HomeMy WebLinkAboutPA-2022-29 09.14.23 PAR COMMENT LETTER (2) CITY OF ^=_
LA ICE �og LS I I1OPE
` DREAM EXTREME
SUBMITTED ELECTRONICALLY TO: jo.howard(a�kwcengineers.com
October 5, 2023
KWC Engineers
1880 Compton Ave, Unit 100
Corona, CA 92881
RE: Planning Application No. 2022-29, West Nichols Logistics Center (PAR-2023-06)
Dear Jo Howard,
Thank you for requesting a pre-application review for the West Nichols Logistics Center, a
proposed industrial development containing a 1,025,383 sq. ft. industrial building including up to
40,000 sq. ft. of office space, 204 dock doors, 462 standard vehicle parking stalls, and 249 trailer
parking stalls on approximately 61.10-acres located south of Nichols Road and southwest of the
intersection of Nichols Road and Baker Street.
Per Section 17.410.040 of the Lake Elsinore Municipal Code, this letter aims to provide you with
information on relevant policies, regulations, and procedures and identify potential issues relevant
to the proposed project. Moreover, the information, pertinent policies, or recommendations
provided herein are advisory only and shall not constitute or be construed as an approval or denial
of a land use or a development permit by the City.
Accordingly, the City's Design Review Committee (DRC), consisting of staff from the Planning
Division, Engineering Division, Building & Safety Division, Fire Department, and Elsinore Valley
Municipal Water District, have reviewed your application and provided comments (or maybe
forthcoming) that are included in this letter and the attachments for your reference.
If you have questions about this letter, please contact me at (951) 674-3124 ext. 273 or via e-mail
at jmendoza(a�lake-elsinore.orq.
M?�
Joey Mendoza
Associate Planner, City of Lake Elsinore
PA 2022-29 (West Nichols Logistics Center) PAR Letter
10/05/2023
Page 2 of 5
Planning Division Comments
1. The project site is located within the General Plan's Alberhill District and has a General Plan
Land Use Designation of Residential Mixed Use (RMU), Low-Medium Residential (LMR), and
Murdock Alberhill Ranch Specific Plan (MARSP). The current zoning for the subject site is
Residential Mixed Use (RMU), Single-Family Residential (R-1), and MARSP with C-1 and R-
3 designations.
2. The conceptual proposal includes a General Plan Amendment to change the Land Use
Designation from Residential Mixed Use (RMU) and Low-Medium Residential (LMR) to
Limited Industrial (LI), a Specific Plan Amendment to remove the westerly approximately 14-
acre portion of the property located within the Murdock Alberhill Ranch Specific Plan
(MARSP), and a Zone Change to change the zoning designation from Residential Mixed Use
(RMU) and Single-Family Residential (R-1) to Limited Manufacturing (M-1).
a. The General Plan shows that residentially designated land uses surround the subject
property. The subject property is also surrounded by residential development currently
approved and under construction. The proposed General Plan Amendment and Zone
Change would create incompatible land uses in the area. Justification with supporting
documentation will be necessary as part of the formal application.
b. To offset negative impacts of noise, light, visibility, activities and/or vehicular traffic
associated with industrial activities on residential and other sensitive land uses, the project
would need incorporate design measures which may include, but not limited to, building
siting and design, physical barriers, and land use transitions. (General Plan Section 2.3.4
Policy 3.2; General Plan Section 4.8.3 Policy 12.1-2).
c. Per Section 17.415.020.G (General Plan Amendments) of the Lake Elsinore Municipal
Code (LEMC), the applicant shall demonstrate to the City Council that there is a
substantial benefit to be derived from the amendment.
d. Per Section 17.415.040.E (Zoning Amendments) of the LEMC, the applicant shall
demonstrate that the proposed amendment will not be detrimental to the health, safety,
comfort, or general welfare of the person residing or working within the neighborhood of
the proposed amendment or within the City, or injurious to property or improvements in
the neighborhood or within the City.
e. Per Section 17.415.030.K (Specific Plans) of the LEMC, a specific plan may be amended
as necessary under the same procedures as adoption of a specific plan.
3. The proposed request for a General Plan Amendment change to Limited Industrial (LI) Land
Use Designation and Zone Change to Limited Manufacturing (M-1) raises concerns with
respect to potential reductions in currently permitted residential densities.
a. Adequate information has not been provided to demonstrate how the proposal would
comply with Senate Bill No. 330 (SB330).
b. S13330, which became effective January 1, 2020, prohibits the City from changing a land
use from a residential use to a less intensive non-residential use (or other land use
entitlement that will reduce housing capacity) unless the City concurrently changes the
development standards, policies, and conditions application to other parcels within the
jurisdiction to ensure that there is no net loss in residential capacity.
