HomeMy WebLinkAboutPA 2020-103.PPA 2020-09. PAR Letter CITY OF ins
42
LADE ,LSINORE
�1u DREAM EXTREME
October 21, 2020
CHI/Acquisitions CA, LP.
Attn: Dane Palanjian
527 W 71" Street, Suite 308
Los Angeles, CA 90014
RE: Planning Application No. 2020-103 (Preliminary Application Review No. 2020-09)
(Baker Street Industrial)
Dear Mr. Palanjian;
Thank you for submitting the above-mentioned preliminary application for the development of a
new industrial warehouse complex with three (3) buildings (1,287,740 sq. ft. in total), 1,161 auto
parking spaces, and 281 trailer parking spaces on an approximately 71.43 acre site. The project
site is located at the southeast corner of Pierce Street and Baker Street. (APNs: 378-020-014, -
015, -016, -028, -029, -030, -031, -036, -037, -038, -039 and -048). This letter and the
corresponding attachments are a summary of comments made at the October 15, 2020 Design
Review Committee (DRC) meeting.
1. The project is located within a Western Riverside Multiple Species Habitat Conservation Plan
(MSHCP) Criteria Cell #4166. An application for MSHCP Consistency Determination (LEAP)
along with the required fee should be submitted for review. The application form is available
online: http://www.lake-elsinore.org/home/showdocument?id=24725.
2. The current General Plan Land Use Designation for the project site is Limited Industrial (LI).
The LI land use designation provides for industrial parks, warehouses, manufacturing,
research and development, public and quasi-public uses, and similar and compatible uses.
The Floor Area Ratio (FAR) shall not exceed 0.45.
3. The current zoning for the subject site is Limited Manufacturing (M-1) and General
Manufacturing (M-2). Staff recommends processing a Zone Change application to change the
entire site to M-2 concurrently with the other entitlements. Both the M-1 and M-2 zoning
designations are compatible with the LI General Plan Land Use Designation. This will ensure
that the Parcels created with this project will not result in split zoning designations and same
development standards will apply to the overall project.
4. The project has a potential to impact the surrounding residential zoned area. Potential issues
that need to be addressed include, but not limited to, the following:
■ Integration with or adequate buffer from the surrounding residential area.
■ Vehicular traffic generated by the project
■ Noise impacts
■ Health impacts to sensitive receptors
■ Air Quality and Green House Gas (GHG) impacts
5. The applicant should conduct a community outreach to the surrounding neighbors.
\\FLINT\shared\Community Development\Planning\CURRENT PLANNING\Project Files\PA\2020\PA 2020-103 Baker Street Industrial\Correspondence\PA 2020-
103.PPA 2020-09.PAR Letter.dou
PA 2020-103/PPA 2020-09
October 21, 2020
Page 2 of 3
6. Required Applications:
■ Zone Change
■ Tentative Parcel Map
■ Conditional Use Permit
■ Industrial Design Review
7. An Environmental Impact Report(EIR)will be required for this project. The following technical
studies are anticipated as necessary:
■ Air Quality Analysis
■ Biological Resources/MSHCP Consistency Analysis
■ Cultural resources
■ Energy Analysis
■ Geotechnical/soils evaluation
■ Greenhouse Gas Analysis
■ Health Risk Assessment
■ Hydrology Study
■ Noise Study
■ Paleontological Resources
■ Phase I Environmental Site Assessment
■ Traffic Impact Study (See Traffic Impact Analysis Preparation Guide)
■ Utilities and Service Systems Study
■ Water Quality Management Plan
8. Comments from the following departments regarding this project are attached to this letter:
■ Engineering Department
■ Fire Department
■ Building and Safety Department
■ Elsinore Valley Municipal Water District
Please direct specific questions to the following DRC members as applicable:
• Building Division: Bill Belvin, (951) 674-3124, Ext. 286 or bbelvin(a Lake-elsinore.orq
• Fire Department: Steve Payne, (951) 674-3124, Ext. 225 or spayne(a_lake-elsinore.org
• Engineering: Carlos Norvani, (951) 674-3124, Ext. 248 or cnorvani(a)-Lake-Elsinore.orq
If you have any questions or concerns regarding this letter, you may reach me by phone at (951)
674-3124, Ext. 913 or by e-mail at dabraham(a-)_lake-elsinore.orq.
