Loading...
HomeMy WebLinkAboutAppendix J TransportationMISSION TRAIL RESIDENTIAL TRAFFIC IMPACT ANALYSIS September 6, 2022 Prepared For: City of Lake Elsinore Engineering Department 130 South Main Street Lake Elsinore, CA 92530 Prepared By: 2355 Main Street, Suite 100 Irvine, CA 92614 (949) 794-1180 Contact: Meghan Macias, TE meghan@epdsolutions.com Mission Trail Residential Development Traffic Impact Analysis i Table of Contents 1 EXECUTIVE SUMMARY ...................................................................................................... 1 2 INTRODUCTION ................................................................................................................. 1 2.1 Project Description .................................................................................................................. 1 2.2 Study Area and Analysis Scenarios ....................................................................................... 4 2.3 Methodology .......................................................................................................................... 7 2.4 Significance Criteria ............................................................................................................... 7 3 EXISTING CONDITIONS ..................................................................................................... 9 3.1 Existing Roadway Facilities ................................................................................................... 9 3.2 Existing Bicycle and Pedestrian Facilities ............................................................................... 9 3.3 Existing Public Transit Services ............................................................................................ 10 3.4 Existing Traffic Volumes and Intersection Operations .......................................................... 10 4 PROPOSED PROJECT ....................................................................................................... 14 4.1 Project Description and Site Access ...................................................................................... 14 4.2 Project Trip Generation ......................................................................................................... 14 4.3 Project Trips .......................................................................................................................... 14 5 FUTURE CONDITIONS ...................................................................................................... 18 5.1 Project Completion Conditions Traffic Volumes and Intersection Operations ...................... 18 5.2 Cumulative Traffic Volumes and Intersection Operations .................................................... 21 6 RECOMMENDED IMPROVEMENTS ................................................................................... 30 6.1 Recommendation for Project Completion Conditions Improvements ................................... 30 6.2 Recommendation for Cumulative Conditions Improvements ............................................... 30 6.3 Fair Share Contributions ....................................................................................................... 31 6.4 Recommendations for Project Driveways on Mission Trail and Lemon Street ...................... 34 7 VEHICLE MILES TRAVELLED (VMT) SCREENING ANALYSIS ............................................. 35 Figures FIGURE 1: PROJECT LOCATION .................................................................................................................................................................... 2 FIGURE 2: PROJECT SITE PLAN ..................................................................................................................................................................... 3 FIGURE 3: PROJECT STUDY AREA ................................................................................................................................................................. 6 FIGURE 4: PROJECT STUDY AREA LANE GEOMETRY .................................................................................................................................. 11 FIGURE 5: EXISTING AM PEAK HOUR TRAFFIC VOLUMES ......................................................................................................................... 12 FIGURE 6: EXISTING PM PEAK HOUR TRAFFIC VOLUMES .......................................................................................................................... 13 FIGURE 7: PROJECT TRIP DISTRIBUTION ..................................................................................................................................................... 15 FIGURE 8: PROJECT AM PEAK HOUR TRIP ASSIGNMENT .......................................................................................................................... 16 FIGURE 9: PROJECT PM PEAK HOUR TRIP ASSIGNMENT........................................................................................................................... 17 FIGURE 10: PROJECT COMPLETION CONDITIONS AM PEAK HOUR TRAFFIC VOLUMES ........................................................................... 19 FIGURE 11: PROJECT COMPLETION CONDITIONS PM PEAK HOUR TRAFFIC VOLUMES ............................................................................ 20 FIGURE 12: LOCATION OF CUMULATIVE PROJECTS .................................................................................................................................. 22 FIGURE 13: CUMULATIVE PROJECTS AM PEAK HOUR TRIP ASSIGNMENT ................................................................................................. 25 FIGURE 14: CUMULATIVE PROJECTS PM PEAK HOUR TRIP ASSIGNMENT ................................................................................................. 26 FIGURE 15: CUMULATIVE AM PEAK HOUR TRAFFIC VOLUMES ................................................................................................................. 27 Mission Trail Residential Development Traffic Impact Analysis ii FIGURE 16: CUMULATIVE PM PEAK HOUR TRAFFIC VOLUMES.................................................................................................................. 28 FIGURE 17: WRCOG VMT TOOL SCREENING ....................................................................................................................................... 38 Tables TABLE 1. CONVERSION RATE ................................................................................................................................................................ 5 TABLE 2. RELATIONSHIP BETWEEN CONTROL DELAY AND LOS AT A SIGNALIZED INTERSECTION .......................................................... 7 TABLE 3. RELATIONSHIP BETWEEN DELAY AND LOS AN UNSIGNALIZED INTERSECTION ........................................................................ 7 TABLE 4. EXISTING ROADWAY SYSTEM IN THE STUDY AREA ................................................................................................................. 9 TABLE 5. EXISTING AM AND PM PEAK HOUR LEVELS OF SERVICE .................................................................................................... 10 TABLE 6. PROJECT TRIP GENERATION ................................................................................................................................................ 14 TABLE 7. PROJECT COMPLETION CONDITIONS AM AND PM PEAK HOUR LEVELS OF SERVICE ......................................................... 18 TABLE 8. CUMULATIVE PROJECTS TRIP GENERATION ......................................................................................................................... 23 TABLE 9. CUMULATIVE CONDITIONS AM AND PM PEAK HOUR LEVELS OF SERVICE ......................................................................... 29 TABLE 10. RECOMMENDED IMPROVEMENTS ON PROJECT COMPLETION AM AND PM PEAK HOUR LEVELS OF SERVICE ............... 32 TABLE 11. RECOMMENDED IMPROVEMENTS ON CUMULATIVE AM AND PM PEAK HOUR LEVELS OF SERVICE ............................... 33 TABLE 12. PROJECT FAIR SHARE CONTRIBUTION ............................................................................................................................ 34 TABLE 13. VMT ANALYSIS OF PROJECT IMPACT ............................................................................................................................ 39 TABLE 14. PROJECT EFFECT ON VMT ............................................................................................................................................. 39 Appendices APPENDIX A – TRAFFIC STUDY SCOPING AGREEMENT APPENDIX B – TRAFFIC COUNTS APPENDIX C – ROUTE 8 LAKE ELSINORE – WILDOMAR LOOP APPENDIX D – LEVEL OF SERVICE CALCULATIONS Mission Trail Residential Development Traffic Impact Analysis 1 1 EXECUTIVE SUMMARY This Traffic Impact Analysis (TIA) evaluates the potential traffic impacts of the Mission Trail residential project which proposes to construct 191 two story single-family detached residences on Mission Trail and Lemon Street. Based on the Institute of Transportation Engineers (ITE), Trip Generation Manual 11th Edition trip generation rates, the project would generate 1801 daily trips including 134 AM peak hour and 180 PM peak hour trips. The following study area intersections were evaluated during the AM and PM peak hours, which are defined as the hours with the highest traffic volumes during the 7 AM to 9 AM and 4 PM to 6 PM peak commute periods: 1. Mission Trail and Project Dwy (Proposed) 2. Mission Trail and Lemon St (Existing) 3. Mission Trail and Corydon Rd (Existing) 4. Mission Trail and Bundy Canyon Rd (Existing) 5. Almond St and Bundy Canyon Rd (Existing) 6. Orange St and Bundy Canyon Rd (Existing) 7. I-15 SB Ramps and Bundy Canyon Rd (Existing) 8. I-15 NB Ramps and Bundy Canyon Rd (Existing) AM and PM peak hour traffic operations were evaluated for the following scenarios:  Existing Conditions  Project Completion (existing + ambient + project) Conditions  Cumulative (existing + ambient + project + cumulative) Conditions Existing Conditions Intersection Analysis Results All intersections operate at satisfactory LOS D or better except the intersection of Orange Street and Bundy Canyon Road which would operate at unsatisfactory LOS E during PM peak hour in this scenario. Project Completion Conditions Intersection Analysis Results The intersection of Mission Trail and Project Driveway and the intersection of Orange Street and Bundy Canyon Road operates at unsatisfactory LOS E during PM peak hour in this scenario. Cumulative Conditions Intersection Analysis Results The following three intersections operate at unsatisfactory LOS in this scenario: - Mission Trail and Project Dwy - Orange St and Bundy Canyon Rd - I-15 SB Ramps and Bundy Canyon Rd Mission Trail Residential Development Traffic Impact Analysis 2 Recommended Improvements The following improvements are recommended for satisfactory intersection operations: - Mission Trail and Project Dwy: Change to signal control intersection - Orange St and Bundy Canyon Rd: As per the recommended improvements in East Lake Specific Plan (ELSP) TIA (March 22, 2017), widen and/or restripe the southbound approach to provide an exclusive left-turn lane and a shared through-right-turn lane. - I-15 SB Ramps and Bundy Canyon Rd: o Alternative 1: As per the recommended improvements in ELSP TIA (March 22, 2017), widen and/or restripe the southbound approach to provide an exclusive right-turn lane. Widen and/or restripe the eastbound approach on Bundy Canyon Rd to provide a second through lane and an exclusive right-turn lane. o Alternative 2: As per the recommended improvements in City of Lake Elsinore General Plan (CLEGP) EIR (December 2011), widen and/or restripe the southbound approach to provide two exclusive left-turn lane. Widen and/or restripe the eastbound approach on Bundy Canyon Rd to provide three through lane and an exclusive right-turn lane. Widen and/or restripe the westbound approach on Bundy Canyon Rd to provide three through lane and two exclusive left-turn lane. o Alternative 3: Widen and/or restripe the southbound approach to provide an exclusive left-turn lane and a shared left-through-right lane. Widen and/or restripe the eastbound approach on Bundy Canyon Rd to provide a second through lane and an exclusive right-turn lane. Project Fair Share The fair share percentage for recommended intersection improvements is listed below: - Mission Trail and Project Dwy: 15% - Orange St and Bundy Canyon Rd: 31% - I-15 SB Ramps and Bundy Canyon Rd: 14% Vehicle Miles Travelled (VMT) Screening Analysis Results EPD Solutions used the screening thresholds from the City of Lake Elsinore Traffic Impact Analysis Preparation Guide for Vehicle Miles Traveled (VMT) to determine if this project would require a VMT analysis. The proposed project is not located in a Transit Priority Area (TPA), does not pass Low VMT Area Screening and is not classified as a low project type; so it would not meet Screening Criteria 1, 2 and 3 as listed in the City’s TIA guidelines. Therefore, the project’s impact on VMT were not considered to be less than significant and an analysis of VMT was completed. The year 2022 project VMT per service population obtained was 21.1, which is 40.66 percent below the City’s threshold of 35.6. The Cumulative project VMT per service population obtained was 22.8, which is 35.88 percent below the City’s threshold of 35.6. The project’s effect on VMT would also not be considered significant as both the baseline and Cumulative link level boundary VMT per service population are reduced with the implementation of the project. As a result, the project would have a less than significant impact on VMT. Mission Trail Residential Development Traffic Impact Analysis 1 2 INTRODUCTION This Traffic Impact Analysis (TIA) has been prepared by EPD Solutions, Inc. (EPD) to analyze the potential transportation-related impacts of the proposed Mission Trail Residential Development project (proposed project). The scope of work for this TIA was reviewed and approved by the City of Lake Elsinore (City) and is provided in Appendix A. The TIA was prepared according to the approved scope of work using methodologies and significance criteria consistent with the requirements of the City of Lake Elsinore Traffic Impact Analysis Preparation Guide for vehicle miles traveled and level of service assessment. 2.1 Project Description The 18-acre project site is located in the southeastern portion of the City of Lake Elsinore, west of Mission Trail, and across from Lemon Street, Lewis Street, and Victorian Lane. Interstate 15 (I-15) runs east of the project site as shown in Figure 1 - Project Location. The project site plan is shown in Figure 2 – Project Site Plan. Local access to the site on Mission Trail is provided via Bundy Canyon Road connecting to I-15 on the east. Within the City, Mission Trail is the arterial roadway that provides access to the project site. The project proposes to construct 191 two story single-family detached residences, including 713 parking spaces. It is to be noted that the provided number of parking spaces is more than the 446 parking spaces that are required by the City. The proposed project is anticipated to be built in 2024. Mission Trail Residential Development Traffic Impact Analysis 2 Figure 1: Project Location Mission Trail Residential Development Traffic Impact Analysis 3 Figure 2: Project Site Plan Mission Trail Residential Development Traffic Impact Analysis 4 2.2 Study Area and Analysis Scenarios This TIA includes all signalized and unsignalized intersections where the project has the potential to add 50-trips or more during any peak hour. The location of the study area intersections is shown in Figure 3 – Project Study Area. The lane geometry for the study area intersections is shown in Figure 4 – Project Study Area Lane Geometry. This TIA includes the analysis of the following seven off-site intersections, six of which would be signalized intersections and one would be an all-way stop controlled (AWSC) intersection. The Mission Trail and Project Driveway is assumed be a two-way stop controlled (TWSC) intersection. The following intersections were included in the analysis: 1. Mission Trail and Project Dwy (Proposed -TWSC) 2. Mission Trail and Lemon St (Existing – Signalized) 3. Mission Trail and Corydon Rd (Existing – Signalized) 4. Mission Trail and Bundy Canyon Rd (Existing – Signalized) 5. Almond St and Bundy Canyon Rd (Existing – AWSC) 6. Orange St and Bundy Canyon Rd (Existing – Signalized) 7. I-15 SB Ramps and Bundy Canyon Rd (Existing – Signalized) 8. I-15 NB Ramps and Bundy Canyon Rd (Existing – Signalized) Study area intersections were evaluated during the AM and PM peak hours, which are defined as the hour with the highest traffic volumes during the 7 AM to 9 AM and 4 PM to 6 PM peak commute periods. AM and PM peak hour traffic operations were evaluated for the following scenarios: - Existing Conditions - Project Completion (existing + ambient + project) Conditions - Cumulative (existing + ambient + project + cumulative) Conditions Because existing traffic volumes were collected on June 21st, 2022, while schools were not in session, traffic count data were factored from the approved TIA1 traffic counts while school were in session. As shown in Table 1, a factor of 37% was obtained for the AM peak hour counts and a factor of 12% was obtained for PM peak hour counts. The final baseline existing traffic volumes utilized in the study are attached in Appendix B for reference. Forecast traffic volumes for the Project Completion (2024) Conditions were developed by applying a growth rate of two percent per year to the obtained 2022 traffic counts and by adding the traffic generated by the project. The growth rate of two percent per year was approved by the City of Lake Elsinore Engineering staff during the scoping process. Cumulative Conditions were developed by adding the nearby cumulative (approved and not yet build and those under review) development projects within a two-mile radius to the Project site to the Project Completion Conditions. Cumulative projects were provided by the City of Lake Elsinore and City of Wildomar Planning Department and are included in the Cumulative analysis scenarios. 1 Lake Elsinore Mission Trails/Corydon C-Store Traffic Impact Analysis (Red Corydon, LLC, January 20, 2020) Mission Trail Residential Development Traffic Impact Analysis 5 Table 1. Conversion Rate AM PM 2019 Count Plus Ambient Growth Rate 2022 Count 2019 Count Plus Ambient Growth Rate 2022 Count Volumes 5527 3501 5684 5030 Difference in Percentage 37% 12% Mission Trail Residential Development Traffic Impact Analysis 6 Figure 3: Project Study Area Mission Trail Residential Development Traffic Impact Analysis 7 2.3 Methodology Intersection operations are evaluated using Level of Service (LOS), which is a measure of the delay experienced by drivers on a roadway facility. LOS A indicates free-flow traffic conditions and is generally the best operating conditions. LOS F is an extremely congested condition and is the worst operating condition from the driver’s perspective. In this report, LOS at signalized and unsignalized intersections is calculated using the Highway Capacity Manual (HCM), 7 th Edition methodology. LOS at signalized intersections is defined in terms of the weighted average control delay for the intersection as a whole. Control delay is a measure of the increase in travel time that is experienced due to traffic signal control and is expressed in terms of average control delay per vehicle (in seconds). Control delay is determined based on the intersection geometry and volume, signal cycle length, phasing and coordination along the arterial corridor. Table 1 shows the relationship between control delay and LOS. Table 2. Relationship between Control Delay and LOS at a Signalized Intersection LOS Delay (Seconds per Vehicle) A ≤ 10 B >10 – 20 C >20 – 35 D >35 – 55 E >55 – 80 F >80 Unsignalized intersections are categorized as either all-way stop control (AWSC) or two-way stop control (TWSC). LOS at AWSC intersections is determined by the weighted average control delay of the overall intersection. The HCM TWSC intersection methodology calculates LOS based on the delay experienced by drivers on the minor (stop-controlled) approaches to the intersection. For TWSC intersections, LOS is determined for each minor-street movement, as well as the major-street left-turns. The relationship between delay and LOS at Unsignalized intersections is shown in Table 2. Table 3. Relationship between Delay and LOS an Unsignalized Intersection LOS Delay (seconds) A 0-10 B >10 – 15 C >15 – 25 D >25 – 35 E >35 – 50 F >50 2.4 Significance Criteria City of Lake Elsinore The City of Lake Elsinore, in general, requires that peak-hour intersections operate at LOS “D” or better to be considered acceptable. Therefore, any City intersection operating at LOS Mission Trail Residential Development Traffic Impact Analysis 8 “E” or LOS “F” will be considered deficient. An addition of Project traffic that degrades operations from LOS D or better to LOS E or worse or increases delay on a facility operating at LOS D or worse will be considered deficient and would need to identify an improvement to return to LOS D or better. City of Wildomar The City of Wildomar General Plan Mobility Element identifies LOS D as the threshold for all Mobility Element roadways and intersections, with the exception of Clinton Keith Road, between Hidden Spring Road and I-15 Northbound Ramps, where LOS E would be acceptable due to right-of-way constraints, unless otherwise approved by the City Engineer. California Department of Transportation (Caltrans) The Caltrans Guide for the preparation of Traffic Impact Studies (December 2002) required that State Highway facilities be analyzed when project traffic was added to the facility. As per the guidelines, LOS D is required standard at intersections under the jurisdiction of Caltrans. However, Caltrans states the following: “Caltrans acknowledges that this may not always be feasible and recommends that the lead agency consult with Caltrans to determine the appropriate target LOS.” In response to Implementation of SB 743, Caltrans released the Vehicle Miles Travel-Focused Transportation Impact Study Guide, May 20, 2020. According to the latest guide, “With this guidance, the Department will transition away from requesting LOS or other vehicle operations analyses of land use projects.” Mission Trail Residential Development Traffic Impact Analysis 9 3 EXISTING CONDITIONS This section discusses the Existing conditions. Existing conditions are those conditions that exist within the study area without the proposed project. 3.1 Existing Roadway Facilities The 18-acre project site is located in the southeastern portion of the City of Lake Elsinore, west of Mission Trail, and across from Lemon Street, Lewis Street, and Victorian Lane. Interstate 15 (I-15) runs east of the project site. The characteristics of the roadway system in the study area are described in Table 4 below. The study area intersections as well as their lane geometry are shown on Figure 4 – Project Study Area Lane Geometry. Although both project driveways are unbuilt in the existing baseline conditions, it is to be noted that Figure 4 – Project Study Area Lane Geometry also shows the lane geometry of the proposed project driveways for the purposes of reference. The proposed project driveway 1 is full access while the project driveway 2 is exit only. The lane geometry on Lemon Street is based on the approved TIA2 which assumes project opening year as 2021. Table 4. Existing Roadway System in the Study Area 3.2 Existing Bicycle and Pedestrian Facilities There is no existing Class II on-Street bicycle lane in the vicinity of the project. There are existing sidewalks on Mission Trail, Corydon Road and Bundy Canyon Road. There are existing striped 2 Lake Elsinore Mission Trails/Corydon C-Store Traffic Impact Analysis (Red Corydon, LLC, January 20, 2020) Roadway Classification1 Jurisdiction Direction Existing Travel Lanes Median Type2 Speed Limit (mph) On-Street Parking Mission Trail Urban Arterial City of Lake Elsinore/ City of Wildomar North-South 4 NM, TWLTL 50 No Lemon St Major City of Wildomar East-West 2 NM 40 No Corydon St Major City of Lake Elsinore/ City of Wildomar East-West 2 TWLTL 45 No Bundy Canyon Rd Urban Arterial City of Wildomar East-West 2 NM 40 No Almond St Collector City of Wildomar North-South 2 NM 25 Yes Orange St Collector City of Wildomar North-South 2 NM 35 Yes I-15 Interstate Freeway Caltrans North-South 6 NM 65 No 1City of Lake Elsinore General Plan Circulation Element (2011) 2TWLTL = Two-way Left-Turn Lane, NM = No Median. Mission Trail Residential Development Traffic Impact Analysis 10 crossings at the intersections of Mission Trail and Lemon Street, Mission Trail and Corydon Road, Mission Trail and Bundy Canyon Road, Almond Street and Bundy Canyon Road, Orange Street and Bundy Canyon Road, I-15 SB Ramps and Bundy Canyon Road and I-15 NB Ramps and Bundy Canyon Road. 3.3 Existing Public Transit Services The City of Lake Elsinore and Riverside Transit Agency provide local and regional transit services within the study area. Bus Route 8 Lake Elsinore – Wildomar loop starts from Lake Elsinore Outlet Center and has bus stops on Misstion Trail. At least two bus stops are within a quarter mile of the Project site. Route 8 operates in loops with headway of around 60 minutes. Appendix C shows the routing and timetables of Bus Route 8. 3.4 Existing Traffic Volumes and Intersection Operations Traffic counts at the existing study area intersections shown in Figure 3 – Project Study Area, were collected on Tuesday, June 21, 2022, while schools were not in session. Because existing counts were collected while schools were not in session, an adjustment was made from approved Lake Elsinore TIA traffic counts while school were in session. Intersection turn movement count sheets are provided in Appendix B. Existing AM and PM peak hour traffic volumes are shown in Figure 5 – Existing AM Peak Hour Traffic Volumes and on Figure 6 – Existing PM Peak Hour Traffic Volumes respectively. The existing Levels of Service at the existing study area intersections were determined using the HCM methodology, described previously in Section 2.3 Methodology. Table 5 shows the existing AM and PM peak hour levels of service at the study area intersections. All LOS calculations are provided in Appendix D. As shown in Table 5, all study intersections operate at satisfactory LOS D or better during the AM and PM peak hours except the intersection of Orange Street and Bundy Canyon Road which operates at unsatisfactory LOS E during the PM peak hour in the Existing Conditions. Table 5. Existing AM and PM Peak Hour Levels of Service Delay1 LOS2 Delay1 LOS2 1. Mission Trail and Project Dwy City of Lake Elsinore/City of Wildomar TWSC - - - - D 2. Mission Trail and Lemon St City of Lake Elsinore/City of Wildomar Signal 7.0 A 7.0 A D 3. Mission Trail and Corydon Rd City of Lake Elsinore/City of Wildomar Signal 17.0 B 16.0 B D 4. Mission Trail and Bundy Canyon Rd City of Wildomar Signal 14.2 B 20.9 C D 5. Almond St and Bundy Canyon Rd City of Wildomar AWSC 10.8 B 12.3 B D 6. Orange St and Bundy Canyon Rd City of Wildomar Signal 24.9 C 60.6 E D 7. I-15 SB Ramps and Bundy Canyon Rd Caltrans Signal 18.9 B 21.0 C D 8. I-15 NB Ramps and Bundy Canyon Rd Caltrans Signal 15.3 B 17.5 B D =Unsatisfactory Level of Service Threshold of Significance PM Peak 2 Level of Service Intersection Traffic Control 1 Delay in Seconds AM Peak TWSC = Two-Way Stop Control AWSC = All-Way Stop Control Jurisdiction Mission Trail Residential Development Traffic Impact Analysis 11 Figure 4: Project Study Area Lane Geometry Mission Trail Residential Development Traffic Impact Analysis 12 Figure 5: Existing AM Peak Hour Traffic Volumes Mission Trail Residential Development Traffic Impact Analysis 13 Figure 6: Existing PM Peak Hour Traffic Volumes Mission Trail Residential Development Traffic Impact Analysis 14 4 PROPOSED PROJECT 4.1 Project Description and Site Access As described in Section 2.1 – Project Description, the project proposes to construct 191 two story single-family detached residences. The project provides one full access gated entry from Mission Trail to the project site and an exit only driveway on Lemon Street west of Mission Trail. Mission Trail along the project site will be widened to be three lanes and a Class II on-Street bicycle lane will be added. 4.2 Project Trip Generation Vehicle trips were generated for the project using trip rates from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition, 2021. The trip generation for the project is shown in Table 6. The project would generate 1,801 daily trips, including 134 AM peak hour and 180 PM peak hour trips. Table 6. Project Trip Generation 4.3 Project Trips Project trips were distributed to the eight study area intersections based on logical routes of travel. The project trip distribution is shown in Figure 7 – Project Trip Distribution. The project AM and PM trip assignment is shown in Figure 8 – Project AM Peak Hour Trip Assignment and Figure 9 – Project PM Peak Hour Trip Assignment respectively. Project trips were assigned to the study area intersections by multiplying the project trip generation by the trip distribution percent at each location. Land Use Units Daily In Out Total In Out Total Trip Rates Single-Family Detached Housing1 DU 9.43 0.18 0.52 0.70 0.59 0.35 0.94 Project Trip Generation Proposed Single-Family Detached Residential 191 DU 1801 35 99 134 114 66 180 DU = Dwelling Unit AM Peak Hour PM Peak Hour 1Trip rates from the Institute of Transportation Engineers, Trip Generation Manual, 11th Edition, 2021, Land Use Code 210 - Single-Family Detached Housing Mission Trail Residential Development Traffic Impact Analysis 15 Figure 7: Project Trip Distribution Mission Trail Residential Development Traffic Impact Analysis 16 Figure 8: Project AM Peak Hour Trip Assignment Mission Trail Residential Development Traffic Impact Analysis 17 Figure 9: Project PM Peak Hour Trip Assignment Mission Trail Residential Development Traffic Impact Analysis 18 5 FUTURE CONDITIONS This section discusses the Future conditions in the study area. Future conditions include Project Completion Conditions and Cumulative Conditions. 