HomeMy WebLinkAboutAttachment 0 - Staff Report_DA Edits
Page 1 of 11
REPORT TO PLANNING COMMISSION
To: Honorable Chair and Members of the Planning Commission
From: Damaris Abraham, Assistant Community Development Director
Prepared by: Carlos Serna, Associate Planner
Date: October 17, 2023
Subject: Planning Application No. 2022-03 (Mission Trail at Lemon) – A Request for
Approval of Tentative Tract Map No. 38378 to Subdivide an Approximately
17.21-Acre Site into one (1) Lot for Residential Condominium Purposes and
Residential Design Review to Construct 191 detached Condominium
Residences within the East Lake Specific Plan
Applicant: Brett Crowder, Coastal Commercial Properties
Recommendation
1. Find that and determine that the project is exempt from the California Environmental
Quality Act (CEQA) pursuant to California Public Resource Code Section 21166 and
California Environmental Quality Act (CEQA) Guidelines Section 15182(c) (Residential
Projects Implementing Specific Plans)62;
1.
2. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, RECOMMENDING ADOPTION OF FINDINGS THAT
PLANNING APPLICATION NO. 2022-03 (TENTATIVE TRACT MAP NO. 38378 AND
RESIDENTIAL DESIGN REVIEW NO. 2022-02) IS CONSISTENT WITH THE WESTERN
RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN
(MSHCP);
2.
3. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, RECOMMENDING APPROVAL OF TENTATIVE TRACT
MAP NO. 38378 TO SUBDIVIDE AN APPROXIMATELY 17.21-ACRE SITE INTO ONE
LOT AND 191 RESIDENTIAL UNITS FOR CONDOMINIUM PURPOSES LOCATED IN
THE ACTION SPORTS, TOURISM, COMMERCIAL AND RECREATION WITH A MIXED
Formatted: Font: Not Bold, No underline
Formatted: No underline
Formatted: Space After: 0 pt
Formatted: Indent: Left: 0.5", Space After: 0 pt, No
bullets or numbering
Formatted: Space After: 0 pt
Formatted: Indent: Left: 0.5", Space After: 0 pt, No
bullets or numbering
Formatted: Space After: 0 pt, Add space between
paragraphs of the same style
PA 2022-03 (Mission Trail at Lemon)
Page 2 of 11
USE OVERLAY LAND USE DESIGNATION OF THE EAST LAKE SPECIFIC PLAN
(APNS: 370-050-019, 370-050-020, AND 370-050-032); and
3.
4. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, RECOMMENDING APPROVAL OF RESIDENTIAL DESIGN
REVIEW NO. 2022-02 PROVIDING BUILDING DESIGNS AND RELATED
IMPROVEMENTS FOR 191 TWO-STORY DETACHED CONDOMINIUM RESIDENTIAL
UNITS IN LOCATED IN THE ACTION SPORTS, TOURISM, COMMERCIAL AND
RECREATION WITH A MIXED USE OVERLAY LAND USE DESIGNATION OF THE
EAST LAKE SPECIFIC PLAN (APNS: 370-050-019, 370-050-020, AND 370-050-032.)
Project Location
The project site located adjacent to and west of Mission Trail, across from Lemon Street to the
south, and
Lewis Street , and Victorian Lane to the north within the East Lake Specific Plan. The project site
encompasses and specifically known as Assessor Parcel Numbers (APNs) : 370-050-019, 370-
050-020, and 370-050-030.
