Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Executed Agreement Michael Baker
DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 AGREEMENT FOR PROFESSIONAL SERVICES Michael Baker International, Inc. Plan Check Services This Agreement for Professional Services (the "Agreement") is made and entered into as of June 27, 2023, by and between the City of Lake Elsinore, a municipal corporation ("City") and Michael Baker International, Inc., a corporation ("Consultant"). RECITALS A. The City has determined that it requires the following professional services: Plan Check Services B. Consultant has submitted to City a proposal, dated March 24, 2023, attached hereto as Exhibit A ("Consultant's Proposal") and incorporated herein, to provide professional services to City pursuant to the terms of this Agreement. C. Consultant possesses the skill, experience, ability, background, certification and knowledge to perform the services described in this Agreement on the terms and conditions described herein. D. City desires to retain Consultant to perform the services as provided herein and Consultant desires to provide such professional services as set forth in this Agreement. AGREEMENT 1. Scope of Services. Consultant shall perform the services described in Consultant's Proposal (Exhibit A). Consultant shall provide such services at the time, place, and in the manner specified in Consultant's Proposal, subject to the direction of the City through its staff that it may provide from time to time. 2. Time of Performance. a. Time of Essence. Time is of the essence in the performance of this Agreement. The time for completion of the professional services to be performed by Consultant is an essential condition of this Agreement. Consultant shall prosecute regularly and diligently the professional services contemplated pursuant to this Agreement according to the agreed upon performance schedule in Consultant's Proposal (Exhibit A). b. Performance Schedule. Consultant shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the Consultant's Proposal (Exhibit A). When requested by Consultant, extensions to the time period(s) specified may be approved in writing by the City Manager. C. Term. Unless earlier terminated as provided elsewhere in this Agreement, this Agreement shall continue in full force and effect for a period commencing on July 1, 2023 and Professional Services Agreement-Michael Baker 071823R Page 1 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 ending June 30, 2026. The City may, at its sole discretion, extend the term of this Agreement on a 12-month basis not to exceed two (2) additional twelve (12) month renewal terms by giving written notice thereof to Consultant not less than thirty (30) days before the end of the contract term, such notice to be exercised by the City Manager. 3. Compensation. Compensation to be paid to Consultant shall be in accordance with the fees set forth in Consultant's Proposal (Exhibit A), which is attached hereto and incorporated herein by reference. In no event shall Consultant's annual compensation exceed Two Hundred Thousand Dollar ($200,000) without additional written authorization from the City. Notwithstanding any provision of Consultant's Proposal to the contrary, out of pocket expenses set forth in Exhibit A shall be reimbursed at cost without an inflator or administrative charge. Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment. 4. Method of Payment. Consultant shall promptly submit billings to the City describing the services and related work performed during the preceding month to the extent that such services and related work were performed. Consultant's bills shall be segregated by project task, if applicable, such that the City receives a separate accounting for work done on each individual task for which Consultant provides services. Consultant's bills shall include a brief description of the services performed, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Consultant no later than thirty (30) days after receipt of the monthly invoice by City staff. 5. Background Checks. At any time during the term of this Agreement, the City reserves the right to make an independent investigation into the background of Consultant's personnel who perform work required by this Agreement, including but not limited to their references, character, address history, past employment, education, social security number validation, and criminal or police records, for the purpose of confirming that such personnel are lawfully employed, qualified to provide the subject service or pose a risk to the safety of persons or property in and around the vicinity of where the services will be rendered or City Hall. If the City makes a reasonable determination that any of Consultant's prospective or then current personnel is deemed objectionable, then the City may notify Consultant of the same. Consultant shall not use that personnel to perform work required by this Agreement, and if necessary, shall replace him or her with a suitable worker. 6. Suspension or Termination. a. The City may at any time, for any reason, with or without cause, suspend or terminate this Agreement, or any portion hereof, by serving upon the Consultant at least ten (10)days prior written notice. Upon receipt of such notice, the Consultant shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement such suspension or termination shall not make void or invalidate the remainder of this Agreement. b. In the event this Agreement is terminated pursuant to this Section, the City shall pay to Consultant the actual value of the work performed up to the time of termination, provided that the work performed is of value to the City. Upon termination of the Agreement pursuant to this Section, the Consultant will submit an invoice to the City, pursuant to Section entitled "Method of Payment" herein. Page 2 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 7. Plans, Studies, Documents. a. Ownership of Documents. All plans, studies, documents and other writings prepared by and for Consultant, its officers, employees and agents and subcontractors in the course of implementing this Agreement, except working notepad internal documents, shall become the property of the City upon payment to Consultant for such work, and the City shall have the sole right to use such materials in its discretion without further compensation to Consultant or to any other party. Consultant shall, at Consultant's expense, provide such reports, plans, studies, documents and other writings to City upon written request. City shall have sole determination of the public's rights to documents under the Public Records Act, and any third- party requests of Consultant shall be immediately referred to City, without any other actions by Consultant. b. Licensing of Intellectual Property. This Agreement creates a nonexclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant shall require that all subcontractors agree in writing that City is granted a nonexclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were prepared by design professionals other than Consultant or provided to Consultant by the City. City shall not be limited in any way in its use of the Documents & Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. C. Confidentiality. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other Documents& Data either created by or provided to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant. Such materials shall not, without the prior written consent of City, be used by Consultant for any purposes other than the performance of the services under this Agreement. Nor shall such materials be disclosed to any person or entity not connected with the performance of the services under this Agreement. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use City's name or insignia, photographs relating to project for which Consultant's services are rendered, or any publicity pertaining to the Consultant's services under this Agreement in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of City. 8. Consultant's Books and Records. a. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant to this Agreement. Page 3 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 b. Consultant shall maintain all documents and records which demonstrate performance under this Agreement for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Agreement. C. Any records or documents required to be maintained pursuant to this Agreement shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Manager, City Attorney, City Auditor or a designated representative of these officers. Copies of such documents shall be provided to the City for inspection at City Hall when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Consultant's address indicated for receipt of notices in this Agreement. d. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Consultant's business, City may, by written request by any of the above-named officers, require that custody of the records be given to the City and that the records and documents be maintained in City Hall. Access to such records and documents shall be granted to any party authorized by Consultant, Consultant's representatives, or Consultant's successor-in-interest. 9. Independent Contractor. a. Consultant is and shall at all times remain as to the City a wholly independent contractor pursuant to California Labor Code Section 3353. The personnel performing the services under this Agreement on behalf of Consultant shall at all times be under Consultant's exclusive direction and control. Neither City nor any of its officers, employees, or agents shall have control over the conduct of Consultant or any of Consultant's officers, employees, or agents, except as set forth in this Agreement. Consultant shall not at any time or in any manner represent that it or any of its officers, employees, or agents are in any manner officers, employees, or agents of the City. Consultant shall not incur or have the power to incur any debt, obligation, or liability whatsoever against City, or bind City in any manner. b. Notwithstanding any other federal, state and local laws, codes, ordinances and regulations to the contrary and except for the fees paid to Consultant as provided in the Agreement, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits. 10. PERS Eligibility Indemnification. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS)to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. 11. Interests of Consultant. Consultant (including principals, associates and professional employees) covenants and represents that it does not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered Page 4 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 by this Agreement or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Consultant's services hereunder. Consultant further covenants and represents that in the performance of its duties hereunder no person having any such interest shall perform any services under this Agreement. Consultant is not a designated employee within the meaning of the Political Reform Act because Consultant: a. will conduct research and arrive at conclusions with respect to his/her rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal agreement monitoring; and b. possesses no authority with respect to any City decision beyond rendition of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).) 12. Professional Ability of Consultant. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall therefore provide properly skilled professional and technical personnel to perform all services under this Agreement. All work performed by Consultant under this Agreement shall be in accordance with applicable legal requirements and shall meet the standard of quality ordinarily to be expected of competent professionals in Consultant's field of expertise. 13. Compliance with Laws. a. Consultant shall comply with all local, state and federal laws and regulations applicable to the services required hereunder, including any rule, regulation or bylaw governing the conduct or performance of Consultant and/or its employees, officers, or board members. b. Consultant represents that it has obtained and will maintain at all times during the term of this Agreement all professional and/or business licenses, certifications and/or permits necessary for performing the services described in this Agreement, including a City business license. 14. Licenses. Consultant represents and warrants to City that it has the licenses, permits, qualifications, insurance and approvals of whatsoever nature which are legally required of Consultant to practice its profession. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement, any licenses, permits, insurance and approvals which are legally required of Consultant to practice its profession. Consultant shall maintain a City of Lake Elsinore business license. 15. Indemnity. Consultant shall indemnify, defend, and hold harmless the City and its officials, officers, employees, agents, and volunteers from and against any and all losses, liability, claims, suits, actions, damages, and causes of action arising out of any personal injury, bodily injury, loss of life, or damage to property, or any violation of any federal, state, or municipal law or ordinance, to the extent actively caused by the willful misconduct or negligent acts or omissions of Consultant or its employees, subcontractors, or agents, by acts for which they could be held strictly liable. The foregoing obligation of Consultant shall not apply when (1) the injury, loss of life, damage to property, or violation of law arises from the sole negligence or willful misconduct Page 5 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 of the City or its officers, employees, agents, or volunteers and (2) the actions of Consultant or its employees, subcontractor, or agents have contributed in no part to the injury, loss of life, damage to property, or violation of law. It is understood that the duty of Consultant to indemnify and hold harmless includes the duty to defend as set forth in Section 2778 of the California Civil Code. By execution of this Agreement, Consultant acknowledges and agrees to the provisions of this Section and that it is a material element of consideration. 16. Insurance Requirements. a. Insurance. Consultant, at Consultant's own cost and expense, shall procure and maintain, for the duration of the contract, unless modified by the City's Risk Manager, the following insurance policies. i. Workers' Compensation Coverage. Consultant shall maintain Workers' Compensation Insurance and Employer's Liability Insurance for his/her employees in accordance with the laws of the State of California. In addition, Consultant shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California for all of the subcontractor's employees. Any notice of cancellation or non-renewal of all Workers' Compensation policies must be received by the City at least thirty(30)days prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Consultant for City. In the event that Consultant is exempt from Worker's Compensation Insurance and Employer's Liability Insurance for his/her employees in accordance with the laws of the State of California, Consultant shall submit to the City a Certificate of Exemption from Workers Compensation Insurance in a form approved by the City Attorney. ii. General Liability Coverage. Consultant shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit. Required commercial general liability coverage shall be at least as broad as Insurance Services Office Commercial General Liability occurrence form CG 0001 (ed. 11/88) or Insurance Services Office form number GL 0002 (ed. 1/73) covering comprehensive General Liability and Insurance Services Office form number GL 0404 covering Broad Form Comprehensive General Liability. No endorsement may be attached limiting the coverage. Page 6 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 iii. Automobile Liability Coverage. Consultant shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000)combined single limit for each occurrence. Automobile liability coverage must be at least as broad as Insurance Services Office Automobile Liability form CA 0001 (ed. 12/90) Code 1 ("any auto"). No endorsement may be attached limiting the coverage. iv. Professional Liability Coverage. Consultant shall maintain professional errors and omissions liability insurance appropriate for Consultant's profession for protection against claims alleging negligent acts, errors or omissions which may arise from Consultant's services under this Agreement, whether such services are provided by the Consultant or by its employees, subcontractors, or sub consultants. The amount of this insurance shall not be less than one million dollars ($1,000,000) on a claims-made annual aggregate basis, or a combined single limit per occurrence basis. b. Endorsements. Each general liability and automobile liability insurance policy shall be with insurers possessing a Best's rating of no less than A:VII and shall be endorsed with the following specific language: i. Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, the protection offered by all policies, except for Workers' Compensation, shall bear an endorsement whereby it is provided that, the City and its officers, employees, servants, volunteers and agents and independent contractors, including without limitation, the City Manager and City Attorney, are named as additional insureds. Additional insureds shall be entitled to the full benefit of all insurance policies in the same manner and to the same extent as any other insureds and there shall be no limitation to the benefits conferred upon them other than policy limits to coverages. ii. This policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers. Any insurance maintained by the City, including any self-insured retention the City may have, shall be considered excess insurance only and shall not contribute with it. iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company. iv. The insurer waives all rights of subrogation against the City, its elected or appointed officers, officials, employees or agents. V. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents or volunteers. vi. The insurance provided by this Policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the City. Page 7 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 C. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the City's option, Consultant shall demonstrate financial capability for payment of such deductibles or self-insured retentions. d. Certificates of Insurance. Consultant shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Certificates of such insurance shall be filed with the City on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with the City at all times during the term of this Agreement. 17. Notices. Any notice required to be given under this Agreement shall be in writing and either served personally or sent prepaid, first class mail. Any such notice shall be addressed to the other party at the address set forth below. Notice shall be deemed communicated within 48 hours from the time of mailing if mailed as provided in this section. If to City: City of Lake Elsinore Attn: City Manager 130 South Main Street Lake Elsinore, CA 92530 With a copy to: City of Lake Elsinore Attn: City Clerk 130 South Main Street Lake Elsinore, CA 92530 If to Consultant: Michael Baker International, Inc. Attn: John D. Tanner III, PE 40810 Country Center Drive, Suite 200 Temecula, CA 92591 18. Assignment and Subcontracting. The parties recognize that a substantial inducement to City for entering into this Agreement is the professional reputation, experience and competence of Consultant and the subcontractors listed in Exhibit B. Consultant shall be fully responsible to City for all acts or omissions of any subcontractors. Assignments of any or all rights, duties or obligations of the Consultant under this Agreement will be permitted only with the express consent of the City. Consultant shall not subcontract any portion of the work to be performed under this Agreement except as provided in Exhibit B without the written authorization of the City. If City consents to such subcontract, Consultant shall be fully responsible to City for all acts or omissions of those subcontractors. Nothing in this Agreement shall create any contractual relationship between City and any subcontractor nor shall it create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise is required by law. 19. Waiver. Waiver of a breach or default under this Agreement shall not constitute a continuing waiver of a subsequent breach of the same or any other provision under this Agreement. 