5.1 Project Completion Conditions Traffic Volumes and Intersection Operations The traffic volumes of Project Completion Conditions (existing + ambient + project) scenario were developed by applying an ambient growth rate of two percent per year to the existing (2022) traffic volumes and adding traffic generated by the proposed project. The Project Completion Conditions (year 2024) traffic volumes are illustrated in Figure 10 – Project Completion Conditions AM Peak Hour Traffic Volumes and Figure 11 – Project Completion Conditions PM Peak Hour Traffic Volumes. The Project Completion Conditions levels of service (LOS) at the eight existing study area intersections were determined using the HCM methodology, described previously in Section 2.3 - Methodology. Table 7 shows the Project Completion Conditions AM and PM peak hour levels of service at the study area intersections. As shown in Table 7, all study intersections operate at satisfactory LOS D or better during the AM and PM peak hours in the Project Completion Conditions except the intersections of Mission Trail and Project Driveway, and Orange St and Bundy Canyon Road, which operate at unsatisfactory LOS E during the PM peak hour. Recommended improvements for unsatisfactory LOS operations are discussed in the Section 6 - Recommended Improvements. Table 7. Project Completion Conditions AM and PM Peak Hour Levels of Service Delay1 LOS2 Delay1 LOS2 1. Mission Trail and Project Dwy City of Lake Elsinore/City of Wildomar TWSC 27.0 D 40.8 E D 2. Mission Trail and Lemon St City of Lake Elsinore/City of Wildomar Signal 7.7 A 7.7 A D 3. Mission Trail and Corydon Rd City of Lake Elsinore/City of Wildomar Signal 16.9 B 15.7 B D 4. Mission Trail and Bundy Canyon Rd City of Wildomar Signal 16.0 B 21.7 C D 5. Almond St and Bundy Canyon Rd City of Wildomar AWSC 11.7 B 14.2 B D 6. Orange St and Bundy Canyon Rd City of Wildomar Signal 33.7 C 62.8 E D 7. I-15 SB Ramps and Bundy Canyon Rd Caltrans Signal 20.8 C 23.7 C D 8. I-15 NB Ramps and Bundy Canyon Rd Caltrans Signal 17.3 B 19.4 B D =Unsatisfactory Level of Service TWSC = Two-Way Stop Control AWSC = All-Way Stop Control 1 Delay in Seconds 2 Level of Service Threshold of SignificanceIntersectionTraffic Control AM Peak PM PeakJurisdiction Mission Trail Residential Development Traffic Impact Analysis 19 Figure 10: Project Completion Conditions AM Peak Hour Traffic Volumes Mission Trail Residential Development Traffic Impact Analysis 20 Figure 11: Project Completion Conditions PM Peak Hour Traffic Volumes Mission Trail Residential Development Traffic Impact Analysis 21 5.2 Cumulative Traffic Volumes and Intersection Operations The traffic volumes of Cumulative (existing + ambient + project + cumulative) scenario were developed by applying an ambient growth rate of two percent per year to the existing (2022) traffic volumes, adding traffic generated by the proposed project and adding the nearby cumulative (approved and not yet build and those under review) development projects within a two-mile radius to the project site. A total of 14 projects in the City of Lake Elsinore and City of Wildomar were included in the Cumulative (Year 2024) condition. The location of the cumulative projects is shown in Figure 12 – Location of Cumulative Projects. Based on availability, previously completed TIAs were used as a source for trip generation and assignment for pending and approved projects. If no sources were available, the cumulative project trip generation was calculated using trip rates from the Institute of Transportation Engineers, Trip Generation Manual, 11th Edition. Table 8 shows the trip generation for each of the cumulative project. The traffic volumes generated by the cumulative projects were distributed to the study area intersections based on logical routes of travel and are illustrated in Figure 13 – Cumulative Projects AM Peak Hour Trip Assignment and Figure 14 – Cumulative Projects PM Peak Hour Trip Assignment. The Cumulative traffic volumes are illustrated in Figure 15 – Cumulative AM Peak Hour Traffic Volumes and Figure 16 – Cumulative PM Peak Hour Traffic Volumes. The Cumulative levels of service (LOS) at the eight existing study area intersections were determined using the HCM methodology, described previously in Section 2.3 - Methodology. As shown in Table 9, all intersections operate at satisfactory LOS D or better during both the AM and PM peak hours in the Cumulative condition except the intersections of Mission Trail and Project Driveway, Orange Street and Bundy Canyon Road, and I-15 Southbound Ramps and Bundy Canyon Road. The intersection of Mission Trail and Project Driveway operates at unsatisfactory LOS F during the AM peak and PM peak hours in the Cumulative Conditions. The intersection of Orange Street and Bundy Canyon Road operates at an unsatisfactory LOS F during the PM peak hour in the Cumulative Conditions. The intersection of I-15 Southbound Ramps and Bundy Canyon Road operates at unsatisfactory LOS E during the AM peak hour and LOS F during the PM peak hour in the Cumulative Conditions. Recommended improvements for unsatisfactory LOS operations are discussed in the Section 6 - Recommended Improvements. Mission Trail Residential Development Traffic Impact Analysis 22 Figure 12: Location of Cumulative Projects Mission Trail Residential Development Traffic Impact Analysis 23 Table 8. Cumulative Projects Trip Generation Mission Trail Residential Development Traffic Impact Analysis 24 Mission Trail Residential Development Traffic Impact Analysis 25 Figure 13: Cumulative Projects AM Peak Hour Trip Assignment Mission Trail Residential Development Traffic Impact Analysis 26 Figure 14: Cumulative Projects PM Peak Hour Trip Assignment Mission Trail Residential Development Traffic Impact Analysis 27 Figure 15: Cumulative AM Peak Hour Traffic Volumes Mission Trail Residential Development Traffic Impact Analysis 28 Figure 16: Cumulative PM Peak Hour Traffic Volumes Mission Trail Residential Development Traffic Impact Analysis 29 Table 9. Cumulative Conditions AM and PM Peak Hour Levels of Service Delay1 LOS2 Delay1 LOS2 1. Mission Trail and Project Dwy City of Lake Elsinore/City of Wildomar TWSC 50.8 F 10000.0 F D 2. Mission Trail and Lemon St City of Lake Elsinore/City of Wildomar Signal 13.3 B 16.2 B D 3. Mission Trail and Corydon Rd City of Lake Elsinore/City of Wildomar Signal 19.8 B 13.1 B D 4. Mission Trail and Bundy Canyon Rd City of Wildomar Signal 15.7 B 24.1 C D 5. Almond St and Bundy Canyon Rd City of Wildomar AWSC 13.5 B 20.9 C D 6. Orange St and Bundy Canyon Rd City of Wildomar Signal 38.8 D 59.7 E D 7. I-15 SB Ramps and Bundy Canyon Rd Caltrans Signal 56.0 E 123.8 F D 8. I-15 NB Ramps and Bundy Canyon Rd Caltrans Signal 23.2 C 41.8 D D =Unsatisfactory Level of Service TWSC = Two-Way Stop Control AWSC = All-Way Stop Control 1 Delay in Seconds 2 Level of Service Threshold of SignificanceIntersectionTraffic Control AM Peak PM PeakJurisdiction Mission Trail Residential Development Traffic Impact Analysis 30 6 RECOMMENDED IMPROVEMENTS This section discusses recommended improvements for Project Completion Conditions and Cumulative Conditions to achieve satisfactory intersection operations. 6.1 Recommendation for Project Completion Conditions Improvements As shown in Table 7 previously under Project Completion Conditions scenario, the intersections of Mission Trail and Project Driveway and Orange Street and Bundy Canyon Road operate at unsatisfactory LOS E during the PM peak pours. It is recommended that the unsignalized intersection of Mission Trail and Project Driveway be changed from a two-way stop control to a signalized intersection. After the installation of the recommended improvement, the intersection of Mission Trail and Project Driveway would operate at satisfactory LOS A during the PM peak hours. The previously completed East Lake Specific Plan (ELSP) TIA (March 22, 2017) was referenced for recommended improvements at the intersection of Orange Street and Bundy Canyon Road. As per the ESLP TIA Section 9.3.23, it is recommended that the southbound approach be widened and/or restriped to provide an exclusive left-turn lane and a shared through-right-turn lane. After the installation of the recommended improvements, the intersection of Orange Street and Bundy Canyon Road would operate at satisfactory LOS B during the PM peak hours. Both intersections would operate at satisfactory LOS D or better during the PM peak hours after the installation of the recommended improvements. Table 10 shows the LOS during AM and PM peak hours with recommended improvements. 6.2 Recommendation for Cumulative Conditions Improvements As shown in Table 9 previously under Cumulative scenario, the intersection of Mission Trail and Project Driveway operates at unsatisfactory LOS F during both the AM peak and PM peak hours. The intersection of Orange Street and Bundy Canyon Road operates at unsatisfactory LOS E during the PM peak hour. The intersection of I-15 SB Ramps and Bundy Canyon Road operates at unsatisfactory LOS E during the AM peak hour and at unsatisfactory LOS F during the PM peak hour. As discussed above, it is recommended that the unsignalized intersection of Mission Trail and Project Driveway be changed from a two-way stop control to a signalized intersection. After the installation of the recommended improvement, the intersection of Mission Trail and Project Driveway would operate at satisfactory LOS A during both AM and PM peak hours. The previously completed ELSP TIA was referenced for recommended improvements at the intersection of Orange Street and Bundy Canyon Road, and the intersection I-15 SB Ramps and Bundy Canyon Road. As per the ESLP TIA 9.3.23, it is recommended that for the intersection of Orange Street and Bundy Canyon Road, the southbound approach be widened and/or restriped to provide an exclusive left-turn lane and a shared through-right-turn lane. For the intersection I-15 SB Ramps and Bundy Canyon Road it is recommended as per the ESLP TIA that the southbound approach be widened and/or restriped to provide an exclusive right-turn lane and the eastbound approach on Bundy Canyon Road be widened and/or restriped to provide a second through land 3 ESLP TIA Section 9.3.2 - Recommended Improvements: Year 2022 with East Lake Specific Plan Project Phase I Traffic Conditions Mission Trail Residential Development Traffic Impact Analysis 31 an exclusive right-turn lane. After the installation of the recommended improvements, the intersection of Orange Street and Bundy Canyon Road would operate at satisfactory LOS B during the PM peak hour. After the installation of the recommended improvements, the intersection of I-15 SB Ramps and Bundy Canyon Road would continue to operate at LOS F during the PM peak hours. It is to be noted that although the intersection of I-15 SB Ramps and Bundy Canyon Road would continue to operate at LOS F during the PM peak hours with the recommended improvements, the improvements would result in better-than existing intersection operations. The City of Lake Elsinore General Plan (CLEGP) EIR (December 2011) was also referenced for recommended improvements particularly for the intersection of I-15 SB Ramps and Bundy Canyon Road as the application of recommended improvements as per ELSP TIA would still result in the intersection operating at LOS F during PM peak hours. As per the CLEGP EIR 4, it is recommended that the southbound approach be widened/restriped to provide two exclusive left-turn-lanes. It is also recommended that the eastbound approach on Bundy Canyon Road be widened and/or restriped to provide three through lanes and an exclusive right-turn lane. The westbound approach on Bundy Canyon Road would require widening and/or restriping to provide three through lanes and two exclusive left-turn lanes. After the installation of the recommended improvements, the intersection of I-15 SB Ramps and Bundy Canyon Road would operate at a satisfactory LOS B during both the AM peak and PM peak hours. It is recommended that the improvements as per the CLEGP EIR be followed for better intersection operations as compared to the improvements stated in the ELSP TIA. A third alternative was considered for the intersection of I-15 SB Ramps and Bundy Canyon Road. It is recommended that the southbound approach to be widened and/or restriped to provide an exclusive left-turn lane and a shared left-through-right lane, and the eastbound approach on Bundy Canyon Road be widened and/or restriped to provide a second through lane and an exclusive right-turn lane. After the installation of the recommended improvements, the intersection of I-15 SB Ramps and Bundy Canyon Road would operate at satisfactory LOS C during the AM peak hours and at satisfactory LOS D during the PM peak hours. Table 11 shows the LOS during AM and PM peak hours with recommended improvements for these intersections. 6.3 Fair Share Contributions The project would be responsible for paying fair share contribution for the recommended intersection improvements. The calculation of fair share contribution follows the City’s TIA guidelines. As shown in Table 12, the project fair share contribution is 15% for the intersection of Mission Trail and Project Driveway, 31% for the intersection of Orange Street and Bundy Canyon Road, 14% for the intersection of I-15 SB Ramps and Bundy Canyon Road. 4 City of Lake Elsinore General Plan Traffic Study – Executive Summary: Exhibit ES-C Mission Trail Residential Development Traffic Impact Analysis 32 Table 10. Recommended Improvements on Project Completion AM and PM Peak Hour Levels of Service AM Delay PM Delay Delay1 LOS2 Delay1 LOS2 Delay1 LOS2 Delay1 LOS2 Difference Difference Delay1 LOS2 Delay1 LOS2 1. Mission Trail and Project Dwy Jurisdiction: City of Lake Elsinore/City of Wildomar Traffic Control: TWSC - - - - 27.0 D 40.8 E 27.0 40.8 D Yes Signal - - 2.9 A No 6. Orange St and Bundy Canyon Rd Jurisdiction: City of Wildomar Traffic Control: Signal 24.9 C 60.6 E 33.7 C 62.8 E 8.8 2.2 D Yes As Per ELSP TIA3: Widen and/or restripe the southbound approach to provide an exclusive left-turn lane and a shared through-right-turn lane. - - 19.1 B No =Unsatisfactory Level of Service TWSC = Two-Way Stop Control Impact Recommended Improvements Project Completion IMP ImpactAM Peak PM Peak AM Peak PM Peak AM Peak PM Peak Threshold of Significance 3 Recommeded improvement is based on East Lake Specific Plan Amendment No.11 (March 22, 2017). Intersection Existing Project Completion AWSC = All-Way Stop Control 1 Delay in Seconds 2 Level of Service Mission Trail Residential Development Traffic Impact Analysis 33 Table 11. Recommended Improvements on Cumulative AM and PM Peak Hour Levels of Service Delay1 LOS2 Delay1 LOS2 Delay1 LOS2 Delay1 LOS2 Delay1 LOS2 Delay1 LOS2 1. Mission Trail and Project Dwy Jurisdiction: City of Lake Elsinore/City of Wildomar Traffic Control: TWSC - - - - 50.8 F 10000.0 F D Yes Signal 3.7 A 4.0 A No 6. Orange St and Bundy Canyon Rd Jurisdiction: City of Wildomar Traffic Control: Signal 24.9 C 60.6 E 38.8 D 59.7 E D Yes As Per ELSP TIA3: Widen and/or restripe the southbound approach to provide an exclusive left- turn lane and a shared through-right-turn lane. - - 18.6 B No As Per ELSP TIA3: Widen and/or restripe the southbound approach to provide an exclusive right- turn lane. Widen and/or restripe the eastbound approach on Bundy Canyon Rd to provide a second through lane and an exclusive right-turn lane. 43.1 D 94.5 F Yes As Per CLEGP TIA4:Widen and/or restripe the southbound approach to provide two exclusive left- turn lane. Widen and/or restripe the eastbound approach on Bundy Canyon Rd to provide three through lane and an exclusive right-turn lane. Widen and/or restripe the westbound approach on Bundy Canyon Rd to provide three through lane and two exclusive left-turn lane. 16.5 B 18.3 B No Additional Recommendation: Widen and/or restripe the southbound approach to provide an exclusive left- turn lane and a shared left-through-right lane. Widen and/or restripe the eastbound approach on Bundy Canyon Rd to provide a second through lane and an exclusive right-turn lane. 29.0 C 45.1 D No =Unsatisfactory Level of Service TWSC = Two-Way Stop Control 4 Recommeded improvement is based on City of Lake Elsinore General Plan Update, Annotated Recirculated Draft EIR (December, 2011). ImpactAM Peak PM Peak AM Peak PM Peak AM Peak Existing Cumulative PM Peak Cumulative IMP Recommended Improvements Yes7. I-15 SB Ramps and Bundy Canyon Rd Jurisdiction: Caltrans Traffic Control: Signal 18.9 B 21.0 DC 56.0 Threshold of Significance Impact AWSC = All-Way Stop Control 1 Delay in Seconds 2 Level of Service 3 Recommeded improvement is based on East Lake Specific Plan Amendment No.11 (March 22, 2017). Intersection E 123.8 F Mission Trail Residential Development Traffic Impact Analysis 34 Table 12. Project Fair Share Contribution 6.4 Recommendations for Project Driveways on Mission Trail and Lemon Street As shown in Table 12, the Project would be required to contribute 15% fair share for signal installation at the intersection of Mission Trail and Project Driveway. Additionally, it is recommended that the project restripe the existing northbound through lane on Mission Trail to shared northbound left-through lane. The length of the project driveway at the intersection is approximately 125 feet as per the site plan. The observed queueing is less than 75 feet in all scenarios with the installation of the traffic signal and hence the available storage length on the project driveway is sufficient to accommodate project trips out of the project site in all future scenarios. No queueing deficiencies are expected at the intersection. As per the project site plan and the site plan provided in previous approved TIA 5 for the development proposed south of the project site, the centerline of the proposed west leg of Lemon Street appears to be aligned with the existing east leg of Lemon Street. No alignment issues are expected as per the proposed lane geometry at this intersection. The intersection is configured as follows:  Modify traffic signal to include the future west leg  Construct one shared eastbound (EB) left/through lane and one EB right turn lane  Provide a dedicated northbound (NB) left turn lane The lane geometry of intersection Mission Trail and Lemon Street is shown in Figure 4. 5 Lake Elsinore Mission Trails/Corydon C-Store Traffic Impact Analysis (Red Corydon, LLC, January 20, 2020) Project Trips Future Development Trips Fair Share Project Trips Future Development Trips Fair Share 1. Mission Trail and Project Dwy 110 750 15%164 1350 12% 6. Orange St and Bundy Canyon Rd 83 269 31%116 415 28% 7. I-15 SB Ramps and Bundy Canyon Rd 83 606 14%116 1037 11% AM Peak PM Peak Intersection Fair share contribution percentage for improvements where the project is not directly responsible is calculated by the formula: Fair share percentage = Project trips/(Project trips + Future development trips) Mission Trail Residential Development Traffic Impact Analysis 35 7 VEHICLE MILES TRAVELLED (VMT) SCREENING ANALYSIS Senate Bill (SB) 743 was signed by Governor Brown in 2013 and required the Governor’s Office of Planning and Research (OPR) to amend the CEQA Guidelines to provide an alternative to LOS for evaluating Transportation impacts, aiming to promote the reduction of greenhouse gas emissions, the development of multimodal transportation networks and a diversity of land uses. In response, Section 15064.3 - Determining the Significance of Transportation Impacts, was added to the CEQA Guidelines which states that VMT is the most appropriate measure of transportation impacts and shall apply statewide beginning on July 1, 2020. City of Lake Elsinore VMT Screening Criteria: Section 5.1 of the City’s TIA Preparation Guide provides VMT screening thresholds to identify projects that would be considered to have a less-than significant impact on VMT and therefore could be screened out from further analysis. If a project meets one of the following criteria, then the VMT impact of the project would be considered less-than significant and no further analysis of VMT would be required: 1. The project is located within a Transit Priority Area (TPA). 2. The project is in a low VMT-generating area. 3. The project type has been identified as low project type. The applicability of each criterion to the project is discussed below: Screening Criteria 1 - Transit Priority Area Screening: According to the City’s guidelines, projects located in a TPA may be presumed to have a less than significant impact. The project is not located in a TPA, therefore the project would not satisfy the requirements of Screening Criteria 1 – TPA screening. Screening Criteria 2 - Low VMT Area Screening: The City’s TIA preparation guide includes a screening threshold for projects located in a low VMT generating area. Low VMT generating area is defined as traffic analysis zones (TAZs) with a total daily VMT/Service Population (employment plus population) that is less than the baseline level for the city. The project’s site was evaluated using the WRCOG VMT Tool. As shown in Figure 17, the City wide VMT/Service Population is 33.6 and the VMT/Service Population for the project zone (TAZ 1042) is 55.1. The VMT/Service Population of the project zone is 63.97% above the jurisdiction VMT. Therefore, the project would not meet Screening Criteria 2 – Low-VMT Area Screening. Screening Criteria 3 - Low Project Type: According to the City’s TIA preparation guide, projects which propose local serving retail (retail projects less than 50,000 square feet) or other local serving uses would have a less than significant impact on VMT. The types of projects considered local serving include supermarkets, hair/nail salon, walk-in medical clinics/urgent care, K-12 schools, day care centers, and community institutions such as libraries, fire stations, etc. The project does not propose a local serving land use and therefore would not satisfy the requirements of screening criteria 3. The proposed project is not located in a TPA, does not pass Low VMT Area Screening and is not classified as a low project type; so it would not meet Screening Criteria 1, 2 and 3. Therefore, the Mission Trail Residential Development Traffic Impact Analysis 36 project’s impact on VMT would not be considered less than significant and an analysis of VMT would be required. City of Lake Elsinore VMT Analysis Methodology: A VMT analysis was prepared using the City’s guidelines for VMT analysis. The analysis was prepared by EPD using the Riverside County Model (RIVCOM) hereafter referred to as “Model”. The project is located within in Traffic Analysis Zone 1042, referred to as “Zone” hereafter. The potential population generated by the project was calculated using a population of 3.27 per household as noted in the City of Lake Elsinore General Plan, Section 3.13 – Population and Housing, December 2011. Based on this data, the proposed project would have a population of 625 persons (191 single family dwelling units X 3.27 persons per household). The project population and households were entered into the project Zone in both the 2018 and 2045 models. It should be noted that the socioeconomic data (SED) in the RIVCOM model is based on demographic and economic data derived for the 2012 SCAG model with applied growth from the WRCOG GIS-based growth model. Since the time that the SED for Zone 1042 was developed, additional residential units have been constructed in the project zone. The RIVCOM 2018 SED included 0 households, so no households were coded into Zone 1042 in the 2018 condition. The 2045 Zone SED included 3 households. The 2045 with-project condition was modeled by adding the proposed 191 units to the 3 households included in the 2045 model. In addition to the SED, EPD updated the model network to represent access more realistically to Zone 1042. The Project was connected to the RIVCOM network to have access to the Project site. The model includes validated scenarios for 2018 and 2045. These scenarios have been validated using existing 2018 traffic counts. Data for years between 2018 and 2045 can be extrapolated using linear interpolation between the 2018 and 2045 model output. The model was run for the base year (2018) and future year (2045) without and with-project conditions (i.e. four full model runs). VMT was then evaluated using the Origin-Destination (OD) matrices as required by the City’s guidelines. The OD matrices do not include trip purpose, but are broken down by vehicle type (i.e. passenger vehicles, light heavy-duty trucks, heavy heavy-duty trucks). As noted under the discussion of thresholds, the City threshold is based on the OD data. To determine VMT, the OD trips were multiplied by the trip lengths to determine the VMT. The OD VMT is divided by the service population (employment plus population) to determine the OD VMT per service population. VMT Impact Thresholds: A project would result in a significant project generated VMT impact if either of the following conditions are satisfied: 1. The baseline (2022) project generated VMT per service population exceeds the City’s baseline VMT per service population, calculated as of 35.6 VMT per service population, or 2. The cumulative project generated VMT per service population exceeds the City’s baseline VMT per service population, calculated as 35.6 VMT per service population. Mission Trail Residential Development Traffic Impact Analysis 37 The project’s effect on VMT would be considered significant if it resulted in either of the following conditions: 1. The baseline link-level boundary VMT per service population (City boundary) increases under the plus project condition compared to the no project condition, or 2. The cumulative link-level boundary VMT per service population (City boundary) increases under the plus project condition compared to the no project condition. Project VMT Evaluation: The VMT analysis results are shown in Tables 13 and 14. As shown in Table 13, the project would have a less than significant impact on VMT in the baseline and cumulative conditions. The year 2022 project VMT per service population would be 21.1, which is 40.66 percent below the City’s threshold of 35.6. The Cumulative project VMT per service population would be 22.8, which is 35.88 percent below the City’s threshold of 35.6. The project’s effect on VMT would not be considered significant as both the baseline and Cumulative link level boundary VMT per service population are reduced with the implementation of the project. The project effect on VMT is shown in Table 14. In summary, because the baseline and cumulative VMT per service population is below the City’s threshold of 35.6 and the project would result in a lower link-level VMT both in baseline and cumulative when measured within the City boundary, the project would have a less than significant impact on VMT. Mission Trail Residential Development Traffic Impact Analysis 38 Figure 17: WRCOG VMT Tool Screening Mission Trail Residential Development Traffic Impact Analysis 39 Table 13. VMT Analysis of Project Impact Table 14. Project Effect on VMT 2018 2045 2022 Project Zone VMT 17126 23216 18028 TAZ 1042 Population 625 634 626 TAZ 1042 Employment 200 383 227 TAZ 1042 Service Population 825 1017 853 Project VMT/SP 20.8 22.8 21.1 Baseline Threshold1 Baseline Proj VMT/SP % Above/Below Threshold Baseline VMT Impact? Cumulative Threshold1 Cumulative Proj VMT/SP % Above/Below Threshold Cumulative VMT Impact? 1The Baseline and Cumulative Thresholds of 35.6 VMT per service population are based on the City of Lake Elsinore Baseline (2022) VMT per service population, which is reflected in the WRCOG VMT Tool. 35.6 -40.66% 35.6 -35.88% No No21.1 22.8 Without Project With Project VMT Impact? 2018 Citywide Roadway VMT 1340619 1340604 No 2045 Citywide Roadway VMT 1911371 1911095 No Mission Trail Residential Development Traffic Impact Analysis APPENDIX A – TRAFFIC STUDY SCOPING AGREEMENT Traffic Impact Analysis Preparation Guide -14- June 2020 Provide SP No. and list of other approved or active projects within the SP. SCOPING AGREEMENT FOR TRAFFIC IMPACT STUDY This letter acknowledges the City of Lake Elsinore requirements for traffic impact analysis of the following project. The analysis must follow the City of Lake Elsinore Traffic Study Guidelines dated May 2020. Case No. PA 2022-03 (TTM 38378 and RDR 2022-02) Related Cases - SP No. EIR No. GPA No. CZ No. Project Name: Mission Trails Residential Project Address: Vacant parcel on Mission Trail and Lemon St (APNs 370-050-019, 020 and 032) Project Description: Development of 191, 2 story single-family detached residential units. Consultant Developer Name: Address: Telephone: Fax: EPD Solutions 2355 Main Street Suite #100 Irvine CA 92614 949-794-1186 Brett Crowder Coastal Commercial Properties 1020 Second St, Suite C Encinitas, CA 92024 A. Trip Generation Source: ITE Trip Generation Manual; 11th edition Current GP Land Use: East Lake Specific Plan Proposed Land Use: East Lake Specific Plan Current Zoning: Mixed Use Overlay Proposed Zoning: Mixed Use Overlay Current Trip Generation Proposed Trip Generation In Out Total In Out Total AM Trips 35 99 134 PM Trips 114 66 180 Internal Trip Allowance ☐ Yes ☒ No % Trip Discount Pass-By Trip Allowance ☐ Yes ☒ No % Trip Discount B. Trip Geographic Distribution: N_55__% S_30_% E_3_% W_12_% (Attached exhibit for detailed assignment) C. Background Traffic Project Build-out Year: 2024 Annual Ambient Growth Rate: 2 % Phase Year(s): Other area projects to be analyzed: Cumulative development projects will be obtained from the city of Lake Elsinore. To be provided by Planning Department. Model/Forecast methodology: Annual ambient growth applied over existing volumes for the project opening. Traffic Impact Analysis Preparation Guide -15- June 2020 Scoping Agreement – Page 2 D. Study intersections: (NOTE: Subject to revision after other projects, trip generation and distribution are determined, or comments from other agencies.) 1.Mission Trail/Project Dwy 2.Mission Trail/Lemon St 3.Mission Trail/Corydon Rd 4.Mission Trail/Bundy Canyon Rd 5.Almond St/Bundy Canyon Rd 6.Orange St/Bundy Canyon Rd 7.I-15 SB Ramps/Bundy Canyon Rd 8.I-15 NB Ramps/Bundy Canyon Rd 9. 10. 11. 12. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. E. Study Roadway Segments: (NOTE: Subject to revision after other projects, trip generation and distribution are determined, or comments from other agencies.) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. E. Other Jurisdictional Impacts Is this project within a one-mile radius of another jurisdiction or State Highway? Yes No If so, name of Agency: Caltrans, City of Wildomar F. Site Plan (please attach figure) G. Specific issues to be addressed in the Study (in addition to the standard analysis described in the Guideline) (To be filled out by City) 1) Analyze eastbound Lemon Street signalized intersection approach roadway width and alignment with existing westbound Lemon Street approach and provide recommendations. 