Loading...
HomeMy WebLinkAboutBelvinB20220419rcvdBUILDING AND SAFETY DEPARTMENT General Conditions B-1. Final Building and Safety Conditions. Final Building and Safety Conditions will be addressed when building construction plans are submitted to Building and Safety for review. These conditions will be based on occupancy, use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal. Solar will be required. B-2. Compliance with Code. All design components shall comply with applicable provisions of the 2019 edition of the California Building, Plumbing and Mechanical Codes: 2019 California Electrical Code; California Administrative Code, 2019 California Energy Codes, 2019 California Green Building Standards, California Title 24 Disabled Access Regulations, and Lake Elsinore Municipal Code. B-3. Street Addressing. Applicant must obtain street addressing for all proposed buildings by requesting street addressing and submitting a site plan for commercial or multi-family residential projects or a recorded final map for single- family residential projects. It takes 10 days for addressing to be approved please submit to Sonia Salazar at ssalazar@lake-elsinore.org B-4. Clearance from LEUSD. A receipt or clearance letter from the Lake Elsinore School District shall be submitted to the Building and Safety Department to ensure the payment or exemption from School Mitigation Fees. B-5. Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit approvals prior to commencement of any construction work. B-6. Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light standards, Solar and any block walls will require separate approvals and permits. B-7. Sewer and Water Plan Approvals. On-site sewer and water plans will require separate approvals and permits. Septic systems will need to be approved from Riverside County Environmental Health Department before permit issuance. At Plan Review Submittal B-8. Submitting Plans and Calculations. Applicant must submit to Building and Safety online portal for electronic plan check and permitting: a. An electrical plan including load calculations and panel schedule, plumbing schematic, and mechanical plan applicable to scope of work. b. A Sound Transmission Control Study in accordance with the provisions of the 2019 edition of the California Building Code Section 1207. c. Truss calculations that have been stamped by the engineer of record of the building and the truss manufacturer engineer. d. Solar will be required. Prior to Issuance of Grading Permit(s) grading plans must be submitted to Engineering prior to submitting plans to Building B-9. Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted separately from the building plans, shall be submitted to Building and Safety for review and approval. B-10. Demolition Permits. A demolition permit shall be obtained if there is an existing structure to be removed as part of the project. Prior to Issuance of Building Permit(s) B-11. Plans Require Stamp of Registered Professional. Applicant shall provide appropriate stamp of a registered professional with original signature on the plans. Provide C.D. of approved plans to Building Division. Prior to Beginning of Construction B-12. Pre-Construction Meeting. A pre-construction meeting is required with the building inspector prior to the start of the building construction.