Loading...
HomeMy WebLinkAboutResolution 2021-20 PA 2016-56 Consisten with MSHCPRESOLUTION NO. 2021-20 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, FINDING THAT PLANNING APPLICATION NO. 2016- 56 (RESIDENTIAL DESIGN REVIEW NO. 2021-01 AND VARIANCE NO. 2021-01) IS CONSISTENT WITH THE WESTERN RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP) Whereas, Edgar Gomez, Richmond American Homes has filed an application with the City of Lake Elsinore (City) requesting approval of Planning Application No. 2016-56 (Residential Design Review No. 2021-01 and Variance No. 2021-01) proposing the design and construction of 96 single-family residential units, preliminary plotting, conceptual wall and fence plan, and related improvements located within Tract Map No. 31957 and a variance for Lot 7 to encroach 5.6 ft. into the required 20 ft. rear yard setback due to site constraints. The project proposes five (5) floor plans ranging in size from 2,012 sq. ft. to 2,481 sq. ft. and three architectural styles. The lot sizes for Tract Map No. 31957 range in size from 6,050 sq. ft. to 16,100 sq. ft. and are 8,162 sq. ft. on average. The project site is located northerly of Lincoln Street and westerly of Mountain Street and Running Deer Road (APNs: 394-120-007, 008, 012, and 013); and, Whereas, Section 6.0 of the Multiple Species Habitat Conservation Plan (MSHCP) requires that all discretionary projects within a MSHCP Criteria Cell undergo the Lake Elsinore Acquisition Process (LEAP) and the Joint Project Review (JPR) to analyze the scope of the proposed development and establish a building envelope that is consistent with the MSHCP criteria; and, Whereas, Section 6.0 of the MSHCP further requires that the City adopt consistency findings demonstrating that the proposed discretionary entitlement complies with the MSHCP Criteria Cell, and the MSHCP goals and objectives; and, Whereas, pursuant to Section 17.415.050 (Major Design Review) and Section 17.415.090 (Variances) of the Lake Elsinore Municipal Code (LEMC) the Planning Commission (Commission) has been delegated with the responsibility of reviewing and approving, conditionally approving, or denying design review applications; and, Whereas, on May 18, 2021 at a duly noticed Public Hearing the Commission has considered evidence presented by the Community Development Department and other interested parties with respect to this item. NOW THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1: The Commission has considered the project and its consistency with the MSHCP prior to adopting Findings of Consistency with the MSHCP. Section 2: That in accordance with the MSHCP, the Commission makes the following findings for MSHCP consistency: 1. The Project is a project under the City’s MSHCP Resolution, and the City must make an MSHCP Consistency finding before approval. DocuSign Envelope ID: 03B038FC-9CED-4EB0-A76D-07675ADA15BD PC Reso. No. 2021-20 Page 2 of 4 Pursuant to the City’s MSHCP resolution, the project must be reviewed for MSHCP consistency, consistent with the Protection of Species Associated with Riparian/Riverine Areas and Vernal Pool Guidelines (MSHCP, Section 6.1.2), Protection of Narrow Endemic Plant Species Guidelines (MSHCP, Section 6.1.3), Additional Survey Needs and Procedures (MSHCP, Section 6.3.2), Urban/Wildlands Interface Guidelines (MSHCP, Section 6.1.4), Vegetation Mapping (MSHCP, Section 6.3.1) requirements, Fuels Management Guidelines (MSHCP, Section 6.4), and payment of the MSHCP Local Development Mitigation Fee (MSHCP Ordinance, Section 4). The project has been reviewed in light of these sections and is consistent therewith. 2. The Project is subject to the City’s Lake Elsinore Acquisition Process (LEAP) and the County’s Joint Project Review (JPR) processes. The project is located within Cell # 4154 and 4155 of the Elsinore Area and was processed through the City’s LEAP and JPR processes as part of the approval of the original Tract Map No. 31957. 