HomeMy WebLinkAboutPA 2018-33 - SR
REPORT TO PLANNING COMMISSION
To: Honorable Chairman and Members of the Planning Commission
From: Justin Kirk, Assistant Community Development Director
Date: December 3, 2019
Subject: IE Licensing – A request by to establish an approximately 5,000 sf Cannabis
Facility within an existing building located at 31885 Corydon Units 130, 140, and
150.
Applicants: David Hargett, I.E. Licensing
Recommendation
ADOPT, A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, RECOMMENDING TO THE CITY COUNCIL OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, APPROVAL OF MODIFICATIONS TO DEVELOPMENT
AGREEMENT NO. 2018-01 TO INCREASE THE TOTAL AREA FROM 1,550 SF TO AN
APPROXIMATELY 5,000 SQUARE FOOT CANNABIS FACILITY WITHIN AN EXISTING
BUILDING LOCATED AT 31885 CORYDON UNITS 130, 140, AND 150 (APN:370-031-17, 370-
031-018 AND 370-031-019); AND,
ADOPT, A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, RECCOMENDING TO THE CITY COUNCIL OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, APPROVAL OF MODIFICATIONS CONDITIONAL USE PERMIT NO.
2018-05 TO INCREASE THE TOTAL AREA FROM 1,550 SF TO AN APPROXIMATELY 5,000
SQUARE FOOT CANNABIS FACILITY WITHIN AN EXISTING BUILDING LOCATED AT 31885
CORYDON UNITS 130, 140, AND 150 (APN:370-031-17, 370-031-018 AND 370-031-019).
Discussion
The proposed project would modify a previously approved 1,550 SF Cannabis Facility within an
existing building (Project). The facility will consist of 812 SF of manufacturing space and 738 SF
of warehouse and ancillary use space. The proposed modifications would result in in
approximately 1,850 SF of cultivation, 2,150 SF of manufacturing and ancillary uses, and a retail
dispensary not to exceed 1,000 SF. The subject site is zoned M1.
Analysis
General Plan Consistency
The subject site has a General Plan Land Use Designation of Limited Industrial (LI) and is in the
Business District. The focus of the Business District is to support its position as the industrial and
commercial hub of the City. Specific Goals of the Business District applicable to this project
include:
Roots 2 Harvest
December 2, 2019
Page 2 of 5
To encourage its position as the industrial and commercial hub of the City and to ensure
that new growth respects the environmental sensitivity of the natural wetlands, floodway
and floodplain.
Support a vibrant commercial and industrial hub with high quality developments that have
a strong orientation towards major corridors.
Provide a safe and comprehensive roadway network for vehicular, truck, bicycle, and
pedestrian traffic throughout the Business District.
The LI designation provides for industrial parks, warehouses, manufacturing, research and
development, public and quasi-public uses, and similar and compatible uses. The proposed
Cannabis Facilities are a hybrid of manufacturing, cultivation and retail commercial uses (i.e.
dispensaries and distribution facilities). These uses are compatible with existing uses within the
LI designation such as Ceramic products manufacture using only previously pulverized clay, and
kilns fired by electricity or gas, manufacturing, assembling, compounding, packaging, and
processing of cosmetics, drugs, and pharmaceuticals, wholesale distribution facilities, and animal,
food, or beverage processing. The retail components of these facilities are limited to accessory
uses, which comprise less than 25% of the total area of the facility This limitation is intended to
engender consistency with the intent of the LI designation and to reduce related impacts to the
existing surrounding land uses. The proposed facilities are wholly located within existing buildings
and do not propose or are allowed to have exterior operations. The proposed cannabis facilities
help to further the goals of the Business district by reinforcing the viability of the industrial hubs
and help to create vibrant industrial hubs by introducing additional business in existing
developments that would create high paying jobs, reduced vacancy rates, and increased
investment in the existing industrial parks.
Development of the existing buildings were subject to the California Environmental Quality Act
and have had corollary environmental analysis, inclusive of a comprehensive traffic impact
analysis previously prepared and approved. The City’s adopted Traffic Impact Analysis guidelines
assert that Level 1 projects (100-200 peak hour trips) in areas where a comprehensive traffic
analysis have been performed and road improvement infrastructure funding mechanisms are in
place are exempt from further review, the proposed project less than 100 peak trips when
compared to the previously analyzed project. Furthermore, the City’s Transportation Infrastructure
Fee (TIF) has been established to further reduce traffic related impacts by funding traffic related
improvements and the individual projects are required to pay applicable fees inclusive of TIF.
Because the individual projects and the cumulative projects do not create peak trip generation in
excess of 200 trips, there have been comprehensive traffic analysis prepared previously and there
is a funding mechanism to traffic improvements, the subject projects are exempt from the
requirements of the preparation project specific traffic impact analysis, no further traffic related
analysis are required
Overall, the proposed cannabis facilities introduce new land uses to an existing mix of industrial
and qusai-commercial uses. The proposed facilities have been previously identified as furthering
the goals of the Business District and not creating new unmitigated significant impacts, because
of this they are found to be consistent with the General Plan.