Environmental Setting
EXISTING USE GENERAL PLAN ZONING
Projec
t Site Vacant East Lake Specific Plan (ELSP)
ELSP - Action Sports, Tourism,
Commercial and Recreation with a
Mixed Use Overlay
North
Vacant
East Lake Specific Plan (ELSP)
ELSP - Action Sports, Tourism,
Commercial and Recreation with a
Mixed Use Overlay
South
Vacant
East Lake Specific Plan (ELSP)
ELSP - Action Sports, Tourism,
Commercial and Recreation with a
Mixed Use Overlay
East Mission Trail
Followed by
lLight industrial,
commercial,
and residential
City of Wildomar
Cityy of Wildomar
West Lake Elsinore
Motor Sport
Park
East Lake Specific Plan (ELSP)
ELSP - Action Sports, Tourism,
Commercial and Recreation with a
Light Industrial Overlay
Project Description
Planning Application No. 2022-03 (Mission Trail at Lemon) consists of requests applications for
Tentative Tract Map No. 38378 to subdivide an approximately 17.21-acre site into one
approximately 16.943-acre lot for condominium purposes (0.28-acre right-of-way dedication) and
Residential Design Review No. 2022-02 to construct 191 detached condominium residences and
Formatted: Font: Bold
Formatted: Indent: Left: 0.5", Space After: 0 pt, Add
space between paragraphs of the same style, No bullets or
numbering
Formatted: Add space between paragraphs of the same
style
Formatted: Font: 10 pt
Formatted Table
Formatted: Font: 10 pt
Formatted: Justified, Don't adjust space between Latin and
Asian text, Don't adjust space between Asian text and
numbers
Formatted: Font: 10 pt
Formatted: Justified, Don't adjust space between Latin and
Asian text, Don't adjust space between Asian text and
numbers
Formatted: Font: 10 pt
Formatted: Font: 10 pt
Formatted: Justified
Formatted: Font: 10 pt
Formatted: Font: 10 pt
Formatted: Justified, Don't adjust space between Latin and
Asian text, Don't adjust space between Asian text and
numbers
Formatted: Font: 10 pt, (Asian) Japanese
Formatted: Left
Formatted: Font: 10 pt
Formatted: Justified, Don't adjust space between Latin and
Asian text, Don't adjust space between Asian text and
numbers
Formatted: Font: 10 pt
PA 2022-03 (Mission Trail at Lemon)
Page 3 of 11
associated improvements within the East Lake Specific Plan. The proposed buildings feature
seven (7) two-story floor plans ranging in size from 1,323 sq. ft. to 2,146 sq. ft. and three (3)
architectural styles (French Country, Santa Barbara and Modern Farmhouse).
Below is a description of the project design aspects and features, including site design, floor plans,
architectural design and conceptual wall and fence plans.
Site Design
The buildings will be arranged in a clustered manner with regular spacing along a 26'-0" wide,
two-lane private loop street. Each building will be served by a 24'-0" wide shared drive aisle
serving up to 8six (6) units or 6eight (8) units per cluster. The site will feature two (2) common
open space areas with amenities including a playground structure (“tot lot”), a swimming pool, a
recreation building and seating areas. Guest parking will be provided near the common open
space areas. Private open space areas will be provided adjacent to the residences between
buildings and in required yards along rear and side property lines.
Access to the development will be provided by a two-way gated entrance located on the westerly
edge of Mission Trail. Common open areas as well as the project frontage will be landscaped with
fully irrigated, drought-resistant plantings.
Floor Plans
Each building will be either rectangular or roughly “L”-shaped in plan. Each unit will contain a two-
car garage, interior laundry facilities, common living areas, and a private patio. Seven floor plans
are proposed as specified below:
6-Plex Cluster
Plan 1: Two-story, 1,631 square-foot unit with 3 bedrooms, 2.5 bathrooms, 2-car garage
Plan 2: Two-story, 1,779 square-foot unit with 3 bedrooms, 2 bathrooms, 2-car garage
Plan 3: Two-story, 2,146 square-foot unit with 5 bedrooms, 4 bathrooms, 2-car garage
8-Plex Cluster
Plan 1: Two-story, 1,323 square-foot unit with 3 bedrooms, 2 bathrooms, 2-car garage
Plan 2: Two-story, 1,599 square-foot unit with 3 bedrooms, 2.5 bathrooms, 2-car garage
Plan 3: Two-story, 1,756 square-foot unit with 3 bedrooms, 2.5 bathrooms, 2-car garage
Plan 4: Two-story, 1,918 square-foot unit with 4 bedrooms, 4 bathrooms, 2-car garage
A sufficient mix and variation of plans will be provided throughout the development as depicted in
the site plan.
