HomeMy WebLinkAboutAttachment 6 - Project Description 43180 Business Park Drive Suite 203 Temecula, CA 92590
714-331-6114 | info@urbandwellarchitects.com
Project Name: Central & Collier
Address: 18295 Collier Ave, Lake Elsinore, Ca 92530
PC#: 2023-15
06-06-2023
Dear City of Lake Elsinore - Planning Division,
Project Description:
The site is located at 18295 Collier Ave, Lake Elsinore, California.
The project is a New Construction for Starbucks coffee shop within an existing shell lease space.
• The Coffeeshop and the drive-through are open to service between 4am and 12am.
• The Coffeeshop offers an indoor and outdoor seating area and Drive-Through and
pickup services.
• The shop is projected to have an average of 25 employees.
• To reduce potential traffic impacts, at peak hours if the Drive-through queue exceeds 10
cars, an employee with handheld device takes orders from the drive-through queue in
addition the Digital Order screen to hasten the ordering process.
The New Construction includes:
Site:
• Landscape Patch & Infill.
• Some parking spaces will be demolished, and new ones will be added.
• Site Signage will be demolished, and new signage will be added.
• Existing drive-through equipment will be demolished, and new equipment will be
added.
• Existing trash enclosure will be demolished, and a new one will be added.
Building:
• A portion of the Storefront will be demolished, and a new storefront will be added.
• Some of the interior and exterior walls will be demolished, and new ones will be added.
• Some of the interior and exterior doors will be demolished, and new ones will be added.
2
• The addition of exterior patio furniture.
• Roof membrane and mechanical equipment will be demolished, and new ones will be
added.
Interior:
• New Interior non-bearing partition walls.
• Restroom will be demolished, and new one will be added.
• New beverage preparation equipment.
• New Casework.
• Floor finishes will be demolished, and new ones will be added.
• Wall finishes will be demolished, and new ones will be added.
• Existing Ceiling will be demolished, and a new one will be added (ACT and Gyp. Board).
• Existing lighting will be demolished, and new ones will be added.
• HVAC diffusers will be demolished, and new ones will be added.
• New trench in existing concrete slab for Plumbing and Electric.
Sincerely,
__________________________________
MAIKEL FARAGALLA, AIA
Architect of Record