Loading...
HomeMy WebLinkAboutPayneS20220729rcvd Planning Case Comments DATE: 7/29/2022 CASE: PA 2022-03 APN 375-050-019, -020, -032 PLANNER: Kevin Beery, Associate Planner REVIEWED BY: Steve Payne, Assistant Fire Marshal The Fire Department has reviewed this submittal and provides the following comments. 1. The applicant or developer shall provide fire hydrants in accordance with the following: a. Prior to placing any combustibles on site, provide an approved water source for firefighting purposes. b. Prior to building permit issuance, submit plans to the water district for a water system capable of delivering fire flow as required by the California Fire Code and Fire Department standards. Fire hydrants shall be spaced in accordance with the California Fire Code. Hydrants must produce the required fire flow per the California Fire Code. 2. Prior to building permit issuance, install the approved water system, approved access roads, and contact the Fire Department for a verification inspection. 3. All residential buildings shall have fire sprinkler systems in accordance with the California Fire Code, Building Code, and Residential Code. In Cooperation With The California Department of Forestry and Fire Protection 130 South Main Street, Lake Elsinore, CA 92530 • Phone (951) 674-3124 www.rvcfire.org Proudly serving the unincorporated areas of riverside county and the cities of: Banning Beaumont Coachella Desert Hot Springs Eastvale Indian Wells Indio Jurupa Valley Lake Elsinore La Quinta Menifee Moreno Valley Norco Palm Desert Perris Rancho Mirage Rubidoux CSD San Jacinto Temecula Wildomar BOARD OF SUPERVISORS: Kevin Jeffries District 1 Karen Spiegel District 2 CHARLES WASHINGTON District 3 V. Manual Perez District 4 Jeff Hewitt District 5 4. Gates must meet Fire Department standards at the time of building permit application. Current standards require that gates have a Knox rapid entry system, an infrared gate opener, and be set back up to 35 feet allow emergency vehicles to safely stop away from traffic flow. 5. Each phase of development must meet applicable standards prior to occupancy. These comments are preliminary; further review will occur upon receiving building plans. Additional conditions may be necessary at that time. Please feel free to contact me with any questions.