Architectural Design
Formatted: Font: Not Bold
Formatted: Indent: Left: 0.19", Space After: 6 pt
Formatted: Font: Not Bold
Formatted: Font: Not Bold
Formatted: Indent: Left: 0.19", Space After: 6 pt
PA 2022-03 (Mission Trail at Lemon)
Page 4 of 11
Three distinct architectural styles are proposed and are generally characterized as follows:
• French Country elevations feature a dark composite tile gabled roof, tan or white stucco
siding, accent wood siding, metallic railing, window shutters, and stone wainscoting.
• Santa Barbara elevations feature a red composite tile varied gable and hipped roof, tan or
white stucco siding, metallic railing, window shutters, accent tiles, and stone wainscoting.
• Modern Farmhouse elevations feature a dark composite tile gabled roof, tan or white
stucco siding, accent siding, metallic railing, window shutters and stone wainscoting.
The architectural styles will be evenly distributed throughout the development as depicted in the
site plan. In addition, enhanced architectural treatments will be provided on all elevations including
those that are visible from common areas and the public right-of-way.
Conceptual Wall and Fence Plan
The project proposes 6-foot-high concrete masonry unit walls along the north, south, and east
sides of the site, and an 8-foot-high concrete masonry unit wall to be constructed along the
western boundary of the site that is adjacent to the Motorsports Park. Pedestrian and vehicular
entry gates would be 6-foot-high metal rolling security gates at the project driveway at Mission
Trail. Residences and private exterior spaces would be separated by rear and side yard 6-foot-
high vinyl fences.
Recreation and Open Space
The project includes the development of two (2) recreation and open space areas totaling 49,044
sq. ft. on site that would include playground equipment, pool/spa, barbeque area, overhead trellis,
turf areas, seating, sidewalks, restrooms, drinking fountains, showers, bocce ball court, fitness
equipment, shade structures, table and chairs.
Parking
The proposed project would provide garage, driveway, and open guest parking. Each residence
would have a two-car garage. The project would also provide 204 driveway spaces and 127 open
common parking spaces. In total the project would provide 713 spaces.
Landscaping
Landscaping proposed as part of the project would consist of ornamental trees, vines, shrubs,
and groundcovers throughout the common areas of the development, such as along roadways,
common walls, site boundary, and the open space/recreation areas. Trees would be installed
along the proposed sidewalks throughout the project site and along Mission Trail. The entrance
Formatted: Space After: 6 pt, Add space between
paragraphs of the same style
Formatted: Underline
Formatted: Underline
PA 2022-03 (Mission Trail at Lemon)
Page 5 of 11
to the project site would have a landscaped median and decorative landscaping. The proposed
landscaping plan has been designed to complement the different architectural styles and to
conform to the water efficiency standards under Chapter 19.08 of the Lake Elsinore Municipal
Code (LEMC).
Site access and Circulation
The project would provide two (2) gated driveways to the project site; one (1) on Mission Trail with
a right-in right-out access, and one (1) on Lemon Street with full access. An approximately 46-
foot-wide main driveway with a landscaped median would be located along Mission Trail, at the
center of the site frontage; and the secondary driveway along Lemon Street would be
approximately 40-feet-wide. The proposed 40-footwide onsite roadway would circle the site and
24 and 26-foot-wide driveways would provide access to each garage and parking space. The
project would include sidewalks throughout the project site. The project includes half-width
roadway improvements to Mission Trail to improve the roadway to meet the City’s urban arterial
standard along the project frontage, which includes sidewalks and a Class II bicycle lane.Final
landscaping and irrigation plans are to be approved by the Planning Division.
Analysis
The project site is located within Planning Area 2 of the East Lake Specific Plan (ELSP) and has
an land use designations of Action Sports, Tourism, Commercial and Recreation Lland Uuse
Ddesignation with a Mixed Use Overlay. The intent of the Mixed Use Overlay is to provide as
much flexibility as is feasible. The Mixed Use overlay also reflects historic land use designations
within the overlay areas and offers land owners an option to develop residential and commercial
uses in additions to those uses described in the Action Sports, Tourism, Commercial, and
Recreation land use designation. Per Table 2-12 (Mixed Use Overlay – Allowable Land Uses) of
the ELSP, Condominiums are listed as permitted uses. Table 2-13 (Mixed Use Overlay
Development Standards) allows The Overlay allows Detached Multiple-Family Cluster Residential
Only density Development with a Residential Ddensity up to 18 Dwelling Units per Net Acre
(du/ac.). The application proposes to construct 191 two-story detached condominium residential
units on an approximately 16.943 net -acre parcel at an approximate density of 11.3 units per net
acredu/ac. Therefore, tThe proposed multi-family residential development is consistent with the
land use goals and policies of the ELSP. The project is also consistent with the General Plan
because the ELSP was found to be consistent with the General Plan at adoption.