Sincerely,
Damaris Abraham
Senior Planner
City of Lake Elsinore
PA 2020-103/PPA 2020-09
October 21, 2020
Page 3 of 3
Attachments:
1. Engineering Department Comments
2. Fire Department Letter dated October 7, 2020
3. EVMWD Letter dated October 14, 2020
4. Building and Safety Requirements
CITY OF cr
LADE C LSINOIJE
ENGINEERING DEPARTMENT -� 7
Project: Baker Street Industrial
Project No.: PA 2020-103 (PAR 2020-09)
DRC Comments:
1. Parcel Map required.
• Reciprocal access easements required between Building 2 and Building 3.
2. Dedicate additional right-of-way on Baker Street for half-width total of 34' along project frontage.
Baker Street is classified as Collector road.
3. Dedicate additional right-of-way on Pierce Street for half-width total of 30' along project frontage.
Pierce Street is classified as Local road.
4. Half-width improvements for Baker Street
• Includes but not limited to curb, gutter, sidewalk, pavement, streetlights, etc.
• Acceptable to construct full width pavement improvements due to nature of project
5. Half-width improvements for Pierce Street
• Includes but not limited to curb, gutter, sidewalk, pavement, streetlights, etc.
• Acceptable to construct full width pavement improvements due to nature of project
6. Project lies within FEMA Special Flood Hazard Zone.
• Meet all requirements of Lake Elsinore Municipal Code 15.64 regarding Flood Damage
Prevention.
7. Soil report required.
8. Preliminary Hydrology report required.
9. Complete and submit Traffic Scoping Agreement to City Traffic Engineer for review and approval.
10. Preliminary/ Final WQMP required
• Preliminary WQMP shall be approved by City prior to Planning Commission hearing
• Final WQMP shall be approved prior to grading plan approval and permit issuance
11. Fees:
• TUMF
• Industrial —$1.84/sf
■ Commercial—$7.50/sf
• Office—$2.38/sf
• TIF
■ Industrial —$0.81/sf
■ Commercial—$3.84/sf
• Office—$1.45/sf
• Area Drainage
• Nichols Street SE District—$3,005/gross acre
CITY OF
LADE L LSINOIZE
�� DREA
ENGINEERING DEPARTMENT
Project: Baker Street Industrial
Project No.: PA 2020-103 (PAR 2020-09)
• Stephens Kangaroo Rat Fee—$500/gross acre
• Plan Check and Permit fees varies.
RIVERSIDE COUNTY FIRE DEPARTMENT
IN COOPERATION WITH
THE CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION
130 South Main Street, Lake Elsinore, CA 92530• Phone (951)674-3124
www.rvcfire.org
PROUDLY SERVING THE
UNINCORPORATED AREAS
OF RIVERSIDE COUNTY
AND THE CITIES OF:
BANNING Planning Case Comments
BEAUMONT DATE: 10/7/2020
CANYON LAKE
COACHELLA CASE: PA 2020-103
DESERT HOT SPRINGS
EASTVALE APN 378-020-014 et al
INDIAN WELLS
INDIO PLANNER: Damaris Abraham, Senior Planner
JURUPA VALLEY
LAKE ELSINORE REVIEWED BY: Steve Payne, Assistant Fire Marshal
LAQUINTA The Fire Department has reviewed this submittal and provides the
MENIFEE following comments:
MORENO VALLEY
1. Hazardous Fire Area: this project is in a Very High Fire Hazard
NORco Severity Zone of Riverside County as shown on a map on file with
PALM DESERT the Clerk of the Board of Supervisors. Any building constructed
PERRIS within this project shall comply with special construction provisions
RANCHO MIRAGE contained in the California Building Code.
RUBIDOUXCSD 2. The applicant must provide a fire hydrant system capable of
SANJACINTO delivering fire flow as required by the California Fire Code and Fire
TEMECULA Department standards. Fire hydrants shall be spaced in
WILDOMAR accordance with the California Fire Code. Based on current
standards, the required fire flow is estimated to be 4,000 GPM at
20 PSI for a 4 hour duration. Estimated fire flow is based on a
BOARD OF 598,090 square foot building area with Type III-B construction per
SUPERVISORS: 2019 California Fire Code.