20. Litigation Expenses and Attorneys' Fees. If either party to this Agreement commences any legal action against the other party arising out of this Agreement, the prevailing party shall be entitled to recover its reasonable litigation expenses, including court costs, expert witness fees, discovery expenses, and attorneys' fees. Page 8 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 21. Mediation. The parties agree to make a good faith attempt to resolve any disputes arising out of this Agreement through mediation prior to commencing litigation. The parties shall mutually agree upon the mediator and share the costs of mediation equally. If the parties are unable to agree upon a mediator, the dispute shall be submitted to JAMS or its successor in interest. JAMS shall provide the parties with the names of five qualified mediators. Each party shall have the option to strike two of the five mediators selected by JAMS and thereafter the mediator remaining shall hear the dispute. If the dispute remains unresolved after mediation, either party may commence litigation. 22. Prohibited Interests. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom. 23. Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. 24. Prevailing Wages. Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Consultant agrees to fully comply with all applicable federal and state labor laws (including, without limitation, if applicable, the Prevailing Wage Laws). It is agreed by the parties that, in connection with the Work or Services provided pursuant to this Agreement, Consultant shall bear all risks of payment or non-payment of prevailing wages under California law, and Consultant hereby agrees to defend, indemnify, and hold the City, and its officials, officers, employees, agents, and volunteers, free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. The foregoing indemnity shall survive termination of this Agreement. 25. Severability. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 26. Controlling Law Venue. This Agreement and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Agreement shall be held exclusively in a state court in the County of Riverside. 27. Authority to Enter Agreement. Consultant has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to Page 9 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 make this Agreement and to bind each respective party. The City Manager is authorized to enter into an amendment or otherwise take action on behalf of the City to make the following modifications to the Agreement: (a) a name change; (b) grant extensions of time; (c) non- monetary changes in the scope of services; and/or (d) suspend or terminate the Agreement. 28. Counterparts. This Agreement may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties hereto. In approving this Agreement, it shall not be necessary to produce or account for more than one such counterpart. 29. Entire Agreement; Incorporation; Conflict. This Agreement contains the entire understanding between the parties relating to the obligations described herein. All prior or contemporaneous understandings, agreements, representations and statements, oral or written, are superseded in total by this Agreement and shall be of no further force or effect. Consultant's Proposal is incorporated only for the description of the scope of services and/or the schedule of performance and no other terms and conditions from such proposal shall apply to this Agreement unless specifically agreed to in writing. In the event of conflict, this Agreement shall take precedence over those contained in the Consultant's Proposal. 30. Amendments. This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney. [Signatures on next page] Page 10 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the date first written above. "CITY" CITY OF LAKE ELSINORE, a municipal "CONSULTANT" corporation Michael Baker International, Inc., a corporation DocuSigned by: �asel�t, �iw�pseln 7/27/2023 10:13 AM P16T DocuSigned by: 7/27/2023 10:13 AM PDT City anager By: John Tanner III, PE Its: Vice President ATTEST: DocuSigned by: 7/31/2023 9:58 AM PDT ity er APPROVED AS TO FORM: DocuSigned by: 3at,"Y,40& 7/25/2023 10:47 AM PDT 1411 I y orney rDocuSigned by: s"W (" 7/25/2023 10:45 AM PDT Assistant Ity Manager Attachments: Exhibit A— Consultant's Proposal Exhibit B — List of Subcontractors Page 11 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 EXHIBIT A CONSULTANT'S PROPOSAL [ATTACHED] EXHIBIT A DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 1 CITY OF LADE O,LSIfiOI�E �L %L DREAM EXTREME PLAN CHECK SERVICES Michael Baker We Make A Difference ■ DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 Michael Baker We Make a Difference INTERNATIONAL March 24, 2023 City of Lake Elsinore Engineering Department 130 South Main Street Lake Elsinore,CA 92530 Re: Proposal for Plan Check Services for Engineering Department Michael Baker International(Michael Baker)is excited at the opportunityto again support the City of Lake Elsinore (City)and are submitting this proposal as a response to the RFQ YEAR FOUNDED: 1940 for"Plan Check Services for the Engineering Department." The City has a rich past that FORM OF ORGANIZATION: Private reaches over 135 years since its incorporation in 1888. Positioned along the Butterfield Corporation Stage Route, Lake Elsinore's City Hall is located just 16 miles from our Temecula office, LEGAL NAME OF FIRM: Michael where we have over 30 engineers, surveyors, and planners. The Michael Baker team is Baker International committed to the City to provide responsive service and will be within arm"s reach of the CONTACT INFORMATION: City allowing for quick response times,and easy meeting coordination. Todd Pitner, PE, QSD/P 40810 County Center Drive,Ste 200 Introduction of the Firm Temecula,CA 92591 Working in Southwest Riverside County for over 35 years supporting our communities, Todd.Pitner@mbakerintl.com Michael Baker is a leader in engineering,consulting,planning,technical,and professional CALIFORNIA DEPT.OF INDUSTRIAL services with a local focus and global expertise. Michael Baker has over 90 offices and RELATIONS#: PW-LR-1000631983 3,000 employees worldwide and offers a full continuum of innovative solutions in OFFICES: Locally:9; Nationally:90 engineering, planning, survey, architectural, environmental, construction, program management and life cycle support, as well as information technology and EMPLOYEES: Locally: 526; Nationally: communications services. The company provides comprehensive services in support of 0 SOUTHERN federal, state,and municipal governments. SOUEMPLOYEES: CALIFORNIA OFFICES& NUMBER OF EMPLOYEES: Temecula (35);Ontario(61); Palm Work provided for this contract with the City will be completed from Michael Baker's Desert(22);Santa Ana (253); Los "TOPS" Region, or Temecula, Ontario and Palm Desert offices with technical support Angeles(6); Long Beach (24); coming from throughout the region.Our Temecula office,which will be the primary office Camarillo(11);Carlsbad (42);San servicing the City, allows the team to provide a quick in-person response time. Diego(88) Additionally, during the pandemic, Michael Baker's staff worked from home for almost three years. Now that restrictions are lifting, staff are encouraged to work in the environment most conducive to productivity—be that home or the office. We are proficient at providing efficient and seamless support to our clients through the variety of communication media commonly used,often resulting in more cost-effective meetings and services. Summary of Qualifications The Michael Baker Team brings elevated value to the City and efficiency to each task by emphasizing the consultant-client partnership and employing a complete-picture perspective. By convening the experience of our in-house engineers,environmental specialists,surveyors and construction management professionals,we can provide quality plan check services based on our experience with innovative solutions that consider the entire arc of a project, mitigate risk,save money and expedite delivery. In addition,we offer the City the following benefits: • Past Experience with the City I Michael Baker has provided services for several projects in the Lake Elsinore Valley and surrounding communities, ensuring our understanding of staff needs and City policies, procedures,and design standards. • Exceptionally Qualified Leader I Contract Manager/Main Point of Contact,Todd Pitner, brings 27 years of experience spanning all aspects of engineering for a wide variety of public works projects. As Manager of this contract, Todd has served as the Project Manager for multiple agencies,during which he has gained 40810 County Center Drive, Suite 100 1 Temecula,CA 92591 MBAKERINTL.COM Ph 951-676-8042 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 invaluable experience working with clients and managing public expectations. Todd brings unique experience and understands the approval process from a local agency's point of view, an experience that few consultants have. • Rapid Response Times I With a robust capacity of more than 500 local professionals (nationally 3,000+), Michael Baker has the resources and capacity to provide the City with continuous undisrupted service while performing multiple complex reviews simultaneously. Our staff knows how to meet demanding project schedules by pooling our resources from qualified staff throughout the region,to provide our clients responsive, insightful service and on-time performance. • Multi-Discipline Capabilities & Depth of In-House Resources I Michael Baker team members provide a diverse range of experience in each of the disciplines required for this contract. Michael Baker can utilize the staff resources and skill sets of other offices within the firm as needed to support tasks or projects that may have compressed timelines. With this deep bench of resources, Michael Baker can provide the City with flexibility, quick response times,and the proven ability to modify any course of action to accommodate changing project needs. • Fully Committed Team I Michael Baker is committed to providing the City the full-service resources available through a large firm combined with the high quality and personal attention expected of a regionally focused company. Our local knowledge, participation in community associations, and history providing professional services throughout Southern California gives us a distinct edge to serving the City in an effective manner. • A Reputation for Being Good Neighbors I Because we specialize in public works and land development projects, we constantly interface with community groups,residents,and business and property owners throughout Southern California. We will work with the City to efficiently address stakeholder concerns;to publicize the projects impacting their neighborhoods,and that their opinions are considered. • Capability and Commitment in a COVID-19 World I The Michael Baker Team has the capacity required to staff and successfully deliver plan checks under this contract. In today's COVID-19 world we have successfully transitioned to a virtual work environment. Since the pandemic began in March 2020, we have proven that we can effectively and efficiently serve our clients and deliver successful results. Throughout the past three years, Michael Baker has made significant investments in technology that have allowed our team to seamlessly work without barriers due to location. This proposal is valid for a term of 120 days from the date of submittal. We look forward to continuing our dedication and support of the City,and we are fully committed to assisting with its continued success to"Dream Extreme." Respectfully submitted, MICHAEL BAKER INTERNATIONAL John nner, PE,QSD/P Todd Pitner, PE, QSD/P Vice President Contract/Project Manager 40810 County Center Drive, Suite 100 Temecula, CA 92591 MBAKERINTL.COM Ph 951-676-8042 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF L LSI MORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Table of Contents CoverLetter.............................................................................................................................................................................................................1 Professional Services to be Provided..................................................................................................................................................................4 References— Representative Contracts.............................................................................................................................................................5 Professional Services Agreement Negotiation................................................................................................................................................11 Insurance...............................................................................................................................................................................................................13 Firm's History........................................................................................................................................................................................................14 PlanChecking Staff..............................................................................................................................................................................................15 OrganizationChart...............................................................................................................................................................................15 TeamQualifications..............................................................................................................................................................................16 KeyTeam Resumes...............................................................................................................................................................................19 PlanCheck Task Order Approach......................................................................................................................................................................26 13 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF L LSI MORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Professional 1 / Provided Michael Baker has the capability and experience to provide the following Plan Check Services: • A thorough review of all plans, online resources, studies, and supporting documents is necessary to avoid unnecessary plan check cycles that compromise overall scheduling goals.This requires our approach to identify all relevant issues during the first core plan check.We have found through experience that investing additional time up front to perform a complete review makes the overall process to the finish line quicker and smoother for all parties. • Plans, studies, and other supporting documents will be reviewed for conformance with general requirements described in City standards and examples, planning, and zoning interpretations, ordinances, construction codes, industry standards, and technical documents. • All submitted plans and reports will be cross-checked for completeness and consistency of information and potential non- conformance with the approved Tentative Map and other provided documents. • Plans, reports, and calculations will be reviewed for consistency with other applicable state and federal requirements such as the Uniform Building Code,ADA, FEMA National Floodplain Insurance Program, and International Building Code (IBC). • We will confirm the status of required approvals and agreements with other reviewing agencies such as CEQA requirements, Riverside County, California Water Board, Caltrans,Army Corp of Engineers, and other stakeholders, including neighboring cities and/or private landowners. • Where applicable,final maps will be reviewed to ascertain that signature omission letters and subordination agreements have been executed with the city, county, or other approval agencies. • Michael Baker's team will review the submittal package for conformance with City standards and "accepted engineering practices," with special consideration to those issues that potentially impact health safety or private property. These issues might include existing non-conformities with sight distance,traffic safety,and flood-prone areas. Our team of experienced project managers and licensed engineers have an extensive project experience, blends design, and plans to check expertise.This unique combination of experiences allows us to identify complex issues that stretch beyond conformance with published standards.We will not mandate design decisions that the Engineer should make of Record. • When requested by the City,Michael Baker's team will provide other engineering and/or transportation related professional services in the areas of Plan Checking and/or Development Review technical support. • Michael Baker will sign maps in the capacity of City Surveyor. Page 14 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF L LSI MORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department References — Representative Contracts To demonstrate our experience, Michael Baker has provided plan check services for regional agencies listed below: • City of Banning City of Menifee City of San Bernardino • City of Carlsbad Metropolitan Water District City of San Diego • City of Chino Hills City of Murrieta City of San Juan Capistrano • City of Coachella County of Orange City of San Diego • City of Corona City of Palm Desert City of San Marcos • City of Indian Wells City of Rancho Mirage City of Upland • City of Lake Elsinore County of Riverside City of Moreno Valley On-Call Plan Checking Services I carlsbad, cA Michael Baker provided professional engineering and land surveying plan check services on an as-needed basis. REFERENCE: Michael Baker reviewed plans, studies, calculations, maps, and supporting CITY OF CARLSBAD documents for conformance with state and local requirements and accepted 1635 FARADAY AVENUE practices.All plans were checked in accordance with the latest edition of the City's CARLSBAD,CALIFORNIA 92008 Project Engineer's Manual and Standards for Design Construction of Public Works FORMER COMMUNITY DEVELOPMENT Improvements in the City of Carlsbad. DIRECTORY,GLEN VAN PESKI Michael Baker staff provided reviews of improvement plans; grading and erosion control plans;final maps and parcel maps; water, sewer, and recycled water improvement plans; stormwater management plans (SWMP) and water pollution control plans (WPCP);and stormwater requirements applicability checklist for best management practices (BMP). This three-year contract allowed Michael Baker team members to function as an extension of City staff. The team met all deadlines established by the City and therefore never incurred a late fee. Michael Baker's office location —just 2.4 miles from the City—helped meet these deadlines and facilitate response to same-day requests. On-Call County-Wide NPDES Program I Riverside County, cA Michael Baker holds an on-call contract to provide assistance with implementation of the Riverside County Transportation Department's (RCTD) NPDES program. Tasks include construction site inspection for construction general permit REFERENCE: compliance on Caltrans oversight projects and non-Caltrans projects; SWPPP RIVERSIDE COUNTY TRANSPORTATION review, including redlines, specific comments, and assistance to RCTD staff in DEPARTMENT 12950 WASHINGTON developing a document review procedure including plan-check of water quality RIVERSIDE,CALIFORNIA 92504 management plans (WQMPs); best management practice (BMP) evaluation and CLAUDIA STEIDING 1 951-955-1694 recommendations for highway and roadway sites;post-construction BMP selection CSTEIDING@RIVCO.ORG I and design,including WQMP development;development and delivery of extensive CGP and MS4 compliance training for RCTD plan checkers and