HomeMy WebLinkAboutCIP Budget for FY 2020-21 to 2024-25CITY OF LAKE ELSINORE, CALIFORNIA CAPITAL IMPROVEMENT PLAN BUDGET FY 2020-2021 to FY 2024-2025
1 Capital Improvement Plan Budget Fiscal Years 2020-2025 City Council Brian Tisdale, Mayor Robert E. Magee, Mayor Pro Tem Natasha Johnson Steve Manos Timothy J. Sheridan City Manager Grant Yates Administrative Services Department Jason Simpson Assistant City Manager 130 South Main Street Lake Elsinore, California 92530 (951) 674-3124 www.lake-elsinore.org
2 VISION STATEMENT THE CITY OF LAKE ELSINORE WILL BE THE ULTIMATE LAKE DESTINATION WHERE ALL CAN LIVE, WORK, AND PLAY BUILD FUTURES AND FULFILL DREAMS
3 VALUE STATEMENT AS EMPLOYEES OF THE CITY OF LAKE ELSINORE, IN STRIVING TO BE DEDICATED TO OUR LOCAL GOVERNMENT, WE VALUE THE FOLLOWING: CITY OF LAKE ELSINORE EXPRESSION OF EXTREME CUSTOMER SERVICE C.A.A.R.E. Customer Service Perspective Treat your customer the way you would want to be treated. Be overly courteous, a good listener and extremely respectful. Treat your fellow employees as your customer! Authentic Best Be your best self and provide sincere customer service. Always remember, there is no way that the quality of customer service can exceed the quality of the people who provide it! Anticipate Customer’s Needs Improve the quality of customer service by preparing in advance for common inquiries. Respond to Customer’s Needs Provide responses that are timely, accurate and complete. Respond within a business day, and assure customers that you are personally accessible if they have further concerns. Extreme Customer Service Make it extremely easy to do business with! Providing extreme customer service is our business.
4
5
TRANSMITTAL MESSAGE
June 23, 2020
The Honorable Mayor and Members of the City Council:
On behalf of City Staff, it is my privilege to submit the City of Lake Elsinore’s Capital Improvement Plan (CIP) Budget for Fiscal Years 2020-21
through 2024-25. All Projects presented in this five-year budget have been carefully programmed to ensure the community’s capital
improvement needs are met both now and in the future.
CITY OF LAKE ELSINORE PROFILE
The City of Lake Elsinore is a community comprised of approximately 63,365 citizens. The City maintains 19 parks on 120 acres throughout the
community, which provide recreation opportunities for both the citizens of Lake Elsinore, as well as surrounding communities . The City
maintains approximately 189.3 miles of streets within its boundaries. The Lake Elsinore Unified School District provides 24 schools for 21,300
students. The City of Lake Elsinore prides itself on its community focus and quality of life by focusing on public safety, i mproving recreational
opportunities and neighborhoods, delivering the highest quality of public services, preserving and enhancing the City ’s economic prosperity, and
by meeting the City’s capital improvement needs, we have outlined plans that make the City of Lake Elsinore the desirable place to live, work,
and play.
ECONOMIC DEVELOPMENT POLICY
The City’s economic development policy centers on providing a broad range of infrastructure improvements to induce both tourism and bu siness
investment. By providing a commercial and residential core that is attractive and possesses adequate infrastructure to suppo rt the residential,
business, and tourist population, the City of Lake Elsinore is the desirable place to live, work, and play. Significant attractions in this budget
document include the Downtown Active Transportation and Urban Greening project, McVicker Skate Park and Launch Pointe. All of these
projects will provide additional opportunities and access to the City and improve the overall quality of life.
CAPITAL BUDGET POLICY
The purpose of the CIP Budget Document is to serve as a planning tool, which coordinates the financing and scheduling of majo r projects
undertaken and revised annually to address changing needs, priorities, and financial conditions. The capital improvements pre sented in this
document are the City’s major projects, which exceed $20,000 in cost, have long-term life spans, and are generally non-recurring. These
projects include land and right-of-way acquisition, design, construction or rehabilitation of public buildings or facilities, public infrastructure
design and construction, and park design and construction. The City’s goal in providing a CIP Budget is to develop a multi-year plan for capital
improvement, update it annually, and follow through with all capital improvements in accordance with the plan. In determinin g the relative merit
of a proposed project, key management team members evaluate projects for feasibility, community enhancement, infrastructure and historic
preservation, and safety.
6
TRANSMITTAL MESSAGE - Continued
CAPITAL IMPROVEMENT PLAN SUMMARY
The purpose of the CIP Budget Document is to serve as a planning tool, which co -ordinates the financing and scheduling of major projects
undertaken by the City. The CIP document is prepared in accordance with generally accepted accounting principles. This docume nt is dynamic
and, consequently, must be revised annually to address changing needs, priorities, and financial conditions. The capital impr ovements
presented in this document are the City’s major projects, which exceed $20,000 in cost, have long -term life spans, and are generally
non-recurring. These projects include land and right-of-way acquisition, design, construction or rehabilitation of public buildi ngs or facilities,
public infrastructure design and construction, and park design and construction. The City ’s goal in providing a CIP Budget is to develop a
multi-year plan for capital improvement, update it annually, and follow through with all capital improvements in accordance with the plan. In
determining the relative merit of a proposed project, key management team members evaluate projects for feasibility, communit y enhancement,
and safety.
PLAN DEVELOPMENT
This CIP budget document was developed by incorporating input from key management team members, based on community comments a nd
feedback received throughout the year. This team then, identified and evaluated community needs in the areas of roads/streets , bridges, public
buildings, and parks and recreation facilities projects. Each proposed project was reviewed and discussed to ensure funding, timing, and
necessity were appropriately addressed. All projects were evaluated by the City ’s Planning Commission to ensure consistency with the City of
Lake Elsinore General Plan, while considering the City’s long-term vision as developed by the City Council. The proposed circulation, facilities,
infrastructure, and park projects were reviewed and approved by the Planning Commission.
Projects in this document have been scheduled in each of the five fiscal years based on community needs, as determined by the City Council
and availability of funding. The fiscal years 2020 -21 to 2024-25 CIP identifies a total of 53 projects consisting of 29 Circulation Projects totaling
$315,640,811, 12 Facilities Projects totaling $66,617,052, 4 Infrastructure Projects totaling $7,689,882; and 8 Park Projects totaling
$59,229,445. The total cost to complete all of the proposed projects is $449,177,190 of which $44,053,805 is programmed for FY2020-21. Also
of note, in this document, there is over $3 million in project costs with unspecified funding sources. These projects have b een identified as
necessary infrastructure of the City, and will require that funding sources be identified before the projects can commence.
7
TRANSMITTAL MESSAGE - Continued
BUDGET CALENDAR
JANUARY Mid-year budget analysis and revision
Council adoption of mid-year operating and CIP budgets
FEBRUARY Development of budget parameters/strategic goals
Distribution of Budget Preparation Guidelines
Budget workshop with key City staff
Proposed CIP ("Capital Improvement Plan") projects submitted to Finance
MARCH All revenue estimates completed by Finance
Budget analysis prepared for review by City Manager
APRIL Preliminary operating and CIP budgets prepared
CIP project timing and priorities modified based on available revenues
MAY Public budget workshop with City Council allowing for public input
Planning Commission - CIP Conformance with General Plan
JUNE Public Hearing Council adoption of final operating and CIP budgets
CIP BUDGET INFORMATION PROVIDED
Information included in this document is as follows:
Description of Priorities provides the guidelines used in prioritizing projects.
Parameters for CIP Budget Costs Estimates provides standard estimating criteria for project costs.
Description of Revenue Sources provides a general description of sources of revenue for the CIP.
Projected Revenue Summary provides five-year projections for each of the major sources of funds to be utilized for capital
improvements.
Project Summary by Type of Project provides summary information of the CIP projects arrayed on spreadsheets by the type
project and priority.
Comparison Between Projected Revenue and Costs provides summary information of costs versus revenue in each fiscal year by
source of funds.