KEVIN JEFFRIES
DISTRICT 1 3. The applicant must provide a fire command center for buildings
KAREN SPIEGEL larger than 300,000 square feet in area in accordance with
DISTRICT 2
California Fire Code 508, Lake Elsinore Municipal Code Section
CHARLES WASHINGTON DISTRICT 3 15.56 and fire department standards.
V.MANUAL PEREZ
DISTRICT 4. Gates must meet Fire Department standards at the time of building
JEFF HEWITT permit application. Current standards require that gates have a
DISTRICT 5
Knox rapid entry system and be set back up to 35 feet to allow
emergency vehicles to safely stop away from traffic flow.
These comments are preliminary; further review will occur upon
receiving further planning applications. Additional conditions may be
necessary at that time.
Please feel free to contact me with any questions.
Board of Directors General Manager
Andy Morris, President Greg Thomas
Phil Williams,Vice President District Secretary
Darcy Burke, Treasurer z:V= Terese Quintanar
Harvey R. Ryan, Director sore 1/alle Municipal WaterDistrict a Legal Counsel
Elsinore Jared K. McBride, Director y pBest Best& Krieger
Our Mission...
EVMWD will provide reliable, cost-effective, high quality water and wastewater services
that are dedicated to the people we serve.
October 14, 2020
CHI/Acquisitions CA, LP
Attn: Dane Palanjian
527 W 71h Street,Suite 308
Los Angeles,CA 90014
SUBJECT: PLANNING APPLICATION (PA) NO. 2020-103
BAKER ST INDUSTRIAL-LAKE ELSINORE
EVMWD WO# 20-013
On September 29,2020,the District received the subject PA.The project consists of a new industrial warehouse
complex with three (3) buildings of 1,287,740 sq. ft. in total gross floor area on approximately 71.43 acre site
located at the southeast corner of Pierce Street and Baker Street (APN 378-020-014, 015, 016, 028, 029, 030,
031, 036, 037, 038, 039 and 048). The site plan for this project is attached as Exhibit A and the existing water
and sewer map is attached as Exhibit B.The District has the following comments:
• Developer/Owner will be required to schedule a Due Diligence meeting with the District to discuss the
following potential sewer and water requirements:
o Provide a water hydraulic study that analysis the offsite and onsite average day demand,maximum
day demand,peak hour demand and maximum day+fire flow demand.
o Provide a sewer hydraulic study that analysis the onsite and offsite sewer system and
includes an analysis on Nichols Lift Station.
o Provide a Preliminary Design Report for the Lift Station.
o Install onsite and offsite water facilities.
o Install onsite and offsite sewer facilities.
o Install 36"master planned transmission water main.
• Developer/Owner will be required to dedicate to the District an Easement for all onsite public water and
sewer facilities.
• Developer/Owner will be required to dedicate to the District a Water Rights Grant Deed.
• Developer/Owner will be required to submit a Fire Flow Application.
• Developer/Owner will be required to submit a Will Serve Application.This application will detail the water
and sewer capacity fees.
• Developer/Owner will be required to submit, and secure, a Wastewater Industrial Permit from EVMWD
Pre-Treatment Department.
• Developer/Owner will be required to submit a Plan Check Application and plan check deposit for the
water,sewer,sewer forcemain and lift station facilities.
• Developer/Owner will be required to submit an Inspection Application Package with inspection
deposit and complete a Pre-Construction meeting with the District prior to construction on/around
sewer, water, and recycled water facilities.
951.674.3146 31315 Chaney Street
Fax 951.674.9872 P.O.Box 3000
www.evmwd.com Lake Elsinore, CA 92530
Dane Palanjian, CHI/Acquisitions CA, LP
October 14, 2020
Page 2
If you have any questions, please contact the Engineering Department at (951) 674-3146 Ext. 6705,
engservices@evmwd.net.
