HomeMy WebLinkAboutCabreraM20221117rcvdFrom:Engineering Services
To:Kevin Beery
Cc:Engineering Services; Mayra Cabrera
Subject:[External]Mission Trail at Lemon - PAR Requirements Letter (PA 2022-03) - WO 22-051
Date:Thursday, November 17, 2022 5:06:11 PM
Attachments:image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
06-17-22 - Preliminary Service Requirements - 22-051.pdf
Message from external sender. Use Caution.
Hello Kevin,
Elsinore Valley Municipal Water District (District) has reviewed the subject PAR application. Please
find the attached PAR requirement/comments.
Feel free to contact us with any questions.
Thank you,
Mayra A. CabreraSenior Civil Engineer – Development ServicesElsinore Valley Municipal Water District
Office 951-674-3146 Ext. 8349
Cell 951-459-906831315 Chaney Street, Lake Elsinore, CA 92530
Please tell us how we’re doing by completing this 3-minute survey.
From: Kevin Beery <kbeery@lake-elsinore.org>
Sent: Wednesday, October 26, 2022 8:18 AM
To: Bill Belvin <bbelvin@Lake-Elsinore.org>; Damaris Abraham <dabraham@lake-elsinore.org>;
Engineering Services <EngServices@evmwd.net>; James Rayls <jrayls@riversidesheriff.org>; Kevin
Beery <kbeery@lake-elsinore.org>; Lonny Olson <lonny.olson@fire.ca.gov>; Mathew Evans
<mevans@Lake-Elsinore.org>; Mayra Cabrera <mcabrera@evmwd.net>; Remon Habib
<rhabib@lake-elsinore.org>; Steve Payne <spayne@Lake-Elsinore.org>; Todd Parton
<tparton@Lake-Elsinore.org>; Yu Tagai <ytagai@Lake-Elsinore.org>
Subject: DRC Review | PA 2022-03 (Mission Trail at Lemon) Transmittal #3
Good morning,
I’ve attached the DRC transmittal package for the above referenced project. Please return your
comments before November 17, 2022. If no further comments, please prepare and submit your
department’s conditions of approval.
Plans and application exhibits can be viewed at the below links.
PA 2022-03 (Mission Trail at Lemon) Transmittal #3
https://studio.bluebeam.com/hyperlink.html?link=studio.bluebeam.com/sessions/630-069-874
Please let me know if you have any questions.
Sincerely,
Kevin Beery
Associate Planner
Planning Division
City of Lake Elsinore
130 South Main Street
Lake Elsinore, CA 92530
(951) 674-3124 x 805
www.lake-elsinore.org
Our Mission…
The EVMWD team delivers total water management that powers the health and vibrancy
of its communities so life can flourish.
951.674.3146 31315 Chaney Street
Fax 951.674.9872 P.O. Box 3000
www.evmwd.com Lake Elsinore, CA 92530
Board of Directors
Darcy M. Burke, President
Andy Morris, Vice President
Chance Edmondson, Treasurer
Harvey R. Ryan, Director
Phil Williams, Director
General Manager
Greg Thomas
District Secretary
Terese Quintanar
Legal Counsel
Best Best & Krieger
June 17, 2022
Lake Elsinore Mission Trail, LLC
Attn: Brett Crowder
1020 Second Street, Suite C
Encinitas, CA 92024
SUBJECT: PRELIMINARY SERVICE REQUIREMENTS FOR T38378 MISSION TRAIL SFD ‐ WO# 22‐051
On May 23, 2022, a Due Diligence meeting was held with Elsinore Valley Municipal Water District (District) and
the Owner/Developer and/or Engineer of the subject project to discuss the water and/or sewer requirements
for this project. The sign-in sheet for this meeting is attachment as Exhibit B. The project consists of 191 single-
family dwelling located near Mission Trail and Lemon Street in the city of Wildomar at APN 370-050-019, 020
and 032. The project site plan is attached as Exhibit C.
The Owner/Developer shall comply with the following preliminary requirements to obtain water and/or sewer
service from the District. A map of the existing water and/or sewer facilities are shown in Exhibit D.
Project Specific Requirements:
1. Prior to final service requirements, the Owner/Developer shall submit a Planning Review Application to
the Planning Department.