2) Analyze #1-Mission Trail/Project Dwy left turn queuing and storage requirements H. Existing Conditions Traffic count data must be new or recent within 1 calendar year. Provide traffic count dates if using other than new counts. Date of counts: New counts will be collected at the study area intersections once this scoping agreement is approved. New counts will be compared to count data from approved Lake Elsinore TIA to account for schools not being in session. I. Traffic Study Requirements Traffic Study Required: _X_ ____________________________________________ Focused Study Required: ___ ____________________________________________ Traffic Impact Analysis Preparation Guide -16- June 2020 Scoping Agreement – Page 3 Except from Analysis: ___ _______________________ Recommended by: Approved Scoping Agreement: 06/21/2022 City of Lake Elsinore Engineering DepartmentConsultant’s Representative Date Scoping Agreement Submitted on 05/12/2022, 06/07/2022, 06/21/2022 Revised on 06/21/2022 Nicholas Lowe 6/22/2022 Traffic Impact Analysis Preparation Guide -17- June 2020 Table 1: Trip Generation AM Peak Hour PM Peak Hour Land Use Units Daily In Out Total In Out Total Trip Rates Single Family Detached Housing1 DU 9.43 0.18 0.52 0.70 0.59 0.35 0.94 Project Trip Generation Single Family Detached Housing 191 DU 1801 35 99 134 114 66 180 DU = Dwelling Unit TSF = Thousand Square Feet 1 Trip rates from the Institute of Transportation Engineers, Trip Generation, 11th Edition, 2021, Land Use Code 210-Single Family Detached Housing Figure 1: Project Location Figure 2: Site Plan N Figure 3: Project Trip Distribution Note: Main project driveway at intersection #1 is full access. Mission Trail Residential Development Traffic Impact Analysis APPENDIX B – TRAFFIC COUNTS T218 DATE:LOCATION:PROJECT #:SC3501 Tue, Jun 21, 22 NORTH & SOUTH: LOCATION #:6 EAST & WEST: CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:X2112XXXX0X0 0000 7:00 AM 0821331100000904221 00000 7:15 AM 0921621140000607237 00000 7:30 AM 011716612600001708290 00000 7:45 AM 016024914400001207356 00000 8:00 AM 0121181411700001008288 00000 8:15 AM 01101081090000603246 00000 8:30 AM 09716711300001105249 00000 8:45 AM 012310699000012011261 00000 VOLUMES 0902123559320000830532,14800000 APPROACH % 0% 88% 12% 6% 94% 0% 0% 0% 0% 61% 0% 39% APP/DEPART 1,025 /955 987 /1,015 0 /178 136 /00 BEGIN PEAK HR VOLUMES 050868374960000450261,180 APPROACH % 0% 88% 12% 7% 93% 0% 0% 0% 0% 63% 0% 37% PEAK HR FACTOR 0.783 0.871 0.000 0.710 0.829 APP/DEPART 576 /534 533 /541 0 /105 71 /00 4:00 PM 0194119155000011012392 00000 4:15 PM 01871313142000016011382 00000 4:30 PM 021823916400008011433 00000 4:45 PM 017628816500001409400 00000 5:00 PM 02042711165000017013437 00000 5:15 PM 020024712900001009379 00000 5:30 PM 01922117177000010010427 00000 5:45 PM 0211151316000009010418 01001 VOLUMES 01,582162871,2570000950853,26801001 APPROACH % 0% 91% 9% 6% 94% 0% 0% 0% 0% 53% 0% 47% APP/DEPART 1,744 /1,668 1,344 /1,352 0 /248 180 /00 BEGIN PEAK HR VOLUMES 080787486310000460421,661 APPROACH % 0% 90% 10% 7% 93% 0% 0% 0% 0% 52% 0% 48% PEAK HR FACTOR 0.968 0.875 0.000 0.733 0.950 APP/DEPART 894 /850 679 /677 0 /134 88 /00 Mission NORTH SIDE Lemon WEST SIDE EAST SIDE Lemon SOUTH SIDE Mission N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 00112 00011 00101 7:15 AM 00000 00000 00000 7:30 AM 00000 00000 00000 7:45 AM 00101 00101 00000 8:00 AM 00101 00000 00101 8:15 AM 10124 00000 10124 8:30 AM 00112 00000 00112 8:45 AM 00011 00011 00000 TOTAL 105511 00123 10438 AM BEGIN PEAK HR 00101 4:00 PM 00000 00000 00000 4:15 PM 00000 00000 00000 4:30 PM 00011 00000 00011 4:45 PM 00112 00000 00112 5:00 PM 00000 00000 00000 5:15 PM 00000 00000 00000 5:30 PM 00000 00000 00000 5:45 PM 00011 00000 00011 TOTAL 00134 00000 00134 00000AMPMAM7:30 AM PM5:00 PM PEDESTRIAN + BIKE CROSSINGS 7:30 AM PM BEGIN PEAK HR 5:00 PM BICYCLE CROSSINGSPEDESTRIAN CROSSINGS U-TURNS Mission Mission Lemon Lemon INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Lake Elsinore Mission Lemon Add U-Turns to Left Turns 2,331 0 2,189 142 TOTAL 2,623 1,344 0 1,257 87 PM 1,668 987 0 932 55 AM 955 136 180 316 0 0 0 53 85 138 0 0 0 TOTALPMAM83 95 178 0 0 0 AMPMTOTAL0 0 0 0 0 0 178 248 426 0 0 0 1,015 AM 0 902 123 1,025 1,352 PM 0 1,582 162 1,744 2,367 TOTAL 0 2,484 285 2,769 1,212 0 1,127 85 TOTAL 1,384 679 0 631 48 PM 850 533 0 496 37 AM 534 71 88 159 0 0 0 26 42 68 0 0 0 TOTALPMAMAM 7:30 AM 8:45 AM 45 46 91 0 0 0 #N/A AMPMTOTAL0 0 0 PM 5:00 PM 5:45 PM 0 0 0 105 134 239 0 0 0 541 AM 0 508 68 576 677 PM 0 807 87 894 1,218 Total 0 1,315 155 1,470 Mission Mission Mission LemonLemonPEAK HOUR AimTD LLC TURNING MOVEMENT COUNTS Mission LemonLemonLake Elsinore SC3501 ALL HOURS T218 DATE:LOCATION:PROJECT #:SC3501 Tue, Jun 21, 22 NORTH & SOUTH: LOCATION #:7 EAST & WEST: CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:1 2 X X 2 1 2 X 2 X X X 0000 7:00 AM 57 44 0 0 56 63 50 0 32 0 0 0 302 00000 7:15 AM 42 50 0 0 57 62 58 0 40 0 0 0 309 00000 7:30 AM 58 70 0 0 70 70 64 0 46 0 0 0 378 00000 7:45 AM 29 88 0 0 71 80 96 0 51 0 0 0 415 00000 8:00 AM 35 50 0 0 68 61 89 0 38 0 0 0 341 00000 8:15 AM 31 51 0 0 57 53 70 0 24 0 0 0 286 00000 8:30 AM 29 44 0 0 64 61 69 0 32 0 0 0 299 00000 8:45 AM 52 69 0 0 51 66 64 0 31 0 0 0 333 00000 VOLUMES 333466 0 0 494516560 0 294 0 0 02,663 00000 APPROACH % 42% 58% 0% 0% 49% 51% 66% 0% 34% 0% 0% 0% APP/DEPART 799 /1,026 1,010 /788 854 /00 /849 0 BEGIN PEAK HR VOLUMES 164 258 0 0 266 273 307 0 175 0 0 0 1,443 APPROACH % 39% 61% 0% 0% 49% 51% 64% 0% 36% 0% 0% 0% PEAK HR FACTOR 0.824 0.892 0.820 0.000 0.869 APP/DEPART 422 /565 539 /441 482 /00 /437 0 4:00 PM 51 107 0 0 76 82 93 0 62 0 0 0 471 00000 4:15 PM 46 112 0 0 76 86 98 0 72 0 0 0 490 00000 4:30 PM 48 109 0 0 68 107 131 0 69 0 0 0 532 00000 4:45 PM 59 95 0 0 61 113 110 0 77 0 0 0 515 00000 5:00 PM 43 116 0 0 76 100 116 0 84 0 0 0 535 00000 5:15 PM 48 126 0 0 69 77 93 0 83 0 0 0 496 00000 5:30 PM 52 101 0 0 77 99 120 0 68 0 0 0 517 00000 5:45 PM 46 114 0 0 82 98 101 0 53 0 0 0 494 00000 VOLUMES 393880 0 0 585762862 0 568 0 0 04,050 00000 APPROACH % 31% 69% 0% 0% 43% 57% 60% 0% 40% 0% 0% 0% APP/DEPART 1,273 /1,742 1,347 /1,153 1,430 /00 /1,155 0 BEGIN PEAK HR VOLUMES 198 446 0 0 274 397 450 0 313 0 0 0 2,078 APPROACH % 31% 69% 0% 0% 41% 59% 59% 0% 41% 0% 0% 0% PEAK HR FACTOR 0.925 0.953 0.954 0.000 0.971 APP/DEPART 644 /896 671 /587 763 /00 /595 0 Mission NORTH SIDE Corydon WEST SIDE EAST SIDE Corydon SOUTH SIDE Mission N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 00202 00101 00101 7:15 AM 00000 00000 00000 7:30 AM 00000 00000 00000 7:45 AM 00101 00101 00000 8:00 AM 00101 00000 00101 8:15 AM 00101 00000 00101 8:30 AM 00011 00000 00011 8:45 AM 00000 00000 00000 TOTAL 00516 00202 00314 AM BEGIN PEAK HR 00101 4:00 PM 00000 00000 00000 4:15 PM 00000 00000 00000 4:30 PM 00000 00000 00000 4:45 PM 01102 00000 01102 5:00 PM 00000 00000 00000 5:15 PM 00000 00000 00000 5:30 PM 00000 00000 00000 5:45 PM 00000 00000 00000 TOTAL 01102 00000 01102 00000AMPMAM7:15 AM PM4:30 PM PEDESTRIAN + BIKE CROSSINGS 7:15 AM PM BEGIN PEAK HR 4:30 PM BICYCLE CROSSINGSPEDESTRIAN CROSSINGS U-TURNS Mission Mission Corydon Corydon INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Lake Elsinore Mission Corydon Add U-Turns to Left Turns 2,357 1,278 1,079 0 TOTAL 2,768 1,347 762 585 0 PM 1,742 1,010 516 494 0 AM 1,026 0 0 0 2,004 1,155 849 0 0 0 0 0 0 TOTALPMAM0 0 0 1,422 862 560 AMPMTOTAL0 0 0 862 568 294 0 0 0 2,284 1,430 854 788 AM 333 466 0 799 1,153 PM 393 880 0 1,273 1,941 TOTAL 726 1,346 0 2,072 1,210 670 540 0 TOTAL 1,461 671 397 274 0 PM 896 539 273 266 0 AM 565 0 0 0 1,032 595 437 0 0 0 0 0 0 TOTALPMAMAM 7:15 AM 8:45 AM 0 0 0 757 450 307 #N/A AMPMTOTAL0 0 0 PM 4:30 PM 5:45 PM 488 313 175 0 0 0 1,245 763 482 441 AM 164 258 0 422 587 PM 198 446 0 644 1,028 Total 362 704 0 1,066 Mission Mission Mission CorydonCorydonPEAK HOUR AimTD LLC TURNING MOVEMENT COUNTS Mission CorydonCorydonLake Elsinore SC3501 ALL HOURS T218 DATE:LOCATION:PROJECT #:SC3501 Tue, Jun 21, 22 NORTH & SOUTH: LOCATION #:8 EAST & WEST: CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:120220010101 0000 7:00 AM 03910422700009053180 00000 7:15 AM 0457425100009047201 00000 7:30 AM 065135541000010265251 00000 7:45 AM 059126237001011157240 00000 8:00 AM 035135032000014042186 00000 8:15 AM 02311523200007050175 00000 8:30 AM 030144741000016139188 00000 8:45 AM 045164226000015069213 00000 VOLUMES 03419639228700109144221,63400000 APPROACH % 0% 78% 22% 58% 42% 0% 0% 100% 0% 18% 1% 82% APP/DEPART 437 /763 679 /378 1 /489 517 /40 BEGIN PEAK HR VOLUMES 0204452091610010443211878 APPROACH % 0% 82% 18% 56% 44% 0% 0% 100% 0% 17% 1% 82% PEAK HR FACTOR 0.798 0.934 0.250 0.838 0.875 APP/DEPART 249 /415 370 /205 1 /255 258 /30 4:00 PM 054177255010017075291 00000 4:15 PM 052127948011023288306 00000 4:30 PM 068108344011028079314 00000 4:45 PM 063167949002119289320 00000 5:00 PM 0621610741000024077327 00000 5:15 PM 056109051000028095330 00000 5:30 PM 048218244010023082301 00000 5:45 PM 044187739000023097298 00000 VOLUMES 0447120669371044118546822,48700000 APPROACH % 0% 79% 21% 64% 36% 0% 44% 44% 11% 21% 0% 78% APP/DEPART 567 /1,133 1,040 /557 9 /793 871 /40 BEGIN PEAK HR VOLUMES 02495235918501319923401,291 APPROACH % 0% 83% 17% 66% 34% 0% 20% 60% 20% 22% 0% 77% PEAK HR FACTOR 0.953 0.919 0.417 0.896 0.978 APP/DEPART 301 /590 544 /285 5 /414 441 /20 Mission NORTH SIDE Bundy Canyon WEST SIDE EAST SIDE Bundy Canyon SOUTH SIDE Mission N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 00000 00000 00000 7:15 AM 00000 00000 00000 7:30 AM 00000 00000 00000 7:45 AM 00011 00011 00000 8:00 AM 00011 00011 00000 8:15 AM 00202 00101 00101 8:30 AM 00011 00000 00011 8:45 AM 00000 00000 00000 TOTAL 00235 00123 00112 AM BEGIN PEAK HR 00022 4:00 PM 02024 02024 00000 4:15 PM 00000 00000 00000 4:30 PM 00000 00000 00000 4:45 PM 00000 00000 00000 5:00 PM 00000 00000 00000 5:15 PM 00000 00000 00000 5:30 PM 00000 00000 00000 5:45 PM 00000 00000 00000 TOTAL 02024 02024 00000 00000 INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Lake Elsinore Mission Bundy Canyon PM BEGIN PEAK HR 4:30 PM BICYCLE CROSSINGSPEDESTRIAN CROSSINGS U-TURNS Mission Mission Bundy Canyon Bundy Canyon AMPMAM7:15 AM PM4:30 PM PEDESTRIAN + BIKE CROSSINGS 7:15 AM Add U-Turns to Left Turns 1,719 0 658 1,061 TOTAL 1,896 1,040 0 371 669 PM 1,133 679 0 287 392 AM 763 517 871 1,388 8 4 4 422 682 1,104 4 4 8 TOTALPMAM91 185 276 4 4 0 AMPMTOTAL5 4 1 1 1 0 489 793 1,282 10 9 1 378 AM 0 341 96 437 557 PM 0 447 120 567 935 TOTAL 0 788 216 1,004 914 0 346 568 TOTAL 1,005 544 0 185 359 PM 590 370 0 161 209 AM 415 258 441 699 5 2 3 211 340 551 3 2 5 TOTALPMAMAM 7:15 AM 8:45 AM 44 99 143 1 1 0 #N/A AMPMTOTAL4 3 1 PM 4:30 PM 5:45 PM 1 1 0 255 414 669 6 5 1 205 AM 0 204 45 249 285 PM 0 249 52 301 490 Total 0 453 97 550 AimTD LLC TURNING MOVEMENT COUNTS Mission Bundy CanyonBundy CanyonLake Elsinore SC3501 ALL HOURS Mission Mission Mission Bundy CanyonBundy CanyonPEAK HOUR T218 DATE:LOCATION:PROJECT #:SC3501 Tue, Jun 21, 22 NORTH & SOUTH: LOCATION #:9 EAST & WEST: CONTROL:STOP ALL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:010010020020 0000 7:00 AM 1 0 0 14 0 0 0 63 0 1 67 2 148 00000 7:15 AM 106104846213665170 00011 7:30 AM 000210127810674174 00000 7:45 AM 101180308611674182 00000 8:00 AM 001121116793545154 00011 8:15 AM 20250027312545146 00000 8:30 AM 203120406031602147 00000 8:45 AM 102140316131778171 00000 VOLUMES 8 0 15 106 5 20 10 550 19 12 512 351,292 00022 APPROACH % 35% 0% 65% 81% 4% 15% 2% 95% 3% 2% 92% 6% APP/DEPART 23 /45 131 /34 579 /673 559 /540 0 BEGIN PEAK HR VOLUMES 2 0 8 61 5 13 7 293 12 7 254 18 680 APPROACH % 20% 0% 80% 77% 6% 16% 2% 94% 4% 3% 91% 6% PEAK HR FACTOR 0.357 0.898 0.897 0.943 0.934 APP/DEPART 10 /25 79 /22 312 /364 279 /269 0 4:00 PM 0 0 4 17 0 0 0 101 0 0 109 6 237 00000 4:15 PM 0006053108001125239 00000 4:30 PM 001806193101257242 00000 4:45 PM 1 1 2 13 0 3 0 113 0 0 109 10 252 00000 5:00 PM 00116032121001206269 00000 5:15 PM 00080001080013411261 00000 5:30 PM 01080421070011512249 00000 5:45 PM 0001205393001207240 01001 VOLUMES 1 2 8 88 0 26 11 844 1 0 944 641,989 01001 APPROACH % 9% 18% 73% 77% 0% 23% 1% 99% 0% 0% 94% 6% APP/DEPART 11 /78 114 /1 856 /939 1,008 /971 0 BEGIN PEAK HR VOLUMES 1 2 3 45 0 10 4 449 0 0 478 39 1,031 APPROACH % 17% 33% 50% 82% 0% 18% 1% 99% 0% 0% 92% 8% PEAK HR FACTOR 0.375 0.724 0.921 0.891 0.958 APP/DEPART 6 /45 55 /0 453 /497 517 /489 0 Almond NORTH SIDE Bundy Canyon WEST SIDE EAST SIDE Bundy Canyon SOUTH SIDE Almond N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 16209 05106 11103 7:15 AM 00000 00000 00000 7:30 AM 00000 00000 00000 7:45 AM 00000 00000 00000 8:00 AM 00000 00000 00000 8:15 AM 00000 00000 00000 8:30 AM 01102 01102 00000 8:45 AM 00000 00000 00000 TOTAL 173011 06208 11103 AM BEGIN PEAK HR 00000 4:00 PM 00000 00000 00000 4:15 PM 00000 00000 00000 4:30 PM 00000 00000 00000 4:45 PM 00000 00000 00000 5:00 PM 00000 00000 00000 5:15 PM 00000 00000 00000 5:30 PM 00000 00000 00000 5:45 PM 00000 00000 00000 TOTAL 00000 00000 00000 00000 INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Lake Elsinore Almond Bundy Canyon PM BEGIN PEAK HR 4:45 PM BICYCLE CROSSINGSPEDESTRIAN CROSSINGS U-TURNS Almond Almond Bundy Canyon Bundy Canyon AMPMAM7:15 AM PM4:45 PM PEDESTRIAN + BIKE CROSSINGS 7:15 AM Add U-Turns to Left Turns 245 46 5 194 TOTAL 123 114 26 0 88 PM 78 131 20 5 106 AM 45 559 1,008 1,567 1,511 971 540 35 64 99 512 944 1,456 TOTALPMAM12 0 12 21 11 10 AMPMTOTAL1,394 844 550 20 1 19 673 939 1,612 1,435 856 579 34 AM 801523 1 PM 12811 35 TOTAL 9 2 23 34 134 23 5 106 TOTAL 70 55 10 0 45 PM 45 79 13 5 61 AM 25 279 517 796 758 489 269 18 39 57 254 478 732 TOTALPMAMAM 7:15 AM 8:45 AM 7 0 7 11 4 7 #N/A AMPMTOTAL742 449 293 PM 4:45 PM 5:45 PM 12 0 12 364 497 861 765 453 312 22 AM 20810 0 PM 1236 22 Total 3 2 11 16 AimTD LLC TURNING MOVEMENT COUNTS Almond Bundy CanyonBundy CanyonLake Elsinore SC3501 ALL HOURS Almond Almond Almond Bundy CanyonBundy CanyonPEAK HOUR T218 DATE:LOCATION:PROJECT #:SC3501 Tue, Jun 21, 22 NORTH & SOUTH: LOCATION #:10 EAST & WEST: CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:011011120120 0000 7:00 AM 0 4 49 32 3 3 7 73 2 26 69 7 275 00000 7:15 AM 0 145841 6 2 0 66 7 527014330 00000 7:30 AM 194845421892257720323 00000 7:45 AM 0 8 33 34 4 0 5 109 2 20 79 16 310 00000 8:00 AM 433321632751146015237 00011 8:15 AM 34332372185418605245 00000 8:30 AM 0 4 25 30 6 2 10 57 1 16 58 12 221 00101 8:45 AM 373438227700178510275 00011 VOLUMES 11 53 313264 38 16 33 624 19 188558 992,216 00123 APPROACH % 3% 14% 83% 83% 12% 5% 5% 92% 3% 22% 66% 12% APP/DEPART 377 /184 318 /243 676 /1,203 845 /586 0 BEGIN PEAK HR VOLUMES 1 35 188 152 17 7 13 337 13 123 295 57 1,238 APPROACH % 0% 16% 84% 86% 10% 4% 4% 93% 4% 26% 62% 12% PEAK HR FACTOR 0.778 0.863 0.782 0.873 0.938 APP/DEPART 224 /105 176 /153 363 /677 475 /303 0 4:00 PM 6 8 28 24 4 1 6 112 7 30 104 25 355 00101 4:15 PM 71245337 2 89863311925395 00011 4:30 PM 1 7 20 28 5 3 2 100 6 40 121 25 358 00022 4:45 PM 1 6 28 38 8 5 4 118 1 42 123 22 396 00022 5:00 PM 4 5 46 32 0 0 2 133 5 44 122 28 421 00011 5:15 PM 3 1 31 30 4 0 7 100 7 37 146 32 398 00000 5:30 PM 2 7 33 36 4 2 7 112 4 27 123 24 381 00000 5:45 PM 5 8 24 23 7 5 5 109 2 27 123 37 375 00101 VOLUMES 29 54 255244 39 18 41 882 38 2809812183,079 00268 APPROACH % 9% 16% 75% 81% 13% 6% 4% 92% 4% 19% 66% 15% APP/DEPART 338 /311 301 /351 961 /1,387 1,479 /1,030 0 BEGIN PEAK HR VOLUMES 10 19 138 136 16 7 20 463 17 150 514 106 1,596 APPROACH % 6% 11% 83% 86% 10% 4% 4% 93% 3% 19% 67% 14% PEAK HR FACTOR 0.759 0.779 0.893 0.895 0.948 APP/DEPART 167 /145 159 /180 500 /740 770 /531 0 Orange NORTH SIDE Bundy Canyon WEST SIDE EAST SIDE Bundy Canyon SOUTH SIDE Orange N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 00000 00000 00000 7:15 AM 00000 00000 00000 7:30 AM 00000 00000 00000 7:45 AM 00101 00101 00000 8:00 AM 00000 00000 00000 8:15 AM 00000 00000 00000 8:30 AM 00101 00101 00000 8:45 AM 10001 10001 00000 TOTAL 10203 10203 00000 AM BEGIN PEAK HR 00101 4:00 PM 00202 00101 00101 4:15 PM 00000 00000 00000 4:30 PM 20013 20002 00011 4:45 PM 00011 00000 00011 5:00 PM 00000 00000 00000 5:15 PM 00000 00000 00000 5:30 PM 00000 00000 00000 5:45 PM 00000 00000 00000 TOTAL 20226 20103 00123 00000AMPMAM7:00 AM PM4:45 PM PEDESTRIAN + BIKE CROSSINGS 7:00 AM PM BEGIN PEAK HR 4:45 PM BICYCLE CROSSINGSPEDESTRIAN CROSSINGS U-TURNS Orange Orange Bundy Canyon Bundy Canyon INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Lake Elsinore Orange Bundy Canyon Add U-Turns to Left Turns 619 34 77 508 TOTAL 495 301 18 39 244 PM 311 318 16 38 264 AM 184 845 1,479 2,324 1,616 1,030 586 99 218 317 558 981 1,539 TOTALPMAM188 280 468 74 41 33 AMPMTOTAL1,506 882 624 57 38 19 1,203 1,387 2,590 1,637 961 676 243 AM 11 53 313 377 351 PM 29 54 255 338 594 TOTAL 40 107 568 715 335 14 33 288 TOTAL 250 159 7 16 136 PM 145 176 7 17 152 AM 105 475 770 1,245 834 531 303 57 106 163 295 514 809 TOTALPMAMAM 7:00 AM 8:45 AM 123 150 273 33 20 13 #N/A AMPMTOTAL800 463 337 PM 4:45 PM 5:45 PM 30 17 13 677 740 1,417 863 500 363 153 AM 1 35 188 224 180 PM 10 19 138 167 333 Total 11 54 326 391 Orange Orange Orange Bundy CanyonBundy CanyonPEAK HOUR AimTD LLC TURNING MOVEMENT COUNTS Orange Bundy CanyonBundy CanyonLake Elsinore SC3501 ALL HOURS T218 DATE:LOCATION:PROJECT #:SC3501 Tue, Jun 21, 22 NORTH & SOUTH: LOCATION #:11 EAST & WEST: CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:XXX§0.50.5X20120 0000 7:00 AM 0 0 0440270698551890365 00011 7:15 AM 0 0 03614308081581060405 00000 7:30 AM 0 0 0 50 0 28 0 79 110 78 96 0 441 00000 7:45 AM 0 0 0400240809363950395 00000 8:00 AM 0 0 0441250636662730334 00000 8:15 AM 0 0 0410200786368730343 00000 8:30 AM 0 0 0330210506574710314 00000 8:45 AM 0 0 04502107070671000373 00000 VOLUMES 0 0 0 333 2 209 0 569633521703 02,970 00011 APPROACH % 0% 0% 0% 61% 0% 38% 0% 47% 53% 43% 57% 0% APP/DEPART 0 /0 544 /1,155 1,202 /903 1,224 /912 0 BEGIN PEAK HR VOLUMES 0 0 0 170 1 122 0 308 369 250 386 0 1,606 APPROACH % 0% 0% 0% 58% 0% 42% 0% 45% 55% 39% 61% 0% PEAK HR FACTOR 0.000 0.916 0.896 0.914 0.910 APP/DEPART 0 /0 293 /619 677 /479 636 /508 0 4:00 PM 0 0 0 98 1 35 0 97 68 44 130 0 473 00000 4:15 PM 0 0 08802909267321540462 00011 4:30 PM 0 0 0 100 0 30 0 114 65 29 175 0 513 00000 4:45 PM 0 0 0 95 0 46 0 104 66 41 159 0 511 00000 5:00 PM 0 0 0 100 1 40 0 140 81 35 149 0 546 00000 5:15 PM 0 0 0 115 0 56 0 106 46 44 182 0 549 00000 5:30 PM 0 0 0 91 1 35 0 130 56 32 144 0 489 00000 5:45 PM 0 0 09204809465411450485 00000 VOLUMES 0 0 0 779 3 319 0 8775142981,23804,028 00011 APPROACH % 0% 0% 0% 71% 0% 29% 0% 63% 37% 19% 81% 0% APP/DEPART 0 /0 1,101 /814 1,391 /1,657 1,536 /1,557 0 BEGIN PEAK HR VOLUMES 0 0 0 410 1 172 0 464 258 149 665 0 2,119 APPROACH % 0% 0% 0% 70% 0% 30% 0% 64% 36% 18% 82% 0% PEAK HR FACTOR 0.000 0.852 0.817 0.900 0.965 APP/DEPART 0 /0 583 /408 722 /874 814 /837 0 I-15 SB Ramps NORTH SIDE Bundy Canyon WEST SIDE EAST SIDE Bundy Canyon SOUTH SIDE I-15 SB Ramps N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 10001 00000 10001 7:15 AM 01001 01001 00000 7:30 AM 01001 01001 00000 7:45 AM 10001 10001 00000 8:00 AM 00000 00000 00000 8:15 AM 10001 10001 00000 8:30 AM 01001 01001 00000 8:45 AM 00000 00000 00000 TOTAL 33006 23005 10001 AM BEGIN PEAK HR 12003 4:00 PM 00000 00000 00000 4:15 PM 00000 00000 00000 4:30 PM 00000 00000 00000 4:45 PM 00000 00000 00000 5:00 PM 00000 00000 00000 5:15 PM 00000 00000 00000 5:30 PM 00000 00000 00000 5:45 PM 00000 00000 00000 TOTAL 00000 00000 00000 00000AMPMAM7:00 AM PM4:30 PM PEDESTRIAN + BIKE CROSSINGS 7:00 AM PM BEGIN PEAK HR 4:30 PM BICYCLE CROSSINGSPEDESTRIAN CROSSINGS U-TURNS I-15 SB Ramps I-15 SB Ramps Bundy Canyon Bundy Canyon INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Lake Elsinore I-15 SB Ramps Bundy Canyon Add U-Turns to Left Turns 1,645 528 5 1,112 TOTAL 0 1,101 319 3 779 PM 0 544 209 2 333 AM 0 1,224 1,536 2,760 2,469 1,557 912 0 0 0 703 1,238 1,941 TOTALPMAM521 298 819 0 0 0 AMPMTOTAL1,446 877 569 1,147 514 633 903 1,657 2,560 2,593 1,391 1,202 1,155 AM 0000 814 PM 0000 1,969 TOTAL0000 876 294 2 580 TOTAL 0 583 172 1 410 PM 0 293 122 1 170 AM 0 636 814 1,450 1,345 837 508 0 0 0 386 665 1,051 TOTALPMAMAM 7:00 AM 8:45 AM 250 149 399 0 0 0 #N/A AMPMTOTAL772 464 308 PM 4:30 PM 5:45 PM 627 258 369 479 874 1,353 1,399 722 677 619 AM 0000 408 PM 0000 1,027 Total0000 I-15 SB Ramps I-15 SB Ramps I-15 SB Ramps Bundy CanyonBundy CanyonPEAK HOUR AimTD LLC TURNING MOVEMENT COUNTS I-15 SB Ramps Bundy CanyonBundy CanyonLake Elsinore SC3501 ALL HOURS T218 DATE:LOCATION:PROJECT #:SC3501 Tue, Jun 21, 22 NORTH & SOUTH: LOCATION #:12 EAST & WEST: CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:1 0.5 0.5 X X X 1 1 0 X 2 0 0000 7:00 AM 28 0 14 0 0 0 28 86 0 0 112 75 343 00000 7:15 AM 45 3 14 0 0 0 39 77 0 0 119 94 391 00000 7:30 AM 44 0 27 0 0 0 31 98 0 0 130 80 410 00000 7:45 AM 42 0 32 0 0 0 34 85 0 0 117 92 402 00000 8:00 AM 31 0 36 0 0 0 25 82 0 0 104 83 361 00000 8:15 AM 38 0 26 0 0 0 44 75 0 0 103 75 361 00000 8:30 AM 26 1 25 0 0 0 24 59 0 0 119 77 331 00000 8:45 AM 42 0 41 0 0 0 21 92 0 0 126 70 392 00000 VOLUMES 296 4 215 0 0 0 246654 0 0 9306462,991 00000 APPROACH % 57% 1% 42% 0% 0% 0% 27% 73% 0% 0% 59% 41% APP/DEPART 515 /896 0 /0 900 /869 1,576 /1,226 0 BEGIN PEAK HR VOLUMES 162 3 109 0 0 0 129 342 0 0 470 349 1,564 APPROACH % 59% 1% 40% 0% 0% 0% 27% 73% 0% 0% 57% 43% PEAK HR FACTOR 0.926 0.000 0.913 0.961 0.954 APP/DEPART 274 /481 0 /0 471 /451 819 /632 0 4:00 PM 87 0 105 0 0 0 28 167 0 0 89 62 538 00000 4:15 PM 96 0 78 0 0 0 31 150 0 0 90 51 496 00000 4:30 PM 109 0 100 0 0 0 24 188 0 0 95 72 588 00000 4:45 PM 102 0 107 0 0 0 31 168 0 0 98 66 572 00000 5:00 PM 101 0 78 0 0 0 38 202 0 0 85 54 558 00000 5:15 PM 111 0 108 0 0 0 23 198 0 0 115 56 611 00000 5:30 PM 90 0 104 0 0 0 44 175 0 0 86 47 546 00101 5:45 PM 98 0 92 0 0 0 18 168 0 0 88 48 512 00000 VOLUMES 794 0 772 0 0 0 2371,4160 0 7464564,421 00101 APPROACH % 51% 0% 49% 0% 0% 0% 14% 86% 0% 0% 62% 38% APP/DEPART 1,566 /692 0 /0 1,653 /2,188 1,202 /1,541 0 BEGIN PEAK HR VOLUMES 423 0 393 0 0 0 116 756 0 0 393 248 2,329 APPROACH % 52% 0% 48% 0% 0% 0% 13% 87% 0% 0% 61% 39% PEAK HR FACTOR 0.932 0.000 0.908 0.937 0.953 APP/DEPART 816 /364 0 /0 872 /1,149 641 /816 0 I-15 NB Ramps NORTH SIDE Bundy Canyon WEST SIDE EAST SIDE Bundy Canyon SOUTH SIDE I-15 NB Ramps N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 10001 00000 10001 7:15 AM 01001 01001 00000 7:30 AM 01001 01001 00000 7:45 AM 10001 10001 00000 8:00 AM 10001 10001 00000 8:15 AM 00000 00000 00000 8:30 AM 01001 01001 00000 8:45 AM 00000 00000 00000 TOTAL 33006 23005 10001 AM BEGIN PEAK HR 22004 4:00 PM 10001 10001 00000 4:15 PM 00000 00000 00000 4:30 PM 00000 00000 00000 4:45 PM 00000 00000 00000 5:00 PM 00000 00000 00000 5:15 PM 00000 00000 00000 5:30 PM 00000 00000 00000 5:45 PM 00000 00000 00000 TOTAL 10001 10001 00000 00000 INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Lake Elsinore I-15 NB Ramps Bundy Canyon PM BEGIN PEAK HR 4:30 PM BICYCLE CROSSINGSPEDESTRIAN CROSSINGS U-TURNS I-15 NB Ramps I-15 NB Ramps Bundy Canyon Bundy Canyon AMPMAM7:15 AM PM4:30 PM PEDESTRIAN + BIKE CROSSINGS 7:15 AM Add U-Turns to Left Turns 0000TOTAL 1,588 0 000PM 692 0 000AM 896 1,576 1,202 2,778 2,767 1,541 1,226 646 456 1,102 930 746 1,676 TOTALPMAM0 0 0 483 237 246 AMPMTOTAL2,070 1,416 654 0 0 0 869 2,188 3,057 2,553 1,653 900 0 AM 296 4 215 515 0 PM 794 0 772 1,566 0 TOTAL 1,090 4 987 2,081 0000TOTAL 845 0 000PM 364 0 000AM 481 819 641 1,460 1,448 816 632 349 248 597 470 393 863 TOTALPMAMAM 7:15 AM 8:45 AM 0 0 0 245 116 129 #N/A AMPMTOTAL1,098 756 342 PM 4:30 PM 5:45 PM 0 0 0 451 1,149 1,600 1,343 872 471 0 AM 162 3 109 274 0 PM 423 0 393 816 0 Total 585 3 502 1,090 AimTD LLC TURNING MOVEMENT COUNTS I-15 NB Ramps Bundy CanyonBundy CanyonLake Elsinore SC3501 ALL HOURS I-15 NB Ramps I-15 NB Ramps I-15 NB Ramps Bundy CanyonBundy CanyonPEAK HOUR LOCATION: NORTH & SOUTH: EAST & WEST: 2019 Counts AM1 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 781 94 35 748 67 45 2019 + Ambient Growth Rate to 2022 Counts AM NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 0 828 100 38 793 0 0 0 0 72 0 48 2022 June Counts AM2 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 0 508 68 37 496 0 0 0 0 45 0 26 Percentage Decrease NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 39% 32% 3% 37% 38% 46% 2019 Counts PM1 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 825 142 40 641 61 51 2019 + Ambient Growth Rate to 2022 Counts PM NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 0 875 151 43 680 0 0 0 0 65 0 55 2022 June Counts PM2 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 0 807 87 48 631 0 0 0 0 46 0 42 Percentage Decrease NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 8% 42% -12% 7% 29% 24% Lake Elsinore Mission Lemon 1Traffic counts from Lake Elsinore Mission Trails/Corydon C-Store Traffic Impact Analysis (Red Corydon, LLC, January 20, 2020) 2Traffic counts were taken on June 21, 2022 LOCATION: NORTH & SOUTH: EAST & WEST: 2019 Counts AM1 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 188 404 444 371 454 250 2019 + Ambient Growth Rate to 2022 Counts AM NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 200 429 0 0 471 394 482 0 265 0 0 0 2022 June Counts AM2 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 164 258 0 0 266 273 307 0 175 0 0 0 Percentage Decrease NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 18% 40% 44% 31% 36% 34% 2019 Counts PM1 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 255 463 331 380 520 243 2019 + Ambient Growth Rate to 2022 Counts PM NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 271 491 0 0 351 403 552 0 258 0 0 0 2022 June Counts PM2 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 198 446 0 0 274 397 450 0 313 0 0 0 Percentage Decrease NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 27% 9% 22% 1% 18% -21% Lake Elsinore Mission Corydon 1Traffic counts from Lake Elsinore Mission Trails/Corydon C-Store Traffic Impact Analysis (Red Corydon, LLC, January 20, 2020) 2Traffic counts were taken on June 21, 2022 LOCATION: NORTH & SOUTH: EAST & WEST: 2019 Counts AM1 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 0 310 65 285 349 0 0 0 0 53 3 259 2019 + Ambient Growth Rate to 2022 Counts AM NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 0 329 69 303 370 0 0 0 0 57 4 275 2022 June Counts AM2 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 0 204 45 209 161 0 0 1 0 44 3 211 Percentage Decrease NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 38% 35% 31% 56% 23% 25% 23% 2019 Counts PM1 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 2 299 54 271 253 0 0 1 0 142 0 378 2019 + Ambient Growth Rate to 2022 Counts PM NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 3 317 58 288 269 0 0 2 0 151 0 401 2022 June Counts PM2 NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 0 249 52 359 185 0 1 3 1 99 2 340 Percentage Decrease NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 100% 21% 10% -25% 31% -50% 34% 15% 1Traffic counts from Lake Elsinore Mission Trails/Corydon C-Store Traffic Impact Analysis (Red Corydon, LLC, January 20, 2020) 2Traffic counts were taken on June 21, 2022 Lake Elsinore Mission Bundy Canyon Mission Trail Residential Development Traffic Impact Analysis APPENDIX C – ROUTE 8 LAKE ELSINORE – WILDOMAR LOOP 42 | RTA RIDE GUIDE - May 8, 2022 | RIVERSIDETRANSIT.COM | RTABUS.COM 74 ORTEGA HWY LAKE ELSINORE - WILDOMAR LOOP8 G R A N D A V E G R A N D A V E P A L OM A R S T WILDOMAR TRL »CORYDON RDL A K E S H O R E D R » C O L L I E R A V E LI N C O L N LAKE S H O R E D R C A N Y O N E S T A T E S D R CHANEY SPRING »MAIN »« KELLOGG ST« LINDSAYPO T T E R Y HE A L D » «GR A H A M «LI M I T E D SUMMERHILL DRMISSION TRMACHADO STRIVERSIDE DR«ViscayaG R A P E S T MALAGA R D BALDWIN BLVD LAKE ELSINORE RAILROAD CANYON RD Routing and timetables subject to change. Rutas designadas y horarios son sujetos a cambios. Lakeside Library David A Brown M.S. Lakeland Village M.S. Mission Trail Library Post Oce Lakeside H.S. LAKE ELSINORE WILDOMAR « C l o c k w i s e | C o u n t e r - c l o c k w i s e »« Clockwise | Counter-clockwise »15 15 3 4 5 6 7 9 8 1 10 2 74 PALOMAR & WILDOMAR 8•23 LAKE ELSINORE OUTLET CENTER 8•9 WALMART AT CENTRAL & CAMBERN 8•9 CENTRAL AVE3RD STC AM B E RN A V E D E X T E R A V E Walmart Senior Center 1 Time and/or Transfer Point Alternate Routing Legend | Map not to scale RTA CUSTOMER INFORMATION CENTER (951) 565-5002 | 43 8 COUNTERCLOCKWISE LOOP VIA GRAND AVE | WEEKDAYS A.M. times are in PLAIN, P.M. times are in BOLD | Times are approximate * Inside Senior Center ** At Central and Cambern LAKE ELSINORE OUTLET CENTERLAKESHORE & VISCAYALAKESIDE HIGH SCHOOLGRAND & BALDWINPALOMAR & WILDOMARMISSION TRAIL & MALAGACANYON ESTATE & SADDLE RIDGE*LAKEPOINT PARKGRAHAM & LANGSTAFF**WALMARTLAKE ELSINORE OUTLET CENTER1 2 3 4 5 6 7 8 9 10 1 6:25 6:33 6:41 6:49 7:06 7:16 7:24 7:29 7:36 7:49 7:59 7:30 7:38 7:46 7:54 8:11 8:21 —8:27 8:34 8:47 8:57 8:42 8:50 8:58 9:06 9:23 9:33 —9:39 9:46 9:59 10:09 9:52 10:00 10:10 10:19 10:36 10:46 —10:53 11:00 11:15 11:25 11:02 11:11 11:21 11:30 11:47 11:57 —12:04 12:11 12:26 12:36 12:12 12:21 12:31 12:40 12:57 1:07 —1:14 1:21 1:36 1:46 1:22 1:31 1:41 1:50 2:07 2:17 —2:24 2:31 2:46 2:59 2:32 2:41 2:52 3:01 3:18 3:28 —3:35 3:42 3:57 4:10 3:46 3:55 4:04 4:13 4:30 4:40 —4:47 4:54 5:09 5:22 5:00 5:09 5:18 5:27 5:45 5:55 6:05 6:12 6:19 6:34 6:44 6:10 6:19 6:28 6:37 6:55 —————— 7:31 7:40 7:49 7:58 8:16 —————— 8 CLOCKWISE LOOP VIA MISSION TRAIL | WEEKDAYS A.M. times are in PLAIN, P.M. times are in BOLD | Times are approximate ** At Central and Cambern LAKE ELSINORE OUTLET CENTER**WALMARTGRAHAM & LANGSTAFFCANYON ESTATE & SADDLE RIDGEMISSION TRAIL & MALAGAPALOMAR & WILDOMARGRAND & BALDWINLAKESIDE HIGH SCHOOLLAKESHORE & VISCAYALAKE ELSINORE OUTLET CENTER1 10 9 7 6 5 4 3 2 1 5:55 6:08 6:17 —6:23 6:40 6:52 6:59 7:10 7:17 6:53 7:06 7:15 7:27 7:33 7:50 8:02 8:09 8:20 8:27 8:05 8:18 8:29 —8:37 8:53 9:05 9:12 9:23 9:31 9:15 9:28 9:39 —9:47 10:03 10:15 10:22 10:33 10:41 10:25 10:40 10:52 —11:00 11:16 11:28 11:35 11:46 11:54 11:35 11:51 12:04 —12:12 12:28 12:40 12:48 12:59 1:07 12:45 1:01 1:14 —1:22 1:38 1:50 1:58 2:09 2:17 1:55 2:11 2:24 —2:32 2:48 3:00 3:08 3:19 3:27 3:05 3:21 3:34 —3:42 3:58 4:10 4:18 4:29 4:37 4:15 4:31 4:44 —4:52 5:08 5:20 5:28 5:39 5:47 5:36 5:52 6:05 6:19 6:27 6:43 6:55 7:03 7:14 7:22 6:50 7:06 7:19 —7:27 7:43 7:55 8:03 8:14 8:22 44 | RTA RIDE GUIDE - May 8, 2022 | RIVERSIDETRANSIT.COM | RTABUS.COM 8 COUNTERCLOCKWISE LOOP VIA GRAND AVE | WEEKENDS A.M. times are in PLAIN, P.M. times are in BOLD | Times are approximate ** At Central and Cambern LAKE ELSINORE OUTLET CENTERLAKESHORE & VISCAYALAKESIDE HIGH SCHOOLGRAND & BALDWINPALOMAR & WILDOMARMISSION TRAIL & MALAGAGRAHAM & LANGSTAFF**WALMARTLAKE ELSINORE OUTLET CENTER1 2 3 4 5 6 9 10 1 6:30 6:38 6:45 6:52 7:08 7:18 7:25 7:37 7:47 7:57 8:05 8:13 8:20 8:36 8:46 8:54 9:06 9:17 9:00 9:08 9:16 9:23 9:39 9:49 9:57 10:10 10:21 10:03 10:11 10:21 10:29 10:45 10:55 11:03 11:18 11:31 11:06 11:15 11:25 11:33 11:49 11:59 12:07 12:22 12:36 12:20 12:29 12:38 12:46 1:02 1:12 1:20 1:35 1:49 1:31 1:40 1:49 1:57 2:14 2:24 2:32 2:47 3:01 2:46 2:55 3:04 3:12 3:29 3:39 3:47 4:02 4:15 4:01 4:10 4:18 4:26 4:43 4:53 5:01 5:16 5:29 5:03 5:12 5:20 5:28 5:45 5:55 6:03 6:18 6:29 6:18 6:27 6:35 6:43 7:00 ———— 8 CLOCKWISE LOOP VIA MISSION TRAIL | WEEKENDS A.M. times are in PLAIN, P.M. times are in BOLD | Times are approximate ** At Central and Cambern LAKE ELSINORE OUTLET CENTER**WALMARTGRAHAM & LANGSTAFFMISSION TRAIL & MALAGAPALOMAR & WILDOMARGRAND & BALDWINLAKESIDE HIGH SCHOOLLAKESHORE & VISCAYALAKE ELSINORE OUTLET CENTER1 10 9 6 5 4 3 2 1 6:20 6:32 6:40 6:46 7:03 7:14 7:21 7:31 7:41 7:18 7:30 7:40 7:46 8:03 8:14 8:21 8:31 8:43 8:23 8:35 8:45 8:53 9:10 9:21 9:28 9:38 9:53 9:27 9:39 9:49 9:57 10:13 10:24 10:31 10:41 10:56 10:37 10:51 11:02 11:10 11:26 11:37 11:45 11:56 12:10 11:48 12:03 12:15 12:23 12:39 12:50 12:58 1:09 1:21 1:03 1:18 1:30 1:38 1:54 2:05 2:13 2:24 2:36 2:18 2:33 2:45 2:53 3:09 3:20 3:28 3:39 3:51 3:21 3:36 3:48 3:56 4:12 4:23 4:31 4:41 4:53 4:37 4:52 5:04 5:12 5:28 5:39 5:47 5:57 6:08 5:37 5:52 6:04 6:12 6:28 6:39 6:47 6:57 7:07 Mission Trail Residential Development Traffic Impact Analysis APPENDIX D – LEVEL OF SERVICE CALCULATIONS Table of Contents Intersection Analysis Summary ...........................................................................................................................................................2 Intersection Level Of Service Report .................................................................................................................................................3 Intersection 1: Mission Trail/Project Dwy ...................................................................................................................3 Intersection 2: Mission Trail/Lemon St ........................................................................................................................5 Intersection 3: Mission Trail/Corydon Rd ................................................................................................................10 Intersection 4: Mission Trail/Bundy Canyon Rd ....................................................................................................15 Intersection 5: Almond St/Bundy Canyon Rd ........................................................................................................20 Intersection 6: Orange St/Bundy Canyon rd ...........................................................................................................22 Intersection 7: I-15 SB Ramps/Bundy Canyon Rd ................................................................................................27 Intersection 8: I-15 NB Ramps/Bundy Canyon Rd ...............................................................................................32 Turning Movement Volume: Summary .........................................................................................................................................37 8/19/20221EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with Intersection Analysis Summary 8/19/2022Report File: C:\...\Existing AM.pdf Scenario 1 Existing AMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B15.30.557EB LeftHCM 7th EditionSignalizedI-15 NB Ramps/Bundy Canyon Rd8 B18.90.632WB LeftHCM 7th EditionSignalizedI-15 SB Ramps/Bundy Canyon Rd7 C24.90.533EB LeftHCM 7th EditionSignalizedOrange St/Bundy Canyon rd6 B10.80.354EB LeftHCM 7th EditionAll-way stopAlmond St/Bundy Canyon Rd5 B14.20.252SB LeftHCM 7th EditionSignalizedMission Trail/Bundy Canyon Rd4 B17.00.456NB LeftHCM 7th EditionSignalizedMission Trail/Corydon Rd3 A7.00.361SB LeftHCM 7th EditionSignalizedMission Trail/Lemon St2 A0.00.009NB ThruHCM 7th EditionTwo-way stopMission Trail/Project Dwy1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 8/19/20222EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.009Volume to Capacity (v/c): ALevel Of Service: 0.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Mission Trail/Project Dwy Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 25.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Project DwyMission TrailMission TrailName Intersection Setup 000Pedestrian Volume [ped/h] 0008389350Total Analysis Volume [veh/h] 0002102340Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00000.87090.87090.78260.7826Peak Hour Factor 0007307320Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0007307320Base Volume Input [veh/h] Project DwyMission TrailMission TrailName Volumes 8/19/20223EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with AIntersection LOS 0.00d_I, Intersection Delay [s/veh] CAAApproach LOS 19.960.000.00d_A, Approach Delay [s/veh] 0.000.000.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.000.0095th-Percentile Queue Length [veh/ln] BDAAAAMovement LOS 11.1828.750.000.000.009.54d_M, Delay for Movement [s/veh] 0.000.000.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 8/19/20224EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.361Volume to Capacity (v/c): ALevel Of Service: 7.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Mission Trail/Lemon St Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0030.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00140.00125.00100.00100.00Entry Pocket Length [ft] 000000001100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Lemon StLemon StMission TrailMission TrailName Intersection Setup 8/19/20225EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 38087000078159898890Total Analysis Volume [veh/h] 10022000019515222220Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.71000.71000.71001.00001.00001.00000.87090.87090.87090.78260.78260.7826Peak Hour Factor 27062000068051706960Total Hourly Volume [veh/h] 9000000002300Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 36062000068051936960Base Volume Input [veh/h] Lemon StLemon StMission TrailMission TrailName Volumes 8/19/20226EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000100070070Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 01100110049330160Split [s] 0.01.