PA 2022-29 (West Nichols Logistics Center) PAR Letter
10/05/2023
Page 3 of 5
c. Since the proposed General Plan Amendment and Zone Change would change the land
use from Residential to Limited Manufacturing (non-residential), the project is required to
demonstrate how the proposed change would not result in a no net loss in residential
capacity within the City.
4. Per the Lake Elsinore General Plan Chapter 2.3.3, the Floor Area Ratio (FAR) for
developments in the Limited Industrial (LI) Land Use Designation shall not exceed 0.45.
a. The proposed project has a FAR of 0.53.
b. The applicant shall revise the project proposal to comply with the General Plan FAR
restriction for the Limited Industrial Land Use Designation.
5. The project proposes a single 1,025,383 sq. ft. industrial building and is subject to Council
Policy No. 400-16 "Good Neighbor Policy" for Warehousing, Logistics, and Distribution Uses
(GNP) adopted by the City Council on April 25, 2023.
6. Per the GNP, the applicant has submitted an analysis dated August 24, 2023 for this PAR
application for review by the City Council Executive Project Review Subcommittee and the
City's Development Review Committee (DRC). The Council Subcommittee meeting was held
on September 18, 2023 and DRC review was held on July 6, 2023 and September 14, 2023.
The following site-specific items were identified as part of the PAR review:
a. Per the GNP, warehousing, logistics, and distribution lane uses with buildings that are
250,000 sq. ft. in size or larger that are located within 1,000 ft. of an existing or planned
sensitive receptor shall provide detailed justification supporting a proposed separation
of less than 1,000 ft. as measured from the property line of the sensitive receptor to the
nearest point of any proposed warehousing, logistics and distribution building.
The PAR analysis has provided cross-sections (Sections A-A, B-B, and C-C), providing
information on site-specific conditions such as grade difference between residential lots
and proposed screening. Upon submitting a formal application, the applicant shall
provide additional information supporting the proposed screening and landscaping as
well as all applicable technical reports such as noise impact analysis and air quality
analysis.
b. Per the GNP, sites shall be fully screened with perimeter landscaping and masonry
screening walls along all bordering streets and adjacent to the property lines of sensitive
receptors. Perimeter screening shall measure a minimum of 15 ft. in width and shall
include, but not be limited to, a continuous vegetative screen of overstory trees that
measure a minimum of 25 ft. in height. Trees shall be provided at a ratio of one (1)
24"box tree per 20 linear ft.
The PAR analysis indicates that the project will provide landscaping and screening walls
per the GNP. A detailed Landscape Plan shall be submitted with the formal application,
demonstrating compliance with all the screening requirements noted above.
c. Per the GNP, Building planes visible from public view shall be articulated by changes in
exterior building materials, color, decorative accents, and/or articulated features.
Modulation and variation of building masses between adjacent buildings visible from
public streets shall be provided. Pedestrian and ground-level building entries accessible
PA 2022-29 (West Nichols Logistics Center) PAR Letter
10/05/2023
Page 4 of 5
to visitors should be designed using recessed entries, covered entries, projections, or
roofs to provide shade and visual relief at a pedestrian scale.
a. Full elevations will be required at application, showing detailed articulation and
decorative accents.
b. Visual articulation and design impact shall be emphasized on the A-A section of the
PAR exhibits (Terra Cotta Rd).
d. The PAR application has provided preliminary analysis to demonstrate compliance with
the GNP. The formal application should provide additional supporting information
showing compliance with all the development and operational criteria outlined in the
GNP including, but not limited to, project plans, technical reports, and visual impact
study.
7. Required approvals and entitlements include:
a. General Plan Amendment
b. Zone Change
c. Specific Plan Amendment
d. Tentative Tract Map
e. Industrial Design Review
f. Conditional Use Permit
8. In addition to the GNP and zoning district regulations, the following development standards
and guidelines would apply to the project:
a. Parking Requirements, LEMC Chapter 17.148
b. Nonresidential Development Standards, LEMC Chapter 17.112
c. City Landscaping Guidelines
9. A fiscal impact analysis should be prepared for City review.
10. Coordinate early and often with public service providers (e.g., Fire, Police/Sherrill, School)
to understand adequacy of existing service capacity in the project area.