2. Prior to final service requirements, the Owner/Developer shall provide a hydraulic water study that
analysis average day demand, peak hour demand, max day demand and max day and fire flow demand
per the Water Master Plan criteria. The study must be approved prior to the applicant submitting the
design plans for plan check.
3. The Owner/Developer shall construct public water facilities as noted on the approved Water Sewer
study.
4. The Owner/Developer shall construct a public Zone 1434 minimum 12-inch watermain in Mission Trail
along the projects frontage as shown in Exhibit D.
5. The Owner/Developer shall construct a looped public minimum 8-inch onsite water system. The onsite
waterline shall be located within drive paths and avoid crossing under parking stalls and landscape
medians/planters.
6. The Owner/Developer shall construct a public minimum 8-inch onsite gravity sewer main to serve the
development.
7. The parcel(s) are within the Back Basin Benefit Area and the Owner is obligated to reimburse Elsinore
Valley Municipal Water District (EVMWD) for costs of providing mark-up water to the 365-Wetlands,
pumping excess storm water from area’s tributary to the 365-Wetlands, and for emergency pumping of
storm water in order to maintain adequate flood storage volume in the East Lake Specific Plan area. The
property owners will be billed the actual costs based on prorated tributary area on an annual basis. The
Back Basin Benefit Area agreement is attached for reference.
General Requirements:
8. The Owner/Developer shall construct a public individual 1-inch water service for each residential unit.
9. The Owner/Developer shall construct a public minimum 2-inch irrigation water service with backflow
device to serve the project’s common landscaping.
Mr. Crowder, Lake Elsinore Mission Trail, LLC
June 17, 2022
2
10. The Owner/Developer shall construct a private 4-inch sewer lateral to serve each residential unit.
11. The Owner/Developer shall construct onsite and offsite fire hydrants as required by the Fire Department.
12. All water and sewer services shall be installed on the frontage of the property address street.
13. The Owner/Developer shall submit a Fire Flow Test Application if required by the Fire Department.
14. The Owner/Developer shall submit a Will Serve Application to quote the water and sewer capacity fees.
15. The Owner/Developer shall record an Easement to the District for the public water and/or sewer
facilities on private property. No building, fences, walls or other structures of any kind, or trees, shall be
installed, constructed, erected, placed planted or maintained in any portion of the easement area, and no
shrubs or other plants or vegetation shall be placed, planted or maintained in the portion of easement
area, and no changes in the alignment of grading of the easement area will be made without prior written
consent from the District.
16. The Owner/Developer shall record a Water Rights Grant Deed to grant the water rights to the District.
17. The Owner/Developer shall submit a Plan Check application for the review of the Water and Sewer
Improvement Plans for the project.
18. The Owner/Developer shall submit an Inspection Application for the inspection of the facilities to be
constructed.
The District has assigned the following work order number to this project WO# 22‐051. All future
correspondence to this project must include the work order number provided.
Attached as Exhibit A is a list of forms, application and fees required to comply with the requirements mentioned
above.
If you have any questions, please contact the Engineering Department at (951) 674-3146 Ext. 6705,
engservices@evmwd.net.
EVMWD offers a variety of rebates and resources to help our customers save water. For more information, visit
our Water Efficiency page at www.evmwd.com/conservation or contact our Water Efficiency Specialist at 951-
674-3146 x8247.
Respectfully,
Mayra A. Cabrera
Senior Civil Engineer – Development Services
CC: File; City of Lake Elsinore
Attachments: Exhibit A – Forms, Applications and Fees
Exhibit B – Sign-in Sheet (To be provided via DocuSign)
Exhibit C – Site Plan
Exhibit D – Water and Sewer Map
WO# 22‐051 – T38378 Mission Trail SFD
EXHIBIT A
Forms, Applications and Fees
The list below details all the typical forms, application and fees that are submitted to Engineering Department.
ONLY THE CHECKED ITEMS ARE REQUIRED FOR THIS PROJECT.
The application and forms may be downloaded by clicking the hyperlinks below or by visiting the following
website: https://www.evmwd.com/about/departments/engineering/new_development/default.asp
Req.
