Loading...
HomeMy WebLinkAboutLE GAYE ST 15031 (3) CITY OF 4-t� 1 6*1 LAKES C?q�LSIIAORX BUILDING & SAFETY DREAM EXTREME TM 130 South Main Street PERMIT PERMIT NO: 13-00006248 DATE : 2/07/13 JOB ADDRESS . . . . . : 15031 LE GAYE ST DESCRIPTION OF WORK . : ELECTRICAL OWNER CONTRACTOR RICHARD PARAMORE SHIELDS CONTRACTING 15031 LE GAYE 35676 KEANE CT LAKE ELSINORE CA 92530 WILDOMAR, CA 92595 LIC EXP 0/00/00 A. P . I# 379-140-079 2 SQUARE FOOTAGE 0 OCCUPANCY . . . . GARAGE SQ FT 0 CONSTRUCTION . . . FIRE SPRNKLR VALUATION . . . . ZONE . . . . . . R-1 ELECTRICAL PERMIT QTY UNIT CHG ITEM CHARGE BASE FEE 30 . 00 2 . 00 X 1 . 0000 SWITCHES / 1ST 20 2 . 00 2 . 00 X 1 . 0000 RECPT, OUTLET / 1ST 20 2 . 00 2 . 00 X 1 . 0000 LIGHTING FIXTURES/1ST 20 2 . 00 FEE SUMMARY CHARGES PAID DUE PERMIT FEES ELECTRICAL PERMIT 36 . 00 . 00 36 . 00 OTHER FEES PROF.DEV. FEE 1 TRADE 5 . 00 . 00 5 . 00 PLAN RETENTION FEE . 52 . 00 . 52 TOTAL 41 . 52 . 00 41 . 52 SPECIAL NOTES & CONDITIONS ELEC FOR ENCLOSED PATIO taper: Ca NoE Type: -F Drmr: 1 Imo: Z/07/13 07 i�[eipt no: 3� 2013 m IF 3JURE PERT 1 S41.y Total tmdeered $gl.52 Total payernt s41.52 City of Lake Elsinore Please read and initial Building Safety Division 1.I am Licensed under the provisions of Business and professional Code Section 7000 et seq.and my license is in full force. Post in conspicuous place 2.I,as owner of the property,or my employees w/wages as their sole compensation will do the work on the job and the structure is not intended or offered for sale. 3.I,as owner of the property,ant exclusively contracting with licensed contractors to construct the You must furnish PERMIT NUMBER and the project. JOB ADDRESS for each respective inspection: 4.I have a certificate of consent to selfmsure or a certificate of Workers Compensation Insurance Approved plans must be on job or a certified copy thereof. at all times: 5.I shall not employ any person in any manner so as to become subject to Workers Compensation Laws in the performance of the work for which this permit is issued. Note:If you should become subject to Workers Compensation after making this certification, Code Approvals Date Inspector you must forthwith comply with such provisions or this permit shall be deemed revoked. ELO 1 Temporary Electric Service PLO] Soil Pipe Underground EL02 Electric Conduit Underground BPO1 Facings BPO2 Steel Reinforcement BP03 Grout BPO4 Slab Grade PLOT Underground Water Pipe SS01 Rough Septic System SWO1 On Site Sewer ' BP05 Floor Joists BP06 lHoor Sheathing BPO7 Roof Framing BPO8 Roof Sheathing BP09 Shear Wall&Pre-Lath PL03 Rough Plumbing ELO3 I Rough Electric Conduit EL04 Rough Electric Wiring •( EL05 Rough Electric/ T-Bar MEO1 Rough Mechanical ME02 Ducts,Ventilating PL04 lRough Gas Pipe/Test PL02 IRoof Drains BPI O lFraming&Flashing BP12 Insulation BP13 Drywall Nailing BP1 1 Lathing&Siding PL99 Final Plumbing EL99 I Final Electrical L{• 1/�'Sa ME99 lFinal Mechanical BP99 IFinal Building Code Pool&Spa Approvals Date Inspector OTHER DIVISION RELEASES Deputy Inspector Department Approval required prior to the P001 Pool Steel Rein./Forms building being released bX the City PO01 Pool Plumbing/Pressure Test P003 Pre-Gunite Approval I Date Inspector EL06 Rough Pool Electric Planning Sub List Approval Landscape P004 Pool Fencing/Gates/Alarms Finance P005 Pre-Plaster Approval Engineering P009 Final Pool/Spa