3. The Project is consistent with the Riparian/Riverine Areas and Vernal Pools Guidelines. The previously approved Tract Map No. 31957 was determined to be consistent with the Riparian/Riverine and Vernal Pool Guidelines as set forth in Section 6.1.2 of the MSHCP. The scope and nature of the project have not been modified from that which was previously approved and is therefore consistent with the Riparian/Riverine Areas and Vernal Pools Guidelines. 4. The Project is consistent with the Protection of Narrow Endemic Plant Species Guidelines. The previously approved Tract Map No. 31957 was consistent with the Protection of Narrow Endemic Plant Species Guidelines as set forth in Section 6.1.3 of the MSHCP. The project has not been modified from that which was previously approved under Tract Map No. 31957. Therefore, project is consistent with the aforementioned guidelines. 5. The Project is consistent with the Additional Survey Needs and Procedures. The previously approved Tract Map No. 31957 was consistent with the Additional Survey Needs and Procedures as set forth in Section 6.3.2 of the MSHCP. The project has not been modified from that which was previously approved under the Tract Map No. 31957, and the project site has been graded pursuant to previously issued permits. The project is consistent with the Additional Survey Needs and Procedures of the MSHCP. 6. The Project is consistent with the Urban/Wildlands Interface Guidelines. As part of the approval of the original Tract Map No. 31957, mitigation measures have been incorporated into the proposed project so that there will be no project-related drainage, toxics, lighting, noise, invasives, barriers, and grading/land development impacts to the Conservation area. Therefore, project is consistent with the Urban/Wildlands Interface Guidelines of MSHCP Section 6.1.4. 7. The Project is consistent with the Vegetation Mapping requirements. DocuSign Envelope ID: 03B038FC-9CED-4EB0-A76D-07675ADA15BD PC Reso. No. 2021-20 Page 3 of 4 As part of the approval of the original Tract Map No. 31957, the vegetation of the entire project site has been mapped consistent with mapping requirement as set forth in MSHCP Section 6.3.1. 8.The Project is consistent with the Fuels Management Guidelines. As part of the approval of the original Tract Map No. 31957, the project was designed to include a landscape buffer with fire-resistant and non-invasive plants near the proposed MSHCP Conservation Area that will function as a Fuel Modification Zone. The landscape plan complies with Table 6.2 of the MSHCP (Plants That Shall Be Excluded from Landscape Adjacent to Conservation Area). Therefore, the project is consistent with the Fuels Management Guidelines of MSHCP Section 6.4. 9.The Project overall is consistent with the MSHCP. As a condition of approval, the Project will be required to pay the City’s MSHCP Local Development Mitigation Fee at the time of issuance of building permits. Section 3: Based upon the evidence presented, both written and testimonial, and the above findings, the Commission hereby finds that the project is consistent with the MSHCP. Section 4: This Resolution shall take effect immediately upon its adoption. Passed and Adopted at a regular meeting of the Planning Commission of the City of Lake Elsinore, California, this 18th day of May 2021. John Gray Vice Chair Attest: ___________________________________ Justin Kirk, Assistant Community Development Director FOR: DocuSign Envelope ID: 03B038FC-9CED-4EB0-A76D-07675ADA15BD PC Reso. No. 2021-20 Page 4 of 4 STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF LAKE ELSINORE ) I, Justin Kirk, Assistant Community Development Director of the City of Lake Elsinore, California, hereby certify that Resolution No. 2021-20 was adopted by the Planning Commission of the City of Lake Elsinore, California, at a regular meeting held on May 18, 2021 and that the same was adopted by the following vote: AYES: Commissioners Carroll, and Dobler; and Vice Chair Gray NOES: None ABSENT: Commissioner Peters; and Chair Klaarenbeek ABSTAIN: None Justin Kirk Assistant Community Development Director FOR: DocuSign Envelope ID: 03B038FC-9CED-4EB0-A76D-07675ADA15BD