Loading...
HomeMy WebLinkAbout4025_001 Check Report City of Lake Elsinore, CA By Check Number Date Range: 01/24/2023 - 06/30/2023 Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Bank Code:APBNK-APBNK 02740 AAA RESTORATION,INC. 02/23/2023 Virtual Payment 0.00 11,227.15 APA23002688 02740 AAA RESTORATION,INC. 03/16/2023 Virtual Payment 0.00 9,361.25 APA23003422 02740 AAA RESTORATION,INC. 05/25/2023 Virtual Payment 0.00 14,265.00 APA23004144 Bank Code APBNK Summary Payable Payment Payment Type Count Count Discount Payment Regular Checks 0 0 0.00 0.00 Manual Checks 0 0 0.00 0.00 Voided Checks 0 0 0.00 0.00 Bank Drafts 0 0 0.00 0.00 EFT's 0 0 0.00 0.00 Virtual Payments 3 3 0.00 34,853.40 3 3 0.00 34,853.40 7/18/2023 8:44:25 AM Page 1 of 2 v+' AAA RESTORATION,INC Invoice 29850 2ND STREET LAKE ELSINORE,CA 92532 Date Invoice# Uc#B834839 1 0IL 2/10/2023 20784 ftWWq cVf"�'itI Dl'1fI16Ild600WamM Bill To City of Lake Elsinore 130 S.Main St. Lake Elsinore,Ca. 1530 &EPA NAT-61936-1 P.O.No. Terms Project 23-6815 Due on receipt 22037 City yard mise concrete Revised Quant... Description Amount City of lake Elsinore Misc Concrete Work (See Estimate 23-6815) 16 Asphalt saw cut 4'slab If. 352.00 30 Concrete footing 12'xl2'2 Bars of steel Mb If 924.00 48 Split face cinder block wall(Brown)6'x8'xl6'per Lf. (Non-retaining) 1,47L40 30 Purchase and install Standard block cap Brown.3011(CREDITED DUE TO -594.00 CHANGES rN SCOPE) 2 Purchase and install(2)6"pipe ballads with 18"x 18"x 2'footings painted traffic 1,610.00 yellow. 1.5 Concrete pump per pour and yards S8 dollars per yard over 8 yrds.(MIX BY BAND 331.25 INSTEAD)-S 100. 0.75 Prepare job by ordering materials scheduling with management and weekly supervision 937.50 of site. 1 Clean job site,bring trash to dumpster,sweep per sf.(dumpster not included) 300.00 No asphalt patching included. (ADDED SCOPE BELOW) 1 Purchase and supply designer cap for new planter walls and existing wall at entry 5,340.00 1 Purchase and install(24)additional block per city to go higher(REVISED) 219.00 1 Provide solid block grouting for new bl�/o++ck added at planters(REVISED) 329.00 4120- E&Q 1-r3- 7,0Z3 Total $11,227.15 Thank you for your Business!!! • ••• • PAID w ith AP Automation • Fri 4:i Corry:,101esc1 .yrendo 02/24/2023 03/02/2023 AAA RESTORATION, INC. City of Lake Elsinore,CA Flay'went RO"'-r,nce hvok::o Count Amo ;t APA23002688 1 invoice $11,227.15 THIS IS A CONFIRMATION OF A ACH PAYMENT AAA RESTORATION,INC. Invoice 29850 2ND STREET LAKE ELSLtiORE,CA 92532 _ Date Invoice# Lic#B834839 10K 2/16/2023 20790 tSOit�IPJVI�,t1U19!Ila Ill ' i Bill To City of Lake Elsinore � ��� I 130 S.Main St. - - - Lake Elsinore,Ca. 1530 FEB 2 X 2023 =iEP 13v: NAT-61936-1 P.O.No. Terms Project Due on receipt 22039 Fencing @ Minthorn st Bill ZluanL. Description Amount City of Lake Elsinore Fence at lot on Minthorn st as listed below.(BILLING FOR WORK COMPLETED)READ NOTES BELOW Trees and rocks will be removed by City to make a flat area for fencing. Scope; 65 Concrete footing 18'x24'with 2 bars of steel t&b If.(COMPLETE) 5,703.75 1 L metal imbedded In concrete footing for gate to run on.65'long(COMPLETE) 607.50 1 Dig footing for gate(ROCK CLAUSE IF 1N THE WAY MAY INCREASE PRICE) 1,800.00 (COMPLETE) 1 Prepare job by ordering materials scheduling with management and weekly supervision L250.00 of site.('REDUCED AMOUNT) Additional option for a bottom rail would be$2400.00(NOT NEEDED) AAA 965V4Wn'0-(' I Jos µ; �! tar F�.ici ailb� StA�4 �iD)i� � • '• Z�000S Aar: Na• '. 500 -41 so -S b o S Total $9,361.25 Thank you for your Business!!! 000 ����U�� n��nu� withAPAutomation Vendor 03/18/2033 03/22/2023 AAA RESTORATION,iINC. City ofLake Elsinore,CA Poympo�c��eeo/e |o,oioeCoun, Amount AFA23003422 liDYoicS $9,361.25 THIS |3A CONFIRMATION OFAACHPAYMENT AAA RESTORATION.INC. Invoice 29850 2ND STREET LAKE ELSNORE,CA 92532 10 Date Invoice# Lic#B834839 RE IL ' 5/2/2023 20860 SOIIt�Ir'IM�'13�DI'Iffa I!'�l.(r'OIf��EIfOP,cSf!(C2� Bill To City of Lake Elsinore b f(�[ Q 130 S.Main St. - --- -- Lake Elsinore,Ca. 1530 MAY 0 3 ZQ[3 U ;'{ 0 2 T? .E By. — c PAYABLE NAT-61936-1 P.O.No. Terms Project 23-6887 Due on receipt 23010 Peck St Concrete Quant.. Description Amount Peck St Concrete 1 Demo existing asphalt curb and cut street for new gutter 50 l.f. 1,350.00 50 Form and poor curb.and gutter 5011. 2;925.00 200 Form and pour driveway approach 20'x 10'6"thick 3,240.00 250 Form and pour side walk of 5'x 50'4"thick 3,150.00 5 Haul off debris from site to dump.per load. 1,350.00 1.5 Management of job site scheduling daily tasks supervision and inspections per week. 2,250.00 i Total $14,265.00 Thank you for your Business!!! 0�0 !.0 PAID with AP Automation 05/25/2023 05/31/2023 AAA RESTORATION, INC. City of Lake Elsinore,CA P 0,,71enZ Ref€i,i',,nc I;'1`,/colt• =`..:ui;rlt' Lii lri€ ;it APA23004144 1 invoice $14,265.00 THIS IS A CONFIRMATION OF A ACH PAYMENT