Respectfully,
aA"'
Mayra Cabrera
Senior Civil Engineer-Development Services
CC: City of Lake Elsinore
Attachment(s): Exhibit A-Site Plan; Exhibit B-Water and Sewer Map
F:\ENGIN\2_Developer Projects\2020\20-013-Nichols Industrial Center\1.Pre Planning\1st PAR Review\10-14-20-Baker Industrial(PA 2020-103)
-WO 20-013.docx
Exhibit A
- -
- �c4tf �f _ - - - - _ - - -
�:
330
W
W
- - - - - - - - - - - - - - - - - - - - - - - - - --
J -
I
- - - - - - - - - - - - - - - - - - - - - - - - - - � �RI€ � -S-TET -- - - -- - - - -
- - - - - - - - - - - - - - - - -
- - - --
r
=-
�i JOF I -E 0FFfE- € +4
E
UIL
- r
F
\ /
0 240'a
71 TRAILER STALLS 106 TRAILER STALLSco
_F_
i
- -- MASTER PROJECT PARKING DATA - REQUIRED PARKING
PROJECT SUMMARY:
AB�L _ OFFICE YAREHOUSE WAREHOUSE TOTAL --TOTAL APPROX. SITE AREA: 3,111 ,446 SF
\\ BLDG. LOTS S E I OFFICE AREA E PARKING ARKING 1- PARKING 20,001 REQUIRED PROVIDED
B DG.AREA AREA: 20,000SF 71 .43 AC
SF(1/1000) PARKING PARKING
\ - 1 1 267, 0 SF 26,74 SF 40,696 F 107 ST,LLS 1 40 STALLS 1 TALLS 368 STALLS 248 STALLS
3 2 422 0 0_SF 42,2 1 SF 68 186 SF 120 ST�LLS —40 STALLS 3 0 TALLS 569 STALLS 498 STALLS
S 40STALLS $ TALLS 708 STALLS 415 STALLS BUILDING AREA: 1 ,265,740 SF
TOTALS - 1,287,74-0-SF 98,8140 I SIF 1,188,871 SF 395 ST LLS 120 STALL ,129 FALLS 1,644 STALLS 1,161 STALLS
MASTER PROJECT DATA
-- COVERAGE: 40.68
BLDG. LOTS SITE AREA BLDG.AREA MEZZANINE G.F.A. COVERAGE F.A.R. LANDSCAPE LDSP COVERAGE
1 1 593,523 SF 13.63 AC 263,440 SF 4,000 SF 267,440 SF 44.39% 45.06% 93,756 SF 15.80D/o
2 2 1,046,168 SF 24.02 AC 414,210 SF 8,000 SF 422,210 SF 39.59% 40.36% 272,164 SF 26.02%
3 3 1,471,755 SF 33.79 AC 588,090 SF 10,000 SF 598,090 SF 39.96% 40.64% 531,584 SF 36.12%
TOTALS 3,111,446 SF 71.43 AC 1,265,740 SF 22,000 SF 1,287,740 SF 40.68% 41.39% 897,504 SF 28.85%
SCALE:1"=150'-0"
PIERCE BAKER T R E E T RGA PROJECT NO: 20103 DG
CAD FILE NAME: 20103-00-Ai-01 RGA
DRAWN BY: MG
CHK'D BY: CS
Office COPYRIGHT:RGA,OFFICE OF ARCHITECTURAL DESIGN
of " CITY OF LAKE ELSINOR, CA SHEET TITLE
15231 Alton Parkway,Suite 00 CROW HOLDINGS
Irvine,CA 92618 INDUSTRIAL Al - 1
MARK DATE
PRE-APPLICATION SITE PLAN DATE CONCEPTUAL SITE PLAN
DESCRIPTION
Exhibit B
Water and Sewer Map - Baker St Industrial _ Irt,0 0 a a
Elsinore Valley Municipal Water District
P !"
_ Legend
IVf EVMWD Boundary
EVMWD Sphere of Influence
2 o U nt Street Centerlines
rline s
/�S SOT Oca ❑ Parcels
S T w
w Q eO,y ❑ Waterbodies
w Non Potable Pressure Mains
H
IIIW Air Release
O Opw4Q �S t O — Blowoff
='Q Z Q Distribution Main
KINGS HWY J - Hydrant Lateral
O, w
Sampling Point
� HOFF AVE
OO����� �,. — Transmission Main
Drain Line
CARSON
AVE �\���. Recycled Pressure Main
Distribution Main
A� Transmission Main
GRAYAVE STF Air Release
- Blowoff
Hydrant Lateral
Back Basin Tributary Benefit A
'9 SHALL C�C9� L A
•Q MAR , .Q ( ,O� B
SON Area Excluded
O
GPNE� J�' ti Q\ ► Gravity Mains
0 Lift Station
Ag Line
7- GUt4 S S� �� Ag Line
LP
9L�G� ULMER ST �p���(� RSO NRVs`L gF'OpJ� S��, 1: 13,400
2,233.3 0 1,116.67 2,233.3 Feet This application has been provided to give a visual display of District facilities Notes
and related geographic information. To be sure of complete accuracy,please
check with Engineering staff for the most up to date information.