inspectors;and creation of a central tracking database to manage all NPDES- related documents, including MS4-and CGP-required inspections, monitoring,and implementation documents. Jackson Street Widening Plan Check I Riverside County, cA As part of an on-call agreement, Michael Baker provided project management-level civil plan review on behalf of the client partnered with the City of Indio to address traffic congestion, drainage deficiencies, and pedestrian and bicycle accommodations within the Jackson Street and Avenue 50 Intersection Improvement Project limits. Page 15 I N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LPL LSIROKE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department The project included construction for roadway widening,traffic signals,storm drains,and improvements to bicycle lanes and sidewalks along Jackson Street from approximately 1,600 feet south of Avenue 52 to Avenue 49. Improvements also incorporated the improvements on Avenue 50 from approximately 700 feet west of Avenue 50 to the City of Coachella boundaries to the east and widening Avenue 52 from approximately 750 feet west of Jackson Street to approximately 2,000 feet east of Jackson Street. On-Call Plan Check Services I corona, cA Michael Baker provided plan check review for development projects, including Sierra Bella,Arantine Hills,Villages of Terrassa,Montecito,and Encanto Apartments. REFERENCE: Task orders included reviews of plan-check submittals for various apartment P CITY OF CORONA 1i 400 SOUTH VICENTIA development plans for compliance with city codes, policies, project conditions of AVENUE,CORONA,CALIFORNIA 92882 approval, and applicable federal and state requirements. The team also provided MICHELE HINDERSINN, PE,SENIOR review of water quality and drainage aspects for the proposed developments. The ENGINEER 1 951-739-4951 Arantine Hills project included review of a future RCFCD facility,and the plan check MICHFI F_HINDFRSINN0rnRnNACA_c.nv was completed in coordination with the district. Traffic Engineering Plan Checking I Murrieta, cA Michael Baker is currently providing plan checking services to the City of Murrieta. Services include: traffic engineering plan checking to ensure compliance with City, County and State standards; and plan review including signing and striping plans, ppppppp REFERENCE: stage construction/traffic handling plans, and traffic signal plans. In addition, CITY OF MURRIETA 11 TOWN SQUARE Michael Baker is providing assistance in the preparation signal timing plans. MURRIETA,CALIFORNIA 92562 BOB MOEHLING 1 951-461-6036 Currently, Michael Baker is working closely with City staff to develop standard procedures and guidelines for traffic plans and specifications. Also, Michael Baker is involved in reviewing construction cost estimates associated to these projects. Michael Baker maintains a project status matrix that includes the project name,type of plans and submittal dates.This matrix is constantly updated to facilitate the review process. Engineering and Traffic Signal Management Services I Menifee, cA Michael Baker provided traffic engineering and transportation planning services to the City of Menifee. Michael Baker provided an on-site traffic engineer who served and represented the City, interfacing with the public, staff, community groups, REFERENCE: contractors, inspectors, engineers and other governmental agencies. Services Included: CITY OF MENIFEE 129714 HAUN ROAD • Review traffic, parking, and circulation along elementary and middle schools MENIFEE,CALIFORNIA 92586 and provide recommendations for improvements • Review traffic, off-site parking and circulation at San Jacinto Community College and provide recommendations for improvements • Address citizens'complaints • Prepare work orders and associated design plans for City's maintenance staff • Review traffic and parking studies and assist City staff in the development of engineering and development polices, regulations and ordinances in relation to traffic analysis; review site plans and prepare"Conditions of Approval"for proposed developments • Review signing and striping plans,traffic signal plans, and stage construction/traffic handling plans for various projects • Prepare and implemented traffic signal timing plans • Provide construction support for various projects Page 16 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LLA LSI MORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department In addition, Michael Baker worked closely with City staff to develop standard procedures and guidelines for traffic plans and specifications.Also, Michael Baker was involved in reviewing construction cost estimates, specifications and all traffic plans for City Improvement Projects. On-Call Surveying and Mapping Services I County of Riverside, CA Michael Baker is currently providing on-call services to the County Surveyors Office that include map checking for Tract Maps, Parcel Maps, Records of Surveys, and REFERENCE: Corner records according to the Riverside County Map Preparation Manual and COUNTY OF RIVERSIDE 14080 LEMON ST compliance to the Professional Land Surveyors Act. RIVERSIDE,CALIFORNIA 92501 DAVID MCMILLAN, PLS 1 951-955-6700 On-Call Engineering I Palm Desert, CA Michael Baker is currently contracted with the City of Palm Desert to provide City on-call City Engineer services over both the Public Works/CIP Division and Land Development Division of the Engineering Department. Work includes the review of Engineering plans for developments within the City, as well as oversight and REFERENCE: administration of the City's current Capital Improvement Projects. CITY OF PALM DESERT 73-510 FRED WARING DRIVE In addition, Michael Baker has been providing City Surveyor services. Michael Baker PALM DESERT,CALIFORNIA 92260 regularly reviews and approves all Tract Maps,Parcel Maps, Parcel Map Waivers and RANDY BowMAN 1 760-346-0611 supporting survey or mapping documents submitted to the City for compliance with the Subdivision Map Act, the Professional Land Surveyors Act and City Ordinances. Additionally, Michael Baker has provided survey and mapping services including Parcel Map preparation for the Civic Center, San Pablo Avenue, right-of-way and temporary construction easements, and high-accuracy control work to rehabilitate survey monumentation for public streets on numerous Capital Improvement Projects within the City of Palm Desert. Work includes record research, initial boundary and control surveys, right of way and realignment surveys as well as replacing horizontal and vertical survey control monuments and filing appropriate documents with various agencies. On-Call Surveying and Mapping Services I Countyoforonge, CA Michael Baker is currently providing on-call services to the County of Orange for map checking of Subdivision maps.This service includes review of the boundary re- REFERENCE: establishment for compliance with the PLS Act and Boundary Establishment Case Laws, variety of civil code clauses (such as Public Resource code) and Local COUNTY OF ORANGE A ,CA NORTH ROSS ST 92701 Ordinances,review of the map content for compliance with the Subdivision Map act, SANTA G, P CALIFORNIA 714 96 -0846 Local Ordinances, Tentative Map Conditions of Approval and Recording LILY SANDBERG, PLS 714-967-0846 Requirements. This work includes review of title documents, easement documents, technical review of maps and recommendations for approval. Engineering and Survey Plan Checking I Murrieta, CA Michael Baker is currently providing plan checking services to the City of Murrieta. Services include: Reviewing Engineering Plans, Reviewing Parcel and Tract Maps to REFERENCE: ensure compliance with City, County and State standards; and reviewing legal CITY OF MURRIETA 11 TOWN SQUARE descriptions and plats for easements and lot line adjustments. MURRIETA,CALIFORNIA 92562 Currently, Michael Baker is working closely with City staff to develop standard BOB MOEHLING 1 951-461-6036 procedures and guidelines for traffic plans and specifications.Also, Michael Baker is involved in reviewing construction cost estimates associated to these projects. Michael Baker maintains a project status matrix that includes the project name,type of plans and submittal dates.This matrix is constantly updated to facilitate the review process. Page 17 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF L LSI MORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Comprehensive Planning Services I Eastvale, cA Michael Baker provided comprehensive planning services this recently incorporatedFW City in Western Riverside County. REFERENCE: CITY OF EASTVALE 112363 LIMONITE Michael Baker served as the City's planning staff, providing current and advance AVENUE,SUITE 910 planning processing, counter staffing, Planning Commission meeting facilitation; EASTVALE,CALIFORNIA 91752 plan review;staff reports preparation;City functions participation;CEQA compliance BRYAN JONES 1 951-361-0900 and review; Tribes on SB18 and AB52 coordination; Western Riverside County BJONES@EASTVALECA.GOV Regional Conservation Authority (RCA) coordination for their Multiple Species Habitat Conservation Plan (MSHCP);and special project work, such as preparation of the City's Economic Development website. The Planning team routinely coordinated with the City Manager, City Attorney, Public Works team, and other key staff at the City. Project Examples include: Eastvale Crossings—The project involved development of a WalMart shopping center. Staff processed the project application, conducted plan review,and oversaw the preparation of an EIR to satisfy CEQA. Goodman Business Center—The project involved development of an industrial and business park. Staff processed the project application, conducted plan review, and oversaw conditions of approval for this phased project. The Campus—The project involved development of an industrial park. Originally processed by the City,the Michael Baker team processed an application to modify the originally approved project.An EIR Addendum was prepared to evaluate the changes to the project. Costco—The project involved development of a new commercial shopping center. Staff work to efficiently review and process project plans in time for a fall 2018 opening. Lewis Retail Center—The project involved the development of a new retail and municipal center,including a government center and library. Michael Baker coordinated with the developer to process the appropriate entitlements, peer review technical reports, and oversee the preparation of an EIR. Milliken Distribution Center—The project involved development of a new warehouse in the northern portion of the City. The planning team processed the project entitlements, coordinated with the RCA regarding potential impacts to Delhi sand flower-loving fly, conducted AB52 consultation, and prepared an IS-MND to satisfy project CEQA requirements. Page 18 1 N T E R N A T 1 0 N A L DocuSign Envelope ID: B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF L LSI ROR E Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Proven Plan Review Experience r•i r•� r•i r•i r r r••- r•-s r•- r••i r•i r• r •i r••i r••i r r 1 -t r•i r••z r•1 r j IN CHFCK SHFFT FS M M FS A FS n FS FS M rs NUMBERS (TYPI. x. 6' Mfil TER OP, d' SCR Q 5. Af W. . L+7 WATER A MS S S S S S S S S S 420 5 FORM CRAW • S TOR1u 14 DRAM N � F— W ® QL~U (n = x, 10' INA TER � W Z IKAIER ATLAS RETAINING WALL U x W •��< CLEARANCELU _ J - w w >IV BETWEEN FOOTING U PROPERTY LINEI AND WATERLINE? V.I �_ PROVIDE SECTION. �' •oo - 10.?' - rr•a - 1 X. 8, sa:>MrR — — — — — FFIXA1,IATCMINE 5 S- —S- CEMENT i 8 •• + CHECK STATION OpMNSKxV �� D1161ENSION SAME TRENCH AS DIMENSION ELECTRIC INSTALL THRUST RESTRAINT BY MECHANCAL JOINT RESTRAINT FITTINGS RATHER THAN THRUST MOCKS DFTF RAM NF JOINT RFSTRAINT 1 FNGTHS PFR EN004EERING CALCULATIONS OR S8MWD STANDARD DRAWING W6.4. TYP. SHOW ��, CHECK STATION JOINT RESTRAINT I FNGTHS IN PI AN AND PROFR F WITH DIMFNSIONWG AND CI+F•CK STATIC.`. SYMBOLS AS APPROPRIATE. SEE SBMWD DEVELOPER.INSTAL LED PLAN SET N 103 STREET TFMP1 ATF AT WWW SRMWD ORG FOR FXAMPI F ti PLAN: W STREET WATERLINE W im Page 9 1 N T E R N A T 1 0 N A L DocuSign Envelope ID: B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF RA L� LSI ROIZE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department MAPCNECK LEOFND }•ILLEGIELU DRAFTINGCLEANUP COYFAENI COMMENTS N CREEN ARE SUCCIESTIONS FOR ` CONTpIi• CURRY.OR EAPIANATgINs •REVIEWED AND CpIRECi 7 UPIAN OR REMOVE •CLOSURES CHECKED `.IAF'CHECK METHODOLOGY ONE SHEET ONLY THE REVIEWOF THIS MAPISLIKELYTO BE UNDERTAKEN BY AN L S.HAVINGANLSIT PLEASE FILL IN THE IRS NUMBER JI.., .,TICIN I- STOMARY TO SAY•SHEETI CHECK FOR CLOSURES AND SCRIVENER ERRORS O A SIMPLE FIGURE AS THIS IS NOT RECORD OF SURVEY 22 BEN AVAILABLE OF 1:USINN WHEN IS INTERPRETED USING LANGUAGE .IKELY TO RESULT IN COST SAVINGS INTERACTION WITH MULTIPLE PEOPLE MAY EVETI OUTSIDE OF CUSTOMARY MAY CREATE 470 TO THE TIME REQUIRED AND INCREASE THE COST. • CONFUSION WHEN IT IS INTERPRET W IN THE AT PEAK PRODUCTIVITY AND WITH ALL SUPPORTING DOCUMENTATION SUBMITTED M:. FUTURE,WITHOUT THE BENEFIT OF THE ORIGINAL SURVEYOR PRESENT TO CLARIFY INTENT vHOULD BE ABLE TO REVIEW THIS MAP WITHIN THREE HOURS .MALE SOME OF THE COMMENTARY ON THE MAP SEEMS LIKE IT IS VOLUMINOUS.MANY OF I HESE COMMENTS ARE REPETITIVE FROM ONE MAP TO ANOTHER AND THEIR OF THE NORTH HALF OF THE WEST HALF OF THE SOUTHEAST QUARTER 'RODUCTION IS EASILY STREAMLINED IN BLUEBEAM LAND SURVEYOR'S STATEMENT OF SECTION 19 TOWNSHIP 4 NORTH, RANGE 4 EAST S.B.M., SAN ,� AHAT MAY BE EVIDENT FROM THE MAP CHECK LEGEND ABOVE WE PLACE COMMENTS IN THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME _EVERAL CATEGORIES RED COMMENTS FALL IN TE COMPLIANCE WITH THE LAWS BERNARDINO COUNTY, CALIFORNIA �.ECTION.YELLOW HIGHLIGHTING INDICATES WHAT HAS BEEN CHECKED AND ACCEPTED 1 FI.E OR UNDER MY DIRECTION/N CONFORMANCE WITH THE =SUE HIGHLIGHT INDICATED CLOSURES HAVE BEEN VERIFIED.GREEN COMMENTS ARE rHls eaAss CAP APPFAas ro -'I u.o R£OUIR£MENTS OF THE PROFESSIONAL LAND SURVEYORS' TYPICALLY INFORMATIONAL AN=R BEST PRACTICES SUGGESTIONS OR ATTEMPTS TO NAYS BEEN SET OUMND THE 2010.-_ APRIL 2022 C O ACT AT THE REQUEST OF ON APRIL 4, --.:LARIFY INFORMATION,WHICH ARE ARE PRESENTED TO THE SURVEYOR OF RECORD FOR DEPENDENT RESURVEY NOT THE U 01H IONN(ANTS SURVEY PLEASE 2022. N F/T-- CANTEMPLATION,IN ORDER TO INFORM AND MINIMIZE FUTURE AMBIGUITIES AND C-1-PNK:HMONUMENT WAS ALA)A STATEMENT OF PURPOSE I E T r .DIFFICULTIES IN BOUNDARY RETRACEMENT THAT MANY SURVEYORS ENCOUNTER WHEN 900,FOUNDANDUSED for c"\f SIGNATURE IS REWIRED !tETRACING SOMEONE ELSE'S WORK MAP APPROVAL DOES NOT DEPEND ON THE UwD BENC SVRVEYEDwAs PURPOSE OF THIS MAP IS TO RETRACE AND MONUMENT ^..COMMOOATING THESE COMMENTS. PATEHTEONN. PRIOR To THE LAND DESCRIBED IN A DOCUMENT RECORDED ON PER PL5 ACT EITHER Of ME MO SURVEYS EO AUGUST 12.2021 AS INSTRUMENT NO 2021-0363568 OF EXPIRATION DATES ARE T O OFFER A SAMPLE OF OF THIS MAP. FOR CONSIDERATION,VIE HAVE PERFORMED A CN Lp OC NC LONGER REQUIRED. THOROUGH FIRST CHECK OF THIS MAP.AS THEY WOULD BE FORWARDED TO THE COUNTY PLEASE MONUMENT DE DCO THIS ry OFFICIAL RECORD$,IN THE OFFICE OF THE COUNTY MENTEROF NOTION 19 ROl5 J JRVEYOR'S OFFICE AS WE LEARN EACH OTHERS PREFERENCES,MUCH OF THIS CAN BE CENTER OF ucTaIN IP 'a ,LF,FXTHIS'NO REFERENCE-MONUMENT 1S N63•S1O1"E D N• RECORDER OF OF SAN BERNARDINO COUNTY,IN COUNTY SURVEYORS STATEMENT '.DDIFIED TO STREAMLINE THE PROCESS b Cr FROM THE CENTER SEC IDN ESTABLISHED BY COMPLIANCE WITH THE PROFESSIONAL LAND SURVEYORS N -� INTERSECTION AND IT LACKS PEDGREE TO CONTROL THE ACT SECTIONS 8762(b)(4)AND 8762(b)(5) THIS MAP HAS BEEN EXAMINED IN ACCORDANCE TYPICALLY.TO MINIMIZE BASIS FOR BEARINGS CENTER SECTION LOCATION ARETHERELINESOF WITH SECTION 8766 OF THE PROFESSIONAL LAND SURVEYORS' MONUMENT IDENTIFICAT OCCUPATION OR ADDITIONAL RECORDS WHICH WOULD ACT THIS _DAY OF 2022. AMBIGUITY FULL THE BASIS FOR BEARINGS SHOWN ON THIS MAP IS THE n SUBSTANTIATE ITS ACCEPTANCE' DESCRIPTION OR A SOUTH LINE OF THE SE f/4 OF SECTION /9 T. 4 N R. 4 / SINCE MR CARVILLE NEVER FILED RECORD OF HIS SURVEY PLEASE ADD SIGNING SCHEMATIC OF STAMPING C, S.B.M., PER B.L.M. DEPENDENT RESURVEY AND SURVEY O WE ARE NOT CERTAIN THAT HE INDEED MEANT TO DEPUTY STAMP TFIOMAS P. HERRIN, COUNTY SURVEYOR OF EACH MONUMENT IS VE MONUMENT CENTER OF THE SECTION OR IF CORRECT SAN BERNARDINO COUNTY PREFERRED.EXAMPLE. DATED JULY 18, 1960 BEING N89"59, .A =W'WMNOTMATHE TIN LYIDENTCu TO Mrepoc O PROCEDURE WAS USED ACCEPTING THIS MONUMENT YE'SWWOVLDNDCATETHATTOURAHOUIMMEASUREM ENTS IC 2 WOULD CREATE A CONFLT WITH PROPER METHODOLOGY CL WERE TAKENAT.F ONE MNUTEAND NO TRAVERSE ADAISTMENT FOR ESTABLISHMENT OF CENTER QUARTER CORNEA OF A YNK]H MAP OR FIELD NOTES BY., , DEPUTY TOOK PU SH THISNONUMENT'IP EASE TN W CE OW l • a SECTION I INTERSECTIONI.AND CREATE POSSIBLE IT APPEMS TIMi THE MTENi OF THIS SURVEY WAS TO ASSW E SHO MONUMENT STAMPING THE BEAa'NG A'85.560p'A^.;HOVA+ALCNO THE MEASURED ALTERNATE LOCATION 4TMH N89"49'501' 2638.80' AISO THIS MONUMENT DOES NOT APPEAR TO FIT THE TEST RIB All W 114 1318.98• 1319.82' FOR A MONUMENT OF COMMON RAPPORT,SINCE IT DOES 1.120.74' • E 1/4 LEGEND V► SL11f 11 NOT APPEAR TO HAVE BEEN RELIED UPON TO TARE S CW 1116 C i/4 POSSESSION OFLANDT W INDICATES FOUND B.L.M. BRASS CAP AS NOTED OnI 'q A BOUNDARY NARRATNEWLD HELP CLARIFY TIHIS. COMPLEX PER B.L.M. DEPENDENT RESURVEY AND SURVEY MONUMENT FOR T. 4 N., R 4 E., S.B.M. ANTED JULY 18, ' 19 FS_�� E RELATIONSHIP a LINES IF CLOSURES WERE PROVIDED FOR ATION WITH RESPECT TO THIS SYMBOLS ARE 1960 FIGURES SHOWN ON THIS MAP,THEY SOLUTION,IF ANTI PLEASE NOT LIKELY TO ,��Q WOULD BE CHECKED WITH NO CLOSURES DESCRIBE REPRODUCE E INDICATES FOUND 1"D/A IRON PIPE WITH G FROVIDED CALCULATED ROUNDING RECORDATION ♦ YELLOW_ PLASTIC PLUG STAMPED '4.C.E. 18305, y� ERROR15001' SUGGESTION TEXT THIS RECOMMEND CACTI CAD. NO REFERENCE, FLUSH,' EXCEPT-AS SITE CLOSE TO A THICK SOLID USING FILLED NOTED LINE HAS HIGH SQUARE PONY RD F ^ PROBABILITY OF BECOMING INDICATES FOUND 2"DAA. BRASS CAP STAMPED �-- ILLEGIBLE UPON Lp (1/4 MILE) n DOC.# 202 1-0363568 D.R. LA RECORDING PLEASE 'Z.Cf. 13256, TAN R3E R4E 1/4, S24/519, CONSIDER ADDING SMALL NR. /990" NO RffERflyCE DOWN fd" AMOUNT OF WHITE SPACE �,..� PER R s PIA:AND PE 'DOWN SURVEYOR FIELC 4 y N e W BOOK TIES BOOK 11.PAGE i INDICATES FOUND NOTHING,' SET 1/2"D/A �1 CEo M)-• REBAR, 18"LONG, WITH ORANGE PLASTIC CAP O'N Fe P ryi STAMPED FLUSH 5O t0 COUNTY OF SAN SERNARDNOREcoMMEND.TIDNs B.LM. INDICATES BUREAU OF LAND MANAGEMENT WMAT IS THE DISPOSITION OF ABUTTERS FOR MOFAIMBIfAT10N OF OOJERNMENi CORNERS COTTONWOOD SPRINGS RD JFSR RIGHTS'PLEASE SHOW OR DESCRIBE (_) INDICATES RECORD DATA PER B.L.M. DEPENDENT I� H I...,....MR.A.�`"."'-......... RESURVEY AND SURVEY FOR T. L. N., R 4 E., (1 1/4 MILES) \ e "I .�"'.�'`+`�=lr�"=-i``-"� S.B.M. ANTED JULY 18, 1960 P� w N CS 1116 A OF SE 1/16 1� M^`�-H.++N-A•I- •�—��' 11 INDICATES...THE 2015"DEPENDENT RESURVEY ... IG 1321.49 1 J21.49' _ .� N89'55'411E 2642.98' a y O� �E In �-N ®- SURVEYOR'S NOTE. W ' W a v� a 2 SO c., a THE B.L.M. RECORD DISTANCE HAS BEEN CONVERTED FORM \_N\ KN CHAINS TO HUNDRE7HS OF A FOOT AS/S THE CUSTOM/N SAN BERNARDINO COUNTY EVEN THOUGH IT IS NOT AN O\ N ) ACCURATE SIGNIFICANT FIGURE CONVERSION. MT In (1 MILE) 4 MILES) O "2 SUGGEST REMOVING.THIS IS NOT A NOTE RELEVANT TO BOUNDARY Z K of RETRACEMENT OLD WOMAN SPRINGS RD (SR 247) (1 MILE) KtGVKUtf!J 4tK//rlL.A/t THIS MAP HAS BEEN FILED UNDER DOCUMENT NUMBER THIS__ DAY OF VICINITY MAP IN BOOK OF 20 AT_--�M. S AT PAGE , AT THE REQUEST OF NOT TO SCALE IN THE AMOUNT OF j VICINITY MAP IS NOT RECUIRED SPRINGS ROAD'! E E V16 19 20 809 DUTTON OD '! f ASSESSOR-RECORDER S 1/4 } 1322.25'• 1322.25' '•SE SEC. COR. SAN BERNARDINO COUNTY N89'S9'OO-W 2644.49' (N89"59'W,.2643.JJ MNKJHNAPOFFIELDNDTES BASIS of BEARINGS - 30 29 SHOW THIS MONUMI PLEASE SW 0<THE PARTS DEPUTY RECORDER SHOW MONI STANPNG WNKH MAP OR FIELD NOTES aHcw THIS MDNwwn PLCAsc SHOW MONUMENT STAMPING 10 I N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF L LSI MORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Professional Agreement Negotiation We appreciate the opportunity to preview the sample professional services agreement that will be utilized by the City for this project. Michael Baker has contracted on thousands of projects over our over 80-year history and is confident in our ability to come to mutually acceptable terms with all of our clientele. Upon selection of this proposal, we would respectfully request the opportunity to discuss certain of the contract terms with the City due to the professional standard of care required for performance of services, insurance commercially available, and professional experience. Those terms are provided below,text in blue indicate additions and explanations are provided in italics 4. Method of Payment. ...Consultant no later than#eFty#+ve (45)tl days after... 