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Amber [s] 03000300030300300Maximum Green [s] 070070077070Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 040080025060Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/20227EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 75.090.0011.3911.3935.6412.7878.0983.1695th-Percentile Queue Length [ft/ln] 3.000.000.460.461.430.513.123.3395th-Percentile Queue Length [veh/ln] 41.720.006.336.3319.807.1043.3946.2050th-Percentile Queue Length [ft/ln] 1.670.000.250.250.790.281.741.8550th-Percentile Queue Length [veh/ln] YesNoNoNoYesNoNoYesCritical Lane Group CAAACAAALane Group LOS 27.430.002.582.5828.664.736.856.62d, Delay for Lane Group [s/veh] 0.480.000.270.270.430.090.400.38X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.330.000.470.472.180.181.130.90d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.110.500.500.50k, delay calibration 26.090.002.102.1026.484.555.725.72d1, Uniform Delay [s] 2631891429142913698810581222c, Capacity [veh/h] 15751264187018701781158917021870s, saturation flow rate [veh/h] 0.080.000.210.210.030.060.250.25(v / s)_i Volume / Saturation Flow Rate 0.100.100.760.760.070.620.620.62g / C, Green / Cycle 6646464373737g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 2.002.000.000.000.000.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 6060606060606060C, Cycle Length [s] CCCCLRCCLane Group Lane Group Calculations 8/19/20228EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]6.62 6.73 4.73 28.66 2.58 2.58 0.00 0.00 0.00 27.43 27.43 27.43 Movement LOS A A A C A A A A A C C C d_A, Approach Delay [s/veh]6.55 4.41 0.00 27.43 Approach LOS A A A C d_I, Intersection Delay [s/veh]6.97 Intersection LOS A Intersection V/C 0.361 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 21.68 21.68 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 1.696 1.907 Crosswalk LOS F F A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]400 1500 233 233 d_b, Bicycle Delay [s]19.20 1.88 23.41 23.41 I_b,int, Bicycle LOS Score for Intersection 2.385 2.253 1.560 1.781 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-2-Ring 1 Sequence 8/19/20229EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.456Volume to Capacity (v/c): BLevel Of Service: 17.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Mission Trail/Corydon Rd Intersection Level Of Service Report YesNoYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 45.0050.0050.00Speed [mph] 0.00350.000.00120.000.000.00Exit Pocket Length [ft] 010100No. of Lanes in Exit Pocket 280.00310.00125.00100.00100.00200.00Entry Pocket Length [ft] 111001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Mission TrailMission TrailName Intersection Setup 8/19/202210EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 220514314408428273Total Analysis Volume [veh/h] 551287810210768Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.81970.81970.89240.89240.82420.8242Peak Hour Factor 180421280364353225Total Hourly Volume [veh/h] 60094000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 240421374364353225Base Volume Input [veh/h] Mission TrailMission TrailName Volumes 8/19/202211EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 2.02.02.02.02.02.0l2, Clearance Lost Time [s] 2.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 0172121100Pedestrian Clearance [s] 055550Walk [s] 3.03.03.03.03.03.0Vehicle Extension [s] 262630304919Split [s] 1.01.01.01.01.01.0All red [s] 3.03.03.03.03.03.0Amber [s] 303030303030Maximum Green [s] 777777Minimum Green [s] -Lead---LeadLead / Lag 1,82,3Auxiliary Signal Groups 832261Signal Group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 75Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202212EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 45.71187.7846.5079.2029.17212.5795th-Percentile Queue Length [ft/ln] 1.837.511.863.171.178.5095th-Percentile Queue Length [veh/ln] 25.40104.3225.8344.0016.20122.0050th-Percentile Queue Length [ft/ln] 1.024.171.031.760.654.8850th-Percentile Queue Length [veh/ln] NoYesYesNoNoYesCritical Lane Group BCABADLane Group LOS 13.4730.504.4212.374.0036.48d, Delay for Lane Group [s/veh] 0.180.770.280.250.170.86X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.071.870.600.350.156.62d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.500.11k, delay calibration 13.4028.633.8112.023.8529.86d1, Uniform Delay [s] 1199670113616642491319c, Capacity [veh/h] 281334591589356035601781s, saturation flow rate [veh/h] 0.080.150.200.110.120.15(v / s)_i Volume / Saturation Flow Rate 0.430.190.710.470.700.18g / C, Green / Cycle 321454355313g_i, Effective Green Time [s] 0.002.000.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 757575757575C, Cycle Length [s] RLRCCLLane Group Lane Group Calculations 8/19/202213EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]36.48 4.00 12.37 4.42 30.50 13.47 Movement LOS D A B A C B d_A, Approach Delay [s/veh]16.65 8.91 25.40 Approach LOS B A C d_I, Intersection Delay [s/veh]17.04 Intersection LOS B Intersection V/C 0.456 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]29.04 0.00 29.04 I_p,int, Pedestrian LOS Score for Intersection 2.744 0.000 2.890 Crosswalk LOS B F C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1200 693 587 d_b, Bicycle Delay [s]6.00 16.01 18.73 I_b,int, Bicycle LOS Score for Intersection 2.138 2.233 1.560 Bicycle LOS B B A ----------------Ring 4 ----------------Ring 3 ------------8-6-Ring 2 -------------321Ring 1 Sequence 8/19/202214EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.252Volume to Capacity (v/c): BLevel Of Service: 14.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Mission Trail/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0025.0050.0050.00Speed [mph] 320.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 220.00100.00100.00100.00100.00100.00100.00100.00300.00100.00100.00145.00Entry Pocket Length [ft] 100000002001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Intersection Setup 8/19/202215EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 2590720400237306583500Total Analysis Volume [veh/h] 650180100597714870Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.83771.00000.83770.25000.25000.25000.93430.93430.93430.79810.79810.7981Peak Hour Factor 2170600100221286462790Total Hourly Volume [veh/h] 72000000001600Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2890600100221286622790Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Volumes 8/19/202216EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.00.02.02.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.00.02.02.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 00211010001000140Pedestrian Clearance [s] 005550050050Walk [s] 0.00.03.03.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 0030303000241202311Split [s] 0.00.01.01.01.00.00.01.01.00.01.01.0All red [s] 0.00.03.03.03.00.00.03.03.00.03.03.0Amber [s] 0030303000303003030Maximum Green [s] 007770077077Minimum Green [s] --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 007880025061Signal Group OverlapPermissSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 65Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202217EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 48.612.627.647.6499.2336.2837.170.0095th-Percentile Queue Length [ft/ln] 1.940.100.310.313.971.451.490.0095th-Percentile Queue Length [veh/ln] 27.001.454.254.2555.1320.1620.650.0050th-Percentile Queue Length [ft/ln] 1.080.060.170.172.210.810.830.0050th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoNoCritical Lane Group CCAACAAALane Group LOS 30.4527.632.552.5530.755.685.640.00d, Delay for Lane Group [s/veh] 0.390.020.090.090.760.180.180.00X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.370.040.120.122.940.360.340.00d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.110.500.500.11k, delay calibration 29.0727.592.432.4327.825.325.300.00d1, Uniform Delay [s] 18320413751375404110111581c, Capacity [veh/h] 14121870187018703459177918701781s, saturation flow rate [veh/h] 0.050.000.060.060.090.110.110.00(v / s)_i Volume / Saturation Flow Rate 0.080.080.740.740.120.620.620.00g / C, Green / Cycle 554848840400g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 2.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 6565656565656565C, Cycle Length [s] LCCCLCCLLane Group Lane Group Calculations 8/19/202218EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 5.66 5.68 30.75 2.55 2.55 27.63 27.63 27.63 30.45 0.00 0.00 Movement LOS A A A C A A C C C C d_A, Approach Delay [s/veh]5.66 18.45 27.63 30.45 Approach LOS A B C C d_I, Intersection Delay [s/veh]14.24 Intersection LOS B Intersection V/C 0.252 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 24.12 0.00 24.12 I_p,int, Pedestrian LOS Score for Intersection 0.000 2.680 0.000 2.264 Crosswalk LOS F B F B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]585 615 800 800 d_b, Bicycle Delay [s]16.28 15.58 11.70 11.70 I_b,int, Bicycle LOS Score for Intersection 1.909 2.008 1.566 1.560 Bicycle LOS A B A A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 ------------8-21Ring 1 Sequence 8/19/202219EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.354Volume to Capacity (v/c): BLevel Of Service: 10.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 5: Almond St/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 250.000.000.00250.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100100000000No. of Lanes in Exit Pocket 50.00100.00100.0050.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 100100000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 0000Pedestrian Volume [ped/h] 27369111844711208943108Total Analysis Volume [veh/h] 7923411235223802Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.94260.94260.94260.89660.89660.89660.89770.89770.89770.35710.35710.3571Peak Hour Factor 25348101640110187841103Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 25348101640110187841103Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202220EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with BIntersection LOS 10.81Intersection Delay [s/veh] BBBAApproach LOS 10.4911.1011.169.52Approach Delay [s/veh] 2.8630.8531.071.8539.5539.8020.455.2895th-Percentile Queue Length [ft] 0.111.231.240.071.581.590.820.2195th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.040.300.300.020.350.350.220.07Degree of Utilization, x 735642639746651648563591Capacity per Entry Lane [veh/h] Lanes Intersection Settings 8/19/202221EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.533Volume to Capacity (v/c): CLevel Of Service: 24.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Orange St/Bundy Canyon rd Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0035.0035.00Speed [mph] 0.000.000.000.000.000.00260.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket 100.00100.00200.00125.00100.00125.00260.00100.00100.00135.00100.00100.00Entry Pocket Length [ft] 001101100100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdOrange StOrange StName Intersection Setup 8/19/202222EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 664631941759123827241248621Total Analysis Volume [veh/h] 171164841486276062150Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.87320.87320.87320.78230.78230.78230.86270.86270.86270.77780.77780.7778Peak Hour Factor 584041691346218723208193481Total Hourly Volume [veh/h] 20005003006500Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 7840416918462181023208258481Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdOrange StOrange StName Volumes 8/19/202223EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0140014002100170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 025210242003000300Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 077077070070Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 047083020060Signal Group PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 75Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202224EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 158.83165.21163.52226.49227.7820.132.82144.87104.9022.5895th-Percentile Queue Length [ft/ln] 6.356.616.549.069.110.810.115.794.200.9095th-Percentile Queue Length [veh/ln] 88.2491.7890.84132.20133.1611.181.5780.4858.2812.5450th-Percentile Queue Length [ft/ln] 3.533.673.635.295.330.450.063.222.330.5050th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoYesNoNoCritical Lane Group CCDCCDABBALane Group LOS 22.3822.3338.0333.1933.1138.369.2416.3711.869.61d, Delay for Lane Group [s/veh] 0.490.490.810.820.820.350.010.440.310.06X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.690.666.454.464.393.090.022.291.000.12d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.500.50k, delay calibration 21.6821.6731.5728.7328.7235.279.2214.0810.879.49d1, Uniform Delay [s] 53255623937037466804610804994c, Capacity [veh/h] 1790187017811852187017811589102715891868s, saturation flow rate [veh/h] 0.140.140.110.160.160.010.010.260.160.03(v / s)_i Volume / Saturation Flow Rate 0.300.300.130.200.200.040.510.510.510.51g / C, Green / Cycle 2222101515338383838g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.002.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 75757575757575757575C, Cycle Length [s] CCLCCLRCRCLane Group Lane Group Calculations 8/19/202225EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]9.61 9.61 11.86 16.37 16.37 9.24 38.36 33.15 33.19 38.03 22.35 22.38 Movement LOS A A B B B A D C C D C C d_A, Approach Delay [s/veh]11.41 16.16 33.34 26.56 Approach LOS B B C C d_I, Intersection Delay [s/veh]24.86 Intersection LOS C Intersection V/C 0.533 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]29.07 29.07 29.07 29.07 I_p,int, Pedestrian LOS Score for Intersection 2.392 2.256 2.590 3.154 Crosswalk LOS B B B C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]693 693 533 560 d_b, Bicycle Delay [s]16.03 16.03 20.19 19.46 I_b,int, Bicycle LOS Score for Intersection 2.180 2.020 2.084 2.173 Bicycle LOS B B B B ----------------Ring 4 ----------------Ring 3 ------------876-Ring 2 ------------432-Ring 1 Sequence 8/19/202226EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.632Volume to Capacity (v/c): BLevel Of Service: 18.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 7: I-15 SB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0065.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00320.00100.00100.00100.0025.00100.00310.00100.00100.00100.00Entry Pocket Length [ft] 001000101000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/19/202227EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 057937542347101371254000Total Analysis Volume [veh/h] 014594106118034064000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00000.91380.91380.89550.89551.00000.91560.91560.91561.00001.00001.0000Peak Hour Factor 052934337942201251233000Total Hourly Volume [veh/h] 000127004200000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 052934350642201671233000Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202228EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.00.02.00.00.02.00.00.00.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.02.00.00.00.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0700300100000Pedestrian Clearance [s] 050050050000Walk [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Vehicle Extension [s] 0332101200270000Split [s] 0.01.01.00.01.00.00.01.00.00.00.00.0All red [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Amber [s] 0303003000300000Maximum Green [s] 077070070000Minimum Green [s] --Lead---------Lead / Lag Auxiliary Signal Groups 061020040000Signal Group PermissPermissProtectePermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202229EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 33.65219.61242.04217.2166.070.43138.3295th-Percentile Queue Length [ft/ln] 1.358.789.688.692.640.025.5395th-Percentile Queue Length [veh/ln] 18.69127.15143.73125.3936.700.2476.8450th-Percentile Queue Length [ft/ln] 0.755.095.755.021.470.013.0750th-Percentile Queue Length [veh/ln] NoYesYesNoNoNoYesCritical Lane Group ACCBCCCLane Group LOS 3.8327.3624.4919.8823.1020.0627.34d, Delay for Lane Group [s/veh] 0.240.870.740.640.470.000.78X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.235.488.174.411.170.003.96d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.110.500.500.110.110.11k, delay calibration 3.6021.8816.3215.4621.9320.0523.38d1, Uniform Delay [s] 2433431600700292344327c, Capacity [veh/h] 3560178116021870158918701781s, saturation flow rate [veh/h] 0.160.210.280.240.090.000.14(v / s)_i Volume / Saturation Flow Rate 0.680.240.380.380.180.180.18g / C, Green / Cycle 41152323111111g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060C, Cycle Length [s] CLCCRCLLane Group Lane Group Calculations 8/19/202230EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 0.00 0.00 27.34 20.06 23.10 0.00 20.11 24.49 27.36 3.83 0.00 Movement LOS C C C C C C A d_A, Approach Delay [s/veh]0.00 25.84 22.19 13.08 Approach LOS A C C B d_I, Intersection Delay [s/veh]18.95 Intersection LOS B Intersection V/C 0.632 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.72 21.72 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.307 2.286 0.000 0.000 Crosswalk LOS B B F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 766 266 965 d_b, Bicycle Delay [s]30.04 11.44 22.57 8.04 I_b,int, Bicycle LOS Score for Intersection 4.132 2.276 2.402 2.347 Bicycle LOS D B B B ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 ------------4-21Ring 1 Sequence 8/19/202231EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.557Volume to Capacity (v/c): BLevel Of Service: 15.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 8: I-15 NB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0030.0065.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 300.00100.00100.00100.00100.00260.00100.00100.00100.0025.00100.00330.00Entry Pocket Length [ft] 100001000101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/19/202232EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 372670005141940001214240Total Analysis Volume [veh/h] 93167001284800030160Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96130.96131.00001.00000.91280.91281.00001.00001.00000.92570.92570.9257Peak Hour Factor 358644004691770001124222Total Hourly Volume [veh/h] 120000000003700Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 478644004691770001494222Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202233EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.02.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0300700000100Pedestrian Clearance [s] 050050000050Walk [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Vehicle Extension [s] 0120046340000140Split [s] 0.01.00.00.01.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Amber [s] 0300030300000300Maximum Green [s] 070077000070Minimum Green [s] -----Lead------Lead / Lag Auxiliary Signal Groups 060025000080Signal Group PermissPermissPermissPermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202234EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 206.75192.8924.93123.4159.931.77138.3695th-Percentile Queue Length [ft/ln] 8.277.721.004.942.400.075.5395th-Percentile Queue Length [veh/ln] 117.77107.7713.8568.5633.300.9876.8750th-Percentile Queue Length [ft/ln] 4.714.310.552.741.330.043.0750th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesCritical Lane Group BBACCCCLane Group LOS 14.9613.173.3129.8323.9521.0329.72d, Delay for Lane Group [s/veh] 0.640.560.210.770.460.010.82X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.732.490.194.951.260.025.49d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.500.110.110.110.11k, delay calibration 11.2310.683.1324.8922.6921.0124.23d1, Uniform Delay [s] 8209242499252263309294c, Capacity [veh/h] 1661187035601781158918701781s, saturation flow rate [veh/h] 0.310.280.140.110.080.000.13(v / s)_i Volume / Saturation Flow Rate 0.500.500.700.140.160.160.16g / C, Green / Cycle 3030428101010g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060C, Cycle Length [s] CCCLRCLLane Group Lane Group Calculations 8/19/202235EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]29.72 21.03 23.95 0.00 0.00 0.00 29.83 3.31 0.00 0.00 13.57 14.96 Movement LOS C C C C A B B d_A, Approach Delay [s/veh]27.71 0.00 10.58 14.06 Approach LOS C A B B d_I, Intersection Delay [s/veh]15.25 Intersection LOS B Intersection V/C 0.557 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.72 21.72 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.257 2.077 0.000 0.000 Crosswalk LOS B B F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]333 0 1398 266 d_b, Bicycle Delay [s]20.87 30.04 2.72 22.57 I_b,int, Bicycle LOS Score for Intersection 2.223 4.132 2.144 2.518 Bicycle LOS B D B B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 --------------2-Ring 1 Sequence 8/19/202236EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with Turning Movement Volume: Summary 8/19/2022Report File: C:\...\Existing AM.pdf Scenario 1 Existing AMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential 2201 Total Volume 529 Thru 343 Left Westbound 506 Right 422 Thru Eastbound 167 Right 1 Thru 233 Left Southbound I-15 SB Ramps/Bundy Canyon Rd7 Intersection NameID 1697 Total Volume 78 Right 404 Thru 169 Left Westbound 18 Right 462 Thru 18 Left Eastbound 10 Right 23 Thru 208 Left Southbound 258 Right 48 Thru 1 Left Northbound Orange St/Bundy Canyon rd6 Intersection NameID 933 Total Volume 25 Right 348 Thru 10 Left Westbound 16 Right 401 Thru 10 Left Eastbound 18 Right 7 Thru 84 Left Southbound 11 Right 0 Thru 3 Left Northbound Almond St/Bundy Canyon Rd5 Intersection NameID 1198 Total Volume 289 Right 60 Left Westbound 0 Right 1 Thru 0 Left Eastbound 0 Right 221 Thru 286 Left Southbound 62 Right 279 Thru 0 Left Northbound Mission Trail/Bundy Canyon Rd4 Intersection NameID 1977 Total Volume 240 Right 421 Left Eastbound 374 Right 364 Thru Southbound 353 Thru 225 Left Northbound Mission Trail/Corydon Rd3 Intersection NameID 1618 Total Volume 36 Right 0 Thru 62 Left Westbound 0 Right 0 Thru 0 Left Eastbound 0 Right 680 Thru 51 Left Southbound 93 Right 696 Thru 0 Left Northbound Mission Trail/Lemon St2 Intersection NameID 1462 Total Volume 0 Right 0 Left Eastbound 0 Right 730 Thru Southbound 732 Thru 0 Left Northbound Mission Trail/Project Dwy1 Intersection NameID 8/19/202237EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with 2143 Total Volume 478 Right 644 Thru Westbound 469 Thru 177 Left Eastbound 149 Right 4 Thru 222 Left Northbound I-15 NB Ramps/Bundy Canyon Rd8 Intersection NameID 8/19/202238EPD Solutions Inc Existing AMMission Trail Residential Version 2022 (SP 0-8) Generated with Table of Contents Intersection Analysis Summary ...........................................................................................................................................................2 Intersection Level Of Service Report .................................................................................................................................................3 Intersection 1: Mission Trail/Project Dwy ...................................................................................................................3 Intersection 2: Mission Trail/Lemon St ........................................................................................................................5 Intersection 3: Mission Trail/Corydon Rd ................................................................................................................10 Intersection 4: Mission Trail/Bundy Canyon Rd ....................................................................................................15 Intersection 5: Almond St/Bundy Canyon Rd ........................................................................................................20 Intersection 6: Orange St/Bundy Canyon rd ...........................................................................................................22 Intersection 7: I-15 SB Ramps/Bundy Canyon Rd ................................................................................................27 Intersection 8: I-15 NB Ramps/Bundy Canyon Rd ...............................................................................................32 Turning Movement Volume: Summary .........................................................................................................................................37 8/19/20221EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with Intersection Analysis Summary 8/19/2022Report File: C:\...\Existing PM.pdf Scenario 2 Existing PMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B17.50.572EB LeftHCM 7th EditionSignalizedI-15 NB Ramps/Bundy Canyon Rd8 C21.00.673WB LeftHCM 7th EditionSignalizedI-15 SB Ramps/Bundy Canyon Rd7 E60.66.520SB LeftHCM 7th EditionSignalizedOrange St/Bundy Canyon rd6 B12.30.460WB ThruHCM 7th EditionAll-way stopAlmond St/Bundy Canyon Rd5 C20.90.414SB LeftHCM 7th EditionSignalizedMission Trail/Bundy Canyon Rd4 B16.00.458NB LeftHCM 7th EditionSignalizedMission Trail/Corydon Rd3 A7.00.371SB LeftHCM 7th EditionSignalizedMission Trail/Lemon St2 A0.00.010NB ThruHCM 7th EditionTwo-way stopMission Trail/Project Dwy1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 8/19/20222EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.010Volume to Capacity (v/c): ALevel Of Service: 0.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Mission Trail/Project Dwy Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 25.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Project DwyMission TrailMission TrailName Intersection Setup 000Pedestrian Volume [ped/h] 0008699830Total Analysis Volume [veh/h] 0002172460Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00000.87500.87500.96750.9675Peak Hour Factor 0007609510Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0007609510Base Volume Input [veh/h] Project DwyMission TrailMission TrailName Volumes 8/19/20223EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with AIntersection LOS 0.00d_I, Intersection Delay [s/veh] CAAApproach LOS 21.070.000.00d_A, Approach Delay [s/veh] 0.000.000.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.000.0095th-Percentile Queue Length [veh/ln] BDAAAAMovement LOS 11.3230.810.000.000.009.67d_M, Delay for Movement [s/veh] 0.000.000.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 8/19/20224EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.371Volume to Capacity (v/c): ALevel Of Service: 7.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Mission Trail/Lemon St Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0030.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00140.00125.00100.00100.00Entry Pocket Length [ft] 000000001100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Lemon StLemon StMission TrailMission TrailName Intersection Setup 8/19/20225EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 48071000080862759340Total Analysis Volume [veh/h] 12018000020215192340Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.73330.73330.73331.00001.00001.00000.87500.87500.87500.96750.96750.9675Peak Hour Factor 35052000070754739040Total Hourly Volume [veh/h] 12000000002400Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 47052000070754979040Base Volume Input [veh/h] Lemon StLemon StMission TrailMission TrailName Volumes 8/19/20226EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000100070070Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 01100110049330160Split [s] 0.01.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Amber [s] 03000300030300300Maximum Green [s] 070070077070Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 040080025060Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/20227EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 71.350.0011.3211.3237.3710.7084.0289.4095th-Percentile Queue Length [ft/ln] 2.850.000.450.451.490.433.363.5895th-Percentile Queue Length [veh/ln] 39.640.006.296.2920.765.9446.6849.6650th-Percentile Queue Length [ft/ln] 1.590.000.250.250.830.241.871.9950th-Percentile Queue Length [veh/ln] YesNoNoNoYesNoNoYesCritical Lane Group CAAACAAALane Group LOS 27.390.002.592.5928.614.677.076.82d, Delay for Lane Group [s/veh] 0.470.000.280.280.440.080.420.40X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.320.000.490.492.210.151.230.98d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.110.500.500.50k, delay calibration 26.070.002.102.1026.404.525.845.84d1, Uniform Delay [s] 2561871432143214098710571221c, Capacity [veh/h] 15871256187018701781158917021870s, saturation flow rate [veh/h] 0.070.000.220.220.030.050.260.26(v / s)_i Volume / Saturation Flow Rate 0.100.100.770.770.080.620.620.62g / C, Green / Cycle 6646465373737g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 2.002.000.000.000.000.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 6060606060606060C, Cycle Length [s] CCCCLRCCLane Group Lane Group Calculations 8/19/20228EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]6.82 6.94 4.67 28.61 2.59 2.59 0.00 0.00 0.00 27.39 27.39 27.39 Movement LOS A A A C A A A A A C C C d_A, Approach Delay [s/veh]6.77 4.44 0.00 27.39 Approach LOS A A A C d_I, Intersection Delay [s/veh]6.99 Intersection LOS A Intersection V/C 0.371 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 21.68 21.68 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 1.696 1.902 Crosswalk LOS F F A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]400 1500 233 233 d_b, Bicycle Delay [s]19.20 1.88 23.41 23.41 I_b,int, Bicycle LOS Score for Intersection 2.412 2.277 1.560 1.776 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-2-Ring 1 Sequence 8/19/20229EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.458Volume to Capacity (v/c): BLevel Of Service: 16.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Mission Trail/Corydon Rd Intersection Level Of Service Report YesNoYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 45.0050.0050.00Speed [mph] 0.00350.000.00120.000.000.00Exit Pocket Length [ft] 010100No. of Lanes in Exit Pocket 280.00310.00125.00100.00100.00200.00Entry Pocket Length [ft] 111001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Mission TrailMission TrailName Intersection Setup 8/19/202210EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 276528350322540240Total Analysis Volume [veh/h] 69132888113560Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95380.95380.95310.95310.92530.9253Peak Hour Factor 263504334307500222Total Hourly Volume [veh/h] 880111000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 351504445307500222Base Volume Input [veh/h] Mission TrailMission TrailName Volumes 8/19/202211EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 2.02.02.02.02.02.0l2, Clearance Lost Time [s] 2.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 0172121100Pedestrian Clearance [s] 055550Walk [s] 3.03.03.03.03.03.0Vehicle Extension [s] 262630304919Split [s] 1.01.01.01.01.01.0All red [s] 3.03.03.03.03.03.0Amber [s] 303030303030Maximum Green [s] 777777Minimum Green [s] -Lead---LeadLead / Lag 1,82,3Auxiliary Signal Groups 832261Signal Group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 75Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202212EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 60.25191.5046.4558.8339.73191.2795th-Percentile Queue Length [ft/ln] 2.417.661.862.351.597.6595th-Percentile Queue Length [veh/ln] 33.47106.7725.8132.6822.07106.6050th-Percentile Queue Length [ft/ln] 1.344.271.031.310.884.2650th-Percentile Queue Length [veh/ln] NoYesYesNoNoYesCritical Lane Group BCABADLane Group LOS 14.3330.264.1711.474.3336.28d, Delay for Lane Group [s/veh] 0.240.770.300.190.220.83X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.101.840.670.250.205.92d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.500.11k, delay calibration 14.2228.413.5011.234.1230.36d1, Uniform Delay [s] 1168687116117032473290c, Capacity [veh/h] 281334591589356035601781s, saturation flow rate [veh/h] 0.100.150.220.090.150.13(v / s)_i Volume / Saturation Flow Rate 0.410.200.730.480.700.16g / C, Green / Cycle 311555365212g_i, Effective Green Time [s] 0.002.000.