11. Prior to entitlement, the Developer shall submit a Due Diligence application to Elsinore Valley
Municipal Water District (EVMWD) at engservices(a-)evmwd.net and attend a Due Diligence
meeting to obtain the project's requirements for water and/or sewer service.
12. Coordinate early and often with utilities to understand requirements and presence of existing
utilities that may affect project feasibility.
13. Public outreach is strongly encouraged. A public outreach plan should be submitted for
department review.
14. The project will be subject to Senate Bill No. 18 (SB18) and Assembly Bill No. 52 (SB52)
Tribal Consultations.
15. The City contracts with an approved consulting firm to provide California Environmental
Quality Act (CEQA) documentation and compliance. The applicant for the proposed project
PA 2022-29 (West Nichols Logistics Center) PAR Letter
10/05/2023
Page 5 of 5
is responsible for the costs related to CEQA review. An Initial Study will be required for this
project, and it is anticipated that following technical studies will be required:
- Air Quality Analysis
- Biological Resources/MSHCP Consistency Analysis
- Cultural Resources Assessment
- Energy Analysis
- Geotechnical/Soils evaluation
- Greenhouse Gas Analysis
- Health Risk Assessment
- Hydrology Study
- Noise Impact Analysis
- Paleontological Resources
- Phase I Environmental Site Assessment
- Public Service Demand Study
- Traffic Impact Study
- Water Quality Management Plan
- Wildfire Protection Plan and Report
- Utility/Services Systems Study (i.e., Will-Serve Letters)
- Vehicle Miles Traveled (VMT)Analysis
- Visual Impact Study
- Additional technical studies, engineering reports, or other information may be
required
16. Pending Comments
a. Comments from the following Agencies are pending and will be delivered upon
receipt:
a. Elsinore Valley Municipal Water District
17. Interagency Comments
a. Comments from the following City Departments regarding this project are attached
to this letter:
a. Engineering Department, Dated September 14, 2023
b. Fire Prevention Department, Dated September 25, 2023
c. Building & Safety Department Conditions
b. Please direct specific questions to the following DRC members as applicable:
a. Fire Prevention: Traci Williams, Ext. 228 or twilliams(aD_lake-elsinore.orq
b. Building & Safety: Bill Belvin, Ext. 286 or bbelvin(a.lake-elsinore.org
c. Engineering: Yu Tagai, Ext. 246 or ytagai(a-)_lake-elsinore.org
CITY OF cr
LADE C LSIIYOIJE
ENGINEERING DEPARTMENT -� 7
PA 2022-29 West Nichols Logistics Center—Various APNs
PRE-APPLICATION
DRC Date: September 14, 2023
PRE-APP COMMENTS #1:
1. The project is required to extend the existing stormwater line to the regional basin.
2. Provide a preliminary grading plan in the formal submittal.
3. Finance TTM 38597 shows a WQMP basin lot of 5 acres within the proposed building footprint and
the new site plan shows less WQMP area. Ensure there is adequate footprint to address water
quality.
a. Provide details on how the project proposes to relocate the water quality and detention
basins in the formal submittal.
4. Ensure the following dedications are recorded on the final map or per separate instrument(s) at or
prior to the final map recording:
a. A dedication (in fee) along Nichols Road property frontage such that from property line to
centerline is 60 feet.
b. A dedication along Pierce Street full width of 60 feet.
c. A dedication along Terra Cotta Road property frontage such that from property line to
centerline is 30 feet.
d. A dedication of right-of-way necessary to realign Nichols Road for future alignment.
5. Project is required to provide improvements along property frontage roads as requested by the City
of Lake Elsinore. Additional improvements are anticipated upon completion of the Traffic Impact
Analysis.
a. As an important note, the project will be required to construct Terra Cotta Road full width
and signal improvements. Improvements shall be made along property frontage and extend
until the road meets the existing full-width Terra Cotta Road near Carson Avenue.
6. Project is responsible for complying with the Santa Ana Region NPDES permits as warranted
based on nature of developer and/or activity. SAR MS4 permit requires implementation of LID
principles and LID site design where feasible to treat pollutants of concern identified for the project.
Project requires submittal of WQMP.
a. Project shall in order presented, infiltrate, harvest and use, evapotranspire and/or bio-treat
the design capture volume(DCV). Site flows will drain towards Temescal Creek and project
will not qualify for the "Highest and Best Use" exemption.
i. Please provide a WQMP site plan in the formal submittal.
b. When ready, submit preliminary WQMP to City's online portal for plan check review
(http://www.lake-elsinore.org/city-services/online-services/citizen-self-service-portal).