Project Descriptions provide a description of each project which includes the scope of the project, costs, sources of funds, the fiscal
year(s) in which the project is anticipated to be constructed, and a location map.
Future Year Projects provide an opportunity for long range planning that exceeds the five-year period in each of the major
groupings (Circulation, Facilities & Infrastructure, Parks and Successor Agency/Housing).
8
TRANSMITTAL MESSAGE - Continued
CONCLUSION
The revenue estimates, although conservative, are strictly estimates. The actual amount of funds available for construction will vary based upon
the state of the economy. The City’s major revenue sources are primarily received from various county programs, state programs and grants,
and development impact fees. The City Council will be updated throughout the year on the status of projects and correspondin g revenue
sources. The fiscal years 2021-25 Capital Improvement Plan is a result of a total team effort of both City staff and City Council. There are 35
projects which are scheduled to begin design, construction and/or be completed in fiscal year 2020 -21. These projects are intended to enhance
the safety and quality of life for all citizens in the community. I would like to thank staff and the City Council for all o f the contributions that were
made in developing the capital budget that will serve as the footprint for the City’s future.
Sincerely,
Grant Yates,
City Manager
9
RESOLUTION
RESOLUTION NO. 2020 - XXX
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE, CALIFORNIA, ADOPTING
THE CAPITAL IMPROVEMENT PLAN FOR FISCAL YEARS 2020-21 TO 2024-25.
WHEREAS, the City of Lake Elsinore annually adopts and updates a long-range program of proposed capital improvement projects with single
and multiple-year capital expenditures to guide the planning, scheduling and budgeting of capital improvement projects during th e next five-year
period; and,
WHEREAS, staff has prepared a proposed Capital Improvement Plan (CIP) for Fiscal Years 2020-21 to 2024-25 which includes appropriations
for each capital improvement project presented in the budget, with some projects spanning multiple fiscal years; and,
WHEREAS, the proposed CIP for Fiscal Years 2020-21 to 2024-25 was submitted to the Lake Elsinore Planning Commission at its regularly
scheduled public meeting of June 2, 2020; and,
WHEREAS, in accordance with Government Code Section 65401, the Lake Elsinore Planning Commission made a finding at their meeting of
June 2, 2020, that the CIP for Fiscal Years 2020-21 to 2024-25 conforms to the Lake Elsinore General Plan; and,
WHEREAS, the Planning Commission has caused to be transmitted to the City Council a copy of its report and resolution finding that the CIP for
Fiscal Years 2020-21 to 2024-25 conforms to the Lake Elsinore General Plan; and,
WHEREAS, the proposed CIP for Fiscal Years 2020-21 to 2024-25 was submitted to the City Council at a noticed public hearing on June 23,
2020; and,
WHEREAS, the City Council considered testimony and evidence presented at the public hearing on June 23, 2020, and reviewed the proposed
CIP for Fiscal Years 2020-21 through 2024-25 in light of all information presented.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVES, DETERMINES AND ORDERS
AS FOLLOWS:
SECTION 1. The Council confirms and accepts the finding of the Lake Elsinore Planning Commission that the CIP for Fiscal Years 2020 -21 to
2024-25 conforms to the Lake Elsinore General Plan.
10
RESOLUTION - Continued
SECTION 2. The City Council finds that the CIP for Fiscal Years 2020-21 to 2024-25 demonstrates the efficient appropriation of public funds
relating to the implementation of capital improvement projects anticipated to be undertaken throughout the City over the course of the ensuing
five years. The Council further finds that the CIP is a governmental fiscal activity which does not involve a commitment to a specific project that
may result in potentially significant impacts on the environment and that the adoption of the CIP is not a "project" within t he meaning of California
Environmental Quality Act (CEQA). Individual projects developed pursuant to the CIP will be subject to CEQA.
SECTION 3. The CIP for Fiscal Years 2020-21 to 2024-25 is hereby approved and adopted. A copy of the CIP for Fiscal Years 2020 -21 to
2024-25 hereby adopted and certified by the City Clerk, shall be filed with the City Manager or a designated representative, and a further copy
so certified shall be placed and shall remain on file in the Office of the City Clerk where it shall be available for inspect ion.
SECTION 4. This Resolution shall take effect from and after the date of its passage and adoption.
PASSED AND ADOPTED on the 23rd day of June, 2020.
______________________________
Brian Tisdale, Mayor
ATTEST:
____________________________
Candice Alvarez
City Clerk
11
RESOLUTION - Continued
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF LAKE ELSINORE )
I, Mark Mahan, Deputy City Clerk of the City of Lake Elsinore, California, hereby certify that Resolution No. 2020-XXX was adopted
by the City Council of the City of Lake Elsinore, California, at the regular meeting of June 23, 2020, and that the same was adopted
by the following vote:
AYES: Council Members Johnson, Manos and Sheridan, Mayor Tisdale, Mayor Pro Tem Magee
NOES:
ABSENT:
ABSTAIN:
Candice Alvarez
City Clerk
13
TABLE OF CONTENTS
CIRCULATION PROJECTS
Annual Citywide Programs ..................................................................................................................................................................................................................
Crack Seal & Pothole Improvements ........................................................................................................................................................................................ 14
Curb, Gutter & Sidewalk Improvements .................................................................................................................................................................................... 16
Dirt road paving ......................................................................................................................................................................................................................... 18
Intersection Signal Upgrades .................................................................................................................................................................................................... 20
Landscape Renovation ............................................................................................................................................................................................................. 22
Roadway Drainage Improvements ............................................................................................................................................................................................ 24
SB1 Pavement Rehabilitation Program .................................................................................................................................................................................... 26
Sidewalk Improvements ............................................................................................................................................................................................................ 28
Slurry Seal ................................................................................................................................................................................................................................. 30
Traffic Striping ........................................................................................................................................................................................................................... 32
Active Transportation/Commuter Based Access Plan .................................................................................................................................................................... 34
Auto Center Drive Bridge Retrofit .................................................................................................................................................................................................... 36
Downtown Active Transportation—Pottery Court ............................................................................................................................................................................ 38
Highway Safety Improvements Cycle 8........................................................................................................................................................................................... 40
Highway Safety Improvements Cycle 9........................................................................................................................................................................................... 42
I-15/Railroad Canyon Ultimate Interchange Phase I ....................................................................................................................................................................... 44
I-15/State Route 74 Interchange ..................................................................................................................................................................................................... 46
Larson Road Improvements ............................................................................................................................................................................................................ 48
Main Street Interchange .................................................................................................................................................................................................................. 50
Sidewalk Survey Program ............................................................................................................................................................................................................... 52
Sign Inventory .................................................................................................................................................................................................................................. 54
Temescal Canyon Bridge Replacement & Road Widening Phase I ............................................................................................................................................... 56
14
ANNUAL CITYWIDE CRACK SEAL & POTHOLE IMPROVEMENTS
PROGRAM
15
PROJECT TITLE:ANNUAL CITYWIDE CRACK SEAL & POTHOLE IMPROVEMENTS PROGRAM
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10002
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 60,000$
CONSTRUCTION 210,000 230,000 250,000 270,000 290,000 290,000 1,540,000
TOTALS:-$ 220,000$ 240,000$ 260,000$ 280,000$ 300,000$ 300,000$ 1,600,000$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
GAS TAX (FUND 110)220,000$ 240,000$ 260,000$ 280,000$ 300,000$ 300,000$ 1,600,000$
TOTAL FUNDING:-$ 220,000$ 240,000$ 260,000$ 280,000$ 300,000$ 300,000$ 1,600,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
The project is annual and ongoing.
This project represents the City's efforts to proactively maintain and extend the useful life of aging asphalt roadway surfaces.
This project includes annual crack sealing and pothole repair services throughout the City.