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 757575757575C, Cycle Length [s] RLRCCLLane Group Lane Group Calculations 8/19/202213EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]36.28 4.33 11.47 4.17 30.26 14.33 Movement LOS D A B A C B d_A, Approach Delay [s/veh]14.16 7.67 24.79 Approach LOS B A C d_I, Intersection Delay [s/veh]16.01 Intersection LOS B Intersection V/C 0.458 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]29.04 0.00 29.04 I_p,int, Pedestrian LOS Score for Intersection 2.769 0.000 2.959 Crosswalk LOS C F C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1200 693 587 d_b, Bicycle Delay [s]6.00 16.01 18.73 I_b,int, Bicycle LOS Score for Intersection 2.203 2.206 1.560 Bicycle LOS B B A ----------------Ring 4 ----------------Ring 3 ------------8-6-Ring 2 -------------321Ring 1 Sequence 8/19/202214EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.414Volume to Capacity (v/c): CLevel Of Service: 20.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Mission Trail/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0025.0050.0050.00Speed [mph] 320.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 220.00100.00100.00100.00100.00100.00100.00100.00300.00100.00100.00145.00Entry Pocket Length [ft] 100000002001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Intersection Setup 8/19/202215EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 31901242720225437452930Total Analysis Volume [veh/h] 8003112105610911730Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89631.00000.89630.41670.41670.41670.91890.91890.91890.95250.95250.9525Peak Hour Factor 28601111310207402432790Total Hourly Volume [veh/h] 95000000001500Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 38101111310207402582790Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Volumes 8/19/202216EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 2.00.02.02.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 2.00.02.02.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 00211010001000140Pedestrian Clearance [s] 005550050050Walk [s] 3.00.03.03.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 29030303000111702329Split [s] 1.00.01.01.01.00.00.01.01.00.01.01.0All red [s] 3.00.03.03.03.00.00.03.03.00.03.03.0Amber [s] 30030303000303003030Maximum Green [s] 707770077077Minimum Green [s] --Lead-----Lead--LeadLead / Lag 1,7Auxiliary Signal Groups 107880025061Signal Group OverlapPermissSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 70Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202217EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 200.2274.916.3423.3623.36152.0962.7864.080.0095th-Percentile Queue Length [ft/ln] 8.013.000.250.930.936.082.512.560.0095th-Percentile Queue Length [veh/ln] 113.0441.623.5212.9812.9884.5034.8835.600.0050th-Percentile Queue Length [ft/ln] 4.521.660.140.520.523.381.401.420.0050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoNoCritical Lane Group CCCAACBBALane Group LOS 24.8323.9521.425.985.9831.5312.1712.100.00d, Delay for Lane Group [s/veh] 0.720.340.030.100.100.810.210.200.00X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.160.550.020.180.182.980.580.540.00d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.110.500.500.11k, delay calibration 22.6723.4021.395.805.8028.5411.5911.560.00d1, Uniform Delay [s] 446364435113211325398078455c, Capacity [veh/h] 158914061695187018703459178518701781s, saturation flow rate [veh/h] 0.200.090.010.060.060.130.090.090.00(v / s)_i Volume / Saturation Flow Rate 0.280.220.220.610.610.160.450.450.00g / C, Green / Cycle 20161642421132320g_i, Effective Green Time [s] 0.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 707070707070707070C, Cycle Length [s] RLCCCLCCLLane Group Lane Group Calculations 8/19/202218EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 12.13 12.17 31.53 5.98 5.98 21.42 21.42 21.42 23.95 0.00 24.83 Movement LOS A B B C A A C C C C C d_A, Approach Delay [s/veh]12.14 22.84 21.42 24.58 Approach LOS B C C C d_I, Intersection Delay [s/veh]20.87 Intersection LOS C Intersection V/C 0.414 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 26.58 0.00 26.58 I_p,int, Pedestrian LOS Score for Intersection 0.000 2.816 0.000 2.594 Crosswalk LOS F C F B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]543 200 743 743 d_b, Bicycle Delay [s]18.58 28.35 13.83 13.83 I_b,int, Bicycle LOS Score for Intersection 1.851 2.106 1.578 1.560 Bicycle LOS A B A A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 ------------8-21Ring 1 Sequence 8/19/202219EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.460Volume to Capacity (v/c): BLevel Of Service: 12.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 5: Almond St/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 250.000.000.00250.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100100000000No. of Lanes in Exit Pocket 50.00100.00100.0050.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 100100000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 0000Pedestrian Volume [ped/h] 4960000546415069853Total Analysis Volume [veh/h] 121500013714017211Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89140.89140.89140.92070.92070.92070.72370.72370.72370.37500.37500.3750Peak Hour Factor 4453500503411050321Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4453500503411050321Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202220EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with BIntersection LOS 12.32Intersection Delay [s/veh] BBBBApproach LOS 12.4612.3811.3010.02Approach Delay [s/veh] 5.2560.5960.590.0053.3253.4314.382.3495th-Percentile Queue Length [ft] 0.212.422.420.002.132.140.580.0995th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.070.460.460.000.430.430.160.03Degree of Utilization, x 747652652645644644517529Capacity per Entry Lane [veh/h] Lanes Intersection Settings 8/19/202221EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 6.520Volume to Capacity (v/c): ELevel Of Service: 60.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Orange St/Bundy Canyon rd Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0035.0035.00Speed [mph] 0.000.000.000.000.000.00260.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket 100.00100.00200.00125.00100.00125.00260.00100.00100.00135.00100.00100.00Entry Pocket Length [ft] 001101100100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdOrange StOrange StName Intersection Setup 8/19/202222EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 9964318816581258231951532814Total Analysis Volume [veh/h] 25161474145626493874Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89530.89530.89530.89290.89290.89290.77940.77940.77940.75910.75910.7591Peak Hour Factor 8957616814519226181521162111Total Hourly Volume [veh/h] 30005002003900Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 11957616819519228181521552111Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdOrange StOrange StName Volumes 8/19/202223EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0140014001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 023110231102600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 077077070070Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 061025040080Signal Group PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202224EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 162.66169.35140.74151.21152.1916.872.77642.7558.6315.6995th-Percentile Queue Length [ft/ln] 6.516.775.636.056.090.670.1125.712.350.6395th-Percentile Queue Length [veh/ln] 90.3694.0878.1984.0084.559.371.54357.0832.578.7250th-Percentile Queue Length [ft/ln] 3.613.763.133.363.380.370.0614.281.300.3550th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoYesNoNoCritical Lane Group BBDBBCBFBBLane Group LOS 16.6216.5038.7419.8019.7630.5812.18387.6913.6415.58d, Delay for Lane Group [s/veh] 0.520.520.900.510.510.330.011.730.260.20X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.712.5912.563.103.062.580.01358.880.240.49d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.110.500.500.110.110.500.110.11k, delay calibration 13.9113.9126.1716.7116.7028.0012.1728.8013.4015.09d1, Uniform Delay [s] 70173521058759375581126581205c, Capacity [veh/h] 1784187017811852187017811589351589343s, saturation flow rate [veh/h] 0.200.200.110.160.160.010.016.250.100.12(v / s)_i Volume / Saturation Flow Rate 0.390.390.120.320.320.040.370.370.370.37g / C, Green / Cycle 242471919222222222g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.002.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060606060C, Cycle Length [s] CCLCCLRCRCLane Group Lane Group Calculations 8/19/202225EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]15.58 15.58 13.64 387.69 387.69 12.18 30.58 19.78 19.80 38.74 16.55 16.62 Movement LOS B B B F F B C B B D B B d_A, Approach Delay [s/veh]14.05 374.39 20.22 21.04 Approach LOS B F C C d_I, Intersection Delay [s/veh]60.57 Intersection LOS E Intersection V/C 6.520 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.72 21.72 21.72 21.72 I_p,int, Pedestrian LOS Score for Intersection 2.300 2.231 2.644 3.102 Crosswalk LOS B B B C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]732 732 632 632 d_b, Bicycle Delay [s]12.07 12.07 14.05 14.05 I_b,int, Bicycle LOS Score for Intersection 1.946 1.936 2.077 2.352 Bicycle LOS A A B B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence 8/19/202226EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.673Volume to Capacity (v/c): CLevel Of Service: 21.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 7: I-15 SB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0065.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00320.00100.00100.00100.0025.00100.00310.00100.00100.00100.00Entry Pocket Length [ft] 001000101000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/19/202227EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 082718526663701701539000Total Analysis Volume [veh/h] 020746661590430135000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00000.90040.90040.81670.81671.00000.85230.85230.85231.00001.00001.0000Peak Hour Factor 074516721752001451459000Total Hourly Volume [veh/h] 00072004800000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 074516728952001931459000Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202228EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.00.02.00.00.02.00.00.00.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.02.00.00.00.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000300100000Pedestrian Clearance [s] 050050050000Walk [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Vehicle Extension [s] 0362401200240000Split [s] 0.01.01.00.01.00.00.01.00.00.00.00.0All red [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Amber [s] 0303003000300000Maximum Green [s] 077070070000Minimum Green [s] --Lead---------Lead / Lag Auxiliary Signal Groups 061020040000Signal Group PermissPermissProtectePermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202229EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 114.25119.03264.90243.1160.020.31273.5095th-Percentile Queue Length [ft/ln] 4.574.7610.609.722.400.0110.9495th-Percentile Queue Length [veh/ln] 63.4766.13160.89144.5333.350.17167.4050th-Percentile Queue Length [ft/ln] 2.542.656.445.781.330.016.7050th-Percentile Queue Length [veh/ln] NoYesYesNoNoNoYesCritical Lane Group ACCCBBCLane Group LOS 9.0730.3928.7024.2515.5313.5628.60d, Delay for Lane Group [s/veh] 0.430.770.790.720.330.000.92X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.715.2410.686.830.360.009.17d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.110.500.500.110.110.16k, delay calibration 8.3625.1518.0217.4215.1713.5619.43d1, Uniform Delay [s] 1916240571631523615586c, Capacity [veh/h] 3560178116941870158918701781s, saturation flow rate [veh/h] 0.230.100.270.240.110.000.30(v / s)_i Volume / Saturation Flow Rate 0.540.130.340.340.330.330.33g / C, Green / Cycle 3282020202020g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060C, Cycle Length [s] CLCCRCLLane Group Lane Group Calculations 8/19/202230EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 0.00 0.00 28.60 13.56 15.53 0.00 25.55 28.70 30.39 9.07 0.00 Movement LOS C B B C C C A d_A, Approach Delay [s/veh]0.00 25.45 26.48 12.97 Approach LOS A C C B d_I, Intersection Delay [s/veh]20.99 Intersection LOS C Intersection V/C 0.673 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.72 21.72 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 1.915 2.523 0.000 0.000 Crosswalk LOS A B F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 666 266 1065 d_b, Bicycle Delay [s]30.04 13.37 22.57 6.56 I_b,int, Bicycle LOS Score for Intersection 4.132 2.810 2.364 2.395 Bicycle LOS D C B B ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 ------------4-21Ring 1 Sequence 8/19/202231EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.572Volume to Capacity (v/c): BLevel Of Service: 17.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 8: I-15 NB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0030.0065.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 300.00100.00100.00100.00100.00260.00100.00100.00100.0025.00100.00330.00Entry Pocket Length [ft] 100001000101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/19/202232EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 222470009321430003540509Total Analysis Volume [veh/h] 551170023336000890127Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.93710.93711.00001.00000.90830.90831.00001.00001.00000.93150.93150.9315Peak Hour Factor 208440008471300003300474Total Hourly Volume [veh/h] 700000000011000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 278440008471300004400474Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202233EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.02.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0300700000100Pedestrian Clearance [s] 050050000050Walk [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Vehicle Extension [s] 0120037250000230Split [s] 0.01.00.00.01.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Amber [s] 0300030300000300Maximum Green [s] 070077000070Minimum Green [s] -----Lead------Lead / Lag Auxiliary Signal Groups 060025000080Signal Group PermissPermissPermissPermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202234EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 163.33154.72126.4194.48155.290.00256.9695th-Percentile Queue Length [ft/ln] 6.536.195.063.786.210.0010.2895th-Percentile Queue Length [veh/ln] 90.7485.9670.2352.4986.270.00154.9050th-Percentile Queue Length [ft/ln] 3.633.442.812.103.450.006.2050th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesCritical Lane Group BBACCACLane Group LOS 17.8616.588.9131.6820.180.0027.69d, Delay for Lane Group [s/veh] 0.540.490.470.740.710.000.91X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.292.380.815.641.900.007.80d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.500.110.110.110.14k, delay calibration 14.5714.198.1026.0418.270.0019.89d1, Uniform Delay [s] 6387101973192497585557c, Capacity [veh/h] 1680187035601781158918701781s, saturation flow rate [veh/h] 0.210.190.260.080.220.000.29(v / s)_i Volume / Saturation Flow Rate 0.380.380.550.110.310.310.31g / C, Green / Cycle 2323336191919g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060C, Cycle Length [s] CCCLRCLLane Group Lane Group Calculations 8/19/202235EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]27.69 0.00 20.18 0.00 0.00 0.00 31.68 8.91 0.00 0.00 16.91 17.86 Movement LOS C A C C A B B d_A, Approach Delay [s/veh]24.60 0.00 11.94 17.22 Approach LOS C A B B d_I, Intersection Delay [s/veh]17.49 Intersection LOS B Intersection V/C 0.572 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.72 21.72 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.763 1.828 0.000 0.000 Crosswalk LOS C A F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]632 0 1098 266 d_b, Bicycle Delay [s]14.05 30.04 6.10 22.57 I_b,int, Bicycle LOS Score for Intersection 3.165 4.132 2.446 2.188 Bicycle LOS C D B B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 --------------2-Ring 1 Sequence 8/19/202236EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with Turning Movement Volume: Summary 8/19/2022Report File: C:\...\Existing PM.pdf Scenario 2 Existing PMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential 2374 Total Volume 745 Thru 167 Left Westbound 289 Right 520 Thru Eastbound 193 Right 1 Thru 459 Left Southbound I-15 SB Ramps/Bundy Canyon Rd7 Intersection NameID 1788 Total Volume 119 Right 576 Thru 168 Left Westbound 19 Right 519 Thru 22 Left Eastbound 8 Right 18 Thru 152 Left Southbound 155 Right 21 Thru 11 Left Northbound Orange St/Bundy Canyon rd6 Intersection NameID 1153 Total Volume 44 Right 535 Thru 0 Left Westbound 0 Right 503 Thru 4 Left Eastbound 11 Right 0 Thru 50 Left Southbound 3 Right 2 Thru 1 Left Northbound Almond St/Bundy Canyon Rd5 Intersection NameID 1443 Total Volume 381 Right 111 Left Westbound 1 Right 3 Thru 1 Left Eastbound 0 Right 207 Thru 402 Left Southbound 58 Right 279 Thru 0 Left Northbound Mission Trail/Bundy Canyon Rd4 Intersection NameID 2329 Total Volume 351 Right 504 Left Eastbound 445 Right 307 Thru Southbound 500 Thru 222 Left Northbound Mission Trail/Corydon Rd3 Intersection NameID 1861 Total Volume 47 Right 0 Thru 52 Left Westbound 0 Right 0 Thru 0 Left Eastbound 0 Right 707 Thru 54 Left Southbound 97 Right 904 Thru 0 Left Northbound Mission Trail/Lemon St2 Intersection NameID 1711 Total Volume 0 Right 0 Left Eastbound 0 Right 760 Thru Southbound 951 Thru 0 Left Northbound Mission Trail/Project Dwy1 Intersection NameID 8/19/202237EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with 2609 Total Volume 278 Right 440 Thru Westbound 847 Thru 130 Left Eastbound 440 Right 0 Thru 474 Left Northbound I-15 NB Ramps/Bundy Canyon Rd8 Intersection NameID 8/19/202238EPD Solutions Inc Existing PMMission Trail Residential Version 2022 (SP 0-8) Generated with Table of Contents Intersection Analysis Summary ...........................................................................................................................................................2 Intersection Level Of Service Report .................................................................................................................................................3 Intersection 1: Mission Trail/Project Dwy ...................................................................................................................3 Intersection 2: Mission Trail/Lemon St ........................................................................................................................5 Intersection 3: Mission Trail/Corydon Rd ................................................................................................................10 Intersection 4: Mission Trail/Bundy Canyon Rd ....................................................................................................15 Intersection 5: Almond St/Bundy Canyon Rd ........................................................................................................20 Intersection 6: Orange St/Bundy Canyon rd ...........................................................................................................22 Intersection 7: I-15 SB Ramps/Bundy Canyon Rd ................................................................................................27 Intersection 8: I-15 NB Ramps/Bundy Canyon Rd ...............................................................................................32 Turning Movement Volume: Summary .........................................................................................................................................37 8/19/20221EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with Intersection Analysis Summary 8/19/2022Report File: C:\...\Project Completion AM.pdf Scenario 3 Project Complettion AMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B17.30.608EB LeftHCM 7th EditionSignalizedI-15 NB Ramps/Bundy Canyon Rd8 C20.80.676SB LeftHCM 7th EditionSignalizedI-15 SB Ramps/Bundy Canyon Rd7 C33.70.572EB LeftHCM 7th EditionSignalizedOrange St/Bundy Canyon rd6 B11.70.425EB LeftHCM 7th EditionAll-way stopAlmond St/Bundy Canyon Rd5 B16.00.281WB LeftHCM 7th EditionSignalizedMission Trail/Bundy Canyon Rd4 B16.90.479NB LeftHCM 7th EditionSignalizedMission Trail/Corydon Rd3 A7.70.418SB LeftHCM 7th EditionSignalizedMission Trail/Lemon St2 D27.00.061EB LeftHCM 7th EditionTwo-way stopMission Trail/Project Dwy1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 8/19/20222EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.061Volume to Capacity (v/c): DLevel Of Service: 27.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Mission Trail/Project Dwy Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 25.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Project DwyMission TrailMission TrailName Intersection Setup 000Pedestrian Volume [ped/h] 6111387197741Total Analysis Volume [veh/h] 153121824410Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00000.87090.87090.78260.7826Peak Hour Factor 6111375976532Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 611130432Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0007307320Base Volume Input [veh/h] Project DwyMission TrailMission TrailName Volumes 8/19/20223EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with DIntersection LOS 0.88d_I, Intersection Delay [s/veh] CAAApproach LOS 16.440.000.53d_A, Approach Delay [s/veh] 16.8916.890.000.000.871.7595th-Percentile Queue Length [ft/ln] 0.680.680.000.000.030.0795th-Percentile Queue Length [veh/ln] BDAAABMovement LOS 14.5426.980.000.000.0013.05d_M, Delay for Movement [s/veh] 0.130.060.000.010.010.09V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 8/19/20224EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.418Volume to Capacity (v/c): ALevel Of Service: 7.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Mission Trail/Lemon St Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0030.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Lemon StLemon StMission TrailMission TrailName Intersection Setup 8/19/20225EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 390901534088261939650Total Analysis Volume [veh/h] 10023411022015232410Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.71000.71000.71001.00001.00001.00000.87090.87090.87090.78260.78260.7826Peak Hour Factor 280641534076853737550Total Hourly Volume [veh/h] 10005000002400Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 100203406100310Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 36062000068051936960Base Volume Input [veh/h] Lemon StLemon StMission TrailMission TrailName Volumes 8/19/20226EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000100070070Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 01400140046210250Split [s] 0.01.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Amber [s] 03000300030300300Maximum Green [s] 070070077070Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 040080025060Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/20227EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 79.188.313.7925.8125.8136.7915.6597.800.0095th-Percentile Queue Length [ft/ln] 3.170.330.151.031.031.470.633.910.0095th-Percentile Queue Length [veh/ln] 43.994.622.1014.3414.3420.448.6954.330.0050th-Percentile Queue Length [ft/ln] 1.760.180.080.570.570.820.352.170.0050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoYesNoCritical Lane Group CCCAACAAALane Group LOS 28.0423.1722.923.293.2928.625.467.490.00d, Delay for Lane Group [s/veh] 0.520.070.020.320.320.440.100.460.00X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.660.150.030.610.612.190.210.710.00d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.110.500.500.50k, delay calibration 26.3823.0222.892.682.6826.425.256.780.00d1, Uniform Delay [s] 249204310138113811389442115417c, Capacity [veh/h] 11491589168018701870178115893560629s, saturation flow rate [veh/h] 0.110.010.000.240.240.030.060.270.00(v / s)_i Volume / Saturation Flow Rate 0.130.130.130.740.740.080.590.590.59g / C, Green / Cycle 88844445363636g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 2.000.002.000.000.000.000.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 606060606060606060C, Cycle Length [s] CRCCCLRCLLane Group Lane Group Calculations 8/19/20228EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 7.49 5.46 28.62 3.29 3.29 22.92 22.92 23.17 28.04 28.04 28.04 Movement LOS A A A C A A C C C C C C d_A, Approach Delay [s/veh]7.31 4.93 23.09 28.04 Approach LOS A A C C d_I, Intersection Delay [s/veh]7.67 Intersection LOS A Intersection V/C 0.418 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 21.68 21.68 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 1.937 1.918 Crosswalk LOS F F A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]700 1400 333 333 d_b, Bicycle Delay [s]12.68 2.70 20.83 20.83 I_b,int, Bicycle LOS Score for Intersection 2.452 2.338 1.604 1.789 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-2-Ring 1 Sequence 8/19/20229EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.479Volume to Capacity (v/c): BLevel Of Service: 16.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Mission Trail/Corydon Rd Intersection Level Of Service Report YesNoYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 45.0050.0050.00Speed [mph] 0.00350.000.00120.000.000.00Exit Pocket Length [ft] 010100No. of Lanes in Exit Pocket 280.00310.00125.00100.00100.00200.00Entry Pocket Length [ft] 111001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Mission TrailMission TrailName Intersection Setup 8/19/202210EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 228539337502478284Total Analysis Volume [veh/h] 571358412612071Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.81970.81970.89240.89240.82420.8242Peak Hour Factor 187442301448394234Total Hourly Volume [veh/h] 630100000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 041269270Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 240421374364353225Base Volume Input [veh/h] Mission TrailMission TrailName Volumes 8/19/202211EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 2.02.02.02.02.02.0l2, Clearance Lost Time [s] 2.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 0172121100Pedestrian Clearance [s] 055550Walk [s] 3.03.03.03.03.03.0Vehicle Extension [s] 262630304919Split [s] 1.01.01.01.01.01.0All red [s] 3.03.03.03.03.03.0Amber [s] 303030303030Maximum Green [s] 777777Minimum Green [s] -Lead---LeadLead / Lag 1,82,3Auxiliary Signal Groups 832261Signal Group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 75Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202212EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 45.98194.6053.21104.4535.13219.5595th-Percentile Queue Length [ft/ln] 1.847.782.134.181.418.7895th-Percentile Queue Length [veh/ln] 25.55109.0029.5658.0319.52127.1050th-Percentile Queue Length [ft/ln] 1.024.361.182.320.785.0850th-Percentile Queue Length [veh/ln] NoYesYesNoNoYesCritical Lane Group BCABADLane Group LOS 12.9130.214.7113.504.2936.52d, Delay for Lane Group [s/veh] 0.180.770.300.310.190.87X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.071.880.680.500.186.83d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.500.11k, delay calibration 12.8428.334.0313.004.1129.68d1, Uniform Delay [s] 1235696112716182464328c, Capacity [veh/h] 281334591589356035601781s, saturation flow rate [veh/h] 0.080.160.210.140.130.16(v / s)_i Volume / Saturation Flow Rate 0.440.200.710.460.690.18g / C, Green / Cycle 331553345214g_i, Effective Green Time [s] 0.002.000.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 757575757575C, Cycle Length [s] RLRCCLLane Group Lane Group Calculations 8/19/202213EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]36.52 4.29 13.50 4.71 30.21 12.91 Movement LOS D A B A C B d_A, Approach Delay [s/veh]16.30 9.97 25.07 Approach LOS B A C d_I, Intersection Delay [s/veh]16.90 Intersection LOS B Intersection V/C 0.479 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]29.04 0.00 29.04 I_p,int, Pedestrian LOS Score for Intersection 2.798 0.000 2.913 Crosswalk LOS C F C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1200 693 587 d_b, Bicycle Delay [s]6.00 16.01 18.73 I_b,int, Bicycle LOS Score for Intersection 2.188 2.334 1.560 Bicycle LOS B B A ----------------Ring 4 ----------------Ring 3 ------------8-6-Ring 2 -------------321Ring 1 Sequence 8/19/202214EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.281Volume to Capacity (v/c): BLevel Of Service: 16.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Mission Trail/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0025.0050.0050.00Speed [mph] 320.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 220.00100.00100.00100.00100.00100.00100.00100.00300.00100.00100.00145.00Entry Pocket Length [ft] 100000002001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Intersection Setup 8/19/202215EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 2900740400257381603680Total Analysis Volume [veh/h] 730190100649515920Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.83771.00000.83770.25000.25000.25000.93430.93430.93430.79810.79810.7981Peak Hour Factor 2430620100240356482940Total Hourly Volume [veh/h] 81000000001600Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 230000001059040Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2890600100221286622790Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Volumes 8/19/202216EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.00.02.02.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.00.02.02.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 00211010001000140Pedestrian Clearance [s] 005550050050Walk [s] 0.00.03.03.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 0033333300261402311Split [s] 0.00.01.01.01.00.00.01.01.00.01.01.0All red [s] 0.00.03.03.03.00.00.03.03.00.03.03.0Amber [s] 0030303000303003030Maximum Green [s] 007770077077Minimum Green [s] --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 007880025061Signal Group OverlapPermissSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 70Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202217EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 54.962.868.738.73135.0444.9646.140.0095th-Percentile Queue Length [ft/ln] 2.200.110.350.355.401.801.850.0095th-Percentile Queue Length [veh/ln] 30.531.594.854.8575.0224.9825.630.0050th-Percentile Queue Length [ft/ln] 1.220.060.190.193.001.001.030.0050th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoNoCritical Lane Group CCAACAAALane Group LOS 33.1029.882.472.4732.666.296.250.00d, Delay for Lane Group [s/veh] 0.420.020.090.090.810.190.190.00X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.610.040.130.133.330.390.370.00d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.110.500.500.11k, delay calibration 31.4929.842.342.3429.335.905.890.00d1, Uniform Delay [s] 17519714041404472109411491c, Capacity [veh/h] 14121870187018703459178018701781s, saturation flow rate [veh/h] 0.050.000.070.070.110.120.120.00(v / s)_i Volume / Saturation Flow Rate 0.080.080.750.750.140.620.620.00g / C, Green / Cycle 5553531043430g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 2.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 7070707070707070C, Cycle Length [s] LCCCLCCLLane Group Lane Group Calculations 8/19/202218EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 6.27 6.29 32.66 2.47 2.47 29.88 29.88 29.88 33.10 0.00 0.00 Movement LOS A A A C A A C C C C d_A, Approach Delay [s/veh]6.27 20.50 29.88 33.10 Approach LOS A C C C d_I, Intersection Delay [s/veh]16.02 Intersection LOS B Intersection V/C 0.281 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 26.58 0.00 26.58 I_p,int, Pedestrian LOS Score for Intersection 0.000 2.714 0.000 2.294 Crosswalk LOS F B F B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]543 629 829 829 d_b, Bicycle Delay [s]18.58 16.46 12.01 12.01 I_b,int, Bicycle LOS Score for Intersection 1.926 2.086 1.566 1.560 Bicycle LOS A B A A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 ------------8-21Ring 1 Sequence 8/19/202219EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.425Volume to Capacity (v/c): BLevel Of Service: 11.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 5: Almond St/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 250.000.000.00250.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100100000000No. of Lanes in Exit Pocket 50.00100.00100.0050.