Loading...
HomeMy WebLinkAboutFizerP20221130rcvdFrom:Paul Fizer To:Kevin Beery Cc:Remon Habib; Yu Tagai; Damaris Abraham Subject:RE: DRC Review | PA 2022-03 (Mission Trail at Lemon) Transmittal #3 Date:Wednesday, November 30, 2022 8:58:42 AM Attachments:Mission Trail at Lemon_ENG DRC Comments 3_221130.docx image001.jpg image002.png image003.png Kevin, Please see attached engineering comments for Mission Trail at Lemon. Thanks, Paul Fizer Land Development Engineer City of Lake Elsinore Ph: (951)-674-3124 ext. 804 From: Kevin Beery <kbeery@lake-elsinore.org> Sent: Tuesday, November 29, 2022 10:16 AM To: Paul Fizer <pfizer@Lake-Elsinore.org> Subject: RE: DRC Review | PA 2022-03 (Mission Trail at Lemon) Transmittal #3 Thanks for the update, Paul. From: Paul Fizer <pfizer@Lake-Elsinore.org> Sent: Tuesday, November 29, 2022 08:57 To: Kevin Beery <kbeery@lake-elsinore.org> Subject: RE: DRC Review | PA 2022-03 (Mission Trail at Lemon) Transmittal #3 Hi Kevin, Let me look over the files Yu has for this project and the documents. Should have a response to you by tomorrow afternoon. Thank you, Paul Fizer Land Development Engineer City of Lake Elsinore Ph: (951)-674-3124 ext. 804 From: Remon Habib <rhabib@lake-elsinore.org> Sent: Tuesday, November 29, 2022 7:47 AM To: Paul Fizer <pfizer@Lake-Elsinore.org> Subject: FW: DRC Review | PA 2022-03 (Mission Trail at Lemon) Transmittal #3 Paul, are you working on this? remon From: Kevin Beery <kbeery@lake-elsinore.org> Sent: Tuesday, November 29, 2022 7:26 AM To: Remon Habib <rhabib@lake-elsinore.org>; Yu Tagai <ytagai@Lake-Elsinore.org> Cc: Damaris Abraham <dabraham@lake-elsinore.org> Subject: RE: DRC Review | PA 2022-03 (Mission Trail at Lemon) Transmittal #3 Good morning Remon – I am following up on Engineering’s review of this project. Please advise if comments are ready for issuance. Sincerely, Kevin Beery Associate Planner Planning Division City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 (951) 674-3124 x 805 www.lake-elsinore.org From: Kevin Beery Sent: Thursday, November 17, 2022 11:55 To: Yu Tagai <ytagai@Lake-Elsinore.org> Subject: RE: DRC Review | PA 2022-03 (Mission Trail at Lemon) Transmittal #3 Yes, they are in the file highlighted below From: Yu Tagai <ytagai@Lake-Elsinore.org> Sent: Thursday, November 17, 2022 11:42 To: Kevin Beery <kbeery@lake-elsinore.org> Subject: RE: DRC Review | PA 2022-03 (Mission Trail at Lemon) Transmittal #3 Hi Kevin – Did they provide a plan set such as the TTM, maintenance exhibit, etc.? I only see the file which has the renderings for the homes. Regards, Yu Tagai From: Kevin Beery <kbeery@lake-elsinore.org> Sent: Wednesday, October 26, 2022 8:18 AM To: Bill Belvin <bbelvin@Lake-Elsinore.org>; Damaris Abraham <dabraham@lake-elsinore.org>; Engineering Services <EngServices@evmwd.net>; James Rayls <jrayls@riversidesheriff.org>; Kevin Beery <kbeery@lake-elsinore.org>; Lonny Olson <lonny.olson@fire.ca.gov>; Mathew Evans <mevans@Lake-Elsinore.org>; Mayra Cabrera <mcabrera@evmwd.net>; Remon Habib <rhabib@lake-elsinore.org>; Steve Payne <spayne@Lake-Elsinore.org>; Todd Parton <tparton@Lake-Elsinore.org>; Yu Tagai <ytagai@Lake-Elsinore.org> Subject: DRC Review | PA 2022-03 (Mission Trail at Lemon) Transmittal #3 Good morning, I’ve attached the DRC transmittal package for the above referenced project. Please return your comments before November 17, 2022. If no further comments, please prepare and submit your department’s conditions of approval. Plans and application exhibits can be viewed at the below links. PA 2022-03 (Mission Trail at Lemon) Transmittal #3 https://studio.bluebeam.com/hyperlink.html?link=studio.bluebeam.com/sessions/630-069-874 Please let me know if you have any questions. Sincerely, Kevin Beery Associate Planner Planning Division City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 (951) 674-3124 x 805 www.lake-elsinore.org ENGINEERING DEPARTMENT PA 2022-03 Mission Trail at Lemon – APN 370-050-019, -020, -032 DRC #3 DRC Date: November 30, 2022 DRC COMMENTS #3: 1. (Previous comment applies) Project shall coordinate with Riverside Transit Authority for relocating and installing the bus transit facility. Required bus stop improvements shall be shown on plans. Please show RTA’s required improvements. This may impact right-of-way if a large bus turnout is provided. 2. Additional comments will follow upon further information provided.