FUTURE
OPERATION & MAINTENANCE COSTS:
16
ANNUAL CITYWIDE CURB, GUTTER & SIDEWALK IMPROVEMENTS
PROGRAM
17
PROJECT TITLE:ANNUAL CITYWIDE CURB, GUTTER & SIDEWALK IMPROVEMENTS PROGRAM
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10001
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 180,000$
CONSTRUCTION 290,000 310,000 330,000 350,000 370,000 370,000 2,020,000
TOTALS:-$ 320,000$ 340,000$ 360,000$ 380,000$ 400,000$ 400,000$ 2,200,000$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
MEASURE A (FUND 112)220,000$ 190,000$ 190,000$ 190,000$ 195,000$ 195,000$ 1,180,000$
UNSPECIFIED 100,000 150,000$ 170,000$ 190,000$ 205,000$ 205,000$ 1,020,000
TOTAL FUNDING:-$ 320,000$ 340,000$ 360,000$ 380,000$ 400,000$ 400,000$ 2,200,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project extends the life-cycle of City infrastructure, improves water runoff and supports pedestrian and bicyclist safety.
Specific project locations are identified and prioritized based on the level of damage and accompanying potential safety issues.
This is an ongoing annual project for the repair and/or replacement of hazardous curbs, gutters, and sidewalks throughout the City.
FUTURE
OPERATION & MAINTENANCE COSTS:
18
ANNUAL CITYWIDE DIRT ROAD PAVING PROGRAM
19
PROJECT TITLE:ANNUAL CITYWIDE DIRT ROAD PAVING PROGRAM
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10047
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 15,000$ 15,000$
DESIGN 25,000 25,000
CONSTRUCTION 415,558 415,558
TOTALS:-$ 455,558$ -$ -$ -$ -$ -$ 455,558$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
AB2766 (FUND 606)455,558$ 455,558$
TOTAL FUNDING:-$ 455,558$ -$ -$ -$ -$ -$ 455,558$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Pave the dirt road portions of Morton Avenue and Hill Avenue off Chaney Street; Miller Street between Palm Drive and Strickland Avenue; Herbert,
Morton, Lucerne, and Marian off East Lakeshore Drive; Dawes Street from Avenue 6 to the end of the street; Acacia Street from Country Club Boulevard to
the end of the street; and Baker, Bromley and Bunker off Riverside Drive.
This project will eliminate the remaining dirt roads within the City.
This project is annual and ongoing.
FUTURE
OPERATION & MAINTENANCE COSTS:
20
ANNUAL CITYWIDE INTERSECTION SIGNAL UPGRADES PROGRAM
21
PROJECT TITLE:ANNUAL CITYWIDE INTERSECTION SIGNAL UPGRADES
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10052
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
DESIGN 1,000$ 1,000$ 1,000$ 1,000$ 1,000$ 1,000$ 6,000$
CONSTRUCTION 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000
TOTALS:-$ 201,000$ 201,000$ 201,000$ 201,000$ 201,000$ 201,000$ 1,206,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
TIF (FUND 205)201,000$ 201,000$ 201,000$ 201,000$ 201,000$ 201,000$ 1,206,000$
TOTAL FUNDING:-$ 201,000$ 201,000$ 201,000$ 201,000$ 201,000$ 201,000$ 1,206,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Upgrading traffic signals to modern equipment will decrease maintenance costs, improve functionality and increase safety.
This project will be an annual and ongoing project each fiscal year.
FUTURE
OPERATION & MAINTENANCE COSTS:
Signal controller upgrades on Lincoln and Chaney, upgrade emergency vehicle equipment along Central Avenue and citywide signal communications
network.
22
ANNUAL CITYWIDE LANDSCAPE RENOVATION PROGRAM
23
PROJECT TITLE:ANNUAL CITYWIDE LANDSCAPE RENOVATION PROGRAM
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10009
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
DESIGN 100,000$ 100,000$
CONSTRUCTION 200,000 300,000$ 500,000
TOTALS:-$ 300,000$ 300,000$ -$ -$ -$ -$ 600,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CAPITAL IMPROVEMENT (FUND 500)300,000$ 300,000$ 600,000$
TOTAL FUNDING:-$ 300,000$ 300,000$ -$ -$ -$ -$ 600,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project improves landscaping and irrigation within specific right-of-way areas, including the installation of drought tolerant plant materials and
water efficient irrigation equipment.
The project is annual and ongoing.
FUTURE
OPERATION & MAINTENANCE COSTS:
This project provides for the rehabilitation of landscaping, medians, and irrigation equipment within City-maintained right-of-way areas.
24
ANNUAL CITYWIDE ROADWAY DRAINAGE IMPROVEMENTS PROGRAM
25
PROJECT TITLE:ANNUAL CITYWIDE ROADWAY DRAINAGE IMPROVEMENTS PROGRAM
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10000
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 10,000$ 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 160,000$
ENGINEERING 20,000 10,000 10,000 10,000 10,000 10,000 70,000
DESIGN 50,000 25,000 30,000 35,000 35,000 35,000 210,000
CONSTRUCTION 321,675 130,000 145,000 155,000 155,000 155,000 1,061,675
TOTALS:-$ 401,675$ 195,000$ 215,000$ 230,000$ 230,000$ 230,000$ 1,501,675$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
STORM DRAIN (FUND 211)389,481$ 389,481
UNSPECIFIED 12,194 195,000$ 215,000$ 230,000$ 230,000$ 230,000$ 1,112,194
TOTAL FUNDING:-$ 401,675$ 195,000$ 215,000$ 230,000$ 230,000$ 230,000$ 1,501,675$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project is annual and ongoing.
This ongoing project provides for the installation of new or replacement drainage facilities located within City right-of-way areas.
This project ensures that drainage facilities are functioning properly to support the integrity of the roadways during inclement weather.
FUTURE
OPERATION & MAINTENANCE COSTS:
26
ANNUAL CITYWIDE SB1 PAVEMENT REHABILITATION PROGRAM
27
PROJECT TITLE:ANNUAL CITYWIDE SB1 PAVEMENT REHABILITATION PROGRAM
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10059
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 15,000$ 15,000$ 15,000$ 15,000$ 15,000$ 15,000$ 90,000$
DESIGN 20,000 20,000 20,000 20,000 20,000 20,000 120,000
CONSTRUCTION 1,265,000 1,177,686 1,201,940 1,226,679 1,251,912 1,277,650 7,400,867
TOTALS:-$ 1,300,000$ 1,212,686$ 1,236,940$ 1,261,679$ 1,286,912$ 1,312,650$ 7,610,867$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
SB1 (FUND 109)1,091,882$ 1,212,686$ 1,236,940$ 1,261,679$ 1,286,912$ 1,312,650$ 7,402,749$
UNSPECIFIED 208,118 208,118
TOTAL FUNDING:-$ 1,300,000$ 1,212,686$ 1,236,940$ 1,261,679$ 1,286,912$ 1,312,650$ 7,610,867$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
The City receives Road Maintenance and Rehabilitation funds annually as part of the Road Repair and Accountability Act of 2017. Each year, the City
must declare a specific project in May. The selected project is based on Pavement Conditions Indices (PCI) and Average Daily Traffic (ADT) demand.
This project represents the City's efforts to proactively maintain and extend the useful life of aging asphalt roadway surfaces.
This project will be an annual ongoing project each fiscal year.
FUTURE
OPERATION & MAINTENANCE COSTS:
28
ANNUAL CITYWIDE SIDEWALK IMPROVEMENTS PROGRAM
29
PROJECT TITLE:ANNUAL CITYWIDE SIDEWALK IMPROVEMENTS PROGRAM
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10010
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 60,000$
ENGINEERING 40,000 40,000 40,000 40,000 40,000 40,000 240,000
CONSTRUCTION 150,000 150,000 150,000 150,000 150,000 150,000 900,000
TOTALS:-$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,200,000$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
MEASURE A (FUND 112)100,000$ 105,000$ 110,000$ 112,873$ 115,000$ 542,873$
UNSPECIFIED 200,000$ 100,000 95,000 90,000 87,127 85,000 657,127
TOTAL FUNDING:-$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,200,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project is annual and ongoing. Project is contingent on availability of grant funds.
This project will construct ADA compliant sidewalk, curb and gutter along with safe and continuous sidewalk for students and the community.