Approved Preliminary WQMP due prior to Planning Commission.
CITY OF cr
LADE C LSINOIJE
ENGINEERING DEPARTMENT -� 7
PA 2022-29 West Nichols Logistics Center—Various APNs
PRE-APPLICATION
DRC Date: September 14, 2023
c. Approved Final WQMP due prior to grading permit or final map approval,whichever occurs
first.
d. All runoff from site shall be treated for pollutants of concern prior to release.
7. Project is required to submit a Hydrology/Hydraulic Report. Please provide preliminary report in the
formal submittal.
a. Ensure that both on-site flows, and off-site flows from the watershed affecting the project
footprint are examined.
8. Project is required to submit a Soils Report/Geotechnical Report. Please provide preliminary report
in the formal submittal.
a. Ensure all infiltration tests are performed in accordance with the Riverside County Flood
Control Water Conservation District (RCFCWCD), Design Handbook for LID BMPs.
9. Project is required to detain the incremental 10-year pre-and post-development difference.
10. Project will be required to complete a Traffic Scoping Agreement with the City Traffic Engineer for
review and approval.
a. Once Scoping Agreement is approved, a Traffic Impact Analysis will need to be submitted
for review and approval.
11. Installation of streetlights along all constructed streets identified in the project will be required.
Streetlight system shall be a LS-213 system. Location and pole specifications may be determined
at design stage.
12. It is recommended to coordinate with SCE early and often in the development process to review
load forecasts and start advanced engineering study to determine the method and scope for
providing service.
13. Overhead utilities (34.5 KV or lower) shall be ungrounded per LEMC 16.64.
14. The project will be subject to pay Engineering assessed Development Impact Fees that includes
but not limited to K-Rat, Area Drainage Fee, Transportation Uniform Mitigation Fee, and Traffic
Infrastructure Fee.
15. On the Concept Site Plan, there is a line item called out for "Water Quality Dedication" — Please
clarify what this means.
16. Additional comments will follow upon further information provided.
RIVERSIDE COUNTY FIRE DEPARTMENT
IN COOPERATION WITH
THE CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION
130 South Main Street, Lake Elsinore, CA 92530• Phone (951)674-3124
www.rvcfire.org
PROUDLY SERVING THE
UNINCORPORATED AREAS
OF RIVERSIDE COUNTY
AND THE CITIES OF:
BANNING Planning Case Comments
BEAUMONT
CANYON LAKE
September 25, 2023
COACHELLA
DESERT HOT SPRINGS PA 2022-23
EASTVALE PAR 2023-06
INDIANWELLS West Nichols Logistics Center
INDIO Multiple APN
JURUPA VALLEY
LAKE ELSINORE PLANNER: Joey Mendoza, Associate Planner
LA QUINTA
MENIFEE REVIEWED BY: Traci Williams, Fire Marshal
MORENO VALLEY The Fire Department has reviewed this submittal and provides the
NORCO following comments:
PALM DESERT
PERRIS 1. The applicant must provide a fire hydrant system capable of
delivering fire flow as required by the California Fire Code and Fire
RANCHO MIRAGE Department standards. Fire hydrants shall be spaced in
RueIDOUXCSD accordance with the California Fire Code. Based on current
SANJACINTO standards, the required fire flow is estimated to be 4,000 GPM at
20 PSI for a 4 hour duration. Estimated fire flow is based on a
TEMECULA
1,225,000 square foot building area with Type III-B construction
WILDOMAR and the building having a fire sprinkler system per 2022 California
Fire Code.
BOARD OF
SUPERVISORS: 2. The applicant must provide a fire command center for buildings
KEVIN JEFFRIES larger than 300,000 square feet in area in accordance with
DISTRICT 1 California Fire Code 508, Lake Elsinore Municipal Code Section
KAREN SPIEGEL 15.56 and fire department standards.
DISTRICT 2
CHARLESWASHINGTON 3. The applicant will need to evaluate the need for emergency
DISTRICT responder radio coverage inside the building in accordance with
V.MANUAL PEREZ California Fire Code Section 510. Prior to building plan review, the
DISTRICT applicant is encouraged to contact the Riverside County Fire
JEFF HEWITT Department for radio requirements.
DISTRICT 5
4. Gates must meet Fire Department standards at the time of building
permit application.
