HomeMy WebLinkAboutBaker Industrial_Project Description_Reference E I P I D SOLUTIONS, INC. Project Summary
1 PROJECT SETTING
1.1 PROJECT LOCATION
The proposed project—a two new warehouse buildings and related improvements—is located
southwest of the intersection of Baker Street and Pierce Street in the City of Lake Elsinore. Regional
access to the project site is provided by Interstate 15 (1-15) located 0.40 miles east of the site.
Local access to the site is provided from Baker Street and Pierce Street. The existing site and
surrounding area is shown in Figure 1, Aerial Project Location.
The project site is identified by Assessor's Parcel Numbers 378-020-0141 -015, -016, -028, -029,
-030, -031, -036, -037, -048.
1.2 EXISTING PROJECT SITE
The project site encompasses 10 parcels totaling approximately 65.81 acres. The site is currently
vacant and undeveloped with naturally occurring vegetation which consists of low lying shrubs and
grasses. A single-family residential home was once constructed on the site, however it was since
demolished and only the concrete building pad remains and a couple associated trees. Power lines
are located along the site frontage along Baker Street. The site is not flat and contains a sloping
topography associated with the hills south of the site. There are also several dirt trails located
throughout the site that connect to and continue through the adjacent parcels. The project site's
existing conditions are shown in Figure 2, Project Vicinity.
1.3 EXISTING LAND USES AND ZONING DESIGNATION OF THE PROJECT SITE
The project site has a General Plan Land Use designation of Limited Industrial and zoning
designations of Limited Manufacturing (M-1) and General Manufacturing (M-2) which are both
compatible with the Land Use. As it relates to the proposed project, the Limited Industrial Land Use
was designed to provide "for industrial parks, warehouses, manufacturing, research and
development, public and quasi-public uses, and similar and compatible uses". The maximum FAR in
this designation is 0.45.
1.4 SURROUNDING GENERAL PLAN AND ZONING DESIGNATIONS
The surrounding land uses are described in Table 1 along with the General Plan Land Use and
Zoning designations.
Table 1: Surrounding Existing Land Use and Zoning Designations
Existing Use Zone General Plan
Northeast Baker Street followed General Manufacturing M- Limited Industrial
by vacant and 2
undeveloped land
Southeast Non-conforming Limited Manufacturing M- Limited Industrial, Public
residence, institutional 1, Public/Institutional (PI) Institutional
facility
E I P I D SOLUTIONS, 1Nc. Project Summary
Southwest Vacant and Single Family Residential Low-Medium Residential,
undeveloped land.Two (R-1), Hillside Single Family Hillside Residential
single family homes are Residential (RH)
located adjacent to the
southwest most corner
of the site.
Northwest Pierce Street followed Residential Mixed Use Residential Mixed Use
by vacant and (RMU)
undeveloped land.
2 PROJECT DESCRIPTION
2.1 PROJECT OVERVIEW
The proposed project will consist of constructing two new warehouse buildings and related onsite
and offsite improvements. The conceptual site plan is provided as Figure 3.
2.2 PROJECT FEATURES
Development & Operational Summary
The proposed project will consist of two new warehouse buildings totaling a combined 1,000,451
SF. Building 1 will be 212,028 SF, inclusive of 5,000 SF of ground floor office, 5,000 SF of
mezzanine, and include 23 dock doors along the southwest side of the building. Building 2 will be
788,423 SF inclusive of 10,000 SF of ground floor office, 10,000 SF of mezzanine, and include
110 dock doors along the southeast side of the building. Building 1 will be located at the
northwestern end of the site and Building 2 will be located at the southeastern end of the site.
The proposed project will be accessible via five new points of entry. Four driveways will be
constructed along Baker Street and one driveway will be along Pierce Street. Building 1 will be
accessible via the driveway along Pierce Street and one driveway along Baker Street. Truck access
will be via the 53-foot driveway along Baker Street. Building 2 will be accessible via three
driveways along Baker Street. Trucks will utilize the northern and southern most 50-foot driveways
to access the site. The two buildings will not be connected via drive aisles and will only be accessible
via the above-mentioned points of access.
The proposed project includes a total of 406 vehicle parking stalls combined between the two
proposed buildings. Building 1 will have 174 vehicle parking stalls located along the northeastern,
northwestern, and southwestern perimeters of the site. Building 1 will also have 31 trailer stalls
located opposite the dock doors at the southwestern end of the building. Building 2 will have 232
associated vehicle parking stalls located largely to the southwest of the building, and a few stalls
will be located northeast of the building. Additionally, Building 2 will have 219 trailer parking stalls
located to the northwest and northeast of the building. The project also proposes a trailer parking
lot at the southeast most part of the project site which will allow for 149 trailer parking stalls.
Loading and unloading activity within the truck court of both buildings will be secured by a gate at
all points of entry.