FUTURE
OPERATION & MAINTENANCE COSTS:
This project includes the design and construction of sidewalk improvements at various locations within the City.
30
ANNUAL CITYWIDE SLURRY SEAL PROGRAM
31
PROJECT TITLE:ANNUAL CITYWIDE SLURRY SEAL PROGRAM
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10014
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 50,000$ 55,000$ 50,000$ 20,000$ 20,000$ 20,000$ 215,000$
CONSTRUCTION 1,506,536 430,000 440,000 480,000 480,000 480,000 3,816,536
TOTALS:-$ 1,556,536$ 485,000$ 490,000$ 500,000$ 500,000$ 500,000$ 4,031,536$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
MEASURE A (FUND 112)1,556,536$ 200,000$ 205,000$ 210,000$ 210,000$ 210,000$ 2,591,536$
UNSPECIFIED 285,000 285,000 290,000 290,000 290,000 1,440,000
TOTAL FUNDING:-$ 1,556,536$ 485,000$ 490,000$ 500,000$ 500,000$ 500,000$ 4,031,536$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
The Citywide Slurry Seal Program provides for the maintenance and protection of existing asphalt pavement surfaces by filling surface cracks and voids.
Slurry seal is one of the most versatile and cost-effective methods to extend the useful life of the City's paved roadways.
This project is annual and ongoing.
This project includes the design, inspection, striping, monument preservation and slurry seal of asphalt paved roadways maintained by the City. Selected
roadways are programmed annually for slurry seal in accordance with the City's Pavement Management Plan.
FUTURE
OPERATION & MAINTENANCE COSTS:
32
ANNUAL CITYWIDE TRAFFIC STRIPING PROGRAM
33
PROJECT TITLE:ANNUAL CITYWIDE TRAFFIC STRIPING PROGRAM
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10004
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 60,000$
CONSTRUCTION 275,000 285,000 295,000 305,000 315,000 315,000 1,790,000
TOTALS:-$ 285,000$ 295,000$ 305,000$ 315,000$ 325,000$ 325,000$ 1,850,000$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
MEASURE A (FUND 112)185,000$ 195,000$ 200,000$ 205,000$ 205,000$ 205,000$ 1,195,000$
UNSPECIFIED 100,000 100,000 105,000 110,000 120,000 120,000 655,000
TOTAL FUNDING:-$ 285,000$ 295,000$ 305,000$ 315,000$ 325,000$ 325,000$ 1,850,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project is annual and ongoing.
FUTURE
OPERATION & MAINTENANCE COSTS:
This project provides for repairing and/or replacing pavement markings, street striping and legends throughout the City. Our goal is to restripe Stop Bar &
Legends in Thermal Plastic coating which will extend the life of the striping for up to 5 years instead of 1 to 2 years with striping paint.
This project maintains markings that identify travel lanes and other guidance markings for motorists, pedestrians, bicyclists and other forms of
transportation.
34
ACTIVE TRANSPORTATION/COMMUTER BASED ACCESS PLAN
35
PROJECT TITLE:ACTIVE TRANSPORTATION/COMMUTER BASED ACCESS PLAN
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10057
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:COMMUNITY SERVICES
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 191$ 191$
DESIGN 188,300 188,300
CONSTRUCTION 17,500,000$ 17,500,000
TOTALS:188,491$ -$ -$ -$ -$ -$ 17,500,000$ 17,688,491$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
DAG FUND (107)3,684$ 3,684$
SUSTAINABILITY GRANT (FUND 500)134,446 134,446
CAPITAL IMPROVEMENT FUND (500)50,362 50,362
UNSPECIFIED 17,500,000$ 17,500,000
TOTAL FUNDING:188,491$ -$ -$ -$ -$ -$ 17,500,000$ 17,688,491$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project complies with the following adopted Plans and Policies: Maintain the system of bike lanes and multi use trails throughout the City.
Encourage the implementation of the network of Class I, II, and III bike lanes on all development projects through construction of the facility as described
in the Bike Lane Master Plan and/or the Trails Master Plan.
The Active Transportation plan is complete. Implementation will begin when all funding sources are identifed.
This project installation of a Class I Multi-Use Path and sidewalk along the northeastern shore of Lake Elsinore, connecting the communities of Lakeside
Village, Downtown Lake Elsinore and East Lake.
FUTURE
OPERATION & MAINTENANCE COSTS:
36
AUTO CENTER DRIVE BRIDGE RETROFIT
37
PROJECT TITLE:AUTO CENTER DRIVE BRIDGE SEISMIC RETROFIT
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10016
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 19,500$ 40,000$ 30,000$ 20,000$ 109,500$
ENGINEERING 63,487 988,385 345,000 1,396,872
CONSTRUCTION 5,181,200 5,181,200
TOTALS:82,987$ 1,028,385$ 375,000$ 5,201,200$ -$ -$ -$ 6,687,572$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
GENERAL PROJECTS (FUND 105)2,290$ 2,290$
GAS TAX (FUND 110)67,792 18,591$ 86,383
CAPITAL IMPROVEMENT (FUND 500)12,904 12,904
PROPOSITION 1B (FUND 500)379,794 379,794
HBRRP GRANT (FUND 500)630,000 375,000 5,201,200 6,206,200
TOTAL FUNDING:82,987$ 1,028,385$ 375,000$ 5,201,200$ -$ -$ -$ 6,687,572$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project will improve traffic and safety circulation.
This project is currently in the Plan Approval and Environmental Document (PA&ED) phase of work.
This project includes the seismic retrofit of the bridge over the San Jacinto River at Auto Center Drive.
FUTURE
OPERATION & MAINTENANCE COSTS:
38
DOWNTOWN ACTIVE TRANSPORTATION—POTTERY COURT
39
PROJECT TITLE:DOWNTOWN ACTIVE TRANSPORTATION - POTTERY COURT
PROJECT TYPE:CIRCULATION
PROJECT NO.:
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:COMMUNITY SERVICES
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2022-23 FY 2023-24 FUTURE YEARS TOTAL
ADMINISTRATION 16,022$ 35,000$ 51,022$
ENGINEERING 35,000 35,000
DESIGN 109,268 160,000 269,268
CONSTRUCTION 2,210,408 2,210,408
TOTALS:125,290$ 2,440,408$ -$ -$ -$ -$ -$ 2,565,698$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2022-23 FY 2023-24 FUTURE YEARS TOTAL
MEASURE A (FUND 112)
URBAN GREENING GRANT (FUND 500)125,290$ 1,073,348$ 1,198,638$
UNSPECIFIED 1,367,060 1,367,060
TOTAL FUNDING:125,290$ 2,440,408$ -$ -$ -$ -$ -$ 2,565,698$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2022-23 FY 2023-24 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Z10058
The Downtown Active Transportation Connections and Urban Greening Project will cure existing infrastructure gaps and vacant parkways with the
planting of 272 high carbon sequestering shade trees, water efficient vegetation, and drainage infrastructure in parkways, in addition to constructing
over 5,500 linear feet of active transportation infrastructure. In addition, the project will complete a one-mile recreation loop around the downtown
core extending from Main Street, to Pottery Street, across the proposed bridge to the Riverwalk Trail and down the Riverwalk Trail to Graham Avenue and
back to Main Street.
The project will tie into the current bike lane project along Main Street and Graham Street establishing a complete safe shaded downtown core bicycle,
pedestrian, urban greening, and drainage network that connects residents to dozens of activity centers, recreation parks and facilities, and two public
grade schools.
This project is in design stage and will be ready for installation when all funding sources are identifed.