15. Indemnity. Consultant shall indemnify, defend, and hold harmless the City and its officials, officers, employees, agents, and volunteers from and against any and all losses, liability, claims, suits, actions, damages, and causes of action arising out of any personal injury, bodily injury, loss of life,or damage to property,or any violation of any federal,state,or municipal law or ordinance,to the extent directly caused, by the willful misconduct or negligent acts or omissions of Consultant or its employees, subcontractors, or agents, by acts for which they could be held strictly liable, .The foregoing obligation of Consultant shall not apply when (1) the injury, loss of life, damage to property, or violation of law arises from the sole negligence or willful misconduct of the City or its officers, employees, agents, or volunteers and (2) the actions of Consultant or its employees, subcontractor, or agents have contributed in no part to the injury, loss of life, damage to property, or violation of law. It is understood that the duty of Consultant to indemnify and hold harmless includes the duty to defend as set forth in Section 2778 of the California Civil Code. and hold haFfflleSS Elause.This indefflnifiEatien and hold haFfflleSS Elause shall apply te any dafflages OF Elaiffls fer daFnages whether or not SUEh ORSUFaREe pelides shall have been deterfflined te apply. By execution of this Agreement, Consultant acknowledges and agrees to the provisions of this Section and that it is a material element of consideration. Explanation: Please delete the stricken language. The potential for limited hability in this language is inappropriate for Plan Checking services eut ef this AgreeFrient,11 . ... � I .I . J'be entitled te reEever its Feasenable litigatien expenses,induding EeHFt Eests,expert witneS5 fees,diSEevery expenses, and attorneys'fees. Explanation: Please delete the stricken language. Precisely defining this ambiguous language in terms of fairy assigning responsibility in proportion to total and reasonable legal fees is notoriously difficult for the courts 30.Amendments. This Agreement and its scope of work and price may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney. Additions' For the benefit andprotection of all parties,please consider adding the following mutual Waiver of Consequential Damages Clause.• In no event shall any party to this agreement have any claim or right against the other,whether in contract,warranty,tort(including negligence), strict liability or otherwise, for any special, indirect, incidental, or consequential damages of any kind or nature whatsoever, such as but not limited to loss of revenue, loss of profits on revenue, loss of customers or contracts, loss of use of equipment or loss of data, work interruption, increased cost of work or cost of any financing, howsoever caused, even if same were reasonably foreseeable. Page 111 I N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LPL LSI ROKE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Please consider using the following language for limitation of liability, which is standard in many agreements we see for the types of services contemplated hereunder.: Consultant's total aggregate liability(whether such liability is based in contract,warranty,tort,equity,strict liability,statute,common law and/or any other claim or theory)for any loss,damage,expense or cost of whatsoever kind or nature arising out of or relating in any way to the Services, Agreement or Project shall not exceed the net sum actually paid to Consultant for the Services performed hereunder. 31. Force Majeure. Consultant shall not be responsible for delay or failure to perform due to any delay beyond the control of the Consultant,such as acts of God,wars,acts of public enemies,strikes,fires, pandemics or epidemics,floods, or other similar cause, or for any of the foregoing that affect lower tier subcontractors or suppliers. Page 1 12 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY 20F .n�N,,, L LSI110RJE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department I Below is an example of Michael Baker's current insurance policy, provided as proof of ability to meet insurance coverage and licenses required by the City. TESTLAB-02 BJONES ,a►coRO CERTIFICATE OF LIABILITY INSURANCE DATE(MWDDNYYY) 6 26/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: ASSOCIATES AGENCY,INC. PHONE FA% 11470 N 53rd St (Arc,No,Eq):(813)988-1234 (AIC,No):(813)988-0889 Temple Terrace,FL 33617 Eaxna -corts@associaWins.com INSURERISI AFFORDING COVERAGE NAICC INSURER A:Monroe Guaranty Insurance Cc 325M INSURED INSURER B:Auto Owners Insurance Co 18988 Test Lab,Inc. INSURERC:SOuthern Owners Insurance CO 10190 P.O.Box 15732 INSURER D:FCCI Insurance CO 10178 Tampa,FL 33664 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FORTHE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDLINSO SUBR POLICY NUMBER POLICY EFF POLICY EXPLTR LIMBS A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE 1,000,000 CLAIMBMADE FX]OCCUR GLI00041664-84 3/1/2022 3/1/2023 DAMAGE TO RENTED S 100,000 )( Contractual Liab. MED EXP A I me onePerson) $ 5,000 PERSONAL S ADV INJURY $ 11000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE 2,000,000 POLICY PRO- JECT 7 LOC PRODUCTS-COMP/OPAGG 2,000,000 OTHER: EBL S 11000,000 B AUTOMOBILE LIABILITY COMBIBIINNEDSINGLELIMIT $ 500,000 X ANY AUTO 5164484100 3/1/2022 311/2023 BODILY INJURY Per Person) $ OWNED SCHEDULED AUTOS ONLY AL rOS BODILY INJURY Per amides S X AUT0.50NLY X AUl030N® Oa dent AMAGE $ PIP $ 10,000 C X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 3,000,000 EXCESS LIAB CLAIMS-MADE 5184484101 3/1/2022 3/1/2023 AGGREGATE $ 3,000,000 DED I X I RETENTIONS 10,000 $ D WORKERS COMPENSATION )( PER EOTH- R AND EMPLOYERS'LIABILITY ANY PROPRIETORIPARTNERIE(ECUTIVE YIN 1NC010006738104 6/1/2022 6!1/2023 EL.EACH ACCIDENTs 600,000 OFFICER/MEMBER EXCLUDED? N NIA (Mandatory in NH) EL.DISEASE-EA EMPLOYEE $ 600,000 If yes,describe under 500,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT DESCRIPTION OF OPERATIONS!LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached If mone space Is mclUIN dl CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE For Insureds File THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ACORD 25(2016103) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Page 13 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF L LSI MORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Firm's History Company Profile Michael Baker International(Michael Baker)was founded in 1940 as a civil engineering and surveying firm and quickly attained recognition as a premiere full-service engineering and survey firm. Today, we continue to leverage our collective skills and experience to make the communities we serve better. We strive to make them safer, more accessible, more environmentally sustainable and more livable. We facilitate their transformation supported by differentiating innovation,technologies and dedicated employees.We are change agents,leading our partners around the world into the future. Our greatest differentiator, though, is our employees who demonstrate an ability to solve complex problems.We reward innovation and collaboration that leads to effective solutions for our clients. Michael Baker is a leading global provider of engineering MICHAEL BAKER RESOURCES and consulting services, which include planning, FOUNDED IN1940 architectural, environmental, construction, program management, and full life-cycle support services. Our firm ' • ,sa'3000+EMPLOYEES provides its comprehensive range of services and solutions z NATIONWIDE in support of a wide range of clients. Michael Baker is CALIFORNIA currently ranked 35th in the top 500 U.S. engineering . • , : ; •• 12 OFFICES design firms by the Engineering-News Record (ENR). ft`itlt LOCAL t 338 STAFF In 2010 Michael Baker International purchased the local •• .' (APPLIES TO ONTARIO, TEMECULA AND SANTA ANA) firm RBF Consulting. RBF's employees were integrated into 560 PROFESSIONALS the Michael Baker"Wolfpack",enhancing their abilities with IN CALIFORNIA a much larger depth of bench as well as widening service capabilities. Workload, Facilities and Resources Michael Baker maintains a workload backlog sufficient to accommodate the City's needs. All professionals assigned to specific tasks will remain committed to its successful completion. If, due to illness or vacations,a key professional is necessary to be replaced,the City will be notified in advance. Knowledge Of Technical and Functional Needs Team members are selected for each task based on their specific specialty. With the broad depth of bench available to each discipline,the most qualified team members will be assigned with the necessary technical background to help ensure a completed review. Page 1 14 1 N T E R N A T 1 0 N A L DocuSign Envelope ID: B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LAKE LSINOIZE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Plan Checking Staff Organization Chart CITY OF LADE ' LSIROKE DREAM LXTREME • • • CA/CC MANAGIER John Tanner,PE,QSD/P Public Works-Randy Ratzlaff,PE Flood Control-Miguel Gonzalez,PE Structural-Brad Mielke,PE PROJECT MANAGER Survey-JarradTruman,PLS MAIN POINT OF Todd Pitner,PE,QSD/P CIVIL/TRAINSP' ' STRUCTURAL ENGINEERING HYDROLOGY/HYDRALILICS ENGINEERING Roadway/Cavil Bridges/Structures Design Hydrology/Hydraulics Design Miles Costanza,PE* John Duquette,PLS Steven Latino,PE,TE` Chad Harden,PE,SE* Water Quality/SWPPP/NPDES Momcilo Savovic,PE,CCM Jarrad Truman,PLS Lonnie Druliner,PE* Kyle Turner,PE,CBI Todd Pitner,PE,QSD/P* JD Chiniaeff,CCT Connie Barrett,PLS Hector Salcedo,PE Bridge Inspection/Load Rating Danielle Peltier,EIT Ivana Awayjan,EIT Kevin MacDonald,PLS Traffic Signal/Street Lighting/Signing Kyle Turner,PE,CBI Roadway Drainage Octavio Hernandez,PE Kristen Handy,QSD Ryan Zellers,PE,TE Specifications/Cost Estimates Steve Giffen,PE Ciprian Stelea,PE Quantities/Cost Estimates Randy Ratzlaff,PE * Primary Plot?Checker GEOTECHNICAL.ENGINEERS Environmental Services/ Construction Services Landscape Architecture Geocon Regulatory Permitting Patrick Hanity,PE,CISEC, Jeremy Franzini,PLA Peter Minegar,AICP QSD/P,T2,D2 Cathy Johnson,PLA Geotechnical Emily Elliott,AICP Aaron Singer,EIT Neal Berliner,GE Renee Gleason,CEPAT Caltrans Liaison Shelah Riggs Brandon Reyes,PE Pavementisa Bat to,CEGeARM Soils Testing THE MICHAEL BAKER TEAM OFFERS Erik Bezanson 100+engineers/designers in the Inland Empire to support,as well as,350+engineers/designers throughout broader Southern California ff _ M. ffl- 15 1 N T E R N A T 1 0 N A L DocuSign Envelope ID: B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF L LSI ROIZE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Team Qualifications Team Member/Role Yrs of Qualifications Availability Exp PROJECT MANAGEMENT TEAM Todd Pitner 27 B.S., 1995, Civil Engineering,San Diego State University 40 Project Manager Professional Engineer-Civil,California, 1998, 58606 Qualified SWPPP Developer/Practitioner(QSD/P),California,2015,00550 Real Estate License, California, 2010,01864200 John Tanner 28 B.S., 1995, Civil Engineering, San Jose State University 20 Project Director Professional Engineer- Civil, California,2000, 60132 Qualified SWPPP Developer/Practitioner(QSD/P),California,2011,20476 Randy Ratzlaff 29 M.S., 1998, Structural Engineering, California State University at Fullerton 40 Public Works QA/QC B.S., 1993,Civil Engineering,California State University at Fullerton Professional Engineer- Civil,California, 1997, C56867 Miguel Gonzalez 36 M.S., 1995, Civil Engineering, San Diego State University 50 Flood Control QA/QC B.S., 1985, Civil Engineering, University of Guanajuato, Mexico Professional Engineer- Civil, California,2001, 61561 Qualified SWPPP Developer/Practitioner(QSD/P),California,2011,00541 Brad Mielke 44 B.S., 1978,Architectural Engineering (Structural Design Option),California 20 Structural QA/QC State Polytechnic University,San Luis Obispo Structural Engineer,California, 1986,2817 Professional En ineer- Civil,California, 1981, 33334 Jarrad Truman 33 Professional Land Surveying, California,2019,9546 20 Survey QA/QC PLAN CHECK TEAM Steven Latino 18 M.B.A.,2018,General Studies, University of Redlands 50 Roadway/Civil B.S., 2003, Civil Engineering, Purdue University Professional Engineer- Civil, California,2008,73430 Traffic Engineer,California,2019,TE 2902 Lonnie Druliner 10 M.Eng.,2012, Civil Engineering,Tufts University 60 Roadway/Civil B.S.,2010, Structural Engineering, University of California, San Diego Professional Engineer-Civil,California,2016,86346 Chad Harden 19 M.S.,2003, Structural Engineering, University of California, Irvine 60 Structures B.S., 2001, Civil Engineering, University of California, Irvine Professional Engineer- Civil, California,2005, 67648 Structural Engineer,California,2008, 5232 Miles Costanza 15 B.S.,2006, Civil and Environmental Engineering,Arizona State University 40 Water/Wastewater Professional Engineer-Civil,California,2017, C87843 John Duquette 32 A.S., 1996,Surveying and Mapping, Santa Ana College 60 Survey/Mapping Professional Land Surveyor,California, 1999,7566 SUPPORT TEAM (A/ habeticall) Ivana Awayjan 6 B.S., 2016, Environmental/Civil Engineering, University of California, 70 Water/Wastewater Riverside Engineer-I n-Trainin , California,2018, 16-584-89 Connie Barrett 31 B.S., 1987, Surveying and Mapping,CU GKD 50 Survey/Mapping Professional Land Surveyor,California,2021,9646 JD Chiniaeff 33 Certificate,Corrosion Technology, NACE International 60 Water/Wastewater Certified Corrosion Technician, 1998, 5889 Page 16 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY 20F .n�N,,, L LSI110RJE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Team Member/Role Yrs of Qualifications Exp Emily Elliott 14 M.U.R.P., 2014, Urban and Regional Planning, California State Polytechnic 30 Environmental Services University, Pomona B.A.,2009, Geography Natural Resources Management, San Diego State University American Institute of Certified Planners,2015,028647 Jeremy Franzini 25 M.L.A., 1996, Landscape Architecture,Texas A&M University 30 Landscape Architecture B.S., 1993, Environmental Studies, University of California, Santa Barbara Landscape Architect, California, 2001,4514 Steve Giffen 44 M.S., 1991, Civil Engineering, California State University at Long Beach 60 Roadway Drainage B.S., 1983, Civil Engineering, University of California, Irvine Professional Engineer-Civil,California, 1987,42154 Renee Gleason 17 B.A.,2002, English, California State University at San Bernardino 80 Environmental/Regulatory Certified Environmental Professional in Training,2013 Kristen Handy 13 M.S., Environmental Management,Johns Hopkins University 60 Roadway Drainage B.S., 2006, Public Health, University of Nevada, Reno Certified Professional in Erosion and Sediment Control, CA,2017, 8920 Certified Erosion, Sediment&Stormwater Inspector, CA,2011, 2022 Qualified Industrial Stormwater Practitioner, California, 2019, 1038 Qualified SWPPP Developer/Practitioner(QSD/P),California,2015,26615 Patrick Hanify 17 B.S., 2007, Civil Engineering, Geospatial Option, California State 50 Construction Services/ Polytechnic University, Pomona Constructability Certified Construction Manager, 2018, 8612 Grade II Water Distribution Operator(D2), California, 2018,49529 Grade II Water Treatment Operator(T2), California,2011,41009 Professional Engineer- Civil, California,2012,79874 Qualified SWPPP Practitioner(QSP), California,2011, 20942 Certified Inspector of Sediment& Erosion Control, California, 2012, 0789 Qualified SWPPP Developer(QSD), California,2019,C79874 Octavio Hernandez 18 B.S.,2004, Civil Engineering,California State University at Long Beach 40 Traffic Signal/Street Professional Engineer- Civil, California,2011, C78085 Lighting/Signing Cathy Johnson 29 B.S., 1978, Ornamental Horticulture,Washington State University 40 Landscape Architecture Landscape Architect, California, 2001,4545 Kevin MacDonald 27 B.S.C.E., 1996, Civil Engineering, Geospatial Option, California State 60 Survey/Mapping Polytechnic University, Pomona Professional Land Surveyor,California,2008,8431 Peter Minegar 10 M.S.,2019, Environmental Management and Policy, University of Denver 20 Environmental Services B.S., 2014, City and Regional Planning, California State Polytechnic University, San Luis Obispo American Institute of Certified Planners, 2020 Danielle Peltier 3 B.S.,2020, Environmental Engineering, University of California, Riverside 70 Hydrology/Hydraulics,Water Engineer-In-Training,2020 Quality, SWPPP, NPDES Brandon Reyes 15 B.S., 2008, Civil Engineering, California State Polytechnic University, 30 Caltrans Liaison Pomona Professional Engineer- Civil, California,2011,79226 Shelah Riggs 22 M.S., 2002, Environmental Studies, California State University at Fullerton 60 Regulatory Permitting B.A., 1998, Geography, California State University at Fullerton Page 17 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY 20F .n�N,,, LAKE LSIAOIZE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Team Member/Role Yrs of Qualifications Exp Hector Salcedo 9 B.S., 2014, Civil Engineering/Transportation, California State Polytechnic 60 Roadway/Civil University, Pomona Professional Engineer- Civil, California,2019,90382 Momcilo Savovic 37 M.E., 1995, Environmental Engineering, University of Alberta 30 Water/Wastewater M.S., 1992, Mechanical Engineering, University of Sarajevo B.S., 1981, Mechanical Engineering, University of Sarajevo Certified Construction Manager, 1713 Diplomate Environmental Engineer,04-20001 Professional Engineer, California, M32229 Aaron Singer 7 B.S.C.E.,2016, Civil Engineering, California Baptist University 75 Construction Services/ Professional Engineer, California,2022,94535 Constructability Ciprian Stelea 20 M.S.,2006, Civil Engineering/Structures, University of California, Irvine 40 Structural Engineering B.S., 2004, Civil Engineering, Central Connecticut State University Professional Engineer—Civil, California, 2008, 73379 Kyle Turner 17 M.S.,2013, Structural Engineering, University of California, San Diego 40 Structural Engineering, Bridge B.S., 2005, History, U.S. Naval Academy Inspection Professional Engineer- Civil, California,2016, 86211 Certified Bridge Inspector, 2019 Ryan Zellers 24 B.S., 1998, Civil Engineering, Purdue University 40 Traffic Signal/Street Professional Engineer, California,2006, 69470 Lighting/Signing Traffic Engineer, California, 2007,2418 Sub-Consultants olwMichael Baker does not perform in-house geotechnical services in California and has therefore added 1 GEOCON our subconsultant team member Geocon. Founded in 1971, Geocon has grown into a 250-employee firm focused on expanding the services offered,strengthening their client base,and placing an emphasis on client satisfaction. Geocon is a California corporation that specializes in professional engineering consulting providing comprehensive geotechnical,geologic,construction inspection,and environmental engineering and consulting services. In addition to these services, they operate in-house soils and materials testing laboratories and provide environmental remediation contracting (cleanup) services. Geocon will perform all geotechnical assignments necessary to successfully complete each project. Page 1 18 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LJL LSI IYORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Key Team Resumes — Professionals with direct responsibility to the City. Todd L. Pitner, P.E., QSD/P I Project Manager Mr. Pitner is a civil engineer with many years of progressively responsible work experience with extensive knowledge in all 11 N T E R N A T 1 0 N A L aspects of civil engineering. Mr. Pitner's area of expertise is ; Years with Michael Baker hydrology, hydraulics and storm drain design with emphasis on 17 water quality mitigation measures