5. Hazardous Fire Area: this project is in a Very High Fire Hazard
Severity Zone of Riverside County as shown on a map on file with
the Clerk of the Board of Supervisors. Any building constructed
within this project shall comply with special construction provisions
contained in the California Building Code.
6. In the interest of Public Safety, the project shall provide an
Alternate or Secondary Access(s). Said Alternate or Secondary
Access(s) shall have concurrence and approval of both the City
Engineering Department and the Riverside County Fire
Department.
7. Prior to issuance of Building Permits, the applicant/developer shall
provide the Office of the Fire Marshal with an approved site plan
for Fire Lanes and signage. (CFC 501.3)
These comments are preliminary; further review will occur upon
receiving further planning applications. Additional conditions may be
necessary at that time.
Please feel free to contact me with any questions.
BUILDING AND SAFETY DEPARTMENT
General Conditions
B-1. Final Building and Safety Conditions. Final Building and Safety Conditions will
be addressed when building construction plans are submitted to Building and Safety for review.
These conditions will be based on occupancy, use, the California Building Code (CBC), and
related codes, which are enforced at the time of building, plan submittal.
B-2. Compliance with Code. All design components shall comply with applicable
provisions of the 2022 edition of the California Building,Plumbing and Mechanical
Codes: 2022 California Electrical Code; California Administrative Code, 2022
California Energy Codes, 2022 California Green Building Standards, California
Title 24 Disabled Access Regulations, and Lake Elsinore Municipal Code.
B-3.
B-4. Disabled Access. Applicant shall provide details of all applicable disabled access
provisions and building setbacks on plans to include:
a. All ground floor units to be adaptable.
b. Disabled access from the public way to the entrance of the building.
c. Van accessible parking located as close as possible to the main entry.
d. Path of accessibility from parking to furthest point of improvement.
e. Path of travel from public right-of-way to all public areas on site, such as club
house, trach enclosure tot lots and picnic areas.
B-5. Street Addressing. Applicant must obtain street addressing for all proposed
buildings by requesting street addressing and submitting a site plan for commercial
or multi-family residential projects or a recorded final map for single- family
residential projects. It takes 10 days to issue address and notify other agencies.
Please contact Sonia Salazar at ssalazar&lake-elsinore.org or 951-674-3124 X 286
B-6. Clearance from LEUSD. A receipt or clearance letter from the Lake Elsinore
School District shall be submitted to the Building and Safety Department to ensure
the payment or exemption from School Mitigation Fees.
B-7. Obtain Approvals Prior to Construction. Applicant must obtain all building plans
and permit approvals prior to commencement of any construction work.
B-8. Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light
standards, and any block walls will require separate approvals and permits.
B-9. Sewer and Water Plan Approvals. On-site sewer and water plans will require
separate approvals and permits. Septic systems will need to be approved from
Riverside County Environmental Health Department before permit issuance.
B-10. House Electrical Meter. Applicant shall provide a house electrical meter to provide
power for the operation of exterior lighting, irrigation pedestals and fire alarm
systems for each building on the site. Developments with single user buildings
shall clearly show on the plans how the operation of exterior lighting and fire alarm
systems when a house meter is not specifically proposed.
At Plan Review Submittal
B-11. Must submit Grading Plans to Engineering prior to Building. Building will not
accept plans if they have not been submitted to Engineering first.
Submitting Plans and Calculations. Applicant must submit to Building and
Safety online portal for electronic plan check and permitting:
a. An electrical plan including load calculations and panel schedule, plumbing
schematic, and mechanical plan applicable to scope of work.
b. A Sound Transmission Control Study in accordance with the provisions of the
Section 5.507, of the 2022 edition of the California Green Code.
c. A precise grading plan to verify accessibility for the persons with disabilities.
d. Truss calculations that have been stamped by the engineer of record of the
building and the truss manufacturer engineer.
Prior to Issuance of Grading Permit(s)
B-12. Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted
separately from the building plans, shall be submitted to Building and Safety for
review and approval.
B-13. Demolition Permits. A demolition permit shall be obtained if there is an existing
structure to be removed as part of the project. Asbestos report and lead base paint
reports are required before demo permit will be issued.
Prior to Issuance of Building Permit(s)
B-14. Plans Require Stamp of Registered Professional. Applicant shall provide
appropriate stamp of a registered professional with original signature on the plans.
Provide C.D. of approved plans to the Building Division.
Prior to Beginning of Construction
B-1 S. Pre-Construction Meeting. A pre-construction meeting is required with the
building inspector prior to the start of the building construction.