FUTURE
OPERATION & MAINTENANCE COSTS:
40
HIGHWAY SAFETY IMPROVEMENTS—CYCLE 8
41
PROJECT TITLE:HIGHWAY SAFETY IMPROVEMENTS (CYCLE 8)
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10054
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ENGINEERING 267$ 267$
CONSTRUCTION 39,513 745,300$ 784,813
TOTALS:39,780$ 745,300$ -$ -$ -$ -$ -$ 785,080$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
HSIP GRANT (FUND 500)39,780$ 745,300$ 785,080$
TOTAL FUNDING:39,780$ 745,300$ -$ -$ -$ -$ -$ 785,080$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Install advanced delemma zone detection, flashing warning beacons, and left turn phasing at 8 intersections within the City. Intersection are as follows:
Railroad Canyon Road & Church Road, Lake Street & Alberhill Ranch Road, Lake Street & Lakeshore Drive, Lincoln Street & Machado Street, Railroad
Canyon Road & Summerhill Drive, Railroad Canyon Road & Canyon Hills Road, Diamond Drive & Auto Center Drive, Diamond Drive & Lakeshore
Installing advanced dilemma zone dectections for high speed approaches increases safety.
This project is estimated to be completed by the end of fiscal year 2021.
FUTURE
OPERATION & MAINTENANCE COSTS:
42
HIGHWAY SAFETY IMPROVEMENTS—CYCLE 9
43
PROJECT TITLE:HIGHWAY SAFETY IMPROVEMENTS (CYCLE 9)
PROJECT TYPE:CIRCULATION
PROJECT NO.:TBD
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
DESIGN 85,000$ 85,000$
CONSTRUCTION 1,263,900 1,263,900
TOTALS:-$ 1,348,900$ -$ -$ -$ -$ -$ 1,348,900$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
HSIP GRANT (FUND 500)1,348,900$ 1,348,900$
TOTAL FUNDING:-$ 1,348,900$ -$ -$ -$ -$ -$ 1,348,900$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Installing advanced dilemma zone dectections for high speed approaches increases safety.
This project is estimated to be completed by the end of fiscal year 2021.
FUTURE
OPERATION & MAINTENANCE COSTS:
Install advanced dilemma zone detection, protected left turns, and pedestrian countdown heads at 10 various intersections throughout the City.
44
I-15/RAILROAD CANYON ULTIMATE INTERCHANGE PHASE I
45
PROJECT TITLE:I-15/RAILROAD CANYON ULTIMATE INTERCHANGE PHASE I
PROJECT TYPE:CIRCULATION
PROJECT NO.:
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
RIGHT OF WAY 3,300,000$ 3,300,000$
ADMINISTRATION 162,839$ 120,000 120,000$ 402,839
ENGINEERING 966,614 966,614
DESIGN 126,508 4,747,821 600,000 5,474,329
CONSTRUCTION 17,700,000 17,080,000$ 34,780,000
TOTALS:1,255,962$ 8,167,821$ 18,420,000$ 17,080,000$ -$ -$ -$ 44,923,783$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
GENERAL PROJECTS (FUND 105)184,337$ 184,337$
TUMF - WRCOG (FUND 111)36,689 3,879,821$ 17,080,000$ 20,996,510
TUMF - RCTC (FUND 111)986,811 3,550,000 4,536,811
TIF (FUND 205)500,000 500,000
STATE LLP (SB 1)$15,000,000 15,000,000
STIP-RIP 2,920,000 2,920,000
MEASURE A (FUND 112)48,125 48,125
NSFHP GRANT (FUND500)238,000 238,000
UNSPECIFIED 500,000 500,000
TOTAL FUNDING:1,255,962$ 8,167,821$ 18,420,000$ 17,080,000$ -$ -$ -$ 44,923,783$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Construction Contract awarded. Construction set to begin June 2020. The City is required to fund $1 million for landscaping in FY 2021-22.
This project will improve circulation, freeway access and level of service at the Railroad Canyon Road/I-15 interchange and accommodates traffic
generated by future development as well as regional traffic volume increases forecast for 2030.
This project represents the construction of Phase I improvements along Railroad Canyon Interchange.
4227
FUTURE
OPERATION & MAINTENANCE COSTS:
46
I-15/STATE ROUTE 74 INTERCHANGE
47
PROJECT TITLE:I-15/STATE ROUTE 74 INTERCHANGE
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10015
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 46,704$ 100,101$ 146,805$
ENGINEERING 849,509 1,528,650 2,378,159
DESIGN 51,302 5,000,000$ 5,051,302
CONSTRUCTION 54,053,670$ 54,053,670
TOTALS:947,514$ 1,628,751$ -$ 5,000,000$ -$ -$ 54,053,670$ 61,629,935$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
TUMF (FUND 111)552,311$ 1,528,650$ 2,080,960$
MEASURE A (FUND 112)395,203 100,101 495,304
UNSPECIFIED 5,000,000$ 54,053,670$ 59,053,670
TOTAL FUNDING:947,514$ 1,628,751$ -$ 5,000,000$ -$ -$ 54,053,670$ 61,629,935$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project is for PA & ED only. Project design and construction phases cannot begin until a funding source is identified. Construction is estimated at $57
million.
This project improves traffic circulation and reduces traffic congestion at the I-15/SR 74 interchange.
This project will initiate the Plan Approval/Environmental Document (PA&ED) phase of work for future modifications to the existing I-15/SR 74 Interchange
at Central Avenue. Proposed improvements include the construction of a northbound loop entry ramp with acceleration/deceleration lanes;
realignment of the northbound entry/exit ramps; widening of the southbound entry/exit ramps, including acceleration/deceleration lanes; widening of SR
74 from Riverside Drive to Central Avenue from 2 to 4 lanes; widening of Collier Avenue to Cambern Avenue from 6 to 8 lanes; and construction of the
Riverside Drive Overcrossing and road extensions.
FUTURE
OPERATION & MAINTENANCE COSTS:
48
LARSON ROAD IMPROVEMENTS
49
PROJECT TITLE:LARSON ROAD IMPROVEMENTS
PROJECT TYPE:CIRCULATION
PROJECT NO.:TBD
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 10,000$ 10,000
ENGINEERING 50,000 50,000
CONSTRUCTION 690,000 690,000
TOTALS:-$ 750,000$ -$ -$ -$ -$ -$ 750,000$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
STORM DRAIN (FUND 211)350,000$ 350,000$
RCFCD (FUND 500)250,000 250,000
UNSPECIFIED 150,000 150,000
TOTAL FUNDING:-$ 750,000$ -$ -$ -$ -$ -$ 750,000$
FUTURE FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project includes the construction of curb & gutter, cross gutter, driveways, asphalt berms, slurry seal and grinding, resurfacing, storm drain culvert,
headwalls and rip-rap.
Final repairs from the storm damage - Holy Flood.
Construction is anticipated to begin late Fall 2020.
50
MAIN STREET INTERCHANGE
51
PROJECT TITLE:MAIN STREET INTERCHANGE
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10017
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 18,467$ 50,000$ 68,467$
ENGINEERING 150,000 150,000
DESIGN 455,980 455,980
CONSTRUCTION 5,700,000 5,700,000
TOTALS:474,447$ 5,900,000$ -$ -$ -$ -$ -$ 6,374,447$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
MEASURE A (FUND 112)350,352$ 350,352$
TRIP (FUND 121)100,123 100,123
SHOPP GRANT (FUND 500)476,000$ 476,000
CAPITAL IMPROVEMENT (FUND 500)23,972 23,972
UNSPECIFIED 5,424,000 5,424,000
TOTAL FUNDING:474,447$ 5,900,000$ -$ -$ -$ -$ -$ 6,374,447$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
The project will accommodate any temporary detour during the construction of the Railroad Canyon Interchange.
This project is currently in design and construction phases cannot begin until a funding source is identified.
This project provides for improvements to Main Street from 2 lane to 4 lane, Northbound on & off improvements, Southbound off-ramp widening at the
intersection, and installation of a traffic signal at the ramps & intersection of Camino Del Norte and Main Street.