associated with new development and redevelopment to include residential, highway, industrial, Y�ars of Experience commercial facilities and municipal facilities, to comply with the regulatory 11 requirements under the National Pollution Discharge Elimination System (NPDES) ; Education permit. B.S., 1995,Civil Engineering,San Diego State p i University Mr. Pitner, as a Qualified SWPPP Developer, is familiar with the regulatory Licenses/Certifications compliance requirements of the Construction General Permit for both LUP and i Professional Engineer Civil,California, 1998,58606 traditional projects.As the QSD for over 100 SWPPPs, Mr. Pitner has taken an active I Qualified SWPPP Developer(QSD),California,2015, role which includes SWPPP preparation, SMARTS filing and preparation of permit 00550 registration documents (NOI, risk assessment, site maps), amendments throughout Qualified SWPPP Practitioner(QSP),California,2015, construction, NOT's,training and the management/oversight of the monitoring and 00550 reporting program. Real Estate License,California,2010,01864200 Relevant Experience i OSHA 40-Hour HAZWOPER Certification Water Quality Management Services On-Call, Riverside County, California. Riverside County Transportation Department. Project Manager. Responsible for performing and assigning technical reviews of Water Quality Management Plans and hydrology studies. Michael Baker is providing on-call engineering services for plan checks of water quality management plans for new developments and redevelopment projects. Plan-check services include plans for street improvements, striping, utility coordination, street lighting, grading, and other improvement plans per the Riverside County Department of Transportation's plan-check policies and guidelines. Southwest Gas Stormwater Services, Victorville, California. Southwest Gas Corporation. Environmental Specialist. Responsible for preparing the Storm Water Pollution Prevention Plan (SWPPP)for project compliance with the Construction General Permit,adopted Order No. 2009-0009-DWQ. SWPPP development activities included site-specific risk assessments, preparation of permit registration documents, BMP selection and design. QSP services included pre-construction site visit, training of site personnel, routine monitoring, annual report preparation and NOT. Michael Baker is providing construction stormwater support services to Southwest Gas Corporation. It has been performing these services continuously since 2010 and has completed more than 20 projects entailing the development of erosion and sediment control plans, stormwater pollution prevention plans (SWPPP) development and implementation, personnel training, SMARTS stormwater database reporting, agency coordination and negotiation, and permitting and compliance assistance. Land Development and Home Building QSD/QSP Services - Lennar Homes, San Clemente, California. Lennar Homes of California, Inc. Construction Inspector. Responsible for preparing the Storm Water Pollution Prevention Plan (SWPPP) for project compliance with the Construction General Permit, adopted Order No. 2009-0009-DWQ. SWPPP development activities included site-specific risk assessments, preparation of permit registration documents, BMP selection and design. QSP services included pre-construction site visit, training of site personnel, routine monitoring, annual report preparation and NOT. Michael Baker has provided both quality stormwater development (QSD)and quality standards program (QSP)services for Lennar Homes of Southern California for more than eight years.It has helped Lennar maintain compliance throughout, performing stormwater pollution prevention plans (SWPPP) development for Risk Level 1 and 2 projects, annual reporting, COI/NOT development, SMARTS data entry, water quality management plan (WQMP) reviews, NOV responses, QSP inspections, stormwater monitoring, permit interpretations, and negotiations and general stormwater consulting. Michael Baker has also fine-tuned the Lennar-generated SWPPP template to streamline development and cater to region-specific permit interpretations. Page 1 19 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LJL LSI(YORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department John Tanner, P.E., QSD/P I Project Director Mr.Tanner has an extensive background in private development and public sector projects. He has served as Project Manager for ( INTERNATIONAL numerous projects in Riverside and San Diego County and has i years with Michael Baker relationships with many staff members at most of the regional 24 agencies. As the Regional Land Development Manager, Mr. j Tanner is responsible for the coordination of all project teams,assigning members to 128ars of Experience specific project teams, client coordination, contract negotiations, coordination with government agencies, project scheduling,and preparation of all improvement plans. ; Education B.S., 1995, Civil Engineering,San Jose State Relevant Experience ; University Licenses/Certifications Extension of Staff and On-Call Plan Check Services. City of Palm Desert, California. Professional Engineer-Civil,California,2000,60132 Acting City Engineer. Provided Engineering and Plan Check services in the city. ; Qualified SWPPP Developer(QSD),California,2011, Worked closely with City staff in the review of grading, street improvements, 20476 hydrology studies, soils reports, WQMP, SWPPP, lot line adjustments, and parcel Qualified SWPPP Practitioner(QSP),California,2011, maps. Served in the capacity of the City Engineer and provided guidance to staff and 20476 project applicants on development projects. Jackson Avenue Street Improvement,Murrieta,California. CityofMurrieta.Project Manager. Responsible for project management. Michael Baker prepared the Delineation of Jurisdictional Waters and acquired resource agency permits for the Jackson Avenue Street Improvement Project. Jackson Avenue bisects Warm Springs Creek, which had long been exposed to on-going off-highway-vehicles and illegal dumping practices. The project elevated the roadway above Warm Springs Creek to deter illegal dumping. Mixed-Use Murrieta Project, Murrieta, California. Garrett Group LLC. Principal-In-Charge. Responsibilities included overall project oversight. Michael Baker has been selected by The Garrett Group to provide support for survey and mapping, specific plans and Environmental Impact Reports (EIRs),and preliminary and final engineering for a 1.3 million square foot project in the City of Murrieta.The project includes parking structures, class 'A' offices, retail and commercial shops, major tenants, and hotel and entertainment features. Michael Baker is currently in the preliminary design and specific plan stages for the 61-acre wedge, which is framed by Interstates 15 and 215,and Murrieta Hot Springs Road. Extensive off-site improvements will be required including freeway ramps at Murrieta Hot Springs and Interstate 15. Pardee Homes - Countryside Majors, Menifee, California. Pardee Homes Principal-In-Charge. Responsibilities included overall project oversight.Michael Baker redesigned and widened Haun Road,Newport Road,and La Piedra Road.Traffic engineering tasks included signing and striping, new traffic signals,and traffic signal modifications. Harveston Master Planned Community,Temecula, California. Senior Project Manager. Responsible for this 550-acre specific plan, multi- use subdivision. Duties include oversight of on-site and off-site improvement plans for 1,920 residential lots, which included a variety of traditional and non-traditional residential single family attached and detached housing and significant on- and off-site backbone infrastructure. Country Roads Project, Riverside County,California.Senior Project Manager. Responsible for this 241 residential lot subdivision in French Valley, California. The project included an on-site sewer lift station and County of Riverside road improvements for Clinton Keith Road and Briggs Road.Two separate concrete arch culvert structures were required in order for the access roads to traverse Warm Springs Creek. Arroyo-Tract 24188,Temecula,California.Senior Project Manager. Responsible for this 73-lot residential subdivision. Included within this project were the design of an association recreational center and the preparation of precise grading plans for each lot. This project also required a significant amount of coordination between the client and adjacent builders, as well as with the City of Temecula due to the project having been previously put on hold for approximately five years. Page 120 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LJL LSI(YORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Steven Latino, P.E., T.E. I Roadway / Civil Mr. Latino brings experience which include both public and - _ private sector. During his tenure as a municipal employee, he ( INTERNATIONAL served the Cities of Hemet and Ontario in Capital Projects, j years with Michael Baker Traffic/Transportation,and Land Development. His last position 11 before coming back to the private sector was the Engineering Director/City Engineer for the City of Hemet. He has taken many j 18ars of Experience projects from inception and budgeting all the way to construction and closeout, which offers a unique perspective to municipal clients. Education M.B.A.,2018, General Studies, University of Redlands Mr. Latino has managed a wide array of projects throughout his municipal career B.S.,2003,Civil Engineering, Purdue University including street lighting, roadway improvements and rehab, signing and striping, licenses/Certifications and traffic signals. He has been responsible for the writing, securing, and i Professional Engineer-Civil,California,2008,73430 administration of several grant projects for various agencies. During his time at ! Traffic Engineer,California,2019,TE 2902 Ontario, he served as the Project Manager during the selection and administration of the PA&ED for the Grove/1-10 Interchange and Grove Avenue Corridor Project. He was also instrumental in the development of OntarioNET, a city-owned fiber-optic network that allows the City of Ontario to provide carrier-grade services to un-served or underserved industrial areas as well as fiber-to-the home in Ontario Ranch. Relevant Experience Traffic Plan Check. City of Ontario, California. Project Manager for the On-Call plan check of all traffic related plans, including signing & striping,traffic signals and street lighting for the city. Extension of Staff. City of Ontario, California. Provided extension of staff services for the City's Traffic and Transportation division. Assignments included project close out of the Vineyard North and Milliken South grade separation projects, representation of the Traffic and Transportation division at the City's Development Plan Review (DPR) committee and preparation of comments/conditions of approval for the various development projects. In addition, participated in the review of Environmental Impact Reports, Specific Plans and Traffic Impact Analysis reports for several large-scale Specific Plans incorporating large industrial development and residential/commercial. Plan Checking and Project Management Services. City of Palm Springs, California. Project Engineer responsible for the review of traffic related documents, including signing &striping, street lighting,traffic signals and Traffic Impact Analysis for various development projects. Also assisted the city in the development of their new scoping guidelines to incorporate Vehicle Miles Traveled (VMT). On-Call Plan Check and Inspection Services. City of Banning, California. Project Manager during plan check and inspection services of development related projects. Plan check services include review of street,sewer,water,grading,and storm drain projects,as well as review of construction drawings to assure compliance with City, State and Federal regulations. Directly responsible for review of traffic related documents during plan check and inspection of development projects. Reviewed traffic study scoping documents, traffic impact analysis reports,traffic signal plans, signing & striping plans and street lighting plans related to new development in the city. In addition, assisted the Public Works department in the preparation of various Request for Proposal (RFP) documents to assist the city with their Capital Improvement Projects (CIP) Development Review, Plan Check,and Inspection Services. CityofHighland,, California. Project Manager responsible for oversight of the plan check team as well as providing in-house staffing assistance. Reviewed development projects in conjunction with the various departments to provide conditions of approval. Responsible for the coordination with developer's and project management throughout the duration of the project. On-Call Civil Engineering and Plan Check Services. CityofColton, California. Project Engineer during Engineering and Plan Check services in the city.Worked closely with City staff in the review of grading,street improvements, hydrology studies, soils reports,WQMP,SWPPP, lot line adjustments,and parcel maps. Page 121 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LJL LSI MORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Lonnie Druliner, P.E. I Roadway / Civil Ms. Druliner has many years of experience in land development in both private and public sectors throughout southern California. 1 N T E R N A T 1 0 N A L Her project experience range from residential, multi-family, and ! years with Michael Baker commercial development to Capital Improvement Projects (CIP). >1 Her experience has developed her skills in grading and years of Experience improvement plans,storm water calculations, hydrology analyses, ! 10 utility designs,and SWPPP reporting. ! Education Relevant Experience M.Eng.,2012,Civil Engineering,Tufts University B.S.,2010,Structural Engineering, University of Capital Improvement Projects (CIP). City of Escondido. Includes Active California,San Diego Transportation Projects(ATP)throughout the City to improve sidewalk curb and gutter, 1 Licenses/Certifications adding bicycle lanes, implementing traffic calming measures,and promote safe routes i Professional Engineer-Civil,California,2016,86346 to school. Various phases of the projects were environmental (CEQA and NEPA), engineering and specifications, and construction. Grants ranged from $1.2M to 1.6M. Reporting and submittals were coordinated with Caltrans, SANDAG,and California Transportation Commission (CTC). The ATP Cycle 6 application was recently submitted in June of 2022. Midway Drainage Project. City of Escondido. Started because the Escondido Creek channel was designed and constructed by the Army Corp of Engineers in the 60's to carry a 100 year storm event; however,the connecting storm drain facilities were not up-sized to carry such a load. It started as a hydrology and hydraulic study of three main basins in the FEMA floodplain.The primary basin consisted of residential homes in a low income neighborhood.The study would evaluate options to pull these residents out of the flood plain.A Request for Proposals was used to hire a consulting engineering firm to run the analysis and provide adequate sizing for a 100 year event.With the study underway, funding opportunities were pursued through Community Development Block Grant Program (CDBG) and Hazard Mitigation Grant Program (HMGP). Residential Development Projects. Christensen Engineering and Surveying. Designed grading, improvement, erosion control, and wet utility plans for single family and multi-residential properties throughout San Diego. Drainage studies were also developed and SWQMPs were prepared as part of the submittal package. Commercial Development Projects.SALEMEngineering Group Inc.Designed onsite grading,street improvement plans,utility coordination, hydrology analysis, pipe sizing, and storm water reports throughout southern California. Coordination meetings were help with clients as well as cities,counties, and other municipal groups involved in each of the projects. ARMC Parking Structure Eng. San Bernardino County. Civil Engineer. Responsible for providing civil support for the project including grading, storm water,and coordination. Baxter Towne Center. Baxter Town Center LP. Project Manager. Responsible for providing the client with grading plans, retaining wall design,earthwork, and street improvement plans for city approval. Ynez Rd. Sidewalk Imp. City of Temecula. Project Engineer. Responsibilities included updating EWRs, coordinating with the City, and providing support. Page 122 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LJL LSI IYORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Chad Harden , P.E., S.E. I Structural Engineering Mr. Harden serves as a structural engineering project engineer and project manager and is responsible for preparing structural I I N T E R N A T 1 0 N A L analysis, plans, specifications, and estimates (PS&E) and Iyears with Michael Baker construction administration for transportation facilities for both ; 19 public agencies and private clients. Mr. Harden has experience in the design of bridges and industrial facilities,water resources structures,flood control 19ars of Experience facilities,various retaining wall and special foundation systems,and existing structure evaluation. Mr. Harden has become involved with several standing committees of the Education M.S.,2003,Structural Engineering, University of Transportation Research Board (TRB), a National Research Council division. California, Irvine Membership and participation in Seismic Design and Performance of Bridges, B.S.,2001,Civil Engineering, University of California, Foundations of Bridges and Other Structures,and Geoseismic committees allows Chad Irvine to be at the forefront of emerging design and construction guidance;such as nonlinear soil analysis,Accelerated Bridge Construction(ABC),reuse of existing foundations,pile IStructural Englineerons, Utah,2018, 10895007 2203 construction, lightweight materials, and all types of retaining wall alternatives j including MSE, soil nail, tieback, secant pile, soldier pile, sheet pile, and combined ; Structural Engineer,Alaska,2016, 109540 systems. Professional Engineer-Civil,Washington,2020, 20119552 Relevant Experience Professional Engineer-Civil,California,2005,67648 Orange County Flood Control On-Call Contract,Orange County,California. Orange Structural Engineer,California,2008,5232 County. Structural Engineer. Prepared final structural plans, specifications, and Structural Engineer,Washington,2021,20119552 estimates(PS&E)for the design of channel improvements to Barranca Channel,which Professional Engineer, New York,2022, 105547 replaced a rock riprap-lined channel. Prepared final structural PS&E for the design of an approximately two-mile reach of channel improvements to Peters Canyon Channel, which replaced a rock riprap-lined channel with channel lining,warped retaining walls,a trail,and maintenance road bridge undercrossing structures. Prepared final structural PS&E to modify regional stormwater detention basins to provide extended detention water quality storage and wetland features for Marshburn Retarding Basin and Marshburn Channel. Performed a three-dimensional structural analysis for a reinforced concrete box and turnaround structure at Edinger Channel. Michael Baker provided flood control planning and engineering services to support flood control. The projects included: Orange County Flood Control Master Plan; San Diego Creek Master Plan Update; Local Drainage Manual Update; Santiago Creek Scour Analysis Plan Check; San Diego Creek Restoration Plans and Operations and Maintenance Manual; Foothill Basins Restoration Plans and Operations and Maintenance Manual; Santa Ana River Reach 9 SARI Line Protection; San Juan Creek Phases 4, 5, and 6 and Trabuco Creek Phase 8; and Edinger Channel - 3D Structural Analysis for Reinforced Concrete Box.The projects included flood control,water quality, and wildlife corridor or habitat conservation and protection. Michael Baker also provided services to obtain resource agency permits. Flood Control Structural Engineering, Riverside County,California. Riverside County Flood ControiWaterConservation.Project Manager. Responsible for providing structural consulting services for the Riverside County Flood Control and Water Conservation District(District) to develop a Reinforced Concrete Box(RCB)standard detail drawing for RCB-to-RCB Junction Structures. Following the successful collaborative approach for the Arroyo Del Toro LRFD Training class, Michael Baker is again working with the District to provide a constructible, efficient and useful design tool for engineers and contractors. The Standard Drawings are designed according to ASSHTO LRFD Bridge Design Specifications with Caltrans Amendments and include over 25 unique Junction Structure geometries.Michael Baker assisted with preliminary engineering and final plans, specifications, and estimates (PS&E) on a number of flood control projects.Services included custom structural design,standard drawings,and plan checking. Michael Baker also developed a Reinforced Concrete Box(RCB) standard details for RCB-to- RCB Junction Structures. Michael Baker worked with the District to provide a constructible,efficient and useful design tool for engineers and contractors.The Standard Drawings are designed according to ASSHTO LRFD Bridge Design Specifications with Caltrans Amendments and include over 25 unique Junction Structure geometries. Page 123 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LJL LSI IYORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Miles ostanza, P.E. I Water/Wastewater Engineering Mr. Costanza has professional engineering experience in water and wastewater treatment, pump stations, storage tanks, piping, 1 N T E R N A T 1 0 N A L and condition assessment. He has a proven record of experience Iyears with Michael Baker in producing detailed designs, plans, specifications, and in ! 