Staff has reviewed the submitted development plans for compliance with the Mixed Use Overlay
development standards and regulations of Table 2-13 for Detached Multiple-Family Cluster
Residential Only Development of the East Lake Specific PlanELSP. The proposed development
conforms to applicable standards as shown in the below table.
ELSP Development Standards Required Proposed
Density Up to 18 du/ac 11.3 du/ac
Formatted: Underline
PA 2022-03 (Mission Trail at Lemon)
Page 6 of 11
Lot Area Minimum (sq. ft.) No Minimum 737,906.4 sq. ft.
Minimum Lot Width No Minimum n/a
Setbacks (ft.):1
Front – Living Area to Public
Street 10 10’
Front – Living Area to
Private Drive 10 10' min – 19’ max
Front – Porch 10 10' min – 13’ max
Front – Garage, Straight-in
Drive 182 19’ min – 24 max
Front – Garage, Side Entry 10 10’ min – 19’ max
Front – Rear Alley/Street
Loaded Garage 5 n/a
Side – Main Dwelling 5 8’ min -20‘ max
Side – Garage 5 8’ min -20‘ max
Rear 10 20’ min -20‘ max
Rear – Alley/Street Loaded
Garage 18 n/a
Corner Side – Public
Street 10 10’ min – 10’ max
Corner Side – Private
Street 10 10’ min – 10’ max
Separation Between Buildings (ft)3
Garage Face to Garage
Face 28 30’ min – 35’ max
Bldg. Front to Bldg. Front 10 30’ min – 35’ max
Bldg. Front to Bldg. Side 8 43’ min – 74’ max
Bldg. Front to Bldg. Rear
15 for one-story building,
plus 5 additional feet for
each additional story 88’ min – 89.5 max
Bldg. Side to Side 8 8’ min – 20’ max
Bldg. Side to Rear 8 8’ min – 23’ max
Bldg. Rear to Rear 15 for one-story building,
plus 5 additional feet for
each additional story 20’ in – 23’ max
Lot Coverage (%) 704 42%
Building Height 40’ max. 27'-0" max.
1 Front setbacks measured from property line at edge of public right-of-way, or from edge of pavement on
private streets and/or alleys, which do not include shared driveway access into dwelling clusters. Side and
rear setbacks are measured from interior property lines. Setbacks are not measured from the edges of
dwelling unit clusters except where such edge coincides with a property line.
2 Setback measured from edge of alley pavement.
3 Separation of buildings on same lot.
4 Coverage maximum excludes permitted porches and architectural projections
Formatted: Centered
Formatted: Centered
Commented [DA1]: I think the footnotes should be
removed. It will make the staff report to read easy
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
PA 2022-03 (Mission Trail at Lemon)
Page 7 of 11
Parking
382 Covered, & 382 Private
Driveway and/or 191 On-
Street
Total: 713
Covered Spaces: 382
Total Open Spaces: 331
(196 Private Drive Way &
135 On-Street)
Shared driveway access into dwelling unit cluster
Building heights up to 25
feet 26 feet minimum width5 n/a
Building heights greater
than 25 feet
30 feet with no on-
street/alley parking allowed6 n/a
Driveway in front of garage door 18 feet minimum length 19’ min -24’ max
Private Street Width 40 feet minimum7 40’ min – 46’ max
Garage Access Alley/Street Width
Building heights up to 25
feet
24 ft. with no on-street/alley
parking allowed 24’.
Building Heights greater
than 25 feet
30 feet with no on-
street/alley parking allowed n/a
Dwelling Unit Size Minimum (sq. ft.)
Studio Dwelling Units8 900 n/a
One-Bedroom Dwelling
Units 900 n/a
Two-Bedroom Dwelling
Units or Larger
1,000 plus 100 sq. ft. for
each additional bedroom 1,323 sq. ft. – 2,146 sq. ft.
