Loading...
HomeMy WebLinkAboutBaker Industrial_WQMP Application DocuSign Envelope ID:BEB342BF-3755-47AD-8A52-C18F9B4A4E65 CIIY OI LAKE .2Lsl� ENGINEERING DIVISION 130 South Main Street, Lake Elsinore, CA 92530, P 951.674.3124, F 951.674.8761 www.lake-elsi nore.orci PRELIMINARY WATER QUALITY MANAGEMENT PLAN (WQMP) PLAN CHECK SUBMITTAL APPLICATION Instructions 1. Complete Checklist on reverse side. If any question is answered "YES", a project-specific WQMP is required. 2. Complete form below and submit with land use application. If WQMP is required,submit, below-listed documents &fees NOTE: THE PROJECT APPLICATION CANNOT BE DEEMED COMPLETE UNTIL SUCH TIME THAT THE PRELIMINARY WQMP IS APPROVED APN (S): DECIMAL DEGREES: (ex, 33.0000/-117.0000) 378-020-014, -015, -016, -028, -029, -030, -031,-036, -037, -048 33 42'03.72N 117 21 '43.80W • PARCEL/TRACT NO: WATERSHED:San Jacinto • PROJECT STREET ADDRESS:Baker Street CROSS STREETS:Baker Street,Pierce Street PROJECT AREA(to 0.1 acre): 65.8 LIST PROPOSED BMPS: SUBMITTED BY: EPD Solutions COMPANY: STREET ADDRESS 3333 Michelson Drive, Suite 500 CITY/STATE/ZIP: Irvine, CA 92612 PHONE:949-466-1199 EMAIL:heather@epdsolutions.com • ENGINEER: COMPANY: KWC Engineers • STREET ADDRESS 1880 Compton Avenue, Suite 100 CITY/STATE/ZIP: Corona CA 92881 PHONE:951-734-2130 ext 203 EMAIL:brandon.barnett@kwcengineers.com • OWNER/APPLICANT: COMPANY: RIVERSIDE LEGACY IV NICHOLS ROAD,LLC STREET ADDRESS 5550 Newbury Street, Suite B CITY/STATE/ZIP: Baltimore, MD 21209 PHONE:617-877-7637 1 EMAIL:trygg@ecosystempartners.com SUBMIT THE FOLLOWING ITEMS WITH THIS APPLICATION 1 Copy Preliminary WQMP in approved format. - FORMAT: Use WQMP Guidance Document and Template for Santa Ana Region 8, Riverside County 1 Copy of Proposed Tentative Map and/or Site Plan $1,850.00 Application Fee ($1,750.00 Plan Check Fee + $100 Administrative Fee) NOTES: Plan Check Fee covers 3 reviews/plan checks. If more plan checks are required,then additional charges based on time and material will be assessed and due City Plan Check Turnaround Standard: 3 weeks 1st submittal/2 weeks each subsequent submittal. Expedited plan check of 2 weeks/1 week available at additional charge of 50%of original plan check fee $875.00 Wengr\Forms\Engineering Forms\APPLI CATION S\WQMP Submittal Sheet-preliminary.doc DocuSign Envelope ID:BEB342BF-3755-47AD-8A52-C18F9B4A4E65 CITY OF L A VQE LSI� Checklist for Identifying Projects Requiring a MEAM LXTatME Project-Specific WQMP within the Santa Ana Region Project File No.: Project Name: Baker Street Industrial Project Location: Southwest of the Baker Street/Pierce Street Intersection Project Description: Development of 2 high cube warehouses totaling 212,730 SF and 789,181 SF and related site improvements.Previously submitted as PAR 2021 Proposed Project Consists of or Includes: Yes No Significant Redevelopment: The addition or replacement of 5,000 square feet or more of impervious surface on an already developed site. Does not include routine maintenance activities that are conducted to maintain original line and grade, hydraulic capacity,original purpose of the constructed facility or emergency redevelopment activity required to protect public health and safety. Residential developments that create 10,000 square feet or more of impervious surface (collectively over the entire project ❑ site), including residential housing subdivisions requiring a Final Map (i.e., detached single family home subdivisions, multi- family attached subdivisions,condominiums,or apartments,etc.). New industrial and commercial development where the land area' represented by the proposed map or permit is 10,000 ❑ square feet or more. El Mixed use developments that create 10,000 square feet or more of impervious surface (collectively over the entire project El site). u Automotive repair shops [Standard Industrial Classification (SIC) codesZ 5013, 5014, 5541, 7532, 7533, 7534, 7536, 7537, ❑ 7538,and 75391. Restaurants(SIC code 5812)where the land area of development is 5,000 square feet or more. ❑ E Hillside developments disturbing 5,000 square feet or more which are located on areas with known erosive soil conditions or ❑ I—! where the natural slope is 25 percent or more. F� Developments of 2,500 square feet of impervious surface or more adjacent to (within 200 feet) or discharging directly into ESAs. "Directly" means situated within 200 feet of the ESA; "discharging directly" means outflow from a drainage ❑ conveyance system that is composed entirely of flows from the subject development or redevelopment site, and not commingled with flows from adjacent lands. Parking lots of 5,000 square feet or more exposed to stormwater, where"parking lot" is defined as a land area or facility for ❑ the temporary parking or storage of motor vehicles. Ej Retail Gasoline Outlets that are either 5,000 square feet or more of impervious surface with a projected average daily traffic ❑ I of 100 or more vehicles per day. u Public Projects, other than Transportation Projects, that are implemented by a Permittee and similar in nature to the priority ❑ projects described above and meets the thresholds described herein. Condition of Approval requires preparation of a WQMP. 1 Land area is based on acreage disturbed. 2 Descriptions of SIC codes can be found at http://www.osha.gov/pls/imis/sicsearch.html. DETERMINATION: Circle appropriate determination Any question answered "YES" Project requires a project-specific WQMP. All questions are answered "NO" Project requires incorporation of Site Design BMPs and Source Control BMPs imposed through Conditions of Approval or permit conditions. Contact the City NPDES Coordinator for more information or visit the City's Stormwater/NPDES webpage at www.lake-elsinore.org. Wengr\Forms\Engineering Forms\APPLI CATION S\WQMP Submittal Sheet-preliminary.doc