6 construction management in the water and wastewater industry. j He has led teams consisting of contractors, structural engineers, I years of Experience 15 geotechnical engineers, electrical engineers, and corrosion engineers for the condition assessment, rehabilitation, design, and construction of water I Education infrastructure improvements. He has also served as a project engineer on a wide B.S.,2006,Civil and Environmental Engineering, P P J g Arizona State University variety of remote facility projects,including wastewater treatment plants,wastewater Licenses/Certifications lift stations, potable water pump stations, welded steel water storage tanks, gas ; Professional Engineer,Arizona,2013,55059 chlorination systems,and water main replacements. I LEED Accredited Professional,2008 Relevant Experience Professional Engineer-Civil,California,2017,C87843 As-Needed Plan Check Services. San Bernardino Municipal Water Department. Project Manager. Responsible for water and plan reviews for compliance with City standards. Michael Baker provided on-call plan check and construction inspection services to the City of San Bernardino Municipal Water Department for development projects. GS4 Well Reloc/Abandonment. Riverside Public Utilities Engineer. Responsible for engineering calculations, gravity pipeline hydraulics, well equipping design, vendor coordination, design drawings and specifications. Michael Baker was retained by Hillwood to provide construction management, design, geohydrology, and survey services for this well replacement project. This $6.1 million project included the drilling, equipping, and testing of groundwater extraction well Warren 4R; installation of discharge and pump-to-waste pipelines for Warren 4R,and existing Warren 1;installation of a pre-lube system;and the destruction of 12 wells,of which six were demolished and three were demolished with salvage intent. The team constructed electrical improvements and approximately 5,700 linear feet of pipelines, conduits, and equipment which are to handle or carry raw water to a nearby treatment facility. Emergency generator connections were installed at the well. Michael Baker also provided contract administration, scheduling, processing and review of requests for information (RFI) submittals, progress payments, and the final punch list. Banning - Altitude Valves. Banning, City of. Project Engineer. Responsible for valve selection and control, placement and layout of vault, and piping modification design. Project included installation of below-grade altitude valves in vaults at existing reservoirs sites. Included a 16" electronically controlled altitude valve at an existing 1.5 MG concrete storage tank, and two 20" hydraulic control valves serving three steel storage tanks ranging from 1.5 to 2.0 MG. Project also included freeboard calculations for seismic wave sloshing based on current AWWA standards. On-Call Engineering Consulting Services. Inland Empire Utilities Agency. Pipeline Engineer. Project engineer responsible for evaluating performance of existing sewer siphon and providing recommendations for improvements including siphon modifications and alternative alignments. Beaumont-Cherry Valley Water Main Replacements. Beaumont Cherry Valley Water District. Pipeline Engineer. Responsible for water line alignment study, utility verification, evaluating system connections, and general project oversight. Stormwater Management Master Plan, Chandler, Arizona. City of Chandler. Civil Engineer. Responsible for leading and conducting condition inspections of 3 storm water pump station facilities and compiling inspection reports. Responsible for evaluating pumping equipment, developing maintenance schedule, and life cycle evaluation of equipment replacement. Michael Baker assisted the City in complying with the renewed Phase II municipal separate storm sewer system (MS4) permit, including development of a stormwater management program (SWMP).This included identifying changes necessary to meet new requirements, recommendations for modifications to city standards, regulations, drainage,and inspection and maintenance programs. Page 124 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LJL LSI IYORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department John Duquette, P.L.S. Survey/Mapping Services Mr. Duquette has many years of professional surveying experience with a broad background in boundary and right-of-way analysis and j 1 N T E R N A T 1 0 N A L calculations for transportation and road improvement projects fora years with Michael Baker variety of public agencies. 17 Relevant Experience i 3ears of Experience North Peak Specific Plan, Northern Access Road, Lake Elsinore, California. Troxler ii Education &Associates Technician. Responsible for CADD mapping.Michael Baker provided due A.S., 1996,Surveying and Mapping,Santa Ana diligence studies for the North Peak Specific Plan. The studies included a detailed College analysis of project cost estimates,entitlement,boundary issues,and permitting,as well Licenses/Certifications as post-purchase phasing analysis, preliminary engineering and peer review, park Professional Land Surveyor,California, 1999,7566 planning, and construction document preparation. Michael Baker also provided ; Professional Affiliations environmental documentation,traffic studies,and preliminary alignment studies for a California Land Surveyors Association new access road for the northern section of property. Back Basin Blending Pipeline, Lake Elsinore, California. Elsinore Valley Municipal Water District. Technician. Responsible for CADD mapping. Michael Baker prepared the design for the Back Basin Wells Arsenic Blending Pipeline project for Elsinore Valley Municipal Water District. Michael Baker designed 20-inch ductile iron pipe to convey low arsenic well water from the Summerly and Diamond Wells to blend with the high arsenic well water from the Cereal #1 and Corydon Wells. The project design included constructability analyses, corrosion, topographic mapping, field surveys, and hydraulic review of the mixing system. Key issues included construction of facilities in an existing environment, evaluating alternative pipeline alignments, and pipeline constructability. Extensive potholing was provided to map existing utilities in the area.The construction costs came in $30,000 under the projected budget. Waite Street Reservoir, Lake Elsinore, California. Elsinore Valley Municipal Water District. Technician. Responsible for CADD mapping. Michael Baker provided engineering plans, specifications, and cost estimates for Elsinore Valley Municipal Water District's Waite Street Reservoir. The reservoir was a 2.5 million-gallon welded steel tank to supply storage for the district's 1467 pressure zone. The site was planned to accommodate future reservoirs and to maintain service from an existing 500,000-gallon tank during construction activities. Michael Baker provided final and structural engineering services, retaining wall design,and on-site best management practices. Elsinore Valley Municipal Water District Construction Management and Inspection Services of Five Capital Improvement Projects,Lake Elsinore, California. Elsinore Valley Municipal Water District. Technician. Responsible for CADD mapping. Michael Baker performed construction management and inspection for five water resources capital improvement projects. The projects consisted of replacement of 15,600 feet of water mains and new water lines at 25 locations within the client's boundaries,an approximately 1,350-foot extension of lines for recycled water to the five project sites, replacement of broken or inoperative gate valves in four intersections, replacement of approximately 1,500 water meters with new automatic-reading meters, and installation of new water lines and valves at five locations to interconnect two water pressure zones. On-Call Survey Services-City of Murrieta Map Checking, Murrieta,California. 0yof Vurrieta. Project Surveyor. Michael Baker provided on-call map checking services for the City of Murrieta.Involved in checking a variety of projects,including tract maps,Parcel maps,certificates of corrections,and legal descriptions. On-Call Survey Services—Riverside County. Project Surveyor. Michael Baker is providing on-call map checking services for the Riverside County Public Works department. Involved in checking a variety of projects, including tract maps, Parcel maps, certificates of corrections, and legal descriptions. Old Town Temecula Civic Center Mapping, Temecula, California. Project Surveyor. Michael Baker provided a boundary survey and an aerial topographic map as well as engineering services for the Temecula Civic Center. Responsible for providing boundary and control calculations and analysis and preparing an Official Map of the project site. Page 125 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF L LSI MORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department OrderPlan Check Task Approach Proposed Strategy Michael Baker's professional staff has been providing plan checking services for over two decades in both the engineering and planning arenas. Michael Baker staff frequently uses both Adobe Acrobat Professional and Bluebeam PDF software products to review, track comments, and document revisions to construction drawings, reports, and other submittal documents. Michael Baker provides plan check services and has expertise and experience in nearly all categories listed in the Request for Qualifications. Our plan check services include: • Drainage Improvement Plans • Traffic Signal Plans • Hydrologic and Hydraulic Calculations • Traffic Control Plans • Structural Calculations • Covenants, Conditions and Restrictions (CC&Rs) • Street Improvement Plans • Bonding Estimates • Grading Plans& Erosion Control Plans • CEQA Documents; Regulatory/Resource Agency • Water-Sewer Plans Permits; MSHCP Compliance Documents • Final Subdivision Maps and Environmental • Water Quality Management Plans (WQMP) Constraint Sheets • Encroachment Permits (EP) • Adequacy of Right of Way and/or Easement • Geotechnical Reports Requirements . Storm Water Pollution Prevention Plans • Signing and Striping Plans (SWPPP) • Street Light Plans • Technical Specifications Michael Baker utilizes a multi-discipline team approach and state-of-the-art technology to serve our clients in the plan checking process. The firm is committed to providing the City the full-service resources available through a large firm combined with the high quality and personal attention expected of a regionally focused company. Our local knowledge, participation in community associations, and history providing professional services throughout Southern California gives us a distinct edge to serving the City in an effective manner. Task Order Flow Chart Michael Baker also understands that Project demands can fluctuate resulting in additional or reduced deployment of staff. Michael Baker addresses this concern by having multiple staff members with a wide variety of experience and a Research and Execute availability to meet the demands. With our Southern Identify Project Project Work California resources, our staff have the Elements Plan expertise and personnel to facilitate r Internal review of a large or small project Task Posal Scoping depending on the needs of the project Request Meetings ScoR e Design and the expectations of our clients. ernalDiscipline anclTechnical Meetings Expertise Michael Baker employs a variety of cost control and budget methodologies for Approval of Task Order Schedule our plan checking services. It is our goal not to just staff the project as andl Work Refine Weekly Staff necessary but to staff it with the most qualified and appropriate personnel Task Order Scheduling available. We also understand the need to work as efficiently as possible,and Scope ofWork Meetings we will evaluate where forces are already being utilized and create efficiencies cast where possible so that we will meet or beat the target turn-around timeframe Develop provided. Work Plan, Cost Control Schedule and Accounting Resource Commitment Mobilizing appropriate staff quickly is essential to the smooth commencement and progress of assigned plan checks. This requires a balanced management • lan Development approach that emphasizes streamlined communication and quality control. To assist with fluid Quality communication between the City and the Team,Todd Pitner will act as the Team's primary point of contact to the Project Delivery Page 26 I N T E R N A T I O N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LLA LSI MORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department City.Todd will evaluate each plan check request and,together with the City, identify the appropriate personnel for each assignment.Todd will then work closely with our proposed service area Leads(identified on our organizational Chart),who will manage individual assignments, clearly communicate assignments to their respective teams, and coordinate the flow of work from desk to desk, discipline to discipline, through delivery. Leads will be responsible for project oversight, budget and schedule monitoring,and overall product quality. Commitment To Quality Control Throughout each assignment, discipline leads will work directly with Todd to implement our in-house Quality Assurance/Quality Control Program. This process emphasizes quality control as a continuous process used on a daily basis as work proceeds throughout each assignment. By assigning control of the QA/QC process to a collaborative effort between Contract and discipline lead, we do our best to ensure each element of each plan check is held to a consistent and singularly quality standard. Michael Baker's Quality Management Program has four major components: Quality Assurance; Quality Control;Schedule and Cost Control; and Project Wrap Up. This program is based on Total Quality Management (TQM) principals. The Quality Assurance component provides to the early prevention of errors and omissions. Ensuring quality starts with an assignment of the best qualified team and implementation of a plan that will manage quality throughout the life of the contract. The Principal and Quality Assurance Managers will work with the Contract Manager to: • Ensure that our team understands the specific expectations and project objectives and will develop a project plan(budget and schedule) that will realistically meet those expectations and objectives. • Review all work performed. • Ensure on-time delivery of the appropriate documents at the appropriate milestone. STEP I STEP 2 PERSONNEL •••. •. Staff are assigned V Design conforms PROCESS . . lb�secl on the to requirements Deliverables are ., • .. Client's.needs &procedures developed per the . .. &experience of the Client, Client's format& relevant to task as well as other submitted for QC scope,budget& applicable Review schedule A agencies AL Understanding Of Various Tasks In an attempt to address and show understanding of the disciplines that could be tapped under this contract, below are general summaries of Michael Baker's experience and qualifications as it relates to the various fields identified in the Request for Qualifications. Because we have performed these services for so many years,we know what to look for when plan checking. STREETS/PAVEMENT/ADA Roadway Design/Pavement Rehabilitation I Michael Baker's pavement . rehabilitation and roadway design experience includes all phases of the roadway development process and all sizes of projects.The firm has guided � +y many projects from the feasibility stage through preliminary and final „„Yt design and on through construction. f - ADA Compliance I As part of traffic improvement projects,existing access ramps, sidewalks, and driveway approaches may not be current with ADAILI, compliance standards. Michael Baker routinely reviews current Title 24, ADA regulations to identify updates to standards.In addition,we are aware of the current Caltrans changes to their ADA guidelines restricting gradients to less than the maximum ADA compliance standards. Michael Baker has designed hundreds of Caltrans-level ADA applications across the Inland Empire. Page 127 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LPL LSIROKE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Traffic Signal Design I Traffic signal design for various agencies and private developers is one of Michael - Baker's primary services. In the last 25 years, we have designed more than 2,000 signals and 500 signal communication systems for local municipalities and regional transportation planning agencies throughout California.Our team has prepared traffic signal,traffic signal modification,and traffic signal communication -- - plans for various agencies including SBCTA, San Bernardino County, Riverside County, Caltrans Districts 7, __ -- - - 8, 11, and 12,and various cities throughout Southern California. Signing/Striping, and Traffic Controls I Michael Baker will utilize Caltrans, County of San Bernardino Standard Plans and Specifications, CA MUTCD, ITE, and California Vehicle Code and industry policies and standards for the evaluation and analysis of intersections, roadways, bikeways, and the preparation of the specific traffic engineering design. Traffic Signal System Design, Communication and Timing I Michael Baker's staff is highly experienced in preparing traffic signal and timing plans.The timing of traffic signals should be developed to provide the optimal traffic flow for a specific intersection or corridor. To comply with the CA MUTCD, base parameter intervals must be calculated based on field measurements and County speed surveys. When developing optimal signal timing, special consideration must be given to time-of-day demands and holiday schedules.Coordination plans should be developed along corridors for peak periods, but coordination settings must be carefully monitored to ensure traffic flow is progressing, as desired. Michael Baker can use County traffic management software to make appropriate changes or provide recommendations for County staff to update signal timing. Traffic Studies I Michael Baker's team will review and/or produce traffic studies as needed for the County.A standard workflow will be used for the review of any traffic VMT impact analysis to ensure all CEQA requirements are met. Additionally, we will utilize the correct HCM capacity analysis methodologies to calculate level of Service will be utilized for traffic operations studies. Left turn phasing, traffic signal analysis, and safety studies that meet all California Vehicle Code and CA MUTCD requirements can be produced to support County traffic improvement initiatives.The Michael Baker Team will utilize Traffic analysis programs such as Synchro