Open Space (sq. ft.)
Common Open Space9 250 per unit, or 35,000 36,666 sq. ft.
Private Open Space 10 80 per unit 138 sq. ft. min.
Architecture and Site Design
The architectural design of the proposed buildings conforms to the design guidelines of the ELSP
and the Residential Development Standards (Chapter 17.44) of the LEMC. The three elevation
styles will create a distinctive street scene within the project site and serve to avoid repetition.
5 Identified minimum width notwithstanding, additional width shall be provided if required by adopted Fire
Department standards in effect at time of implementing development approval.
6 Identified minimum width notwithstanding, additional width shall be provided if required by adopted Fire
Department standards in effect at time of implementing development approval.
7 24-foot drive with 8-foot parallel parking on both sides. 4-foot sidewalk required both sides of drive
8 Sleeping quarters within living room area
9 Usable open space shall constitute area(s) readily accessible, practical, and generally acceptable for
active and/or passive recreational uses. In all instances, however, a majority of the usable common open
space shall be devoted primarily to active recreational facilities (i.e., pool, court games, par jogging courses,
etc.)
10 . “Private open space” shall mean a fenced or otherwise screened area which is devoid of structures and
improvements other than those provided for landscape or recreation purposes.
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
Formatted: Centered
PA 2022-03 (Mission Trail at Lemon)
Page 8 of 11
Tentative Tract Map Analysis
Tentative Tract Map No. 38378 includes a subdivision of an approximately 17.21-acre site into
one (1) approximately 16.938-acre lot for condominium purposes (0.28-acre right-of-way
dedication). The proposed subdivision meets the minimum lot area requirement and street
frontage width of the East Lake Specific Plan. The tentative map also complies with Chapter 16.24
(Tentative Map) of the LEMC and the Subdivision Map Act. The project will be required to form a
Homeowner’s Association (HOA) for reciprocal access easements, shared parking spaces as well
as for the maintenance of common areas. A
rchitecture and Site DesignDesign Review
The architectural design of the proposed buildings conforms to the design guidelines outlined in
Chapter 8 of the ELSP and the Residential Development Standards (Chapter 17.44) of the LEMC.
The three elevation styles will create a distinctive street scene within the project site and serve to
avoid repetition.
The Design Review Committee, which includes staff from Planning, Building and Safety, Fire, and
Engineering, has reviewed the proposed project, and have conditioned the project to ensure
compliance with the general plan, the LEMC, and the related environmental document.
Environmental Determination
The proposed project has been determined to be categorically exempt from California
Environmental Quality Act (CEQA), pursuant to CEQA Guidelines Section 15182(c) (Residential
Projects Pursuant to a Specific Plan). Where a public agency has prepared an EIR on a Specific
Plan, a residential project undertaken pursuant to and in conformity with that specific plan is
exempt from CEQA if the project meets the following requirements:
1. Eligibility. To qualify for this exemption the public agency must have prepared an EIR on
a specific plan after January 1, 1980.
The City adopted the East Lake Specific Plan, Amendment No. 11 (SPA 2016-02) and
Environmental Impact Report (EIR) SCH No. 2016111029 on November 11, 2017. The
proposed project meets this requirement.
2. Scope. Residential projects covered by this section include but are not limited to land
subdivisions, zoning changes, and residential planned unit development.
The project consists of applications for Tentative Tract Map No. 38378 to subdivide an
approximately 17.21-acre site into one approximately 16.93-acre lot for condominium
purposes (0.28-acre right-of-way dedication) and Residential Design Review No. 2022-02
to construct 191 detached condominium residences with a density of 11.3 du/ac. The
proposed project is consistent with the East Lake Specific Plan, Mixed Use Overlay district
which allows Detached Multiple-Family Cluster Residential Only Development with a
Density up to 18 Dwelling Units per Net Acre (du/ac).