E I P 1 D SOLUTIONS, INC. Project Summary
The project is designed is designed to screen loading and unloading activities away from adjacent
residential land uses. Building 1 is designed for the truck court to be screened from the adjacent
residences west of the building. Building 2 is designed for loading and unloading activity to be
located northeast of the building in order to screen truck activities away from the residentially
related land uses southwest of the building. The proposed project will also include landscaping
along Baker Street to screen the project from the right-of-way. Building 1 will contain a 26.45%
landscape coverage and Building 2 would contain an 27.1 8% landscape coverage. Additionally,
the trailer parking lot would contain a 52.34% landscape coverage for a total site landscape
coverage of 31%.
As part of the proposed project, the M-1 portion of the site will undergo a zone change to M-2 in
order for the project site to have consistent zoning. Additionally, the project will include a tentative
parcel map to merge the 10 parcels into 3 separate parcels. Building 1 and Building 2 would each
be located on a single parcel, and the trailer parking lot would be the third parcel.
Table 2 and Table 3 below shows the proposed project's consistency with the City of Lake Elsinore's
development standards for the M-2 zone.
Table 2: Building 1 Development Standards
Development Standard Required Provided
Parking Office: 1/250 SF 174 spaces
Warehouse 1-20K SF: 11500 SF
Warehouse 20,001 SF+: 1/100 SF
262 spaces required
FAR 0.45 0.39
Maximum Structure Height 45' Will Meet Standard
Front Setback (to building or Shall average 20', but not be less 15' from parking lot,
parking area) than 15'. 10' reduction to parking 95' from building
may be allowed by City Council if
a decorative wall, artwork, or
public amenity is installed.
Interior Setback N/A unless adjacent to residential 48' from parking lot,
use or public right-of-way in which 98' from building
the front setback requirement
applies
Landscape Coverage 1 2% 26.45%
Table 3: Building 2 Development Standards
Development Standard Required Provided
Parking Office: 1/250 SF 232 spaces
Warehouse 1-20K SF: 11500 SF
Warehouse 20,001 SF+: 1/100 SF
868 spaces required
FAR 0.45 0.42
E I P 1 D SOLUTIONS, INC. Project Summary
Development Standard Required Provided
Maximum Structure Height 45' Will Meet Standard
Front Setback (to building or Shall average 20', but not be less 24' from parking lot,
parking area) than 15'. 10' reduction to parking 147' from building
may be allowed by City Council if
a decorative wall, artwork, or
public amenity is installed.
Interior Setback/Side Setback N/A unless adjacent to residential 181' from building
use or public right-of-way in which
the front setback requirement
applies
Landscape Coverage 12% 27.18%
The project is designed to function as a high cube warehouse building. Typical operational
characteristics include employees traveling to and from the site, delivery of materials and supplies
to the site and truck loading and unloading. The project is assumed to operate 24/7, however this
may shift depending on tenant as hours of operation are unknown.
2.3 DISCRETIONARY APPROVALS, PERMITS, AND STUDIES
The following discretionary approval, permits, and studies are anticipated to be necessary for
implementation of the proposed project:
City of Lake Elsinore
• Design Review: Commercial/Industrial
• Conditional Use Permit (allowable uses within 300 feet of a residential district require a
CUP)
• Tentative Parcel Map
• Zone Change
• Environmental Impact Report
ba5sy-`alif u
-� Oulle(s at L�`
C
ogle,• �:�. - ,� .N
1000 ft
E I P I D SOLUTIONS, INC. Project Summary
Figure 2 — Project Vicinity
-41
! �o .may 1. t,f�ti4.:"^ :, ..J,^� '7'+,Y, ��• .�••
L11nity Park
VIP, 0
ZZ
• ,jyr 1LY L� ���:
y� 'r"17
� f
.r•JeI 'Eke
���r • �,� �'" 1w.� y+.��9,��'q�_s� .�.s�t� ��_ .`-,� c._r--) � �h`!: o T ��. :,.'r'tH.
40
i+"- F :' , •'a��t �a t/ ,�y(� y� j,. .y � ?>j'M�' .�f•'� .,'v`� �f }'�+
'' �,Cl '�.� ��'rlts•`!• .�, Ltd— '�'�'x, �(., � �„` �
`_ T, � tit'n i' F� y.•,�{j,! a .".. - ti Cry, `� �'`�L.,.aai-�� y/�' � �%'�` _
E I P I D SOLUTIONS, INC. Project Summary
Figure 3 —Conceptual Site Plan
71
wayRl. atl,.<� WE -
n
GM
O
RU M.I
wE
+a -
r I I
/ I YIGLf i[NWI
/ omPWxr.m708 SF —-P Ruancs ,_�
MEII.VI*[ Sr O _ - - $,.,n_,
GfA.22oEe Sf g —o iGG Duv.B.. -
GGCIWMCx-H51 4$ ARZIINXE:IR.OD)Ri
GGNSFWum rME:111$�
MMRF gSiglfS:' tlCCUPXNR':BIS-1
_ MM NEUNr:5UR CgIyiRUClI%Tmt W8
ITF_'I{�} III—"III YI III }-- ICI 4XUMRER Hi S1UWE5.1 �II{—�II{ "II�''I� II�'II�"'III IIr 14MIERIMITM
tl I t - I�I I .....GM'L f' I _H t1 I I I�_I�1�_ _ Oi � �Iluvlw
R
-P. f T... .M