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 100100000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 0000Pedestrian Volume [ped/h] 28408111953111218973108Total Analysis Volume [veh/h] 71023513335224802Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.94260.94260.94260.89660.89660.89660.89770.89770.89770.35710.35710.3571Peak Hour Factor 26385101747610197871103Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 02300590000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 25348101640110187841103Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202220EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with BIntersection LOS 11.69Intersection Delay [s/veh] BBBAApproach LOS 11.1412.2811.599.80Approach Delay [s/veh] 3.0636.7436.982.0052.7753.0722.215.5195th-Percentile Queue Length [ft] 0.121.471.480.082.112.120.890.2295th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.040.330.340.030.420.430.230.07Degree of Utilization, x 713626622731639637544569Capacity per Entry Lane [veh/h] Lanes Intersection Settings 8/19/202221EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.572Volume to Capacity (v/c): CLevel Of Service: 33.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Orange St/Bundy Canyon rd Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0035.0035.00Speed [mph] 0.000.000.000.000.000.00260.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket 100.00100.00200.00125.00100.00125.00260.00100.00100.00135.00100.00100.00Entry Pocket Length [ft] 001101100100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdOrange StOrange StName Intersection Setup 8/19/202222EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 705072021868924828250258641Total Analysis Volume [veh/h] 171275041726276365160Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.87320.87320.87320.78230.78230.78230.86270.86270.86270.77780.77780.7778Peak Hour Factor 614431761453919724216201501Total Hourly Volume [veh/h] 20005003006700Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 02300590000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 7840416918462181023208258481Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdOrange StOrange StName Volumes 8/19/202223EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0140014002100170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 030490264503000300Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 077077070070Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 047083020060Signal Group PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 105Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202224EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 239.18246.93234.73352.15354.3330.254.00205.57155.0033.2695th-Percentile Queue Length [ft/ln] 9.579.889.3914.0914.171.210.168.226.201.3395th-Percentile Queue Length [veh/ln] 141.60147.38138.30228.26229.9816.812.22116.9186.1118.4850th-Percentile Queue Length [ft/ln] 5.665.905.539.139.200.670.094.683.440.7450th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoYesNoNoCritical Lane Group CCDDDDBBBBLane Group LOS 29.7429.7052.5245.6045.5353.5911.4719.9214.5311.92d, Delay for Lane Group [s/veh] 0.500.500.850.870.870.390.010.450.300.06X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.680.648.105.955.883.990.022.370.920.12d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.500.50k, delay calibration 29.0629.0544.4239.6539.6449.6011.4517.5513.6111.81d1, Uniform Delay [s] 568593238404407618496178491032c, Capacity [veh/h] 1792187017811853187017811589103315891868s, saturation flow rate [veh/h] 0.160.160.110.190.190.010.010.270.160.03(v / s)_i Volume / Saturation Flow Rate 0.320.320.130.220.220.030.530.530.530.53g / C, Green / Cycle 3333142323456565656g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.002.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 105105105105105105105105105105C, Cycle Length [s] CCLCCLRCRCLane Group Lane Group Calculations 8/19/202225EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]11.92 11.92 14.53 19.92 19.92 11.47 53.59 45.56 45.60 52.52 29.72 29.74 Movement LOS B B B B B B D D D D C C d_A, Approach Delay [s/veh]14.00 19.68 45.83 35.63 Approach LOS B B D D d_I, Intersection Delay [s/veh]33.70 Intersection LOS C Intersection V/C 0.572 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]43.88 43.88 43.88 43.88 I_p,int, Pedestrian LOS Score for Intersection 2.418 2.277 2.644 3.229 Crosswalk LOS B B B C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]495 495 419 495 d_b, Bicycle Delay [s]29.72 29.72 32.80 29.72 I_b,int, Bicycle LOS Score for Intersection 2.203 2.036 2.167 2.219 Bicycle LOS B B B B ----------------Ring 4 ----------------Ring 3 ------------876-Ring 2 ------------432-Ring 1 Sequence 8/19/202226EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.676Volume to Capacity (v/c): CLevel Of Service: 20.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 7: I-15 SB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0065.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00320.00100.00100.00100.0025.00100.00310.00100.00100.00100.00Entry Pocket Length [ft] 001000101000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/19/202227EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 061039145753401551264000Total Analysis Volume [veh/h] 015298114133039066000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00000.91380.91380.89550.89551.00000.91560.91560.91561.00001.00001.0000Peak Hour Factor 055735740947801421242000Total Hourly Volume [veh/h] 000137004800000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 070203901600000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 052934350642201671233000Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202228EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.00.02.00.00.02.00.00.00.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.02.00.00.00.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0700300100000Pedestrian Clearance [s] 050050050000Walk [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Vehicle Extension [s] 0451902600150000Split [s] 0.01.01.00.01.00.00.01.00.00.00.00.0All red [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Amber [s] 0303003000300000Maximum Green [s] 077070070000Minimum Green [s] --Lead---------Lead / Lag Auxiliary Signal Groups 061020040000Signal Group PermissPermissProtectePermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202229EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 34.50229.90286.54248.2677.170.43150.7595th-Percentile Queue Length [ft/ln] 1.389.2011.469.933.090.026.0395th-Percentile Queue Length [veh/ln] 19.17134.72177.34148.3842.870.2483.7550th-Percentile Queue Length [ft/ln] 0.775.397.095.941.710.013.3550th-Percentile Queue Length [veh/ln] NoYesYesNoNoNoYesCritical Lane Group ACCCCCCLane Group LOS 3.7828.0629.1021.9824.0920.2929.30d, Delay for Lane Group [s/veh] 0.250.890.820.710.540.000.83X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.246.2212.085.961.620.005.50d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.110.500.500.110.110.11k, delay calibration 3.5321.8417.0216.0222.4720.2923.81d1, Uniform Delay [s] 2450440602700284335319c, Capacity [veh/h] 3560178116081870158918701781s, saturation flow rate [veh/h] 0.170.220.310.260.100.000.15(v / s)_i Volume / Saturation Flow Rate 0.690.250.380.380.180.180.18g / C, Green / Cycle 41152323111111g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060C, Cycle Length [s] CLCCRCLLane Group Lane Group Calculations 8/19/202230EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 0.00 0.00 29.30 20.29 24.09 0.00 22.50 29.10 28.06 3.78 0.00 Movement LOS C C C C C C A d_A, Approach Delay [s/veh]0.00 27.36 25.54 13.26 Approach LOS A C C B d_I, Intersection Delay [s/veh]20.76 Intersection LOS C Intersection V/C 0.676 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.72 21.72 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.365 2.319 0.000 0.000 Crosswalk LOS B B F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 366 732 1365 d_b, Bicycle Delay [s]30.04 20.05 12.07 3.03 I_b,int, Bicycle LOS Score for Intersection 4.132 2.332 2.490 2.385 Bicycle LOS D B B B ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 ------------4-21Ring 1 Sequence 8/19/202231EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.608Volume to Capacity (v/c): BLevel Of Service: 17.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 8: I-15 NB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0030.0065.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 300.00100.00100.00100.00100.00260.00100.00100.00100.0025.00100.00330.00Entry Pocket Length [ft] 100001000101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/19/202232EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 388697005352440001254257Total Analysis Volume [veh/h] 97174001346100031164Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96130.96131.00001.00000.91280.91281.00001.00001.00000.92570.92570.9257Peak Hour Factor 373670004882230001164238Total Hourly Volume [veh/h] 124000000003900Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000039000007Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 478644004691770001494222Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202233EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.02.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0300700000100Pedestrian Clearance [s] 050050000050Walk [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Vehicle Extension [s] 0120042300000180Split [s] 0.01.00.00.01.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Amber [s] 0300030300000300Maximum Green [s] 070077000070Minimum Green [s] -----Lead------Lead / Lag Auxiliary Signal Groups 060025000080Signal Group PermissPermissPermissPermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202234EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 249.55228.5929.60151.6460.111.72143.6095th-Percentile Queue Length [ft/ln] 9.989.141.186.072.400.075.7495th-Percentile Queue Length [veh/ln] 149.34133.7616.4584.2533.400.9679.7850th-Percentile Queue Length [ft/ln] 5.975.350.663.371.340.043.1950th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesCritical Lane Group BBACCCCLane Group LOS 19.7116.693.6628.6223.0320.3028.38d, Delay for Lane Group [s/veh] 0.730.650.220.800.440.010.80X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 6.153.820.214.731.060.014.72d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.500.110.110.110.11k, delay calibration 13.5712.873.4623.9021.9720.2923.66d1, Uniform Delay [s] 7458402448306285336320c, Capacity [veh/h] 1660187035601781158918701781s, saturation flow rate [veh/h] 0.330.290.150.140.080.000.14(v / s)_i Volume / Saturation Flow Rate 0.450.450.690.170.180.180.18g / C, Green / Cycle 27274110111111g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060C, Cycle Length [s] CCCLRCLLane Group Lane Group Calculations 8/19/202235EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]28.38 20.30 23.03 0.00 0.00 0.00 28.62 3.66 0.00 0.00 17.36 19.71 Movement LOS C C C C A B B d_A, Approach Delay [s/veh]26.56 0.00 11.48 18.20 Approach LOS C A B B d_I, Intersection Delay [s/veh]17.31 Intersection LOS B Intersection V/C 0.608 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.72 21.72 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.276 2.145 0.000 0.000 Crosswalk LOS B B F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]466 0 1265 266 d_b, Bicycle Delay [s]17.67 30.04 4.06 22.57 I_b,int, Bicycle LOS Score for Intersection 2.261 4.132 2.202 2.557 Bicycle LOS B D B B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 --------------2-Ring 1 Sequence 8/19/202236EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with Turning Movement Volume: Summary 8/19/2022Report File: C:\...\Project Completion AM.pdf Scenario 3 Project Complettion AMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential 2371 Total Volume 557 Thru 357 Left Westbound 546 Right 478 Thru Eastbound 190 Right 1 Thru 242 Left Southbound I-15 SB Ramps/Bundy Canyon Rd7 Intersection NameID 1846 Total Volume 81 Right 443 Thru 176 Left Westbound 19 Right 539 Thru 19 Left Eastbound 10 Right 24 Thru 216 Left Southbound 268 Right 50 Thru 1 Left Northbound Orange St/Bundy Canyon rd6 Intersection NameID 1051 Total Volume 26 Right 385 Thru 10 Left Westbound 17 Right 476 Thru 10 Left Eastbound 19 Right 7 Thru 87 Left Southbound 11 Right 0 Thru 3 Left Northbound Almond St/Bundy Canyon Rd5 Intersection NameID 1341 Total Volume 324 Right 62 Left Westbound 0 Right 1 Thru 0 Left Eastbound 0 Right 240 Thru 356 Left Southbound 64 Right 294 Thru 0 Left Northbound Mission Trail/Bundy Canyon Rd4 Intersection NameID 2169 Total Volume 250 Right 442 Left Eastbound 401 Right 448 Thru Southbound 394 Thru 234 Left Northbound Mission Trail/Corydon Rd3 Intersection NameID 1802 Total Volume 38 Right 0 Thru 64 Left Westbound 20 Right 3 Thru 4 Left Eastbound 0 Right 768 Thru 53 Left Southbound 97 Right 755 Thru 0 Left Northbound Mission Trail/Lemon St2 Intersection NameID 1631 Total Volume 61 Right 11 Left Eastbound 3 Right 759 Thru Southbound 765 Thru 32 Left Northbound Mission Trail/Project Dwy1 Intersection NameID 8/19/202237EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with 2275 Total Volume 497 Right 670 Thru Westbound 488 Thru 223 Left Eastbound 155 Right 4 Thru 238 Left Northbound I-15 NB Ramps/Bundy Canyon Rd8 Intersection NameID 8/19/202238EPD Solutions Inc Project Completion AMMission Trail Residential Version 2022 (SP 0-8) Generated with Table of Contents Intersection Analysis Summary ...........................................................................................................................................................2 Intersection Level Of Service Report .................................................................................................................................................3 Intersection 1: Mission Trail/Project Dwy ...................................................................................................................3 Intersection 2: Mission Trail/Lemon St ........................................................................................................................5 Intersection 3: Mission Trail/Corydon Rd ................................................................................................................10 Intersection 4: Mission Trail/Bundy Canyon Rd ....................................................................................................15 Intersection 5: Almond St/Bundy Canyon Rd ........................................................................................................20 Intersection 6: Orange St/Bundy Canyon rd ...........................................................................................................22 Intersection 7: I-15 SB Ramps/Bundy Canyon Rd ................................................................................................27 Intersection 8: I-15 NB Ramps/Bundy Canyon Rd ...............................................................................................32 Turning Movement Volume: Summary .........................................................................................................................................37 8/19/20221EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with Intersection Analysis Summary 8/19/2022Report File: C:\...\Project Completion PM.pdf Scenario 4 Project Completion PMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B19.40.625EB LeftHCM 7th EditionSignalizedI-15 NB Ramps/Bundy Canyon Rd8 C23.70.713EB RightHCM 7th EditionSignalizedI-15 SB Ramps/Bundy Canyon Rd7 E62.86.942SB LeftHCM 7th EditionSignalizedOrange St/Bundy Canyon rd6 B14.20.557WB ThruHCM 7th EditionAll-way stopAlmond St/Bundy Canyon Rd5 C21.70.485SB LeftHCM 7th EditionSignalizedMission Trail/Bundy Canyon Rd4 B15.70.481NB LeftHCM 7th EditionSignalizedMission Trail/Corydon Rd3 A7.70.444SB LeftHCM 7th EditionSignalizedMission Trail/Lemon St2 E40.80.066EB LeftHCM 7th EditionTwo-way stopMission Trail/Project Dwy1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 8/19/20222EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.066Volume to Capacity (v/c): ELevel Of Service: 40.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Mission Trail/Project Dwy Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 25.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Project DwyMission TrailMission TrailName Intersection Setup 000Pedestrian Volume [ped/h] 417109031024109Total Analysis Volume [veh/h] 102322625627Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00000.87500.87500.96750.9675Peak Hour Factor 4179790991105Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 417902105Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0007609510Base Volume Input [veh/h] Project DwyMission TrailMission TrailName Volumes 8/19/20223EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with EIntersection LOS 1.13d_I, Intersection Delay [s/veh] CAAApproach LOS 18.490.001.30d_A, Approach Delay [s/veh] 13.2913.290.000.002.424.8395th-Percentile Queue Length [ft/ln] 0.530.530.000.000.100.1995th-Percentile Queue Length [veh/ln] BEAAABMovement LOS 14.6940.770.000.000.0013.48d_M, Delay for Movement [s/veh] 0.090.070.000.010.010.25V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 8/19/20224EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.444Volume to Capacity (v/c): ALevel Of Service: 7.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Mission Trail/Lemon St Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0030.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Lemon StLemon StMission TrailMission TrailName Intersection Setup 8/19/20225EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 5307410220887647910770Total Analysis Volume [veh/h] 13018311022216202690Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.73330.73330.73331.00001.00001.00000.87500.87500.87500.96750.96750.9675Peak Hour Factor 3905410220776567610420Total Hourly Volume [veh/h] 13004000002500Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 3001422041001020Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 47052000070754979040Base Volume Input [veh/h] Lemon StLemon StMission TrailMission TrailName Volumes 8/19/20226EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000100070070Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 01400140046210250Split [s] 0.01.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Amber [s] 03000300030300300Maximum Green [s] 070070077070Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 040080025060Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/20227EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 78.255.582.1822.7722.7738.5212.82111.590.0095th-Percentile Queue Length [ft/ln] 3.130.220.090.910.911.540.514.460.0095th-Percentile Queue Length [veh/ln] 43.473.101.2112.6512.6521.407.1262.000.0050th-Percentile Queue Length [ft/ln] 1.740.120.050.510.510.860.282.480.0050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoYesNoCritical Lane Group CCCAACAAALane Group LOS 28.2123.4423.253.143.1428.585.247.760.00d, Delay for Lane Group [s/veh] 0.530.050.010.320.320.450.080.500.00X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.780.110.020.600.602.230.170.860.00d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.110.500.500.50k, delay calibration 26.4223.3323.232.542.5426.355.076.910.00d1, Uniform Delay [s] 241192298139413941429532134420c, Capacity [veh/h] 12071589171618701870178115893560626s, saturation flow rate [veh/h] 0.110.010.000.240.240.040.050.300.00(v / s)_i Volume / Saturation Flow Rate 0.120.120.120.740.740.080.600.600.60g / C, Green / Cycle 77745455363636g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 2.000.002.000.000.000.000.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 606060606060606060C, Cycle Length [s] CRCCCLRCLLane Group Lane Group Calculations 8/19/20228EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 7.76 5.24 28.58 3.14 3.14 23.25 23.25 23.44 28.21 28.21 28.21 Movement LOS A A A C A A C C C C C C d_A, Approach Delay [s/veh]7.59 4.86 23.39 28.21 Approach LOS A A C C d_I, Intersection Delay [s/veh]7.70 Intersection LOS A Intersection V/C 0.444 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 21.68 21.68 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 1.932 1.916 Crosswalk LOS F F A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]700 1400 333 333 d_b, Bicycle Delay [s]12.68 2.70 20.83 20.83 I_b,int, Bicycle LOS Score for Intersection 2.534 2.344 1.589 1.791 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-2-Ring 1 Sequence 8/19/20229EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.481Volume to Capacity (v/c): BLevel Of Service: 15.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Mission Trail/Corydon Rd Intersection Level Of Service Report YesNoYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 45.0050.0050.00Speed [mph] 0.00350.000.00120.000.000.00Exit Pocket Length [ft] 010100No. of Lanes in Exit Pocket 280.00310.00125.00100.00100.00200.00Entry Pocket Length [ft] 111001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Mission TrailMission TrailName Intersection Setup 8/19/202210EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 287564370383657250Total Analysis Volume [veh/h] 72141939616462Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95380.95380.95310.95310.92530.9253Peak Hour Factor 274538353365608231Total Hourly Volume [veh/h] 910118000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 014846880Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 351504445307500222Base Volume Input [veh/h] Mission TrailMission TrailName Volumes 8/19/202211EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 2.02.02.02.02.02.0l2, Clearance Lost Time [s] 2.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 0172121100Pedestrian Clearance [s] 055550Walk [s] 3.03.03.03.03.03.0Vehicle Extension [s] 262630304919Split [s] 1.01.01.01.01.01.0All red [s] 3.03.03.03.03.03.0Amber [s] 303030303030Maximum Green [s] 777777Minimum Green [s] -Lead---LeadLead / Lag 1,82,3Auxiliary Signal Groups 832261Signal Group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 75Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202212EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 60.54200.9752.4974.7054.40197.4295th-Percentile Queue Length [ft/ln] 2.428.042.102.992.187.9095th-Percentile Queue Length [veh/ln] 33.64113.5829.1641.5030.22111.0250th-Percentile Queue Length [ft/ln] 1.354.541.171.661.214.4450th-Percentile Queue Length [veh/ln] NoYesYesNoNoYesCritical Lane Group BCABADLane Group LOS 13.6429.904.4312.464.8636.22d, Delay for Lane Group [s/veh] 0.240.780.320.230.270.83X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.101.870.740.330.276.04d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.500.11k, delay calibration 13.5428.033.6912.134.5830.18d1, Uniform Delay [s] 1212723115216472436300c, Capacity [veh/h] 281334591589356035601781s, saturation flow rate [veh/h] 0.100.160.230.110.180.14(v / s)_i Volume / Saturation Flow Rate 0.430.210.730.460.680.17g / C, Green / Cycle 321654355113g_i, Effective Green Time [s] 0.002.000.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 757575757575C, Cycle Length [s] RLRCCLLane Group Lane Group Calculations 8/19/202213EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]36.22 4.86 12.46 4.43 29.90 13.64 Movement LOS D A B A C B d_A, Approach Delay [s/veh]13.50 8.52 24.42 Approach LOS B A C d_I, Intersection Delay [s/veh]15.71 Intersection LOS B Intersection V/C 0.481 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]29.04 0.00 29.04 I_p,int, Pedestrian LOS Score for Intersection 2.834 0.000 2.984 Crosswalk LOS C F C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1200 693 587 d_b, Bicycle Delay [s]6.00 16.01 18.73 I_b,int, Bicycle LOS Score for Intersection 2.308 2.278 1.560 Bicycle LOS B B A ----------------Ring 4 ----------------Ring 3 ------------8-6-Ring 2 -------------321Ring 1 Sequence 8/19/202214EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.485Volume to Capacity (v/c): CLevel Of Service: 21.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Mission Trail/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0025.0050.0050.00Speed [mph] 320.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 220.00100.00100.00100.00100.00100.00100.00100.00300.00100.00100.00145.00Entry Pocket Length [ft] 100000002001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Intersection Setup 8/19/202215EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 39501282720242498473160Total Analysis Volume [veh/h] 9903212106012512790Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89631.00000.89630.41670.41670.41670.91890.91890.91890.95250.95250.9525Peak Hour Factor 35401151310222458453010Total Hourly Volume [veh/h] 118000000001500Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 760000007400110Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 38101111310207402582790Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Volumes 8/19/202216EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 2.00.02.02.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 2.00.02.02.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 00211010001000140Pedestrian Clearance [s] 005550050050Walk [s] 3.00.03.03.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 21030303000191702321Split [s] 1.00.01.01.01.00.00.01.01.00.01.01.0All red [s] 3.00.03.03.03.00.00.03.03.00.03.03.0Amber [s] 30030303000303003030Maximum Green [s] 707770077077Minimum Green [s] --Lead-----Lead--LeadLead / Lag 1,7Auxiliary Signal Groups 107880025061Signal Group OverlapPermissSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 70Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202217EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 237.3871.615.9030.4530.45173.5079.6581.360.0095th-Percentile Queue Length [ft/ln] 9.502.860.241.221.226.943.193.250.0095th-Percentile Queue Length [veh/ln] 140.2639.783.2816.9116.9196.3944.2545.200.0050th-Percentile Queue Length [ft/ln] 5.611.590.130.680.683.861.771.810.0050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoNoCritical Lane Group CCBAACBBALane Group LOS 24.4621.2719.047.417.4131.3815.2415.160.00d, Delay for Lane Group [s/veh] 0.770.300.020.120.120.840.260.250.00X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.180.390.020.220.223.300.880.820.00d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.140.110.110.500.500.110.500.500.11k, delay calibration 21.2820.8819.037.197.1928.0814.3714.340.00d1, Uniform Delay [s] 515426502105010505937017343c, Capacity [veh/h] 158914061664187018703459178718701781s, saturation flow rate [veh/h] 0.250.090.010.060.060.140.100.100.00(v / s)_i Volume / Saturation Flow Rate 0.320.270.270.560.560.170.390.390.00g / C, Green / Cycle 23191939391227270g_i, Effective Green Time [s] 0.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 707070707070707070C, Cycle Length [s] RLCCCLCCLLane Group Lane Group Calculations 8/19/202218EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 15.19 15.24 31.38 7.41 7.41 19.04 19.04 19.04 21.27 0.00 24.46 Movement LOS A B B C A A B B B C C d_A, Approach Delay [s/veh]15.20 23.54 19.04 23.68 Approach LOS B C B C d_I, Intersection Delay [s/veh]21.70 Intersection LOS C Intersection V/C 0.485 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 26.58 0.00 26.58 I_p,int, Pedestrian LOS Score for Intersection 0.000 2.870 0.000 2.680 Crosswalk LOS F C F B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]543 429 743 743 d_b, Bicycle Delay [s]18.58 21.61 13.83 13.83 I_b,int, Bicycle LOS Score for Intersection 1.871 2.170 1.578 1.560 Bicycle LOS A B A A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 ------------8-21Ring 1 Sequence 8/19/202219EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.557Volume to Capacity (v/c): BLevel Of Service: 14.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 5: Almond St/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 250.000.000.00250.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100100000000No. of Lanes in Exit Pocket 50.00100.00100.0050.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 100100000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 0000Pedestrian Volume [ped/h] 5270900611415072853Total Analysis Volume [veh/h] 131770015314018211Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89140.89140.89140.92070.92070.92070.72370.72370.72370.37500.37500.3750Peak Hour Factor 4663200563411052321Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 07600400000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4453500503411050321Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202220EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with BIntersection LOS 14.21Intersection Delay [s/veh] BBBBApproach LOS 14.7613.9611.8010.37Approach Delay [s/veh] 5.7786.0586.050.0068.2168.3415.772.4595th-Percentile Queue Length [ft] 0.233.443.440.002.732.730.630.1095th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.070.560.560.000.490.490.180.03Degree of Utilization, x 727636636624624623496505Capacity per Entry Lane [veh/h] Lanes Intersection Settings 8/19/202221EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 6.942Volume to Capacity (v/c): ELevel Of Service: 62.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Orange St/Bundy Canyon rd Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0035.0035.00Speed [mph] 0.000.000.000.000.000.00260.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket 100.00100.00200.00125.00100.00125.00260.00100.00100.00135.00100.00100.00Entry Pocket Length [ft] 001101100100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdOrange StOrange StName Intersection Setup 8/19/202222EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 10475419517650268242031592914Total Analysis Volume [veh/h] 26188494162626514074Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89530.89530.89530.89290.89290.89290.77940.77940.77940.75910.75910.7591Peak Hour Factor 9367517515580236191581212211Total Hourly Volume [veh/h] 31005002004000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 07600400000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 11957616819519228181521552111Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdOrange StOrange StName Volumes 8/19/202223EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0140014001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 023110231102600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 077077070070Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 061025040080Signal Group PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202224EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 198.27203.88154.61175.51176.6617.472.77692.6761.2016.0595th-Percentile Queue Length [ft/ln] 7.938.166.187.027.070.700.1127.712.450.6495th-Percentile Queue Length [veh/ln] 111.63115.6885.9097.5098.149.701.54384.8234.008.9250th-Percentile Queue Length [ft/ln] 4.474.633.443.903.930.390.0615.391.360.3650th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoYesNoNoCritical Lane Group BBDCCCBFBBLane Group LOS 18.2918.1342.4221.0020.9630.4812.18420.3313.7015.54d, Delay for Lane Group [s/veh] 0.600.600.930.570.560.340.011.800.270.21X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.753.5916.143.903.862.540.01391.530.250.48d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.110.500.500.110.110.500.110.11k, delay calibration 14.5414.5426.2917.0917.0927.9412.1728.8013.4515.05d1, Uniform Delay [s] 70273221058859377581126581209c, Capacity [veh/h] 1792187017811853187017811589341589354s, saturation flow rate [veh/h] 0.230.230.110.180.180.010.016.650.100.12(v / s)_i Volume / Saturation Flow Rate 0.390.390.120.320.320.040.370.370.370.37g / C, Green / Cycle 242471919322222222g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.002.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060606060C, Cycle Length [s] CCLCCLRCRCLane Group Lane Group Calculations 8/19/202225EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]15.54 15.54 13.70 420.33 420.33 12.18 30.48 20.98 21.00 42.42 18.20 18.29 Movement LOS B B B F F B C C C D B B d_A, Approach Delay [s/veh]14.09 406.43 21.33 22.69 Approach LOS B F C C d_I, Intersection Delay [s/veh]62.78 Intersection LOS E Intersection V/C 6.942 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.72 21.72 21.72 21.72 I_p,int, Pedestrian LOS Score for Intersection 2.306 2.236 2.691 3.169 Crosswalk LOS B B B C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]732 732 632 632 d_b, Bicycle Delay [s]12.07 12.07 14.05 14.05 I_b,int, Bicycle LOS Score for Intersection 1.959 1.951 2.135 2.454 Bicycle LOS A A B B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence 8/19/202226EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.713Volume to Capacity (v/c): CLevel Of Service: 23.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 7: I-15 SB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0065.