Formatted: Font: Italic
Formatted: List Paragraph, Numbered + Level: 1 +
Numbering Style: 1, 2, 3, … + Start at: 1 + Alignment: Left +
Aligned at: 0.25" + Indent at: 0.5"
Formatted: List Paragraph
Formatted: Indent: Left: 0.5", No bullets or numbering
Formatted: Font: Italic
Formatted: List Paragraph, Numbered + Level: 1 +
Numbering Style: 1, 2, 3, … + Start at: 1 + Alignment: Left +
Aligned at: 0.25" + Indent at: 0.5"
Formatted: Indent: Left: 0.5", No bullets or numbering
Formatted: List Paragraph
PA 2022-03 (Mission Trail at Lemon)
Page 9 of 11
3. Limitation. This section is subject to the limitation that a specific plan undergoes an event,
such as, but not limited to: a substantial change to the proposed project is made that
requires major revisions of the previous EIR; new circumstances under which the project
is undertaken that will require major revisions to the previous EIR; or new information has
been found resulting in new significant effects or increasing the severity of a significant
effect that were not known at the time of the previous EIR. Should one or more of these
events occur, this exemption shall not apply until the city or county which adopted the
specific plan completes a subsequent EIR or supplement to a previous EIR.
Pursuant to CEQA Guidelines Section 15162, the project would not have a significant
effect on the environment and no new environmental documentation is necessary because
all potentially significant effects have been adequately analyzed in a previously adopted
Environmental Impact Report (SCH No. 2016111029) prepared for the East Lake Specific
Plan. A CEQA Exemption Study has been prepared for the project and is included as
Attachment 5 to this report. All potentially significant effects have been avoided or
mitigated pursuant to the EIR and none of the conditions described in Section 15162 have
occurred. EIR (SCH No. 2016111029) was adopted by the City Council on November 28,
2017.Pursuant to California Public Resource Code Section 21166 and California
Environmental Quality Act (CEQA) Guidelines Section 15162, the project would not have
a significant effect on the environment and no new environmental documentation is
necessary because all potentially significant effects have been adequately analyzed in a
previously adopted Environmental Impact Report (SCH No. 2016111029) prepared for the
East Lake Specific Plan. All potentially significant effects have been avoided or mitigated
pursuant to the EIR and none of the conditions described in Section 15162 have occurred.
EIR (SCH No. 2016111029) was adopted by the City Council on November 28, 2017.
MSHCP Consistency
The Project has also been reviewed for consistency with the Western Riverside County Multiple
Species Habitat Conservation Plan (MSHCP). A portion of the project site (0.30 acres) is located
within the MSHCP Elsinore Area Plan, Criteria Cell # 5131. On August 08, 2023, the Western
Riverside County Regional Conservation Authority (RCA) completed the Joint Project Review
(JPR# 23-04-11-01) process and concluded that the Project is consistent with both the Criteria
and other plan requirements of the MSHCP.
Public Outreach
In August 2023, the applicant mailed advance notice of the development proposal to neighboring
property owners within 300 feet of the project site. Additionally, the applicant reached out the
Summerly Community’s Home Owner Association as a part of their public outreach efforts.
Public Notice
Formatted: Indent: Left: 0.5", No bullets or numbering
Formatted: Font: Italic
Formatted: List Paragraph, Numbered + Level: 1 +
Numbering Style: 1, 2, 3, … + Start at: 1 + Alignment: Left +
Aligned at: 0.25" + Indent at: 0.5"
Formatted: Indent: Left: 0.5", No bullets or numbering
Formatted: List Paragraph
Formatted: Line spacing: single
Commented [DA2]: Update with the revised radius map
PA 2022-03 (Mission Trail at Lemon)
Page 10 of 11
Notice of the hearing for this application has been published in the Press-Enterprise newspaper
and mailed to property owners within 300 feet of the subject property. As of the writing of this
report, no written comments concerning this application have been received by staff.
PA 2022-03 (Mission Trail at Lemon)
Page 11 of 11
Attachments
Attachment 1 – MSHCP Resolution
Attachment 2 – TTM Resolution
Attachment 3 – RDR Resolution
Attachment 4 – Conditions of Approval
Attachment 5 – Initial Study – Categorical Exemption GIS Package
Attachment 6 – GIS Package Initial Study – Categorical Exemption
Attachment 7 – TTM 38271
Attachment 8 – Design Review Package
Attachment 9 – Public Notice Materials