FUTURE
OPERATION & MAINTENANCE COSTS:
52
SIDEWALK SURVEY PROGRAM
53
PROJECT TITLE:CITYWIDE SIDEWALK SURVEY PROGRAM
PROJECT TYPE:CIRCULATION
PROJECT NO.:TBD
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 175,000$ 175,000$
CONSTRUCTION 100,000$ 100,000
TOTALS:-$ 175,000$ 100,000$ -$ -$ -$ -$ 275,000$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
TIF (FUND 205)175,000$ 175,000$
UNSPECIFIED 100,000$ 100,000
TOTAL FUNDING:-$ 175,000$ 100,000$ -$ -$ -$ -$ 275,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Safer sidewalks that provide a better walking path with no trip hazards, stay ADA compliant and improve the look of the City.
The project will begin in the middle of FY 2020-21 and be completed by the end of FY 2021-22.
FUTURE
OPERATION & MAINTENANCE COSTS:
Funding for Sidewalk Survey Program. As part of the City's Sidewalk Inspection Program ALL sidewalks are to inspected on a yearly basis. Having a
contractor perform, document, provide repair recommendations and a cost analysis for said repairs would identify the potential hazards City wide. The
survey will better serve staff when identifying areas for the concrete contractor.
54
SIGN INVENTORY
55
PROJECT TITLE:CITYWIDE SIGN INVENTORY
PROJECT TYPE:CIRCULATION
PROJECT NO.:TBD
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 5,000$ 5,000$
ENGINEERING 20,000 20,000
CONSTRUCTION 25,000 25,000
TOTALS:-$ 50,000$ -$ -$ -$ -$ -$ 50,000$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
TIF (FUND 205)50,000$ 50,000$
TOTAL FUNDING:-$ 50,000$ -$ -$ -$ -$ -$ 50,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
City to be in compliance with Minimum Sign Retroreflectivity requirements.
The project will begin in the middle of FY 2020-21 and continue through early FY 2024-25.
FUTURE
OPERATION & MAINTENANCE COSTS:
Contractor will survey, check reflectivity and inventory/GIS/on all City wide street signs. With survey in place contractor can provide a management
system to replace signs that are not in compliance.
56
TEMESCAL CANYON BRIDGE REPLACEMENT & ROAD WIDENING
PHASE I
57
PROJECT TITLE:TEMESCAL CANYON BRIDGE REPLACEMENT & ROAD WIDENING PHASE I
PROJECT TYPE:CIRCULATION
PROJECT NO.:
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
RIGHT OF WAY 1,200,000$ 352,350$ 1,552,350$
ADMINISTRATION 262,188$ 162,202 437,724 437,724$ 1,299,838
DESIGN 1,333,374 1,234,100 918,631 200,000 150,000$ 50,000$ 150,000$ 4,036,105
ENGINEERING 906,301 906,301
CONSTRUCTION 16,251,000 1,000,000 17,251,000
TOTALS:2,501,863$ 2,596,302$ 17,959,705$ 1,637,724$ 150,000$ 50,000$ 150,000$ 25,045,594$
PROJECT FUNDING:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
GAS TAX (FUND 110)159,012$ 159,012$
TUMF (FUND 111)680,389 917,798$ 200,000$ 150,000$ 50,000$ 150,000$ 2,148,187
FHWA GRANT (FUND 500)783,412 783,412
HBP GRANT (FUND 500)879,050 2,446,302$ 15,272,310 18,597,662
RCFCD FUNDING 150,000 1,769,597 1,437,724 3,357,321
TOTAL FUNDING:2,501,863$ 2,596,302$ 17,959,705$ 1,637,724$ 150,000$ 50,000$ 150,000$ 25,045,594$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project will resolve flooding issues in the immediate area so that the roadway and bridge will be functional during storm events.
Currently in the PS&E Phase (95% Complete). Construction estimated to begin in early 2021.
This project includes the design, right-of-way acquisition and construction of a four lane bridge across Temescal Canyon wash.
4344
FUTURE
OPERATION & MAINTENANCE COSTS:
58
59
TABLE OF CONTENTS
FACILITIES PROJECTS
Building Facilities Renovations .......................................................................................................................................................................................................... 60
City Library ........................................................................................................................................................................................................................................... 62
City Yard Expansion ........................................................................................................................................................................................................................... 64
Fire Station Building Renovations ..................................................................................................................................................................................................... 66
Lake Community Center Rehabilitation ......................................................................................................................................................................................... 68
Staging Area Shade Structure .......................................................................................................................................................................................................... 70
60
BUILDING FACILITES RENOVATIONS
61
PROJECT TITLE:BUILDING FACILITIES RENOVATIONS
PROJECT TYPE:FACILITIES
PROJECT NO.:Z20005
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:III
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 9,300$ 20,000$ 29,300$
CONSTRUCTION 457,231 2,050,000 2,507,231
FF & E 293,807 293,807
TOTALS:760,338$ 2,070,000$ -$ -$ -$ -$ -$ 2,830,338$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
GENERAL PROJECTS (FUND 105)566,677$ 566,677$
CITY HALL/PW DIF (FUND 116)27,051 27,051
CAPITAL IMPROVEMENT (FUND 500)166,610 2,070,000$ 2,236,610
TOTAL FUNDING:760,338$ 2,070,000$ -$ -$ -$ -$ -$ 2,830,338$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Health and safety benefit for the employees and citizens who occupy these facilities.
The project is expected to be completed by the end of fiscal year 2021.
This project consists of installation of new HVAC units, LED light upgrades, solar panels, restroom repairs, new roofs at City facilities, and renovating the
City Yard trash area.
FUTURE
OPERATION & MAINTENANCE COSTS:
62
CITY LIBRARY
63
PROJECT TITLE:CITY LIBRARY
PROJECT TYPE:FACILITIES
PROJECT NO.:Z20003
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:CITY MANAGER
PRIORITY:IV
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
LAND ACQUISITION 641,589$ 1,500,000$ 2,141,589$
ADMINISTRATION 63,264 187,000 100,000$ 350,264
ENGINEERING 813,000 325,000 1,138,000
DESIGN 250,000 250,000
CONSTRUCTION 4,245,486 4,245,486
FF & E 400,000 400,000
TOTALS:704,853$ 2,500,000$ -$ -$ -$ -$ 5,320,486$ 8,525,339$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
LIBRARY DIF (FUND 231)704,853$ 1,248,788$ 1,953,641$
UNSPECIFIED 1,251,212 5,320,486$ 6,571,698
TOTAL FUNDING:704,853$ 2,500,000$ -$ -$ -$ -$ 5,320,486$ 8,525,339$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
40,000$ 40,000$ 40,000$ 40,000$ 40,000$ 40,000$ 240,000$
40,000$ 40,000$ 40,000$ 40,000$ 40,000$ 40,000$ 240,000$
This project will provide the community with access to library resources.
The project is expected to be completed when funding is available.
This project includes the design and construction of a new City Library for the residents of Lake Elsinore.
FUTURE
OPERATION & MAINTENANCE COSTS:
64
CITY YARD EXPANSION
65
PROJECT TITLE:CITY YARD EXPANSION
PROJECT TYPE:FACILITIES
PROJECT NO.:Z20023
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:III
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CONSTRUCTION 2,000,000$ 2,000,000$
FF & E 500,000 500,000
TOTALS:-$ 2,500,000$ -$ -$ -$ -$ -$ 2,500,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 2,500,000$ 2,500,000$
TOTAL FUNDING:-$ 2,500,000$ -$ -$ -$ -$ -$ 2,500,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Purchase property adjacent to City Yard. Purchasing this property will allow the City Corporate Yard to expand. Expanding will gain more secure parking
for equipment and staff's personal vehicles. It will also allow installation of a security gate to keep office staff safer.
As the City grows, more equipment and staffing is needed. An area for staff parking and secure equipment storage is needed.
This project is estimated to be completed by the end of fiscal year 2021.
FUTURE
OPERATION & MAINTENANCE COSTS:
66
FIRE STATION BUILDING RENOVATIONS
67
PROJECT TITLE:FIRE STATION BUILDING RENOVATIONS
PROJECT TYPE:FACILITIES
PROJECT NO.:Z20020
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:FIRE
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CONSTRUCTION 30,000$ 30,000$
EQUIPMENT & MATERIALS 20,000 20,000
TOTALS:-$ 50,000$ -$ -$ -$ -$ -$ 50,000$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CAPITAL IMPROVEMENT (FUND 500)50,000$ 50,000$
TOTAL FUNDING:-$ 50,000$ -$ -$ -$ -$ -$ 50,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Lake Elsinore Fire Station 85 room remodel will convert open barracks style bed room into 6-8 private rooms.
