other applicable taxes and fees. All work described on the plans and in the specifications and other incidentals necessary to complete the project shall be paid under items above. No additional payments will be allowed. *BID MAY BE REJECTED IF TOTAL IS NOT SHOWN FOR BOTH FIGURES AND WORDS. TOTAL BID PRICE BASED ON BID SCHEDULES TOTAL OF UNIT PRICES FOR DOWNTOWN SB-821 CURB, GUTTER AND SIDEWALK AND SUMNER AVENUE SIGNING AND STRIPING PROJECT $ Total Bid Price in Numbers $ Total Bid Price in Written Form In case of discrepancy between the written price and the numerical price, the written price shall prevail. C-4 CITY OF LAKE ELSINORE CIP Project NO. Z10081 The undersigned agrees to enter into and execute a contract, with necessary bonds, at the unit prices set forth herein and in case of default in executing such contract, with necessary bonds, the check or bond accompanying this bid and the money payable thereon shall be forfeited thereby to and remain the property of the City of Lake Elsinore. The above unit prices include all work appurtenant to the various items as outlined in the Specifications and all work or expense required for the satisfactory completion of said items. In case of discrepancies between unit prices and totals, the unit prices shall govern. The undersigned declares that it has carefully examined the Plans, Specifications, and Contract Documents, and has investigated the site of the work and is familiar with the conditions thereon. Contractor Date: _______________________________ By: ___________________________________ Contractor’s State License No.: _______________________________ Class: ___________________________________________________ Department of Industrial Relations Registration No: ___________________________________ Registration Date: _________________________ Expiration Date: ______________________ Address: ____________________________________________________________________ Phone: FAX: C-5 CITY OF LAKE ELSINORE CIP Project NO. Z10081 ACKNOWLEDGMENT OF ADDENDA RECEIVED DOWNTOWN SB-821 CURB, GUTTER AND SIDEWALK AND SUMNER AVENUE SIGNING AND STRIPING PROJECT CIP PROJECT NO. Z10081 The Bidder shall acknowledge the receipt of addenda by placing an "X" by each addendum received. Addendum No. 1 Addendum No. 2 Addendum No. 3 Addendum No. 4 If an addendum or addenda have been issued by the City and not noted above as being received by the Bidder, the Bid Proposal may be rejected. Bidder’s Signature Date ____________________________________ ____________________ Print Name Title C-9 CITY OF LAKE ELSINORE CIP Project NO. Z10081 LIST OF SUBCONTRACTORS DOWNTOWN SB-821 CURB, GUTTER AND SIDEWALK AND SUMNER AVENUE SIGNING AND STRIPING PROJECT CIP PROJECT NO. Z10081 The bidder is required to fill in the following blanks in accordance with the provisions of the Subletting and Subcontracting Fair Practices Act (Chapter 2 of Division 5, Title 1 of the Government Code of the State of California) and should familiarize itself with Sections 2-3 of the Standard Specifications. Name Under Which Subcontractor is Licensed: ______________________________________ ____________________________________________________________________________ License Number: _______________________ Address of Office, Mill or Shop: ___________________________________________________ Specific Description of Sub-Contract: and Bid Items of Work:____________________________ ____________________________________________________________________________ Name Under Which Subcontractor is Licensed: ______________________________________ ____________________________________________________________________________ License Number: _______________________ Address of Office, Mill or Shop: ___________________________________________________ Specific Description of Sub-Contract: and Bid Items of Work ____________________________ ____________________________________________________________________________ Name Under Which Subcontractor is Licensed: ______________________________________ ____________________________________________________________________________ License Number: _______________________ Address of Office, Mill or Shop: ___________________________________________________ Specific Description of Sub-Contract: and Bid Items of Work:____________________________ ____________________________________________________________________________ Name Under Which Subcontractor is Licensed: ______________________________________ ____________________________________________________________________________ License Number: _______________________ Address of Office, Mill or Shop: ___________________________________________________ Specific Description of Sub-Contract: and Bid Items of Work:____________________________ ____________________________________________________________________________ Subcontractors listed in accordance with the provisions of Section 2-3 must be properly licensed under the laws of the State of California for the type of work that they are to perform. Do not list alternate subcontractors for the same work. C-10 CITY OF LAKE ELSINORE CIP Project NO. Z10081 REFERENCES DOWNTOWN SB-821 CURB, GUTTER AND SIDEWALK AND SUMNER AVENUE SIGNING AND STRIPING PROJECT CIP PROJECT NO. Z10081 Failure to demonstrate adequate experience may result in rejection of the bid. For all public agency projects with a similar scope of work which you have worked on (or are currently working on) in the past two (2) years, provide the following required information: 1. Name (Firm/Agency) ________________________________________________ Address __________________________________________________________ Project Title ________________________________________________________ Project Location_____________________________________________________ Type of Work ______________________________________________________ Project Manager Contact ____________________ Phone____________________ Dated Completed _______________ Contract Amount ____________________ 2. Name (Firm/Agency) ________________________________________________ Address __________________________________________________________ Project Title ________________________________________________________ Project Location_____________________________________________________ Type of Work ______________________________________________________ Project Manager Contact ____________________ Phone____________________ Dated Completed _______________ Contract Amount ____________________ 3. Name (Firm/Agency) ________________________________________________ Address __________________________________________________________ Project Title ________________________________________________________ Project Location_____________________________________________________ Type of Work ______________________________________________________ Project Manager Contact ____________________ Phone____________________ Dated Completed _______________ Contract Amount ____________________ C-11 CITY OF LAKE ELSINORE CIP Project NO. Z10081 List any other projects (private, older than three (3) years, etc.) that may represent qualifying or similar experience: 4. Name (Firm/Agency) ________________________________________________ Address __________________________________________________________ Project Title ________________________________________________________ Project Location_____________________________________________________ Type of Work ______________________________________________________ Project Manager Contact ____________________ Phone____________________ Dated Completed _______________ Contract Amount _____________________ 5. Name (Firm/Agency) ________________________________________________ Address __________________________________________________________ Project Title ________________________________________________________ Project Location_____________________________________________________ Type of Work ______________________________________________________ Project Manager Contact ____________________ Phone____________________ Dated Completed _______________ Contract Amount ____________________ 6. Name (Firm/Agency) ________________________________________________ Address __________________________________________________________ Project Title ________________________________________________________ Project Location_____________________________________________________ Type of Work ______________________________________________________ Project Manager Contact ____________________ Phone____________________ Dated Completed _______________ Contract Amount ____________________ C-12 CITY OF LAKE ELSINORE CIP Project NO. Z10081 CONTRACTOR INFORMATION DOWNTOWN SB-821 CURB, GUTTER AND SIDEWALK AND SUMNER AVENUE SIGNING AND STRIPING PROJECT CIP PROJECT NO. Z10081 Contractor’s License No.: ______________________ Class: _____________________ a. Date first obtained: __________________________ Expiration _____________ b. Has Bidder’s License ever been suspended or revoked? ________________ If yes, describe when and why: _____________________________________________ c. Any current claims against License or Bond? _________________ If yes, describe claims: ___________________________________________________ Principals in Company (List all – attach additional sheets if necessary): NAME TITLE LICENSE NO. (If Applicable) CITY OF LAKE ELSINORE CIP Project NO. Z10081 VIOLATIONS OF FEDERAL, STATE OR LOCAL LAWS DOWNTOWN SB-821 CURB, GUTTER AND SIDEWALK AND SUMNER AVENUE SIGNING AND STRIPING PROJECT CIP PROJECT NO. Z10081 1. Has your firm or its