Municipal Code Consistency
Roots 2 Harvest
December 2, 2019
Page 3 of 5
The subject projects have a base zoning designation M-1 Limited Manufacturing District. The
proposed cannabis facilities are located wholly within existing industrial parks, which have been
previously analyzed for consistency with the base district development standards and other
criteria and were found to be consistent with the applicable base zoning designations. A review
of the current operational characteristics did not find any code violations and the building are in
compliance with the base district regulations as well. With respect to Cannabis related land uses,
Chapter 17.156 Cannabis Uses, of the Lake Elsinore Municipal Code, specifically regulate these
uses. Chapter 17.156 asserts specific operational requirements including the following:
Site Security
Limitation to indoor locations only
Restricted access, including specific spaces accessible to the public and those spaces
restricted
Signage
Proximity to schools and religious institutions
Prohibition on the consumption of cannabis onsite
Prohibition on the possession, sales and consumption of alcoholic beverages
Prohibition of juveniles to be onsite or work in a cannabis facility
Hours of Operation – 7:00 am to 9:00 pm
Annual financial reporting
Compliance with Building, Fire Code and other permitting requirements.
Limitation on certain equipment, methods, solvents, gases and mediums when creating
cannabis extracts.
o Manufacturing facilities with a state license of a Type 6 (nonvolatile) or a Type 7
(volatile) classification may be allowed to operate under this chapter.
o Manufacturers shall not use any Class I or Class II solvents, as those terms are
defined in Federal Drug Administration Guidance, Table I, published in the Federal
Register on December 24, 1997 (62 FR 67377), for extraction.
o Manufacturers shall use butanes, ethanol, carbon dioxide, propane, heptane or
other solvents exhibiting low to minimal potential human health-related toxicity for
extraction, or other methods approved by the State of California
o Manufacturers may use heat, screens, presses, steam distillation, ice water, and
other methods of extraction without employing solvents or gases to create kief,
hashish, bubble hash, or vegetable oils or fats derived from natural sources, and
other extracts.
Specific requirements on the supervision of the design, installation and operation of the
facility’s systems and manufacturing processes
Compliance with state regulations
The proposed cannabis facilities have been analyzed for the consistency with these operational
requirements and the proposed facilities have been found to meet these requirements. In addition
to the aforementioned code requirements, additional detail information was specified in the
application materials these include the following:
Fire protection plan
Closure plan, i.e., a plan to fully restore the occupied space to the condition that existed
before the establishment of a cannabis related facility and the posting of a bond so that
the City could authorize the work without incurring financial liability
Roots 2 Harvest
December 2, 2019
Page 4 of 5
Information related to project proponents
Project specific details as to the operational characteristics identifying the number of
employees, production quantities and values, and other pertinent information.
These additional details were required to ensure that the proposed facilities operated in a safe
manner and would not create unintended impacts during the construction, operation and closure
of these facilities. Staff has reviewed these additional details and have found that the materials
submitted demonstrate that the proposed cannabis facilities would operate in a manner that would
not adversely impact the adjacent business in operation.
Because the proposed cannabis facilities meet the minimum code requirements and do not
propose any adverse impacts on adjacent businesses, they have been found consistent with the
Municipal Code.
Implementation
The proposed cannabis facilities are currently in the first phase of the establishment of the use.
This first phase will culminate in an action on the appropriateness of the proposed land use and
the corollary environmental review.
The next phase will involve the plan checking, permitting and inspection of the perspective
cannabis land uses. Specifically, during the plan check process the internal tenant improvements
will be vetted against the applicable building and fire codes and other state requirements for these
facilities. After permit issuance, typical inspections would occur to ensure that compliance with
the approved building plans. During the construction-permitting process, the proposed cannabis
facilities would be able to proceed with obtaining requisite state licenses that would mirror some
of the City process of the cannabis business permit. These mirrored processes would include
review of the proposed security plans, fire protection plans, and other operational characteristics.
Culmination of these processes would occur with the issuance of certificate of occupancy, which
has been conditioned to be dependent on the issuance of a State license and a City cannabis
business permit.
Once operational, the proposed cannabis facilities have been conditioned to have quarterly life
safety inspections to ensure the operations are in compliance with the relevant permits and that
they are operating in a safe manner. Furthermore, an annual inspection with the potential
responding fire crews will help to facilitate a safer emergency response by ensuring those
responding have inspected the facility and have a familiarity with the operation. The proposed
cannabis facilities have also been required to retain specific financial information, changes in
owners and/or operators and an inventory control system to ensure that there is a transparency
in the operation.
Summary
The proposed cannabis facility has been vetted against all applicable standards and have been
found consistent with those standards. Appropriate Conditions of Approval have been included
that would mitigate any potential issues associated with the future development and
establishment of the use. Building and Safety and Fire divisions will conduct occupancy inspection
to ensure the space is adequate for the proposed use.
Roots 2 Harvest
December 2, 2019
Page 5 of 5
Environmental Determination
The proposed project is exempt from the California Environmental Quality Act (CEQA) pursuant
to Section 15301 (Class 1: Existing Facilities). Class 1 consists of the operation, repair,
maintenance, permitting, leasing, licensing, or minor alteration of existing public or private
structures, facilities, mechanical equipment, or topographical features, involving negligible or no
expansion of use beyond that existing at the time of the lead agency’s determination. The
proposed projects will be located in existing buildings. The site is fully developed, and only minor
interior alterations are planned in association with the proposed use. Further, the proposed
projects have been adequately conditioned to minimize potential adverse environmental impacts
and have been required to obtain all applicable regulatory permits.
Exhibits
A – PA 2019-28 DA Resolution
B – PA 2019-28 CUP Resolution
C – PA 2019-28 Conditions of Approval
D – PA 2018-33 Vicinity Map
E – PA 2018-33 Aerial Map
F – PA 2018-33 Amended Business Description
G - PA 2018-33 Amended Project Plans