Provide privacy to fire station staff and become current with the fire department standards for fire station building construction.
This project is estimated to be completed by the end of fiscal year 2021.
FUTURE
OPERATION & MAINTENANCE COSTS:
68
LAKE COMMUNITY CENTER REHABILITATION
69
PROJECT TITLE:LAKE COMMUNITY CENTER REHABILITATION
PROJECT TYPE:FACILITIES
PROJECT NO.:
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 60,000$ 60,000$
ENGINEERING 70,000 70,000
DESIGN 50,000 50,000
CONSTRUCTION 600,000 600,000
TOTALS:-$ 780,000$ -$ -$ -$ -$ -$ 780,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CDBG (FUND 150)466,188$ 466,188$
UNSPECIFIED 313,812 313,812
TOTAL FUNDING:-$ 780,000$ -$ -$ -$ -$ -$ 780,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
TBD
Remodel existing Lake Community Center lobby, gymnasium, kitchen, dance room, former pre-school learning area, lobby bathrooms, storage areas,
parking area, external lighting, and upstairs offices.
The Lake Community Center is the hub for all recreation programming for the City of Lake Elsinore. By upgrading the facility the Community Services
Department could attract more instructors, recreation class participants, and renters.
The project is expected to be completed when funding is available.
FUTURE
OPERATION & MAINTENANCE COSTS:
70
STAGING AREA SHADE STRUCTURE
71
PROJECT TITLE:STAGING AREA SHADE STRUCTURE
PROJECT TYPE:FACILITIES
PROJECT NO.:TBD
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:III
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
FF & E 175,000$ 175,000$
TOTALS:-$ 175,000$ -$ -$ -$ -$ -$ 175,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CAPITAL IMPROVEMENT (FUND 500)175,000$ 175,000$
TOTAL FUNDING:-$ 175,000$ -$ -$ -$ -$ -$ 175,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Shade structure built in staging area. Shade struture is required by NPDES (National Pollutant Diascharge Elimination) to cover materials such as asphalt,
aggregate, mulch etc.. this avoids material from getting rained on and having stormwater discharge. Shade over work area, cover over signs and
barricades which will stop sun damage to expensive item and equipments. Metal roofing for a long lasting and durable shade structure.
Shade will help signs, barricades and other equipment last longer with proper storage.
Project will be completed once funding has been identified.
FUTURE
OPERATION & MAINTENANCE COSTS:
72
73
TABLE OF CONTENTS
INFRASTRUCTURE PROJECTS
Drainage Improvements—Various Locations ................................................................................................................................................................................ 74
Murrieta Creek Regional Trail Connection ..................................................................................................................................................................................... 76
Palomar Multi-Use Trails ...................................................................................................................................................................................................................... 78
74
DRAINAGE IMPROVEMENTS—VARIOUS LOCATIONS
75
PROJECT TITLE:DRAINAGE IMPROVEMENTS - VARIOUS LOCATIONS
PROJECT TYPE:INFRASTRUCTURE
PROJECT NO.:Z10032
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 15,000$ 15,000$
ENGINEERING 10,000 10,000
DESIGN 35,000 35,000$ 70,000
CONSTRUCTION 350,000 350,000
TOTALS:-$ 60,000$ 385,000$ -$ -$ -$ -$ 445,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
STORM DRAINAGE FEE (FUND 211)60,000$ 115,000$ 175,000$
UNSPECIFIED 270,000 270,000
TOTAL FUNDING:-$ 60,000$ 385,000$ -$ -$ -$ -$ 445,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Project design to begin early 2021. Construction will start when funding is identified.
Installation of roadway and drainage improvements on Country Club Blvd/Mill Street from the intersection of Lakeshore Drive to Avenue 2.
This project will direct flows from the hillside down to Lakeshore Drive.
FUTURE
OPERATION & MAINTENANCE COSTS:
76
MURRIETA CREEK REGIONAL TRAIL CONNECTION
77
PROJECT TITLE:MURRIETA CREEK REGIONAL TRAIL CONNECTION
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z30010
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ENGINEERING 365,000$ 350,000$ 715,000$
LAND ACQUISITION 300,000 160,000 460,000
CONSTRUCTION 3,904,000$ 3,904,000
TOTALS:-$ 665,000$ 510,000$ -$ 3,904,000$ -$ -$ 5,079,000$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ATP GRANT (FUND 500)665,000$ 510,000$ -$ 3,904,000$ - 5,079,000$
TOTAL FUNDING:-$ 665,000$ 510,000$ -$ 3,904,000$ -$ -$ 5,079,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
10,000$ 10,000$ 10,000$ 30,000$
-$ -$ -$ 10,000$ 10,000$ 10,000$ 30,000$
Acquire easement behind Serenity neighborhood to establish a connection from the MCRT to the Levee Trail (completing the City's connections for the
MCRT). Develop easement and Levee Trail with 10' paved bike path and decomposed granite shoulders with solar lighting and retaining wall with
screening (vegetation or artist mural). Implement wayfinding signage along MCRT and Levee Trail in accordance with ATP sign guidelines.
Supports regional trail plans, active transportation plans, as well as local City of Lake Elsinore General Plan, East Lake Specific Plan, Healthy LE intiative,
and Active LE Plan (Active Transportation Plan).
FUTURE
OPERATION & MAINTENANCE COSTS:
The project is currently in the PA&ED phase. Construction of the project is expected to begin in FY 2023-24.
78
PALOMAR MULTI-USE TRAILS
79
PROJECT TITLE:PALOMAR MULTI-USE TRAILS
PROJECT TYPE:INFRASTRUCTURE
PROJECT NO.:Z30008
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 39,147$ 39,147$
CONSTRUCTION 198,119 294,568$ 492,687
TOTALS:237,266$ 294,568$ -$ -$ -$ -$ -$ 531,834$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
GENERAL PROJECTS (FUND 105)66,153$ 62,643$ 128,796$
DAG FEES (FUND 107)50,763 84,247 135,010
GAS TAX (FUND 110)210 210
MEASURE A (FUND 112)1,507 1,507
SB821 (FUND 113)118,633 125,143 243,776
CAPITAL IMPROVEMENT (FUND 500)22,535 22,535
TOTAL FUNDING:237,266$ 294,568$ -$ -$ -$ -$ -$ 531,834$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project proposes to install a class I multi-use trail on adjacent to the flood control channel near Palomar Street. This portion is a part of the Murrieta
Creek Regional Trail and will link southern parts of the trail to the trail on the levee. The project will also proposes to construct on the south side of the
flood control channel for the entirety of the segment.
This proposed projects will provide bicycle facilities to segments within the City that do not have existing facilities and will help spur further development
of the Regional Trail.
This project is estimated to be completed by the end of calendar year 2020.