Items Name Description Fees/Deposit 1
Plan Review
☒ Utility Request Form This form is required to obtain existing
record drawings.
No Fee
Duration – 3-5 days
☒ Planning Application
This application is required to initiate the
review of water and sewer studies.
Deposit – min. $5,000.00
Duration – 21 days/cycle
☒ Plan Check Application
This application is required to initiate the
plan review of the water, sewer and or
recycled water improvement plans. The
plans must conform to the District’s
Standards and Title Block requirements.
Deposit - 3% of Engineers Cost Estimate
(min. $1,500.00)
Duration – 21 days/cycle
☒
Easement Review
Application (The
Easement application is
not required if it is
submitted with the Plan
Check Application)
The application initiates the review of
Easements and Quit Claims. One
application is required for each document.
If a Plan Check Application was submitted,
no additional deposit is required.
If a Plan Check Application was not
required, the following applies:
Deposit - $2,000 for Easements
Deposit - $1,500 for Quit Claims
Duration – 21 calendar days/cycle
☒ Fire Flow Application
This application is required to request Fire
Flow information from a specific hydrant
within the water system.
Application Fee - $125.00
Fire Flow Credit Card Form
Duration – 10 business days/cycle
☐ Commercial Will Serve
Application
This application is required to determine
the water and sewer capacity fees for
commercial developments. These capacity
fees will be due prior to water meter
installation.
Application Fee - $340.00
Will Serve Credit Card Form
Fee – Refer to Capacity Fees
Duration – 20 calendar days
☒ Residential Will Serve
Application
This application is required to determine
the water and sewer capacity fees for
residential developments. These capacity
fees will be due prior to water meter
installation.
Application Fee - $170.00 for Single
Family Residence or $340.00 for Tract
Will Serve Credit Card Form
Fee – Refer to Capacity Fees
Duration – 20 calendar days
☐ Commercial Industrial
Information Form
This application initiates the review of
regulatory environmental compliance of
discharges into the sewer system for
commercial and industrial developments.
No initial fees. Fees will be determined
after application had been reviewed.
Construction
☒ Inspection Application
This application initiates the inspection
for the construction of the project.
Deposit – 11.5% of Construction Contract
(10% for inspection services and 1.5% fee
for mapping services) (min. $1,500.00)
Duration – 10 workdays/cycle (Materials)
1 The fees and deposits noted are the rates at issuance of this letter. The Owner/Developer will be
responsible to pay the most current rates published by the District at the time of payment.
PARK696870677166726561606259635864575352545155505649454446434742484137363835393440332928302731263225212022192318241713121411151016954637281767573747778807984838182858688879291908995949398979610110099104103102107106105110109108113112111116115114119118117122121120125124123128127126131130129134133132137136135140139138143142141146145144149148147151150152156155154153158157159160162161163164185186184183189188187191190180181182177178179174175176171172173168169170165166167CORPORATIONWILSON MIKAMILAKE ELSINORE, CAWMC PROJECT NO. 10397.00LAKE ELSINORE MISSION TRAIL, LLC1020 Second St., Suite CEncinitas, CA 92024949.632.312218 ACRE PROPERTY - MISSION TRAILCONCEPT UTILITY PLANC.476Exhibit C
DRC Mission Trail at Lemon
This application has been provided to give a visual display of District facilities
and related geographic information. To be sure of complete accuracy, please
check with Engineering staff for the most up to date information.
8,983
1,497.1
Legend
1:
Feet1,497.10748.54
Data Sources: EVMWD, County of Riverside 4/20/2022 5:09:58 PM
Notes
EVMWD Boundary
EVMWD Sphere of Influence
Street Centerlines
Parcels
Waterbodies
Non Potable Pressure Mains
Air Release
Blowoff
Distribution Main
Hydrant Lateral
Sampling Point
Transmission Main
Drain Line
On Site Irrigation Lines
Recycled Pressure Main
Distribution Main
Transmission Main
Air Release
Blowoff
Hydrant Lateral
Fee Credits Sewer
Fee Credits Water
Reimbursements - Sewer
Reimbursements - Water
Back Basin Tributary Benefit Area
A
B
Area Excluded
Force Main
Gravity Mains
Lift Station
Ag Line
Ag Line
Open Canal
Exhibit D