Loading...
HomeMy WebLinkAboutTRN Lake Elsinore Kevin Berry_2022-10-20S:\10408.00\graphics\DRC Submittal\3rd Submittal\backup\TRN Lake Elsinore Kevin Berry_2022-10-20.doc WILSON•MIKAMI•CORPORATION 9 CORPORATE PARK•SUITE 100•IRVINE•CA•92606 Letter of Transmittal Date: October 25, 2022 Job No.: 10408.00 To: City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 Attn: Kevin Berry Project: 18 Acres property- Mission Trail Tract 38378 CC: Re: 18 Acres property- Mission Trail Tract 38378 -3rd Submittal For approval For your use As requested For Signature Other: Items transmitted: Copies Doc Date Pages Description 1 10/25/22 8 Item 1- Response to 2nd Comments 1 10/25/22 17 Item 2 - Planning Application 1 10/25/22 5 Item 3 – Environmental Form Letter 1 10/25/22 104 Item 4- Geotechnical Report 1 10/25/22 111 Item 5- Drainage Report 1 10/25/22 308 Item 6- Preliminary WQMP 1 10/25/22 5 Item 7- Project Description 1 10/25/22 64 Item 8-14 DRC Plans 1 10/25/22 21 Item 15- Material Board 1 10/25/22 16 Item 16- Preliminary Title Report Remarks: Kevin - Attached is the DRC Package 3rd submittal for your review Thank you. Signed: Scott M. Wilson, PE, PLS swilson@wilsonmikami.com t: 949-679-0092 X