Data Sources:EVMWD,County of Riverside
10/12/2020 1:49:48 PM
BUILDING AND SAFETY DEPARTMENT
General Conditions
B-1. Final Building and Safety Conditions. Final Building and Safety Conditions will
be addressed when building construction plans are submitted to Building and Safety for review.
These conditions will be based on occupancy, use, the California Building Code (CBC), and
related codes, which are enforced at the time of building, plan submittal.
B-2. Compliance with Code. All design components shall comply with applicable
provisions of the 2019 edition of the California Building,Plumbing and Mechanical
Codes: 2019 California Electrical Code; California Administrative Code, 2019
California Energy Codes, 2019 California Green Building Standards, California
Title 24 Disabled Access Regulations, and Lake Elsinore Municipal Code.
B-3. Green Measures. The application shall provide 10% voluntary green measures on
the project, as stipulated by the 2019 California Green Building Standards.
B-4. Disabled Access. Applicant shall provide details of all applicable disabled access
provisions and building setbacks on plans to include:
a. All ground floor units to be adaptable.
b. Disabled access from the public way to the entrance of the building.
c. Van accessible parking located as close as possible to the main entry.
d. Path of accessibility from parking to furthest point of improvement.
e. Path of travel from public right-of-way to all public areas on site, such as club
house, trach enclosure tot lots and picnic areas.
B-5. Street Addressing. Applicant must obtain street addressing for all proposed
buildings by requesting street addressing and submitting a site plan for commercial
or multi-family residential projects or a recorded final map for single- family
residential projects. It takes 10 days to issue address and notify other agencies.
Please contact Sonia Salazar at ssalazar&lake-elsinore.org or 951-674-3124 X 286
B-6. Clearance from LEUSD. A receipt or clearance letter from the Lake Elsinore
School District shall be submitted to the Building and Safety Department to ensure
the payment or exemption from School Mitigation Fees.
B-7. Obtain Approvals Prior to Construction. Applicant must obtain all building plans
and permit approvals prior to commencement of any construction work.
B-8. Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light
standards, and any block walls will require separate approvals and permits.
B-9. Sewer and Water Plan Approvals. On-site sewer and water plans will require
separate approvals and permits. Septic systems will need to be approved from
Riverside County Environmental Health Department before permit issuance.
B-10. House Electrical Meter. Applicant shall provide a house electrical meter to provide
power for the operation of exterior lighting, irrigation pedestals and fire alarm
systems for each building on the site. Developments with single user buildings
shall clearly show on the plans how the operation of exterior lighting and fire alarm
systems when a house meter is not specifically proposed.
At Plan Review Submittal
B-11. Must submit Grading Plans to Engineering prior to Building. Building will not
accept plans if they have not been submitted to Engineering first.
Submitting Plans and Calculations. Applicant must submit to Building and
Safety four (4) complete sets of plans and two (2) sets of supporting calculations
for review and approval including:
a. An electrical plan including load calculations and panel schedule, plumbing
schematic, and mechanical plan applicable to scope of work.
b. A Sound Transmission Control Study in accordance with the provisions of the
Section 5.507, of the 2019 edition of the California Green Code.
c. A precise grading plan to verify accessibility for the persons with disabilities.
d. Truss calculations that have been stamped by the engineer of record of the
building and the truss manufacturer engineer.
Prior to Issuance of Grading Permit(s)
B-12. Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted
separately from the building plans, shall be submitted to Building and Safety for
review and approval.
B-13. Demolition Permits. A demolition permit shall be obtained if there is an existing
structure to be removed as part of the project. Asbestos report and lead base paint
reports are required before demo permit will be issued.
Prior to Issuance of Building Permit(s)
B-14. Plans Require Stamp of Registered Professional. Applicant shall provide
appropriate stamp of a registered professional with original signature on the plans.
Provide C.D. of approved plans to the Building Division.
Prior to Beginning of Construction
B-1 S. Pre-Construction Meeting. A pre-construction meeting is required with the
building inspector prior to the start of the building construction.