officers been assessed any penalties by an agency for noncompliance or violations of Federal, State or Local labor laws and/or business or licensing regulations within the past five (5) years relating to your construction projects? YES / NO (circle one) Federal / State / Local (circle one) If “YES,” identify and describe, (including agency and status): ____ ____ Have the penalties been paid? YES / NO (circle one) 2. Does your firm or its officers have any ongoing investigations by any public agency regarding violations of the State Labor Code, California Business and Professions Code or State Licensing Laws? YES / NO (circle one) Code/Laws: Section/Article: If “yes,” identify and describe, (including agency and status): ____ ___ 3. Has Bidder been “default terminated” by an owner (other than for convenience), or has a Surety completed a contract for Bidder within the last five (5) years? YES / NO (circle one) If “yes,” please explain: ______________________________ __________ 4. Has Bidder been cited more than twice for failure to pay prevailing wages in the last five (5) years? YES / NO (circle one) If “yes,” please explain: _____________________________ __________ CITY OF LAKE ELSINORE CIP Project NO. Z10081 Notes: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification. Signature Date Print Name Title __________________________________________________________ Contractor Name CITY OF LAKE ELSINORE CIP Project NO. Z10081 DISQUALIFICATION OR DEBARMENT DOWNTOWN SB-821 CURB, GUTTER AND SIDEWALK AND SUMNER AVENUE SIGNING AND STRIPING PROJECT CIP PROJECT NO. Z10081 Has your firm, any officer of your firm, or any employee who has a proprietary interest in your firm ever been disqualified, removed, or otherwise prevented from bidding on, performing work on, or completing a federal, state or local project because of a violation of law or a safety regulation? YES / NO (circle one) If yes, provide the following information (if more than once, use separate sheets): Date: _______________ Entity: Location: Reason: Provide Status and any Supplemental Statement: ____ Has your firm been reinstated by this entity? YES / NO (circle one) Notes: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification. Signature Date Print Name Title Contractor Name CITY OF LAKE ELSINORE CIP Project NO. Z10081 If the Bidder fails to properly sign or omits the required signature, the bid will be considered non-responsive and will be rejected. UTILITY AGREEMENT DOWNTOWN SB-821 CURB, GUTTER AND SIDEWALK AND SUMNER AVENUE SIGNING AND STRIPING PROJECT CIP PROJECT NO. Z10081 HONORABLE MAYOR AND CITY COUNCIL CITY OF LAKE ELSINORE, CALIFORNIA The undersigned hereby promises and agrees that in the performance of the work specified in this contract for Project NO. Z10081, DOWNTOWN SB-821 CURB, GUTTER AND SIDEWALK AND SUMNER AVENUE SIGNING AND STRIPING PROJECT, (I) (we) (it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary, primary or transmission facilities. The term “Qualified person” is defined in Title 8, California Administrative code, Section 2700, as follows: Qualified Person: A person who by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved.” The undersigned also promises and agrees that all such work shall be performed in accordance with all applicable electrical utility company’s requirements, Public Utility Commission orders, and State of California Cal-OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Signature By: Name Title Contractor Name CITY OF LAKE ELSINORE CIP Project NO. Z10081 PUBLIC CONTRACT CODE DOWNTOWN SB-821 CURB, GUTTER AND SIDEWALK AND SUMNER AVENUE SIGNING AND STRIPING PROJECT CIP PROJECT NO. Z10081 Public Contract Code Section 10285.1 Statement In accordance with Public Contract Code Section 10285.1 (Chapter 376, State. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has __ , has not ________ been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term “bidder” is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1. Note: The bidder must place a check mark after “has” or “has not” in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. Public Contract Code Section 10162 Questionnaire In accordance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire: Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation: Yes No If the answer is yes, explain the circumstances in the following space. Public Contract Code 10232 Statement In accordance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediate preceding two- year period because of the Contractor’s failure to comply with an order of federal court which orders the Contractor to comply with an order of the National Labor Relations Board. Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. Signature Date Print Name Title Contractor Name