with Simtraffic,Trutraffic,and VISSIM as appropriate to analyze conditions based on the County needs. Construction Staging and Traffic Control and Detours I Michael Baker will provide detailed construction staging and traffic control planning specific to the anticipated construction improvements for the street rehabilitation projects. The construction improvements for the County will be staged to minimize impacts to vehicle,truck transit,bicyclist,and pedestrian traffic.Specific construction work areas will be protected from traffic in accordance to each construction stage,type of construction,and construction equipment that will be required within the work area. The construction stage areas will be designed to maximize lane usage for all traffic movements, maintain pedestrian and bicyclist access routes on local streets, and provide a safe workable area. STRUCTURAL ENGINEERING Michael Baker provides a wide range of Structural Engineering services including design of buildings; bridges;flood control facilities;water resources structures; retaining, sound, and security walls;and special structures. Projects completed by Michael Baker are designed under the supervision of State Licensed Structural Engineers. Examples of Michael Baker's structural engineering experience include: Bridges I Michael Baker provides a full range of services from preliminary engineering and preparation of Advance Planning Studies through final design and preparation of Plans, Specifications, and Estimate (PS&E) packages. Bridges are designed to the latest edition of the AASHTO-LRFD Bridge Design Specifications including Caltrans supplements and modifications and incorporating local municipality requirements. To optimize the final design, Michael Baker utilizes the latest software developed specifically for bridge design including MIDAS Civil Bridge Finite Element Analysis, Xtract, LPILE, CTAbut, RetainPro, AASHTOWare BrR, and a large cache of licensed alternatives. Michael Baker's bridge design experience includes a wide variety of structure types and utilizes numerous construction methods and materials. Michael Baker also offers comprehensive bridge inspection, rehabilitation,and load rating services with local FHWA/NHI certified bridge safety inspectors holding SPRAT/IRATA rope access certifications for ease and cost-effective access to bridge elements without requiring expensive specialized equipment. Page 128 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF L LSI MORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department Flood Control Structures I Michael Baker has experience in the structural design of single- and multi-barrel box culverts, multi-plate arch culverts,box inlet structures,channel transition structures, rectangular channels,drop structures,drop inlet structures,energy dissipater and dam outlet structures (e.g. Prado Dam),and special box designs providing large access shafts for maintenance equipment. Water Resources Structures I Michael Baker has designed pumping station buildings and equipment foundations,lift stations,water delivery system structures including blow-off structures and service connection structures (turnouts and metering vaults), circular pre-stressed concrete reservoirs, steel tanks,and equipment vaults. Retaining/Sound/Security Walls I Michael Baker has extensive experience in the design of sound walls, security walls, and earth retaining structures including conventional spread- and pile-footing CIP concrete, mechanically stabilized earth (MSE), ground-anchor, soldier-pile, steel sheet pile,crib, masonry block,and timber trail retaining walls. Michael Baker's designs have utilized numerous construction methods and materials including geotextiles, cast-in-place concrete, shotcrete, masonry, and structural steel. Special Structures I Michael Baker has design experience with pedestrian/equestrian trail and trail bridge, retaining wall, and erosion prevention structures; post-installed sail shade structures; scour countermeasure and foundation retrofit structures;seismic retrofit analysis and design of existing bridge and building structures; water-main and pump station retrofit structures; toll gantry seismic design; unique utility crossings; and other unique and innovative approaches to unusual structural challenges. Storage/Facility Buildings I Michael Baker's staff of structural engineers and designers provides analysis, construction documents, and support during construction for new buildings as well as remodeled or rehabilitated structures. Extensive experience includes the design of multi-story buildings constructed of concrete, steel, masonry, and timber built for a variety of uses including hotels, restaurants, shopping centers, office buildings, schools, and industrial facilities. Michael Baker also provides structural engineering design and technical reports for the rehabilitation of existing structures required by current seismic code requirements, including the latest design guidelines. HYDROLOGY AND HYDRAULICS Storm Drain/Hydrology and Hydraulic Design I Michael Baker has planned and designed storm drainage and flood control facilities for public agencies and private developers throughout Southern California.The firm has prepared preliminary drainage studies for addressing such issues as dam inundation,flood hazards, NPDES/water quality issues, wetlands and similar issues. Michael Baker's specific drainage design capabilities include the preparation of storm drain master plans,sedimentation studies,engineering and economic feasibility studies, concept through construction drawings for storm drain pipelines,earthen dams and spillways,flood control channels, retention basins,and drainage pump stations. The firm is a leader in wetlands restoration and the reclamation of low-lying flood prone areas by designing appropriate flood protection facilities, utilizing the latest in computer programs available, including flood plain mapping, pipe and channel hydraulic analysis,hydrology calculations,drainage master planning,structural design programs for reinforced concrete pipe and rectangular channels,and cost estimating. Urban Stormwater Engineering Design, Review&Inspection Services I Michael Baker has provided public clients with NPDES compliance services. Relevant experience includes site inspection, permit requirements interpretation, response to notices from regulators and annual reporting. Michael Baker has also developed municipal stormwater programs for various Southern California counties and cities. Michael Baker's Storm Water Quality capabilities include the development of surface water quality plans,research relative to BMP effectiveness, BMP siting, design, construction, construction management and operation, maintenance and monitoring. Furthermore, Michael Baker has completed studies relative to BMP effectiveness and cost including prototype studies relative to operation and maintenance cost and capital costs evaluation for new construction and retrofit construction. Michael Baker has completed designs for various types of structural controls including natural detention and infiltration basins to structural BMPs such as Sand Filters and Multi- Chambered Treatment Trains. Michael Baker has worked continuously with Caltrans for the past 15+ years, developing their storm water quality guidelines, conducting siting studies, initiating the Caltrans BMP Retrofit Pilot Program, launching statewide BMP retrofit projects, developing construction specifications, and refining their stormwater management systems. Page 129 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF LPL LSIROKE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department ENVIRONMENTAL AESTHETICS BIOLOGICAL ROADWAY CULTURAL UTILITIES As a leader in the environmental consulting field, Michael Baker offers RESOURCES RESOURCES an extensive array of services associated with environmental compliance g c ......... and documentation. Michael Baker provides evaluation for the full range of environmental effects for all types of projects, including CEQA and C E Q A / N E P A D O C U M E N T S NEPA documentation,air quality and health risk assessments,greenhouse gas analyses, noise studies, regulatory agency permitting, biological �0<_7 ago resources, visual assessments and photo simulations, traffic studies, GREENHOUSE TRIP drainage/water quality assessments,community/socioeconomic analyses, GAS POPULATION AIR QUALITY HAZMAT REDUCTION and biological mitigation/monitoring. Our environmental compliance managers have a broad resume of project experience in urban communities and have worked on numerous complex projects requiring technical specialization, creative solutions, and development of effective and workable mitigation. We can confidently say that our environmental experience makes us primed to assist with any on-call request needed by the City. Environmental documents prepared by Michael Baker address the full range of environmental and technical issues,with in-house specialists providing technical evaluation for traffic and transportation, flood control and drainage, air quality, climate change, noise, land use, socioeconomics, utilities and services, energy conservation, visual and aesthetic effects, relevant planning, Phase I hazardous materials, neighborhood and construction effects, landform modification, agricultural suitability and many other environmental issue areas. Michael Baker draws upon the profession's leading subconsultants for biological and cultural resources support to build a multi-disciplinary team of environmental analysts. Michael Baker is one of only a handful of companies in the Inland Empire that can provide all engineering, survey, hydrology studies, land use planning,environmental planning,and technical services staff in-house. However,we believe that this on-call contract requires a careful balance of experience and cost to ensure that City's projects are completed in the most time and cost-efficient way possible.Our team knows how to adequately assess and scale the type of documentation needed to gain the necessary approvals. Where appropriate, we will recommend ways to reduce the regulatory and CEQA burden of a project and present the full range of compliance options to the City to support decision making. Our integrated services are described in detail below. Technical Analysis and Peer Review Services I Often, as an extension of agency staff, we are asked to peer review studies submitted by applicants. Our in-house team of technical analysts and seasoned practitioners are available to the City to provide peer review services or prepare technical studies for City initiated projects, including: ✓ Air Quality, Greenhouse Gas, and Energy Analysis ✓ Phase I Environmental Assessments ✓ Noise Impact Assessments/Analyses ✓ Visual Impact Analysis ✓ Traffic Analysis ✓ Cultural Resources SURVEY AND MAPPING Land Surveying I Michael Baker survey personnel have performed complete project services,from initial design topography through final monumentation and construction staking on many varied public and private developments throughout the western U.S. All survey crews work under the direct supervision of a Licensed Land Surveyor registered in the State of California. Each survey crew is equipped with the latest survey equipment, state-of-the-art instruments, GNSS receivers and WiFi-enabled field computers. Field data collectors are wirelessly interfaced with our wide area network computer system and internet uplink to ensure accurate and timely information transfers.This means fast turnarounds for tightly scheduled projects. All survey vehicles are equipped with radios and cellular phones for efficient and effective response time.All field personnel have been trained in safety,cost and budget controls.Specific surveys include: ✓ Aerial Ground Control and Profiles ✓ Final Plan/Map Preparation ✓ Monitoring Surveys ✓ Alta/ACSM Land Title Surveys ✓ Geographic Information Systems (GIS) ✓ Photogrammetry ✓ Boundary Surveys/Boundary Analysis ✓ Topographic Mapping/Cross Sections ✓ Records of Survey ✓ Cadastral Surveying ✓ Global Navigation Satellite System Surveys ✓ Right of Way Surveys ✓ Construction Surveying and Staking ✓ Legal Descriptions and Mapping ✓ Topographic/Hydrographic Surveys Page 130 1 N T E R N A T 1 0 N A L DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 CITY OF L LSMORE Statement of Qualifications DREAM EXTREME Plan Check Services for Engineering Department This wide range of surveying services has given Michael Baker the ability to complete even the most challenging survey assignment in a cost effective and efficient manner. Aerial Topographic Ma pping/Photog ram metry I Michael Baker will prepare topographic maps using a workflow that involves Licensed Land Surveyors at every step. IPId We take advantage of modern technology from photographic instrumentation to gather Ilglll ,, w data, process the data within GIS and graphics computer systems and translate the data to usable form for review by engineers and planners. Our Registered Photogrammetry staff has extensive experience in surveying, remote sensing and analytic =` photogrammetry. Monument Ties,Replacement and Corner Record Preparation I Michael Baker will perform a field survey to verify, set or and/or measure sufficient reference tie accessory points and /or monuments to each location of centerline or right of way control that may be destroyed during the construction of the project, as required under Section 8771 of the Professional - Land Surveyor Act. After completion of construction,reconstruction or maintenance,Michael Baker will replace any disturbed or destroyed monuments or their accessories as required ' under said Section 8773.3 of the P.L.S. Act and submit a final Corner Record to the County Surveyors Office for filing as a public record,said final Corner Record document showing the monument(s) or its accessories destroyed,tied out and replaced. Mapping I Michael Baker provides mapping and boundary services for the full range of projects within the survey profession. All boundary analysis, legal descriptions, parcel maps, tract maps, ALTA/ NSPS surveys, records of survey and corner records are prepared by or under the direction of Michael Baker's registered professional land surveyors. Right of Way Engineering I Many of Michael Baker's recently completed projects have established the firm as a key provider of right of way engineering and land surveying services. Michael Baker has extensive experience in assembling right of way, topographic and utility information into a digital map database. �• _''� 3-D Data Acquisition I Michael Baker's team was a pioneer and early adopter of LiDAR. The firm is the most experienced, well-respected, proficient, well-travelled and active within the .'�,•., profession. Following Michael Baker's acquisition of Mobile LiDAR technology nearly a decade ago (the second of its kind in the world), the firm's Mobile LiDAR Team has successfully �- performed hundreds of projects throughout 24 different U.S. States. Beginning as a way to Calibration collections are performed to augment traditional surveys, LiDAR quickly evolved into highly detailed, 3D surveys. We find ensure proper sensor configuration, ever increasing uses of terrestrial point-cloud data.We have used stationary LiDAR to map roof alignment,orientation,and point densities tops for the deployment of solar arrays. We have used it to map 3D scenes converting point are achieved during field collections. clouds to wire frames to 3D rendered objects.We have used mobile LiDAR to non-invasively map and identify which structures are within a floodplain. Michael Baker was one of the first companies in the nation to develop a mobile LiDAR capability and our unit has since racked up thousands of miles mapping roads, bridges, railroads, runways, levees and beaches. � - Unmanned Aircraft Systems for In-The-Field Photography/Mapping I Michael Baker has received authorization to utilize unmanned aircraft in the field to provide surveying,GIS/GIT,on-site photography, video and mapping services for projects sensitive to safety as well as accessibility. Though there are restrictions based on areas regarding size, height,air spaces and pedestrians, it is an innovative approach to seeing the progress of the project in 360-degree view for weekly and monthly progress meetings. Page 31 1 N T E R N A T 1 0 N A L DocuSign Envelope ID: B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 r � s� r � 4A We Make A Difference 40810 County Center Drive,Suite 200 Michael Baker Temecula,CA 92591 951.676.8042 www.MBAKERINTL.com 0 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 DATE(MM/DD/YYYY) ,a�ofzo® CERTIFICATE OF LIABILITY INSURANCE 07/13/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain w/ p y, policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT '6 NAME: AOn Risk Services Central, Inc. PHONE FAX Pittsburgh PA Office (A/C.No.Ext): (866) 283-7122 (A/c.No.): (800) 363-0105 'a IPlaza - Suite 2700 E-MAIL x 625 Liberty Avenue ADDRESS: Pittsburgh PA 15222-3110 USA INSURER(S)AFFORDING COVERAGE NAIL# INSURED INSURERA: XL insurance America Inc 24554 Michael Baker International, Inc INSURERB: American Guarantee & Liability Ins Co 26247 County Center Drive Suite 200 INSURER Allied world surplus Lines Insurance Co 24319 Suite Temecula CA 92591-0649 USA INSURER D: Zurich American Ins Co 16535 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: 570100829973 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, Limits shown are as requested INSR ADDL SUBR POLICY I POLICY ILTR TYPE OF INSURANCE INSD WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) LIMITS D X COMMERCIAL GENERAL LIABILITY GL0419728101 08/30/2022 08/30/2023 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTED CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) $1,000,000 VIED EXP(Any one person) $1.0,000 PERSONAL&ADV INJURY $2,000,000 M r P'ILAGGREGATE LIMITAPPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY 2 PRO LOC PRODUCTS-COMP/OPAGG $4,000,000 p JECT 0 OTHER: SIR/Deductible $250,000 0 r D AUTOMOBILE LIABILITY BAP4197284-01 08/30/2022 08/30/2023 COMBINED SINGLE LIMIT (Ea accident) $1,000,000 JXX ANY AUTO BODILY INJURY(Per person) O OWNED SCHEDULED BODILY INJURY(Per accident) Z AUTOS 01 AUTOS ONLY PROPERTY DAMAGE iC HIRED AUTOS X NON-OWNED (Per accident) U ONLY AUTOS ONLY Deductible $100 000 N B X UMBRELLA LIAB OCCUR AUc053258204 08/30/2022 08/30/2023 EACH OCCURRENCE $10,000,000 L) X EXCESS LIAB CLAIMS-MADE AGGREGATE $10,000,000 DIED I X RETENTION $10,000 D WORKERS COMPENSATION AND WC419728201 08/30/2022 08/30/2023 X PER STATUTE ORTH- EMPLOYERS'LIABILITYJE r/N AOS $1,000,000 D ANY EXECUTIVE OFFICER/MEMBER IN N/A WC419728501 08/30/2022 08/30/2023 E.L.EACH ACCIDENT EXECUTIVE OFFICER/MEMBER (Mandatory in NH) WI E.L.DISEASE-EA EMPLOYEE $1,000,000 Dy es,describe under $1,000,000 DESCRIPTION ow E.L.OPERATIONS below DISEASE-POLICY LIMIT c E&O - Professional Liability 03124806 08/30/2022 08/30/2023 Per Claim $1,000,000 Primary Claims Made Aggregate $5,000,000=_=_ SIR applies per policy terms & condi tions SIR/Deductible $200,000■■ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) ` RE: All operations. City of Lake Elsinore, its appointed officers, officials, employees, agents and volunteers are included as Additional Insured in accordance with the policy provisions of the General Liability and Automobile Liability policies. Ny General Liability and Automobile Liability policies evidenced herein are Primary and Non-Contributory to other insurance available to Additional Insured, but only in accordance with the policy's provisions. A waiver of Subrogation is granted in favor of the City, its elected or appointed officers, officials, employees or agents in accordance with the policy provisions of the General Liability, Automobile Liability and workers' Compensation policies. jy Ni CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION �+ DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Lake Elsinore AUTHORIZED REPRESENTATIVE Attn: Nicole McCalmont - 130 S. Main Street �J Lake Elsinore CA 92530 USA INN ©1988-2015 ACORD CORPORATION.All rights reserved ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 Additional Insured — Automatic — Owners, Lessees Or Z U RI C H Contractors THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. Policy No. GLO 4197281-01 Effective Date: 08/30/2022 This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part A. Section II —Who Is An Insured is amended to include as an additional insured any person or organization whom you are required to add as an additional insured under a written contract or written agreement executed by you, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" and subject to the following: 1. If such written contract or written agreement specifically requires that you provide that the person or organization be named as an additional insured under one or both of the following endorsements: a. The Insurance Services Office (ISO) ISO CG 20 10 (10/01 edition); or b. The ISO CG 20 37 (10/01 edition), such person or organization is then an additional insured with respect to such endorsement(s), but only to the extent that"bodily injury", "property damage" or"personal and advertising injury" arises out of: (1) Your ongoing operations, with respect to Paragraph 1.a. above; or (2) "Your work", with respect to Paragraph 1.b. above, which is the subject of the written contract or written agreement. However, solely with respect to this Paragraph 1., insurance afforded to such additional insured: (a) Only applies if the"bodily injury", "property damage"or"personal and advertising injury"offense occurs during the policy period and subsequent to your execution of the written contract or written agreement; and (b) Does not apply to "bodily injury" or "property damage" caused by "your work" and included within the "products-completed operations hazard" unless the written contract or written agreement specifically requires that you provide such coverage to such additional insured. 