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00320.00100.00100.00100.0025.00100.00310.00100.00100.00100.00Entry Pocket Length [ft] 001000101000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/19/202227EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 088619328869402241560000Total Analysis Volume [veh/h] 022248721740560140000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00000.90040.90040.81670.81671.00000.85230.85230.85231.00001.00001.0000Peak Hour Factor 079817423556701911477000Total Hourly Volume [veh/h] 00079006400000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0230132605400000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 074516728952001931459000Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202228EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.00.02.00.00.02.00.00.00.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.02.00.00.00.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000300100000Pedestrian Clearance [s] 050050050000Walk [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Vehicle Extension [s] 0361202400240000Split [s] 0.01.01.00.01.00.00.01.00.00.00.00.0All red [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Amber [s] 0303003000300000Maximum Green [s] 077070070000Minimum Green [s] --Lead---------Lead / Lag Auxiliary Signal Groups 061020040000Signal Group PermissPermissProtectePermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202229EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 127.89126.62316.36279.9781.810.31299.9595th-Percentile Queue Length [ft/ln] 5.125.0612.6511.203.270.0112.0095th-Percentile Queue Length [veh/ln] 71.0570.35200.31172.3245.450.17187.6350th-Percentile Queue Length [ft/ln] 2.842.818.016.891.820.017.5150th-Percentile Queue Length [veh/ln] NoYesYesNoNoNoYesCritical Lane Group ACDCBBCLane Group LOS 9.5231.3335.5928.0116.1713.4432.09d, Delay for Lane Group [s/veh] 0.470.800.870.790.420.000.94X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.826.0416.699.800.540.0012.50d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.110.500.500.110.110.18k, delay calibration 8.7025.2918.9018.2115.6313.4319.59d1, Uniform Delay [s] 1903241564622529622593c, Capacity [veh/h] 3560178116951870158918701781s, saturation flow rate [veh/h] 0.250.110.290.260.140.000.31(v / s)_i Volume / Saturation Flow Rate 0.530.130.330.330.330.330.33g / C, Green / Cycle 3282020202020g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060C, Cycle Length [s] CLCCRCLLane Group Lane Group Calculations 8/19/202230EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 0.00 0.00 32.09 13.44 16.17 0.00 30.23 35.59 31.33 9.52 0.00 Movement LOS C B B C D C A d_A, Approach Delay [s/veh]0.00 27.52 31.80 13.42 Approach LOS A C C B d_I, Intersection Delay [s/veh]23.65 Intersection LOS C Intersection V/C 0.713 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.76 21.76 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 1.951 2.610 0.000 0.000 Crosswalk LOS A B F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 665 665 1064 d_b, Bicycle Delay [s]30.08 13.41 13.41 6.59 I_b,int, Bicycle LOS Score for Intersection 4.132 2.960 2.435 2.450 Bicycle LOS D C B B ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 ------------4-21Ring 1 Sequence 8/19/202231EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.625Volume to Capacity (v/c): BLevel Of Service: 19.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 8: I-15 NB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0030.0065.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 300.00100.00100.00100.00100.00260.00100.00100.00100.0025.00100.00330.00Entry Pocket Length [ft] 100001000101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/19/202232EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 232489009701770003680554Total Analysis Volume [veh/h] 581220024244000920138Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.93710.93711.00001.00000.90830.90831.00001.00001.00000.93150.93150.9315Peak Hour Factor 217458008811610003430516Total Hourly Volume [veh/h] 720000000011500Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00000260000023Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 278440008471300004400474Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/19/202233EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.02.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0300700000100Pedestrian Clearance [s] 050050000050Walk [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Vehicle Extension [s] 0120036240000240Split [s] 0.01.00.00.01.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Amber [s] 0300030300000300Maximum Green [s] 070077000070Minimum Green [s] -----Lead------Lead / Lag Auxiliary Signal Groups 060025000080Signal Group PermissPermissPermissPermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/19/202234EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 195.18184.01145.02114.48154.270.00288.4595th-Percentile Queue Length [ft/ln] 7.817.365.804.586.170.0011.5495th-Percentile Queue Length [veh/ln] 109.41102.2380.5763.6085.710.00178.8050th-Percentile Queue Length [ft/ln] 4.384.093.222.543.430.007.1550th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesCritical Lane Group CCACBACLane Group LOS 22.1220.039.9630.6519.070.0030.37d, Delay for Lane Group [s/veh] 0.630.570.510.770.700.000.93X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 5.343.700.985.331.650.0010.95d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.500.110.110.110.17k, delay calibration 16.7816.338.9825.3217.410.0019.42d1, Uniform Delay [s] 5686321901230529623593c, Capacity [veh/h] 1679187035601781158918701781s, saturation flow rate [veh/h] 0.210.190.270.100.230.000.31(v / s)_i Volume / Saturation Flow Rate 0.340.340.530.130.330.330.33g / C, Green / Cycle 2020328202020g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060C, Cycle Length [s] CCCLRCLLane Group Lane Group Calculations 8/19/202235EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]30.37 0.00 19.07 0.00 0.00 0.00 30.65 9.96 0.00 0.00 20.58 22.12 Movement LOS C A B C A C C d_A, Approach Delay [s/veh]25.86 0.00 13.15 21.07 Approach LOS C A B C d_I, Intersection Delay [s/veh]19.40 Intersection LOS B Intersection V/C 0.625 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.72 21.72 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.815 1.873 0.000 0.000 Crosswalk LOS C A F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]666 0 1065 266 d_b, Bicycle Delay [s]13.37 30.04 6.56 22.57 I_b,int, Bicycle LOS Score for Intersection 3.271 4.132 2.506 2.214 Bicycle LOS C D B B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 --------------2-Ring 1 Sequence 8/19/202236EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with Turning Movement Volume: Summary 8/19/2022Report File: C:\...\Project Completion PM.pdf Scenario 4 Project Completion PMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential 2586 Total Volume 798 Thru 174 Left Westbound 314 Right 567 Thru Eastbound 255 Right 1 Thru 477 Left Southbound I-15 SB Ramps/Bundy Canyon Rd7 Intersection NameID 1976 Total Volume 124 Right 675 Thru 175 Left Westbound 20 Right 580 Thru 23 Left Eastbound 8 Right 19 Thru 158 Left Southbound 161 Right 22 Thru 11 Left Northbound Orange St/Bundy Canyon rd6 Intersection NameID 1314 Total Volume 46 Right 632 Thru 0 Left Westbound 0 Right 563 Thru 4 Left Eastbound 11 Right 0 Thru 52 Left Southbound 3 Right 2 Thru 1 Left Northbound Almond St/Bundy Canyon Rd5 Intersection NameID 1633 Total Volume 472 Right 115 Left Westbound 1 Right 3 Thru 1 Left Eastbound 0 Right 222 Thru 458 Left Southbound 60 Right 301 Thru 0 Left Northbound Mission Trail/Bundy Canyon Rd4 Intersection NameID 2578 Total Volume 365 Right 538 Left Eastbound 471 Right 365 Thru Southbound 608 Thru 231 Left Northbound Mission Trail/Corydon Rd3 Intersection NameID 2099 Total Volume 52 Right 0 Thru 54 Left Westbound 14 Right 2 Thru 2 Left Eastbound 0 Right 776 Thru 56 Left Southbound 101 Right 1042 Thru 0 Left Northbound Mission Trail/Lemon St2 Intersection NameID 1943 Total Volume 41 Right 7 Left Eastbound 9 Right 790 Thru Southbound 991 Thru 105 Left Northbound Mission Trail/Project Dwy1 Intersection NameID 8/19/202237EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with 2763 Total Volume 289 Right 458 Thru Westbound 881 Thru 161 Left Eastbound 458 Right 0 Thru 516 Left Northbound I-15 NB Ramps/Bundy Canyon Rd8 Intersection NameID 8/19/202238EPD Solutions Inc Project Completion PMMission Trail Residential Version 2022 (SP 0-8) Generated with Table of Contents Intersection Analysis Summary ...........................................................................................................................................................2 Intersection Level Of Service Report .................................................................................................................................................3 Intersection 1: Mission Trail/Project Dwy ...................................................................................................................3 Intersection 2: Mission Trail/Lemon St ........................................................................................................................5 Intersection 3: Mission Trail/Corydon Rd ................................................................................................................10 Intersection 4: Mission Trail/Bundy Canyon Rd ....................................................................................................15 Intersection 5: Almond St/Bundy Canyon Rd ........................................................................................................20 Intersection 6: Orange St/Bundy Canyon rd ...........................................................................................................22 Intersection 7: I-15 SB Ramps/Bundy Canyon Rd ................................................................................................27 Intersection 8: I-15 NB Ramps/Bundy Canyon Rd ...............................................................................................32 Turning Movement Volume: Summary .........................................................................................................................................37 8/18/20221EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with Intersection Analysis Summary 8/18/2022Report File: C:\...\Cumulative AM.pdf Scenario 5 Cumulative AMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C23.20.741NB RightHCM 7th EditionSignalizedI-15 NB Ramps/Bundy Canyon Rd8 E56.00.913SB LeftHCM 7th EditionSignalizedI-15 SB Ramps/Bundy Canyon Rd7 D38.80.604EB LeftHCM 7th EditionSignalizedOrange St/Bundy Canyon rd6 B13.50.525EB LeftHCM 7th EditionAll-way stopAlmond St/Bundy Canyon Rd5 B15.70.376WB LeftHCM 7th EditionSignalizedMission Trail/Bundy Canyon Rd4 B19.80.609NB LeftHCM 7th EditionSignalizedMission Trail/Corydon Rd3 B13.30.642SB LeftHCM 7th EditionSignalizedMission Trail/Lemon St2 F50.80.123EB LeftHCM 7th EditionTwo-way stopMission Trail/Project Dwy1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 8/18/20222EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.123Volume to Capacity (v/c): FLevel Of Service: 50.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Mission Trail/Project Dwy Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 25.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Project DwyMission TrailMission TrailName Intersection Setup 000Pedestrian Volume [ped/h] 611131179145241Total Analysis Volume [veh/h] 153129536310Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00000.87090.87090.78260.7826Peak Hour Factor 611131027113632Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 6111326837532Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0007307320Base Volume Input [veh/h] Project DwyMission TrailMission TrailName Volumes 8/18/20223EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with FIntersection LOS 0.89d_I, Intersection Delay [s/veh] CAAApproach LOS 24.500.000.45d_A, Approach Delay [s/veh] 28.0228.020.000.000.871.7595th-Percentile Queue Length [ft/ln] 1.121.120.000.000.030.0795th-Percentile Queue Length [veh/ln] CFAAACMovement LOS 19.7650.800.000.000.0016.32d_M, Delay for Movement [s/veh] 0.160.120.000.010.010.13V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 8/18/20224EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.642Volume to Capacity (v/c): BLevel Of Service: 13.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Mission Trail/Lemon St Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0030.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Lemon StLemon StMission TrailMission TrailName Intersection Setup 8/18/20225EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 14535961522362210921309712730Total Analysis Volume [veh/h] 36924469527332243180Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.71000.71000.71001.00001.00001.00000.87090.87090.87090.78260.78260.7826Peak Hour Factor 103256815223619951113769960Total Hourly Volume [veh/h] 34005006002500Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 100254202236252446042720Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 36062000068051936960Base Volume Input [veh/h] Lemon StLemon StMission TrailMission TrailName Volumes 8/18/20226EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000100070070Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 01600160044220220Split [s] 0.01.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Amber [s] 03000300030300300Maximum Green [s] 070070077070Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 040080025060Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/20227EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 178.047.3629.1581.0481.4180.5324.65224.220.0095th-Percentile Queue Length [ft/ln] 7.120.291.173.243.263.220.998.970.0095th-Percentile Queue Length [veh/ln] 98.914.0916.2045.0245.2344.7413.70130.540.0050th-Percentile Queue Length [ft/ln] 3.960.160.651.801.811.790.555.220.0050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoYesNoCritical Lane Group CBCAACABALane Group LOS 29.3019.4420.075.935.9230.208.5214.610.00d, Delay for Lane Group [s/veh] 0.810.050.170.450.450.690.120.720.00X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 4.490.060.241.181.174.350.322.630.00d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.110.500.500.50k, delay calibration 24.8119.3819.834.754.7525.848.1911.970.00d1, Uniform Delay [s] 342318337123812471897851758276c, Capacity [veh/h] 13081589120018571870178115893560506s, saturation flow rate [veh/h] 0.210.010.050.300.300.070.060.360.00(v / s)_i Volume / Saturation Flow Rate 0.200.200.200.670.670.100.500.500.50g / C, Green / Cycle 12121240406303030g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 2.000.002.000.000.000.000.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 606060606060606060C, Cycle Length [s] CRCCCLRCLLane Group Lane Group Calculations 8/18/20228EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 14.61 8.52 30.20 5.93 5.93 20.07 20.07 19.44 29.30 29.30 29.30 Movement LOS A B A C A A C C B C C C d_A, Approach Delay [s/veh]14.18 8.46 19.94 29.30 Approach LOS B A B C d_I, Intersection Delay [s/veh]13.33 Intersection LOS B Intersection V/C 0.642 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 21.68 21.68 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 1.974 2.123 Crosswalk LOS F F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]600 1333 400 400 d_b, Bicycle Delay [s]14.70 3.33 19.20 19.20 I_b,int, Bicycle LOS Score for Intersection 2.710 2.591 1.688 2.071 Bicycle LOS B B A B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-2-Ring 1 Sequence 8/18/20229EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.609Volume to Capacity (v/c): BLevel Of Service: 19.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Mission Trail/Corydon Rd Intersection Level Of Service Report YesNoYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 45.0050.0050.00Speed [mph] 0.00350.000.00120.000.000.00Exit Pocket Length [ft] 010100No. of Lanes in Exit Pocket 280.00310.00125.00100.00100.00200.00Entry Pocket Length [ft] 111001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Mission TrailMission TrailName Intersection Setup 8/18/202210EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 259690408648625392Total Analysis Volume [veh/h] 6517310216215698Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.81970.81970.89240.89240.82420.8242Peak Hour Factor 212566364578515323Total Hourly Volume [veh/h] 710122000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 331289719914889Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 240421374364353225Base Volume Input [veh/h] Mission TrailMission TrailName Volumes 8/18/202211EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 2.02.02.02.02.02.0l2, Clearance Lost Time [s] 2.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 0172121100Pedestrian Clearance [s] 055550Walk [s] 3.03.03.03.03.03.0Vehicle Extension [s] 262630305424Split [s] 1.01.01.01.01.01.0All red [s] 3.03.03.03.03.03.0Amber [s] 303030303030Maximum Green [s] 777777Minimum Green [s] -Lead---LeadLead / Lag 1,82,3Auxiliary Signal Groups 832261Signal Group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 80Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/202212EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 44.83251.85108.21191.5767.14308.2595th-Percentile Queue Length [ft/ln] 1.7910.074.337.662.6912.3395th-Percentile Queue Length [veh/ln] 24.91151.0760.11106.8237.30194.0350th-Percentile Queue Length [ft/ln] 1.006.042.404.271.497.7650th-Percentile Queue Length [veh/ln] NoYesYesNoNoYesCritical Lane Group ACACADLane Group LOS 9.8031.427.3820.695.8139.49d, Delay for Lane Group [s/veh] 0.170.840.390.490.270.91X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.052.391.101.310.2810.01d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.500.15k, delay calibration 9.7529.036.2919.385.5329.48d1, Uniform Delay [s] 1490822104613192358431c, Capacity [veh/h] 281334591589356035601781s, saturation flow rate [veh/h] 0.090.200.260.180.180.22(v / s)_i Volume / Saturation Flow Rate 0.530.240.660.370.660.24g / C, Green / Cycle 421953305319g_i, Effective Green Time [s] 0.002.000.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 808080808080C, Cycle Length [s] RLRCCLLane Group Lane Group Calculations 8/18/202213EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]39.49 5.81 20.69 7.38 31.42 9.80 Movement LOS D A C A C A d_A, Approach Delay [s/veh]18.79 15.55 25.52 Approach LOS B B C d_I, Intersection Delay [s/veh]19.77 Intersection LOS B Intersection V/C 0.609 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]31.51 0.00 31.51 I_p,int, Pedestrian LOS Score for Intersection 2.944 0.000 3.023 Crosswalk LOS C F C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1250 650 550 d_b, Bicycle Delay [s]5.63 18.23 21.03 I_b,int, Bicycle LOS Score for Intersection 2.399 2.531 1.560 Bicycle LOS B B A ----------------Ring 4 ----------------Ring 3 ------------8-6-Ring 2 -------------321Ring 1 Sequence 8/18/202214EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.376Volume to Capacity (v/c): BLevel Of Service: 15.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Mission Trail/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0025.0050.0050.00Speed [mph] 320.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 220.00100.00100.00100.00100.00100.00100.00100.00300.00100.00100.00145.00Entry Pocket Length [ft] 100000002001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Intersection Setup 8/18/202215EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 35201000400355457845450Total Analysis Volume [veh/h] 88025010089114211360Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.83771.00000.83770.25000.25000.25000.93430.93430.93430.79810.79810.7981Peak Hour Factor 2950840100332427674350Total Hourly Volume [veh/h] 98000000002200Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 920220000102130251450Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2890600100221286622790Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Volumes 8/18/202216EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.00.02.02.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.00.02.02.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 00211010001000140Pedestrian Clearance [s] 005550050050Walk [s] 0.00.03.03.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 0032323200231502315Split [s] 0.00.01.01.01.00.00.01.01.00.01.01.0All red [s] 0.00.03.03.03.00.00.03.03.00.03.03.0Amber [s] 0030303000303003030Maximum Green [s] 007770077077Minimum Green [s] --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 007880025061Signal Group OverlapPermissSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 70Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/202217EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 75.272.8114.3414.34161.6081.4084.260.0095th-Percentile Queue Length [ft/ln] 3.010.110.570.576.463.263.370.0095th-Percentile Queue Length [veh/ln] 41.811.567.977.9789.7845.2246.810.0050th-Percentile Queue Length [ft/ln] 1.670.060.320.323.591.811.870.0050th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoNoCritical Lane Group CCAACAAALane Group LOS 33.6829.212.812.8132.298.068.010.00d, Delay for Lane Group [s/veh] 0.530.020.130.130.840.300.290.00X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.280.030.190.193.630.720.690.00d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.110.500.500.11k, delay calibration 31.4029.182.612.6128.667.337.320.00d1, Uniform Delay [s] 18921613841384543104110911c, Capacity [veh/h] 14121870187018703459178418701781s, saturation flow rate [veh/h] 0.070.000.090.090.130.170.170.00(v / s)_i Volume / Saturation Flow Rate 0.090.090.740.740.160.580.580.00g / C, Green / Cycle 6652521141410g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 2.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 7070707070707070C, Cycle Length [s] LCCCLCCLLane Group Lane Group Calculations 8/18/202218EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 8.03 8.06 32.29 2.81 2.81 29.21 29.21 29.21 33.68 0.00 0.00 Movement LOS A A A C A A C C C C d_A, Approach Delay [s/veh]8.03 19.40 29.21 33.68 Approach LOS A B C C d_I, Intersection Delay [s/veh]15.72 Intersection LOS B Intersection V/C 0.376 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 26.58 0.00 26.58 I_p,int, Pedestrian LOS Score for Intersection 0.000 2.809 0.000 2.337 Crosswalk LOS F C F B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]543 543 800 800 d_b, Bicycle Delay [s]18.58 18.58 12.60 12.60 I_b,int, Bicycle LOS Score for Intersection 2.097 2.230 1.566 1.560 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 ------------8-21Ring 1 Sequence 8/18/202219EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.525Volume to Capacity (v/c): BLevel Of Service: 13.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 5: Almond St/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 250.000.000.00250.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100100000000No. of Lanes in Exit Pocket 50.00100.00100.0050.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 100100000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 0000Pedestrian Volume [ped/h] 28505111963811218973108Total Analysis Volume [veh/h] 71263516035224802Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.94260.94260.94260.89660.89660.89660.89770.89770.89770.35710.35710.3571Peak Hour Factor 26476101757210197871103Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0114001550000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 25348101640110187841103Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/18/202220EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with BIntersection LOS 13.50Intersection Delay [s/veh] BBBBApproach LOS 12.7714.5412.2010.24Approach Delay [s/veh] 3.1853.1053.412.0776.0376.4323.735.8695th-Percentile Queue Length [ft] 0.132.122.140.083.043.060.950.2395th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.040.430.430.030.520.520.240.07Degree of Utilization, x 687605603706620618517537Capacity per Entry Lane [veh/h] Lanes Intersection Settings 8/18/202221EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.604Volume to Capacity (v/c): DLevel Of Service: 38.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Orange St/Bundy Canyon rd Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0035.0035.00Speed [mph] 0.000.000.000.000.000.00260.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket 100.00100.00200.00125.00100.00125.00260.00100.00100.00135.00100.00100.00Entry Pocket Length [ft] 001101100100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdOrange StOrange StName Intersection Setup 8/18/202222EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 706122021881224828250258641Total Analysis Volume [veh/h] 171535042036276365160Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.87320.87320.87320.78230.78230.78230.86270.86270.86270.77780.77780.7778Peak Hour Factor 615341761463519724216201501Total Hourly Volume [veh/h] 20005003006700Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0114001550000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 7840416918462181023208258481Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdOrange StOrange StName Volumes 8/18/202223EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0140014002100170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 039250463204900490Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 077077070070Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 047083020060Signal Group PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 120Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/202224EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 307.32316.29266.84461.05463.7334.964.85236.42187.4440.3395th-Percentile Queue Length [ft/ln] 12.2912.6510.6718.4418.551.400.199.467.501.6195th-Percentile Queue Length [veh/ln] 193.31200.25162.36315.42317.5919.422.69139.55104.1422.4050th-Percentile Queue Length [ft/ln] 7.738.016.4912.6212.700.780.115.584.170.9050th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoYesNoNoCritical Lane Group CCEDDEBCBBLane Group LOS 32.4032.3761.3351.9751.9061.3813.7423.3317.2714.27d, Delay for Lane Group [s/veh] 0.540.540.880.900.900.410.010.460.310.06X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.730.7110.088.298.234.530.022.570.970.12d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.140.140.110.500.500.500.50k, delay calibration 31.6731.6751.2543.6843.6856.8513.7220.7616.3014.14d1, Uniform Delay [s] 621644231459463598315998311007c, Capacity [veh/h] 1803187017811856187017811589103715891868s, saturation flow rate [veh/h] 0.190.190.110.220.220.010.010.270.160.03(v / s)_i Volume / Saturation Flow Rate 0.340.340.130.250.250.030.520.520.520.52g / C, Green / Cycle 4141163030463636363g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.002.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 120120120120120120120120120120C, Cycle Length [s] CCLCCLRCRCLane Group Lane Group Calculations 8/18/202225EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]14.27 14.27 17.27 23.33 23.33 13.74 61.38 51.94 51.97 61.33 32.39 32.40 Movement LOS B B B C C B E D D E C C d_A, Approach Delay [s/veh]16.67 23.06 52.20 39.00 Approach LOS B C D D d_I, Intersection Delay [s/veh]38.79 Intersection LOS D Intersection V/C 0.604 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]51.32 51.32 51.32 51.32 I_p,int, Pedestrian LOS Score for Intersection 2.424 2.283 2.709 3.295 Crosswalk LOS B B B C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]750 750 700 584 d_b, Bicycle Delay [s]23.42 23.42 25.33 30.09 I_b,int, Bicycle LOS Score for Intersection 2.203 2.036 2.268 2.305 Bicycle LOS B B B B ----------------Ring 4 ----------------Ring 3 ------------876-Ring 2 ------------432-Ring 1 Sequence 8/18/202226EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.913Volume to Capacity (v/c): ELevel Of Service: 56.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 7: I-15 SB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0065.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00320.00100.00100.00100.0025.00100.00310.00100.00100.00100.00Entry Pocket Length [ft] 001000101000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/18/202227EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 070853246663001551493000Total Analysis Volume [veh/h] 01771331161570390123000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00000.91380.91380.89550.89551.00000.91560.91560.91561.00001.00001.0000Peak Hour Factor 064748641756401421451000Total Hourly Volume [veh/h] 000139004800000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 097129301250160209000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 052934350642201671233000Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/18/202228EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.00.02.00.00.02.00.00.00.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.02.00.00.00.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0700300100000Pedestrian Clearance [s] 050050050000Walk [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Vehicle Extension [s] 0663103500290000Split [s] 0.01.01.00.01.00.00.01.00.00.00.00.0All red [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Amber [s] 0303003000300000Maximum Green [s] 077070070000Minimum Green [s] --Lead---------Lead / Lag Auxiliary Signal Groups 061020040000Signal Group PermissPermissProtectePermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 95Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/202229EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 120.88645.98650.51513.82118.540.68580.4295th-Percentile Queue Length [ft/ln] 4.8425.8426.0220.554.740.0323.2295th-Percentile Queue Length [veh/ln] 67.16452.10460.67358.5565.850.38399.5350th-Percentile Queue Length [ft/ln] 2.6918.0818.4314.342.630.0215.9850th-Percentile Queue Length [veh/ln] NoYesYesNoNoNoYesCritical Lane Group AFFDCCFLane Group LOS 7.5084.3879.9249.0829.1225.8084.56d, Delay for Lane Group [s/veh] 0.301.051.030.900.370.001.05X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.3450.3747.9118.560.550.0049.56d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.410.500.500.110.110.36k, delay calibration 7.1634.0132.0230.5228.5725.8035.00d1, Uniform Delay [s] 2323506530610418492469c, Capacity [veh/h] 3560178116261870158918701781s, saturation flow rate [veh/h] 0.200.300.340.290.100.000.28(v / s)_i Volume / Saturation Flow Rate 0.650.280.330.330.260.260.26g / C, Green / Cycle 62273131252525g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 95959595959595C, Cycle Length [s] CLCCRCLLane Group Lane Group Calculations 8/18/202230EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 0.00 0.00 84.56 25.80 29.12 0.00 53.09 79.92 84.38 7.50 0.00 Movement LOS F C C D E F A d_A, Approach Delay [s/veh]0.00 71.23 64.50 40.48 Approach LOS A E E D d_I, Intersection Delay [s/veh]55.99 Intersection LOS E Intersection V/C 0.913 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]38.93 38.93 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.537 2.503 0.000 0.000 Crosswalk LOS B B F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 526 653 1305 d_b, Bicycle Delay [s]47.51 25.80 21.56 5.74 I_b,int, Bicycle LOS Score for Intersection 4.132 2.710 2.578 2.583 Bicycle LOS D B B B ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 ------------4-21Ring 1 Sequence 8/18/202231EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.741Volume to Capacity (v/c): CLevel Of Service: 23.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 8: I-15 NB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0030.0065.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 300.00100.00100.00100.00100.00260.00100.00100.00100.0025.00100.00330.00Entry Pocket Length [ft] 100001000101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/18/202232EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 566912008582440002474271Total Analysis Volume [veh/h] 141228002146100062168Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96130.96131.00001.00000.91280.91281.00001.00001.00000.92570.92570.9257Peak Hour Factor 544877007832230002294251Total Hourly Volume [veh/h] 182000000007600Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 2292070029539000150020Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 478644004691770001494222Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/18/202233EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.02.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0300700000100Pedestrian Clearance [s] 050050000050Walk [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Vehicle Extension [s] 0330046130000140Split [s] 0.01.00.00.01.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Amber [s] 0300030300000300Maximum Green [s] 070077000070Minimum Green [s] -----Lead------Lead / Lag Auxiliary Signal Groups 060025000080Signal Group PermissPermissPermissPermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/202234EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 422.56334.8248.74174.09166.801.76172.9095th-Percentile Queue Length [ft/ln] 16.9013.391.956.966.670.076.9295th-Percentile Queue Length [veh/ln] 284.30214.6727.0896.7192.670.9896.0550th-Percentile Queue Length [ft/ln] 11.378.591.083.873.710.043.8450th-Percentile Queue Length [veh/ln] YesNoNoYesYesNoNoCritical Lane Group CCADDCCLane Group LOS 34.0421.813.9835.7937.4520.9234.53d, Delay for Lane Group [s/veh] 0.930.820.340.900.920.010.90X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 19.298.360.3810.6512.740.029.92d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.500.110.110.110.11k, delay calibration 14.7413.443.6025.1424.7020.9124.61d1, Uniform Delay [s] 7928992489271268315300c, Capacity [veh/h] 1647187035601781158918701781s, saturation flow rate [veh/h] 0.450.400.240.140.160.000.15(v / s)_i Volume / Saturation Flow Rate 0.480.480.700.150.170.170.17g / C, Green / Cycle 2929429101010g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060C, Cycle Length [s] CCCLRCLLane Group Lane Group Calculations 8/18/202235EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]34.53 20.92 37.45 0.00 0.00 0.00 35.79 3.98 0.00 0.00 24.13 34.04 Movement LOS C C D D A C C d_A, Approach Delay [s/veh]35.80 0.00 11.02 27.92 Approach LOS D A B C d_I, Intersection Delay [s/veh]23.25 Intersection LOS C Intersection V/C 0.741 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.76 21.76 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.450 2.375 0.000 0.000 Crosswalk LOS B B F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]332 0 1396 964 d_b, Bicycle Delay [s]20.91 30.08 2.74 8.07 I_b,int, Bicycle LOS Score for Intersection 2.546 4.132 2.469 2.929 Bicycle LOS B D B C ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 --------------2-Ring 1 Sequence 8/18/202236EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with Turning Movement Volume: Summary 8/18/2022Report File: C:\...\Cumulative AM.pdf Scenario 5 Cumulative AMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential 2895 Total Volume 647 Thru 486 Left Westbound 556 Right 564 Thru Eastbound 190 Right 1 Thru 451 Left Southbound I-15 SB Ramps/Bundy Canyon Rd7 Intersection NameID 2033 Total Volume 81 Right 534 Thru 176 Left Westbound 19 Right 635 Thru 19 Left Eastbound 10 Right 24 Thru 216 Left Southbound 268 Right 50 Thru 1 Left Northbound Orange St/Bundy Canyon rd6 Intersection NameID 1238 Total Volume 26 Right 476 Thru 10 Left Westbound 17 Right 572 Thru 10 Left Eastbound 19 Right 7 Thru 87 Left Southbound 11 Right 0 Thru 3 Left Northbound Almond St/Bundy Canyon Rd5 Intersection NameID 1761 Total Volume 393 Right 84 Left Westbound 0 Right 1 Thru 0 Left Eastbound 0 Right 332 Thru 427 Left Southbound 89 Right 435 Thru 0 Left Northbound Mission Trail/Bundy Canyon Rd4 Intersection NameID 2751 Total Volume 283 Right 566 Left Eastbound 486 Right 578 Thru Southbound 515 Thru 323 Left Northbound Mission Trail/Corydon Rd3 Intersection NameID 2494 Total Volume 137 Right 25 Thru 68 Left Westbound 20 Right 22 Thru 36 Left Eastbound 25 Right 951 Thru 113 Left Southbound 101 Right 996 Thru 0 Left Northbound Mission Trail/Lemon St2 Intersection NameID 2270 Total Volume 61 Right 11 Left Eastbound 3 Right 1027 Thru Southbound 1136 Thru 32 Left Northbound Mission Trail/Project Dwy1 Intersection NameID 8/18/202237EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with 3169 Total Volume 726 Right 877 Thru Westbound 783 Thru 223 Left Eastbound 305 Right 4 Thru 251 Left Northbound I-15 NB Ramps/Bundy Canyon Rd8 Intersection NameID 8/18/202238EPD Solutions Inc Cumulative AMMission Trail Residential Version 2022 (SP 0-8) Generated with Table of Contents Intersection Analysis Summary ...........................................................................................................................................................2 Intersection Level Of Service Report .................................................................................................................................................3 Intersection 1: Mission Trail/Project Dwy ...................................................................................................................3 Intersection 2: Mission Trail/Lemon St ........................................................................................................................5 Intersection 3: Mission Trail/Corydon Rd ................................................................................................................10 Intersection 4: Mission Trail/Bundy Canyon Rd ....................................................................................................15 Intersection 5: Almond St/Bundy Canyon Rd ........................................................................................................20 Intersection 6: Orange St/Bundy Canyon rd ...........................................................................................................22 Intersection 7: I-15 SB Ramps/Bundy Canyon Rd ................................................................................................27 Intersection 8: I-15 NB Ramps/Bundy Canyon Rd ...............................................................................................32 Turning Movement Volume: Summary .........................................................................................................................................37 8/18/20221EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with Intersection Analysis Summary 8/18/2022Report File: C:\...\Cumulative PM.pdf Scenario 6 Cumulative PMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. D41.80.874EB LeftHCM 7th EditionSignalizedI-15 NB Ramps/Bundy Canyon Rd8 F123.81.164WB LeftHCM 7th EditionSignalizedI-15 SB Ramps/Bundy Canyon Rd7 E59.76.986SB LeftHCM 7th EditionSignalizedOrange St/Bundy Canyon rd6 C20.90.733WB ThruHCM 7th EditionAll-way stopAlmond St/Bundy Canyon Rd5 C24.10.634SB LeftHCM 7th EditionSignalizedMission Trail/Bundy Canyon Rd4 B13.10.553EB LeftHCM 7th EditionSignalizedMission Trail/Corydon Rd3 B16.20.686WB RightHCM 7th EditionSignalizedMission Trail/Lemon St2 F10,000.00.148EB RightHCM 7th EditionTwo-way stopMission Trail/Project Dwy1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 8/18/20222EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.148Volume to Capacity (v/c): FLevel Of Service: 10,000.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Mission Trail/Project Dwy Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 25.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Project DwyMission TrailMission TrailName Intersection Setup 000Pedestrian Volume [ped/h] 4171016081612109Total Analysis Volume [veh/h] 102340240327Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00000.87500.87500.96750.9675Peak Hour Factor 417914071560105Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 4179617571105Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0007609510Base Volume Input [veh/h] Project DwyMission TrailMission TrailName Volumes 8/18/20223EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with FIntersection LOS 142.48d_I, Intersection Delay [s/veh] FAAApproach LOS 10000.000.001.50d_A, Approach Delay [s/veh] 204.90204.900.000.002.575.1495th-Percentile Queue Length [ft/ln] 8.208.200.000.000.100.2195th-Percentile Queue Length [veh/ln] FFAAACMovement LOS 10000.0010000.000.000.000.0023.64d_M, Delay for Movement [s/veh] 0.150.000.000.020.020.56V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 200Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 8/18/20224EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.686Volume to Capacity (v/c): BLevel Of Service: 16.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Mission Trail/Lemon St Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0030.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Lemon StLemon StMission TrailMission TrailName Intersection Setup 8/18/20225EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 21126831023371613732628414680Total Analysis Volume [veh/h] 53621369434365213670Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.73330.73330.73331.00001.00001.00000.87500.87500.87500.96750.96750.9675Peak Hour Factor 15519611023371412012298114200Total Hourly Volume [veh/h] 52004005002700Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 1581971423371946617374800Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 47052000070754979040Base Volume Input [veh/h] Lemon StLemon StMission TrailMission TrailName Volumes 8/18/20226EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoYesNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000100070070Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 04300430027110160Split [s] 0.01.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0300030003070300Maximum Green [s] 070070077070Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 040080025060Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtPerPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 70Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/20227EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 213.965.5634.61178.99178.9975.0126.81339.730.0095th-Percentile Queue Length [ft/ln] 8.560.221.387.167.163.001.0713.590.0095th-Percentile Queue Length [veh/ln] 123.013.0919.2399.4499.4441.6714.89218.510.0050th-Percentile Queue Length [ft/ln] 4.920.120.773.983.981.670.608.740.0050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoYesNoCritical Lane Group CCCAABACALane Group LOS 27.9620.5921.408.828.8019.799.7720.210.00d, Delay for Lane Group [s/veh] 0.730.030.170.570.570.610.110.840.00X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.420.030.241.981.966.230.284.910.00d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.500.500.500.50k, delay calibration 25.5420.5621.166.856.8413.579.5015.300.00d1, Uniform Delay [s] 436375346121012154327841756191c, Capacity [veh/h] 1571158911121862187061815893560389s, saturation flow rate [veh/h] 0.200.010.050.370.370.420.050.410.00(v / s)_i Volume / Saturation Flow Rate 0.230.230.230.650.650.650.490.490.49g / C, Green / Cycle 161616464646353535g_i, Effective Green Time [s] 2.002.002.002.002.000.002.002.002.00l2, Clearance Lost Time [s] 2.000.002.000.000.000.000.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 707070707070707070C, Cycle Length [s] CRCCCLRCLLane Group Lane Group Calculations 8/18/20228EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 20.21 9.77 19.79 8.81 8.82 21.40 21.40 20.59 27.96 27.96 27.96 Movement LOS A C A B A A C C C C C C d_A, Approach Delay [s/veh]19.65 10.55 21.28 27.96 Approach LOS B B C C d_I, Intersection Delay [s/veh]16.24 Intersection LOS B Intersection V/C 0.686 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 26.58 26.58 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 1.974 2.472 Crosswalk LOS F F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]343 657 1114 1114 d_b, Bicycle Delay [s]24.03 15.78 6.86 6.86 I_b,int, Bicycle LOS Score for Intersection 2.862 2.926 1.682 2.173 Bicycle LOS C C A B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-2-Ring 1 Sequence 8/18/20229EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.553Volume to Capacity (v/c): BLevel Of Service: 13.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Mission Trail/Corydon Rd Intersection Level Of Service Report YesNoYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 45.0050.0050.00Speed [mph] 0.00350.000.000.000.000.00Exit Pocket Length [ft] 010000No. of Lanes in Exit Pocket 280.00310.00100.00100.00100.00100.00Entry Pocket Length [ft] 110000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Mission TrailMission TrailName Intersection Setup 8/18/202210EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 325757530663874352Total Analysis Volume [veh/h] 8118913216621988Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95380.95380.95310.95310.92530.9253Peak Hour Factor 310722505632809326Total Hourly Volume [veh/h] 1040168000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 4919821031328995Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 351504445307500222Base Volume Input [veh/h] Mission TrailMission TrailName Volumes 8/18/202211EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoYesMinimum Recall 2.02.02.02.02.02.0l2, Clearance Lost Time [s] 2.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 0172121100Pedestrian Clearance [s] 055550Walk [s] 3.03.03.03.03.03.0Vehicle Extension [s] 292930304111Split [s] 1.01.01.01.01.01.0All red [s] 3.03.03.03.03.03.0Amber [s] 30303030307Maximum Green [s] 777777Minimum Green [s] -Lead---LeadLead / Lag 1,82,3Auxiliary Signal Groups 832261Signal Group OverlapSplitOverlapPermissivePermissiveProtPermControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 70Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/202212EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 62.69227.1129.90133.09106.01114.4295th-Percentile Queue Length [ft/ln] 2.519.081.205.324.244.5895th-Percentile Queue Length [veh/ln] 34.83132.6616.6173.9458.8963.5750th-Percentile Queue Length [ft/ln] 1.395.310.662.962.362.5450th-Percentile Queue Length [veh/ln] NoYesYesNoNoYesCritical Lane Group BCABABLane Group LOS 12.8325.013.4713.677.6315.13d, Delay for Lane Group [s/veh] 0.270.790.420.410.400.65X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.121.531.060.780.565.87d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.500.50k, delay calibration 12.7123.482.4112.897.079.26d1, Uniform Delay [s] 1219955124916112170544c, Capacity [veh/h] 28133459158935603560746s, saturation flow rate [veh/h] 0.120.220.330.190.250.47(v / s)_i Volume / Saturation Flow Rate 0.430.280.790.450.610.61g / C, Green / Cycle 301955324343g_i, Effective Green Time [s] 0.002.000.002.002.000.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 707070707070C, Cycle Length [s] RLRCCLLane Group Lane Group Calculations 8/18/202213EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]15.13 7.63 13.67 3.47 25.01 12.83 Movement LOS B A B A C B d_A, Approach Delay [s/veh]9.78 9.14 21.35 Approach LOS A A C d_I, Intersection Delay [s/veh]13.14 Intersection LOS B Intersection V/C 0.553 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]26.58 0.00 26.58 I_p,int, Pedestrian LOS Score for Intersection 3.042 0.000 3.376 Crosswalk LOS C F C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1057 743 714 d_b, Bicycle Delay [s]7.78 13.83 14.46 I_b,int, Bicycle LOS Score for Intersection 2.571 2.682 1.560 Bicycle LOS B B A ----------------Ring 4 ----------------Ring 3 ------------8-6-Ring 2 -------------321Ring 1 Sequence 8/18/202214EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.634Volume to Capacity (v/c): CLevel Of Service: 24.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Mission Trail/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0025.0050.0050.00Speed [mph] 320.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 220.00100.00100.00100.00100.00100.00100.00100.00300.00100.00100.00145.00Entry Pocket Length [ft] 100000002001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Intersection Setup 8/18/202215EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 47701832720468614775240Total Analysis Volume [veh/h] 1190461210117153191310Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89631.00000.89630.41670.41670.41670.91890.91890.91890.95250.95250.9525Peak Hour Factor 42801641310430564734990Total Hourly Volume [veh/h] 143000000002400Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 1750490000215146372090Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 38101111310207402582790Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdMission TrailMission TrailName Volumes 8/18/202216EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 2.00.02.02.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 2.00.02.02.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 00211010001000140Pedestrian Clearance [s] 005550050050Walk [s] 3.00.03.03.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 22030303000232202322Split [s] 1.00.01.01.01.00.00.01.01.00.01.01.0All red [s] 3.00.03.03.03.00.00.03.03.00.03.03.0Amber [s] 30030303000303003030Maximum Green [s] 707770077077Minimum Green [s] --Lead-----Lead--LeadLead / Lag 1,7Auxiliary Signal Groups 107880025061Signal Group OverlapPermissSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 75Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/202217EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 313.60121.015.9479.1479.14218.78186.27191.520.0095th-Percentile Queue Length [ft/ln] 12.544.840.243.173.178.757.457.660.0095th-Percentile Queue Length [veh/ln] 198.1767.233.3043.9743.97126.54103.48106.780.0050th-Percentile Queue Length [ft/ln] 7.932.690.131.761.765.064.144.270.0050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoNoCritical Lane Group CCBBBCCCALane Group LOS 28.9524.3918.0710.0310.0331.7923.6223.420.00d, Delay for Lane Group [s/veh] 0.830.490.020.240.240.860.510.500.00X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.241.020.010.560.563.123.152.970.00d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.270.110.110.500.500.110.500.500.11k, delay calibration 21.7223.3718.069.479.4728.6720.4720.440.00d1, Uniform Delay [s] 5783705569919917165816073c, Capacity [veh/h] 158914061621187018703459178818701781s, saturation flow rate [veh/h] 0.300.130.010.130.130.180.160.160.00(v / s)_i Volume / Saturation Flow Rate 0.360.310.310.530.530.210.320.320.00g / C, Green / Cycle 27232340401624240g_i, Effective Green Time [s] 0.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 757575757575757575C, Cycle Length [s] RLCCCLCCLLane Group Lane Group Calculations 8/18/202218EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 23.50 23.62 31.79 10.03 10.03 18.07 18.07 18.07 24.39 0.00 28.95 Movement LOS A C C C B B B B B C C d_A, Approach Delay [s/veh]23.52 22.38 18.07 27.69 Approach LOS C C B C d_I, Intersection Delay [s/veh]24.14 Intersection LOS C Intersection V/C 0.634 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 0.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 29.04 0.00 29.04 I_p,int, Pedestrian LOS Score for Intersection 0.000 3.106 0.000 2.823 Crosswalk LOS F C F C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]507 507 693 693 d_b, Bicycle Delay [s]20.91 20.91 16.01 16.01 I_b,int, Bicycle LOS Score for Intersection 2.075 2.452 1.578 1.560 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 ------------8-21Ring 1 Sequence 8/18/202219EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.733Volume to Capacity (v/c): CLevel Of Service: 20.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 5: Almond St/Bundy Canyon Rd Intersection Level Of Service Report YesNoYesNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 250.000.000.00250.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100100000000No. of Lanes in Exit Pocket 50.00100.00100.0050.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 100100000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 0000Pedestrian Volume [ped/h] 5287800772921072853Total Analysis Volume [veh/h] 132200019325018211Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89140.89140.89140.92070.92070.92070.72370.72370.72370.37500.37500.3750Peak Hour Factor 4678300711815052321Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0227001884400000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4453500503411050321Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/18/202220EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with CIntersection LOS 20.93Intersection Delay [s/veh] CCBBApproach LOS 22.5820.1512.8211.04Approach Delay [s/veh] 6.20156.73156.730.00123.65124.1518.742.6895th-Percentile Queue Length [ft] 0.256.276.270.004.954.970.750.1195th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.080.730.730.000.660.670.200.03Degree of Utilization, x 679599599588588587459463Capacity per Entry Lane [veh/h] Lanes Intersection Settings 8/18/202221EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 6.986Volume to Capacity (v/c): ELevel Of Service: 59.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Orange St/Bundy Canyon rd Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0035.0035.00Speed [mph] 0.000.000.000.000.000.00260.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket 100.00100.00200.00125.00100.00125.00260.00100.00100.00135.00100.00100.00Entry Pocket Length [ft] 001101100100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdOrange StOrange StName Intersection Setup 8/18/202222EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 10492319517815268242031592914Total Analysis Volume [veh/h] 26231494204626514074Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89530.89530.89530.89290.89290.89290.77940.77940.77940.75910.75910.7591Peak Hour Factor 9382617515728236191581212211Total Hourly Volume [veh/h] 31005002004000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0227001880000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 11957616819519228181521552111Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdOrange StOrange StName Volumes 8/18/202223EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0140014001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 023110231102600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 077077070070Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 061025040080Signal Group PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/202224EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 249.45254.48154.61231.45232.4917.472.77692.6761.2016.0595th-Percentile Queue Length [ft/ln] 9.9810.186.189.269.300.700.1127.712.450.6495th-Percentile Queue Length [veh/ln] 149.27153.0485.90135.87136.649.701.54384.8234.008.9250th-Percentile Queue Length [ft/ln] 5.976.123.445.435.470.390.0615.391.360.3650th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoYesNoNoCritical Lane Group CCDCCCBFBBLane Group LOS 21.5521.2942.4224.9824.9330.4812.18420.3313.7015.54d, Delay for Lane Group [s/veh] 0.710.710.930.700.700.340.011.800.270.21X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 6.095.8416.146.926.872.540.01391.530.250.48d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.110.500.500.110.110.500.110.11k, delay calibration 15.4615.4526.2918.0618.0627.9412.1728.8013.4515.05d1, Uniform Delay [s] 70773221058959377581126581209c, Capacity [veh/h] 1804187017811857187017811589341589354s, saturation flow rate [veh/h] 0.280.280.110.220.220.010.016.650.100.12(v / s)_i Volume / Saturation Flow Rate 0.390.390.120.320.320.040.370.370.370.37g / C, Green / Cycle 242471919322222222g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.002.000.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 60606060606060606060C, Cycle Length [s] CCLCCLRCRCLane Group Lane Group Calculations 8/18/202225EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]15.54 15.54 13.70 420.33 420.33 12.18 30.48 24.96 24.98 42.42 21.40 21.55 Movement LOS B B B F F B C C C D C C d_A, Approach Delay [s/veh]14.09 406.43 25.13 24.77 Approach LOS B F C C d_I, Intersection Delay [s/veh]59.67 Intersection LOS E Intersection V/C 6.986 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]21.72 21.72 21.72 21.72 I_p,int, Pedestrian LOS Score for Intersection 2.306 2.236 2.778 3.256 Crosswalk LOS B B C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]732 732 632 632 d_b, Bicycle Delay [s]12.07 12.07 14.05 14.05 I_b,int, Bicycle LOS Score for Intersection 1.959 1.951 2.272 2.593 Bicycle LOS A A B B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence 8/18/202226EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 1.164Volume to Capacity (v/c): FLevel Of Service: 123.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 7: I-15 SB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0065.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00320.00100.00100.00100.0030.00100.00310.00100.00100.00100.00Entry Pocket Length [ft] 001000101000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/18/202227EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 01046448306855022911021000Total Analysis Volume [veh/h] 0262112772140570255000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00000.90040.90040.81670.81671.00000.85230.85230.85231.00001.00001.0000Peak Hour Factor 094240325069801951870000Total Hourly Volume [veh/h] 00083006500000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0167229321570590393000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 074516728952001931459000Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/18/202228EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.00.02.00.00.02.00.00.00.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.02.00.00.00.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000300100000Pedestrian Clearance [s] 050050050000Walk [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Vehicle Extension [s] 0592503400510000Split [s] 0.01.01.00.01.00.00.01.00.00.00.00.0All red [s] 0.03.03.00.03.00.00.03.00.00.00.00.0Amber [s] 0303003000300000Maximum Green [s] 077070070000Minimum Green [s] --Lead---------Lead / Lag Auxiliary Signal Groups 061020040000Signal Group PermissPermissProtectePermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/202229EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 353.49907.291046.56892.58159.550.591925.1395th-Percentile Queue Length [ft/ln] 14.1436.2941.8635.706.380.0277.0195th-Percentile Queue Length [veh/ln] 229.32597.54709.62623.6688.640.331298.3050th-Percentile Queue Length [ft/ln] 9.1723.9028.3824.953.550.0151.9350th-Percentile Queue Length [veh/ln] NoYesYesNoNoNoYesCritical Lane Group CFFFCBFLane Group LOS 20.75201.90164.38121.6721.4918.15196.48d, Delay for Lane Group [s/veh] 0.591.321.241.130.340.001.35X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.41157.43124.4681.750.290.00164.89d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.390.500.500.110.110.50k, delay calibration 19.3444.4739.9239.9221.1918.1531.58d1, Uniform Delay [s] 1786341469512676796758c, Capacity [veh/h] 3560178117111870158918701781s, saturation flow rate [veh/h] 0.290.250.340.310.140.000.57(v / s)_i Volume / Saturation Flow Rate 0.500.190.270.270.430.430.43g / C, Green / Cycle 55213030474747g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110C, Cycle Length [s] CLCCRCLLane Group Lane Group Calculations 8/18/202230EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 0.00 0.00 196.48 18.15 21.49 0.00 135.38 164.38 201.90 20.75 0.00 Movement LOS F B C F F F C d_A, Approach Delay [s/veh]0.00 164.30 143.02 75.07 Approach LOS A F F E d_I, Intersection Delay [s/veh]123.85 Intersection LOS F Intersection V/C 1.164 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]46.36 46.36 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.252 2.970 0.000 0.000 Crosswalk LOS B C F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 855 546 1000 d_b, Bicycle Delay [s]54.99 18.03 29.08 13.74 I_b,int, Bicycle LOS Score for Intersection 4.132 3.731 2.586 2.792 Bicycle LOS D D B C ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 ------------4-21Ring 1 Sequence 8/18/202231EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0.874Volume to Capacity (v/c): DLevel Of Service: 41.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 8: I-15 NB Ramps/Bundy Canyon Rd Intersection Level Of Service Report NoNoYesYesCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0030.0065.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 300.00100.00100.00100.00100.00260.00100.00100.00100.0030.00100.00330.00Entry Pocket Length [ft] 100001000101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Bundy Canyon RdBundy Canyon RdName Intersection Setup 8/18/202232EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 5398700015391850005450572Total Analysis Volume [veh/h] 13521700385460001360143Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.93710.93711.00001.00000.90830.90831.00001.00001.00000.93150.93150.9315Peak Hour Factor 5058150013981680005080533Total Hourly Volume [veh/h] 1680000000017000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 3843570051733000220040Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 278440008471300004400474Base Volume Input [veh/h] Bundy Canyon RdBundy Canyon RdName Volumes 8/18/202233EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.02.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.02.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0300700000100Pedestrian Clearance [s] 050050000050Walk [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Vehicle Extension [s] 0370049120000310Split [s] 0.01.00.00.01.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.03.03.00.00.00.00.03.00.0Amber [s] 0300030300000300Maximum Green [s] 070077000070Minimum Green [s] -----Lead------Lead / Lag Auxiliary Signal Groups 060025000080Signal Group PermissPermissPermissPermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 41.5Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 80Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 8/18/202234EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 694.58526.01362.64224.36510.760.00447.1795th-Percentile Queue Length [ft/ln] 27.7821.0414.518.9720.430.0017.8995th-Percentile Queue Length [veh/ln] 493.48368.58236.53129.51351.420.00304.1650th-Percentile Queue Length [ft/ln] 19.7414.749.465.1814.060.0012.1750th-Percentile Queue Length [veh/ln] YesNoNoYesYesNoNoCritical Lane Group FDBFFADLane Group LOS 68.8639.7416.3671.9465.280.0047.04d, Delay for Lane Group [s/veh] 1.040.920.771.021.020.000.95X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 45.2717.452.8835.9438.710.0021.09d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.500.110.390.110.35k, delay calibration 23.6022.2913.4736.0026.570.0025.95d1, Uniform Delay [s] 6787692005182536630600c, Capacity [veh/h] 1648187035601781158918701781s, saturation flow rate [veh/h] 0.430.380.430.100.340.000.32(v / s)_i Volume / Saturation Flow Rate 0.410.410.560.100.340.340.34g / C, Green / Cycle 3333458272727g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 80808080808080C, Cycle Length [s] CCCLRCLLane Group Lane Group Calculations 8/18/202235EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]47.04 0.00 65.28 0.00 0.00 0.00 71.94 16.36 0.00 0.00 45.28 68.86 Movement LOS D A F F B D E d_A, Approach Delay [s/veh]55.94 0.00 22.32 54.30 Approach LOS E A C D d_I, Intersection Delay [s/veh]41.76 Intersection LOS D Intersection V/C 0.874 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]31.55 31.55 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 3.084 2.289 0.000 0.000 Crosswalk LOS C B F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]674 0 1124 824 d_b, Bicycle Delay [s]17.59 40.04 7.69 13.84 I_b,int, Bicycle LOS Score for Intersection 3.683 4.132 2.982 2.861 Bicycle LOS D D C C ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 --------------2-Ring 1 Sequence 8/18/202236EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with Turning Movement Volume: Summary 8/18/2022Report File: C:\...\Cumulative PM.pdf Scenario 6 Cumulative PMVistro File: C:\...\Mission Trails.vistro Mission Trail Residential 3507 Total Volume 942 Thru 403 Left Westbound 333 Right 698 Thru Eastbound 260 Right 1 Thru 870 Left Southbound I-15 SB Ramps/Bundy Canyon Rd7 Intersection NameID 2275 Total Volume 124 Right 826 Thru 175 Left Westbound 20 Right 728 Thru 23 Left Eastbound 8 Right 19 Thru 158 Left Southbound 161 Right 22 Thru 11 Left Northbound Orange St/Bundy Canyon rd6 Intersection NameID 1621 Total Volume 46 Right 783 Thru 0 Left Westbound 0 Right 711 Thru 8 Left Eastbound 15 Right 0 Thru 52 Left Southbound 3 Right 2 Thru 1 Left Northbound Almond St/Bundy Canyon Rd5 Intersection NameID 2330 Total Volume 571 Right 164 Left Westbound 1 Right 3 Thru 1 Left Eastbound 0 Right 430 Thru 564 Left Southbound 97 Right 499 Thru 0 Left Northbound Mission Trail/Bundy Canyon Rd4 Intersection NameID 3576 Total Volume 414 Right 722 Left Eastbound 673 Right 632 Thru Southbound 809 Thru 326 Left Northbound Mission Trail/Corydon Rd3 Intersection NameID 3338 Total Volume 207 Right 19 Thru 61 Left Westbound 14 Right 23 Thru 37 Left Eastbound 19 Right 1201 Thru 229 Left Southbound 108 Right 1420 Thru 0 Left Northbound Mission Trail/Lemon St2 Intersection NameID 3129 Total Volume 41 Right 7 Left Eastbound 9 Right 1407 Thru Southbound 1560 Thru 105 Left Northbound Mission Trail/Project Dwy1 Intersection NameID 8/18/202237EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with 4265 Total Volume 673 Right 815 Thru Westbound 1398 Thru 168 Left Eastbound 678 Right 0 Thru 533 Left Northbound I-15 NB Ramps/Bundy Canyon Rd8 Intersection NameID 8/18/202238EPD Solutions Inc Cumulative PMMission Trail Residential Version 2022 (SP 0-8) Generated with