2. If such written contract or written agreement specifically requires that you provide that the person or organization be named as an additional insured under one or both of the following endorsements: a. The Insurance Services Office (ISO) ISO CG 20 10 (07/04 edition); or b. The ISO CG 20 37 (07/04 edition), such person or organization is then an additional insured with respect to such endorsement(s), but only to the extent that"bodily injury", "property damage" or"personal and advertising injury" is caused, in whole or in part, by: (1) Your acts or omissions; or (2) The acts or omissions of those acting on your behalf, U-GL-2162-A CW(02/19) Page 1 of 4 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 in the performance of: (a) Your ongoing operations, with respect to Paragraph 2.a. above; or (b) "Your work" and included in the "products-completed operations hazard", with respect to Paragraph 2.b. above, which is the subject of the written contract or written agreement. However, solely with respect to this Paragraph 2., insurance afforded to such additional insured: (i) Only applies if the "bodily injury", "property damage" or "personal and advertising injury" offense occurs during the policy period and subsequent to your execution of the written contract or written agreement; and (ii) Does not apply to "bodily injury" or "property damage" caused by "your work" and included within the "products-completed operations hazard" unless the written contract or written agreement specifically requires that you provide such coverage to such additional insured. 3. If neither Paragraph 1. nor Paragraph 2. above apply and such written contract or written agreement requires that you provide that the person or organization be named as an additional insured: a. Under the ISO CG 20 10 (04/13 edition, any subsequent edition or if no edition date is specified); or b. With respect to ongoing operations (if no form is specified), such person or organization is then an additional insured only to the extent that"bodily injury", "property damage" or"personal and advertising injury" is caused, in whole or in part by: (1) Your acts or omissions; or (2) The acts or omissions of those acting on your behalf, in the performance of your ongoing operations,which is the subject of the written contract or written agreement. However, solely with respect to this Paragraph 3., insurance afforded to such additional insured: (a) Only applies to the extent permitted by law; (b) Will not be broader than that which you are required by the written contract or written agreement to provide for such additional insured; and (c) Only applies if the"bodily injury", "property damage"or"personal and advertising injury"offense occurs during the policy period and subsequent to your execution of the written contract or written agreement. 4. If neither Paragraph 1. nor Paragraph 2. above apply and such written contract or written agreement requires that you provide that the person or organization be named as an additional insured: a. Under the ISO CG 20 37 (04/13 edition, any subsequent edition or if no edition date is specified); or b. With respect to the "products-completed operations hazard" (if no form is specified), such person or organization is then an additional insured only to the extent that"bodily injury"or"property damage" is caused, in whole or in part by "your work" and included in the "products-completed operations hazard", which is the subject of the written contract or written agreement. However, solely with respect to this Paragraph 4., insurance afforded to such additional insured: (1) Only applies to the extent permitted by law; (2) Will not be broader than that which you are required by the written contract or written agreement to provide for such additional insured; (3) Only applies if the "bodily injury" or "property damage" occurs during the policy period and subsequent to your execution of the written contract or written agreement; and (4) Does not apply to "bodily injury" or "property damage" caused by "your work" and included within the "products-completed operations hazard" unless the written contract or written agreement specifically requires that you provide such coverage to such additional insured. U-GL-2162-A CW(02/19) Page 2 of 4 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 B. Solely with respect to the insurance afforded to any additional insured referenced in Section A. of this endorsement, the following additional exclusion applies: This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services including: 1. The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or 2. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the 'occurrence"which caused the"bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or the failure to render any professional architectural, engineering or surveying services. C. Solely with respect to the coverage provided by this endorsement, the following is added to Paragraph 2. Duties In The Event Of Occurrence, Offense, Claim Or Suit of Section IV—Commercial General Liability Conditions: The additional insured must see to it that: (1) We are notified as soon as practicable of an 'occurrence" or offense that may result in a claim; (2) We receive written notice of a claim or"suit"as soon as practicable; and (3) A request for defense and indemnity of the claim or"suit"will promptly be brought against any policy issued by another insurer under which the additional insured may be an insured in any capacity. This provision does not apply to insurance on which the additional insured is a Named Insured if the written contract or written agreement requires that this coverage be primary and non-contributory. D. Solely with respect to the coverage provided by this endorsement: 1. The following is added to the Other Insurance Condition of Section IV — Commercial General Liability Conditions: Primary and Noncontributory insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured provided that: a. The additional insured is a Named Insured under such other insurance; and b. You are required by written contract or written agreement that this insurance be primary and not seek contribution from any other insurance available to the additional insured. 2. The following paragraph is added to Paragraph 4.b. of the Other Insurance Condition under Section IV — Commercial General Liability Conditions: This insurance is excess over: Any of the other insurance,whether primary, excess,contingent or on any other basis, available to an additional insured, in which the additional insured on our policy is also covered as an additional insured on another policy providing coverage for the same 'occurrence", offense, claim or "suit". This provision does not apply to any policy in which the additional insured is a Named Insured on such other policy and where our policy is required by a written contract or written agreement to provide coverage to the additional insured on a primary and non- contributory basis. E. This endorsement does not apply to an additional insured which has been added to this Coverage Part by an endorsement showing the additional insured in a Schedule of additional insureds, and which endorsement applies specifically to that identified additional insured. F. Solely with respect to the insurance afforded to an additional insured under Paragraph A.3. or Paragraph A.4. of this endorsement, the following is added to Section III—Limits Of Insurance: Additional Insured—Automatic—Owners, Lessees Or Contractors Limit The most we will pay on behalf of the additional insured is the amount of insurance: U-GL-2162-A CW(02/19) Page 3 of 4 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 1. Required by the written contract or written agreement referenced in Section A. of this endorsement; or 2. Available under the applicable Limits of Insurance shown in the Declarations, whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. All other terms, conditions, provisions and exclusions of this policy remain the same. U-GL-2162-A CW(02/19) Page 4 of 4 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. DocuSign Envelope ID: B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 POLICY NUMBER: BAP 4197284-01 COMMERCIAL AUTO CA20481013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED FOR COVERED AUTOS LIABILITY COVERAGE This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: MICHAEL BAKER INTERNATIONAL LLC Endorsement Effective Date: SCHEDULE Name Of Person(s) Or Organization(s): ANY PERSON OR ORGANIZATION TO WHOM OR WHICH YOU ARE REQUIRED TO PROVIDE ADDITIONAL INSURED STATUS OR ADDITIONAL INSURED STATUS ON A PRIMARY, NON-CONTRIBUTORY BASIS, IN A WRITTEN CONTRACT OR WRITTEN AGREEMENT EXECUTED PRIOR TO LOSS, EXCEPT WHERE SUCH CONTRACT OR AGREEMENT IS PROHIBITED BY LAW. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CA 20 48 10 13 © Insurance Services Office, Inc., 2011 DocuSign Envelope ID: B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 Waiver Of Subrogation (Blanket) Endorsement Policy No. Eff.Date of Pol. Exp.Date of Pol. Eff.Date of End. Producer Add'1 Prem. Return Prem. GLO 4197281-01 08/30/2022 08/30/2023 15939000 $ INCL I $ THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part The following is added to the Transfer Of Rights Of Recovery Against Others To Us Condition: If you are required by a written contract or agreement,which is executed before a loss,to waive your rights of recovery from others, we agree to waive our rights of recovery. This waiver of rights shall not be construed to be a waiver with respect to any other operations in which the insured has no contractual interest. U-GL-925-B Cw(12/01) Page 1 of 1 DocuSign Envelope ID: B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 POLICY NUMBER: BAP 4197284-01 COMMERCIAL AUTO CA04441013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: MICHAEL BAKER INTERNATIONAL LLC Endorsement Effective Date: SCHEDULE Name(s) Of Person(s) Or Organization(s): ALL PERSONS AND/OR ORGANIZATIONS THAT ARE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT WITH THE INSURED, EXECUTED PRIOR TO THE ACCIDENT OR LOSS, THAT WAIVER OF SUBROGATION BE PROVIDED UNDER THIS POLICY. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The Transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the "accident" or the "loss" under a contract with that person or organization. CA 04 44 10 13 © Insurance Services Office, Inc., 2011 Page 1 of 1 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 00 03 13 (Ed. 4-84) WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule ALL PERSONS AND/OR ORGANIZATIONS THAT ARE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT WITH THE INSURED, EXECUTED PRIOR TO THE ACCIDENT OR LOSS, THAT WAIVER OF SUBROGATION BE PROVIDED UNDER THIS POLICY FOR WORK PERFORMED BY YOU FOR THAT PERSON AND/OR ORGANIZATION. WC 00 03 13 (Ed. 4-84) Policy#WC 4197282-01 ©1983 National Council on Compensation Insurance. DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 Blanket Notification to Others of Cancellation ZURICH or Non-Renewal THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. Policy No. GLO 4197281-01 Effective Date: 08/30/2022 This endorsement applies to insurance provided under the: Commercial General Liability Coverage Part A. If we cancel or non-renew this Coverage Part by written notice to the first Named Insured, we will mail or deliver notification that such Coverage Part has been cancelled or non-renewed to each person or organization shown in a list provided to us by the first Named Insured if you are required by written contact or written agreement to provide such notification. Such list: 1. Must be provided to us prior to cancellation or non-renewal; 2. Must contain the names and addresses of only the persons or organizations requiring notification that such Coverage Part has been cancelled or non-renewed; and 3. Must be in an electronic format that is acceptable to us. B. Our notification as described in Paragraph A. of this endorsement will be based on the most recent list in our records as of the date the notice of cancellation or non-renewal is mailed or delivered to the first Named Insured. We will mail or deliver such notification to each person or organization shown in the list: 1. Within 10 days of the effective date of the notice of cancellation, if we cancel for non-payment of premium; or 2. At least 30 days prior to the effective date of: a. Cancellation, if cancelled for any reason other than nonpayment of premium; or b. Non-renewal, but not including conditional notice of renewal, unless a greater number of days is shown in the Schedule of this endorsement for the mailing or delivering of such notification with respect to Paragraph B.1. or Paragraph 113.2. above. C. Our mailing or delivery of notification described in Paragraphs A. and B. of this endorsement is intended as a courtesy only. Our failure to provide such mailing or delivery will not: 1. Extend the Coverage Part cancellation or non-renewal date; 2. Negate the cancellation or non-renewal; or 3. Provide any additional insurance that would not have been provided in the absence of this endorsement. U-GL-1521-B CW(01/19) Page 1 of 2 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 D. We are not responsible for the accuracy, integrity, timeliness and validity of information contained in the list provided to us as described in Paragraphs A. and B. of this endorsement. SCHEDULE The total number of days for mailing or delivering with respect to Paragraph B.1. of this endorsement is amended to indicate the following number of days: The total number of days for mailing or delivering with respect to Paragraph B.2. of ** this endorsement is amended to indicate the following number of days: * If a number is not shown here, 10 days continues to apply. ** If a number is not shown here, 30 days continues to apply. All other terms and conditions of this policy remain unchanged. U-GL-1521-B CW(01/19) Page 2 of 2 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 Blanket Notification to Others of Cancellation Z U RI C H or Non-Renewal Policy No. Eff.Date of Pol. Exp.Date of Pol. Eff.Date of End. Producer No. AWL Prem Return Prem. BAP 4197284-01 08/30/2022 08/30/2023 15939000 INCL THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the: Commercial Automobile Coverage Part A. If we cancel or non-renew this Coverage Part by written notice to the first Named Insured, we will mail or deliver notification that such Coverage Part has been cancelled or non-renewed to each person or organization shown in a list provided to us by the first Named Insured if you are required by written contact or written agreement to provide such notification. However, such notification will not be mailed or delivered if a conditional notice of renewal has been sent to the first Named Insured. Such list: 1. Must be provided to us prior to cancellation or non-renewal; 2. Must contain the names and addresses of only the persons or organizations requiring notification that such Coverage Part has been cancelled or non-renewed; and 3. Must be in an electronic format that is acceptable to us. B. Our notification as described in Paragraph A. of this endorsement will be based on the most recent list in our records as of the date the notice of cancellation or non-renewal is mailed or delivered to the first Named Insured. We will mail or deliver such notification to each person or organization shown in the list: 1. Within seven days of the effective date of the notice of cancellation, if we cancel for non-payment of premium; or 2. At least 30 days prior to the effective date of: a. Cancellation, if cancelled for any reason other than nonpayment of premium; or b. Non-renewal, but not including conditional notice of renewal. C. Our mailing or delivery of notification described in Paragraphs A. and B. of this endorsement is intended as a courtesy only. Our failure to provide such mailing or delivery will not: 1. Extend the Coverage Part cancellation or non-renewal date; 2. Negate the cancellation or non-renewal; or 3. Provide any additional insurance that would not have been provided in the absence of this endorsement. D. We are not responsible for the accuracy, integrity, timeliness and validity of information contained in the list provided to us as described in Paragraphs A. and B. of this endorsement. All other terms and conditions of this policy remain unchanged. U-CA-832-A CW(01/13) Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY U-WC-3078-A CW (08/17) CANCELLATION AND NONRENEWAL NOTICE ENDORSEMENT A. Part Six—Conditions, Paragraph D.2. is replaced by the following: D. Cancellation 2. We may cancel this policy. We must mail or deliver to you not less than 90 days advance written notice stating when the cancellation is to take effect except for cancellation for non-payment of premium. If we cancel this policy for non-payment of premium we must mail or deliver to you not less than ten days advance written notice. Mailing that notice to you at your mailing address shown in Item 1 of the Information Page will be sufficient to prove notice. B. Part Six—Conditions, Paragraph F. is added. F. Nonrenewal Notice We will mail or deliver to you not less than 90 days advance written notice of our intention to nonrenew this policy. Mailing that notice to you at your mailing address shown in Item 1 of the Information Page will be sufficient to prove notice. All other terms, conditions, provisions and exclusions of this policy remain the same. U-WC-3078-A CW(08/17) Page 1 of 1 Policy#WC4197282-01 DocuSign Envelope ID:B6E3E1CD-E01F-4541-B3AC-C3AD34ECCEF1 BUSINESS LICENSE CITY OF LAKE ELSINORE This business license is issued for revenue purposes only and does not grant authorization Administrative Services-Licensing to operate a business. This business license is issued without verification that the holder is 130 South Main Street, Lake Elsinore, CA 92530 subject to or exempted from licensing by the state, county, federal government, or any PH (951)674-3124 other governmental agency. Business Name: MICHAEL BAKER INTERNATIONAL INC BUSINESS LICENSE NO. 022311 Business Location: 5 HUTTON CENTRE DR STE 500 Business Type: PROFESSIONAL/ENGINEERS SANTA ANA,CA 92707-8714 Owner Name(s): JOHN TANNER Description: ENGINEERING,DESIGN&CONSTRUCTION MANAGEMENT Issue Date: 8/1/2023 Expiration Date: 7/31/2024 MICHAEL BAKER INTERNATIONAL INC 100 AIRSIDE DR MOON TOWNSHIP, PA 15108-4740 Starting January 1, 2021, Assembly Bill 1607 requires the prevention of gender-based discrimination of business establishments. A full notice is available in English or other languages by going to:https://www.dca.ca.gov/publications/ TO BE POSTED IN A CONSPICUOUS PLACE THIS IS YOUR LICENSE • NOT TRANSFERABLE