FUTURE
OPERATION & MAINTENANCE COSTS:
80
81
TABLE OF CONTENTS
PARK PROJECTS
Boat Launch Mitigation .......................................................................................................................................................................... 82
Canyon Hills Park Upgrades ................................................................................................................................................................... 84
Citywide Park Improvements ................................................................................................................................................................ 86
Lakepoint Park Improvements .............................................................................................................................................................. 88
Tuscany Hills Park Improvements .......................................................................................................................................................... 90
82
BOAT LAUNCH MITIGATION
83
PROJECT TITLE:BOAT LAUNCH MITIGATION RESTORATION
PROJECT TYPE:PARKS
PROJECT NO.:Z40026
ACCOUNT NO.:500-4130-XXXX
DEPARTMENT:COMMUNITY DEVELOPMENT
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
DESIGN 412,710$ 412,710$
CONSTRUCTION 98,150 234,811$ 102,219$ 82,262$ 73,065$ 69,676$ 57,850$ 718,033
TOTALS:510,860$ 234,811$ 102,219$ 82,262$ 73,065$ 69,676$ 57,850$ 1,130,743$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CAPITAL IMPROVEMENT (FUND 500)510,860$ 234,811$ 102,219$ 82,262$ 73,065$ 69,676$ 57,850$ 1,130,743$
TOTAL FUNDING:510,860$ 234,811$ 102,219$ 82,262$ 73,065$ 69,676$ 57,850$ 1,130,743$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
The City in 2010 entered into Streambed Alteration Agreement # 1600-2007-0210-R6 (SAA) with the California Department of Fish and Wildlife (CDFW) to
mitigate for impacts resulting from the original excavation of the 11.5-acre Boat Launch Borrow Site (BLBS) as part of the Lake Elsinore Boat Launch Facility
Project, completed in 2012. The previous efforts to mitigate impacts to the BLBS were incomplete and therefore failed to achieve performance standards
for the habitat mitigation and resulted in the necessity to prepare a new Habitat Mitigation and Monitoring Plan (HMMP) subject to review and approval
by CDFW. This project implements the recently approved HMMP for the site and when completed will satisfy the City's obligation pursuant to the SAA.
The proposed CIP project is required in order for the City to comply with the mitigation for the Lake Elsinore Boat Launch Facility Project.
FUTURE OPERATION & MAINTENANCE
COSTS:
Project design has been completed and the updated HMMP has been approved by the various regulatory agencies. Construction has commenced and
should be completed by the Fall of 2019, at which point on maintenance and monitorin will occur.
84
CANYON HILLS PARK UPGRADES
85
PROJECT TITLE:CANYON HILLS PARK UPGRADES
PROJECT TYPE:PARKS
PROJECT NO.:Z40024
ACCOUNT NO.:500-4130-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 10,000$ 10,000$
CONSTRUCTION 298,206$ 490,000 500,000$ 1,288,206
TOTALS:298,206$ 500,000$ 500,000$ -$ -$ -$ -$ 1,298,206$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CAPITAL IMPROVEMENT (FUND 500)298,206$ 500,000$ 798,206$
UNSPECIFIED 500,000$ 500,000
TOTAL FUNDING:298,206$ 500,000$ 500,000$ -$ -$ -$ -$ 1,298,206$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project will make improvements to City parks including, but not limited to: Artificial turf of one soccer/ football field, fresh mulch in landscape
planters; replacement of drinking fountains, picnic tables, benches trash cans and BBQ grills; remove and replace rubberized playground surfacing;
resurfacing of tennis and basketball courts, and shade structures for splash pads, picnic areas, bleachers and dugouts.
Renovating Canyon Hills Park will create a more aesthetically pleasing environment and provide a safe play area while encouraging many residents to
utilize the City's parks.
This project is estimated to be completed by the end of fiscal year 2022.
FUTURE OPERATION & MAINTENANCE
COSTS:
86
CITYWIDE PARK IMPROVEMENTS
87
PROJECT TITLE:CITYWIDE PARK IMPROVEMENTS
PROJECT TYPE:PARKS
PROJECT NO.:Z40023
ACCOUNT NO.:500-4130-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 9,570$ 120,000$ 120,000$ 30,000$ 279,570$
DESIGN 23,240 23,240
CONSTRUCTION 415,095 2,791,990 880,000 240,000 4,327,085
FF&E 61,545 500,000 561,545
TOTALS:509,451$ 3,411,990$ 1,000,000$ 270,000$ -$ -$ -$ 5,191,441$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
LAKESIDE DIF (FUND 118)123,048$ 123,048$
QUIMBY (FUND 221)54,000 54,000
CAPITAL IMPROVEMENT FUND (500)509,451$ 1,123,591 1,000,000$ 270,000$ 2,903,042
UNSPECIFIED 2,111,351 2,111,351
TOTAL FUNDING:509,451$ 3,411,990$ 1,000,000$ 270,000$ -$ -$ -$ 5,191,441$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project will make improvements to City parks including, but not limited to: fresh mulch in landscape planters; replacement of drinking fountains,
picnic tables, benches trash cans and BBQ grills; remove and replace rubberized playground surfacing; resurfacing of tennis and basketball courts, and
shade structures for splash pads, picnic areas, bleachers and dugouts.
Renovating the City's parks would not only create a more aesthetically pleasing environment, but also bring the City into compliance with current rules
and regulations and provide a safe play area, encouraging many residents to utilize the City's parks and continue in the tradition of the Sports Capital of
The project is expected to be completed by the end of fiscal year 2023.
FUTURE
OPERATION & MAINTENANCE COSTS:
88
LAKEPOINT PARK IMPROVEMENTS
89
PROJECT TITLE:LAKEPOINT PARK
PROJECT TYPE:PARKS
PROJECT NO.:Z40018
ACCOUNT NO.:500-4130-XXXX
DEPARTMENT:COMMUNITY SERVICES
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
DESIGN 200,000$ 200,000$
ENGINEERING 300,000 300,000
CONSTRUCTION 432,800$ 2,000,000 2,432,800
TOTALS:-$ 432,800$ -$ -$ -$ -$ 2,500,000$ 2,932,800$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 432,800$ 2,500,000$ 2,932,800$
TOTAL FUNDING:-$ 432,800$ -$ -$ -$ -$ 2,500,000$ 2,932,800$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project includes the complete restoration of all sport fields located within Lakepoint Park. This project is to include one large artificial turf fields with
multiple sport line/ overlays to accommodate all sports, baseball/ softball, football, soccer, lacrosse, etc. Possible inclusion: the upgrade of existing
restroom and snack bar facilities and new LED sports field lighting.
Renovating the City's sports fields would not only provide an aesthetically pleasing environment, but also provide a safe play area, encouraging many
residents to utilize the City's parks and continue in the tradition of the Sports Capital of the World.
This project will be completed when funding is identified.
FUTURE OPERATION & MAINTENANCE
COSTS:
90
TUSCANY HILLS PARK IMPROVEMENTS
91
PROJECT TITLE:TUSCANY HILLS PARK IMPROVEMENTS
PROJECT TYPE:PARKS
PROJECT NO.:Z40021
ACCOUNT NO.:500-4130-XXXX
DEPARTMENT:COMMUNITY SERVICES
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 20,000$ 20,000$
CONSTRUCTION 317,255$ 289,000 606,255
TOTALS:317,255$ 309,000$ -$ -$ -$ -$ -$ 626,255$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CAPITAL IMPROVEMENT (FUND 500)317,255$ 309,000$ 626,255$
TOTAL FUNDING:317,255$ 309,000$ -$ -$ -$ -$ -$ 626,255$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Renovating Tuscany Hills Park will create a more aesthetically pleasing environment and provide a safe play area while encouraging many residents to
utilize the City's parks.
This project is expected to be completed by the end of fiscal year 2021.
This project includes upgrading the restroom facilities, the removal and installation of shade structures, picnic tables, benches, BBQ grills and trash cans
within Tuscany Hills Park.
FUTURE
OPERATION & MAINTENANCE COSTS:
92
93
TABLE OF CONTENTS
FUTURE PROJECTS
CIRCULATION
Active Transportation/Commuter Based Access Plan ................................................................................................................................................................. 96
East Lake Circulation ......................................................................................................................................................................................................................... 98
La Strada Extension .......................................................................................................................................................................................................................... 100
Lake Street Widening ....................................................................................................................................................................................................................... 102
Main Street Bollards .......................................................................................................................................................................................................................... 104
Nichols Road Improvements........................................................................................................................................................................................................... 106
State Route 74 Widening ................................................................................................................................................................................................................. 108
Summerhill Drive Extension .............................................................................................................................................................................................................. 110
FACILITIES
Aquatics Center ............................................................................................................................................................................................................................... 112
City Civic Center .............................................................................................................................................................................................................................. 114
Community Center .......................................................................................................................................................................................................................... 116
Main Street Archway ....................................................................................................................................................................................................................... 118
Senior Center Corridor ..................................................................................................................................................................................................................... 120
NFRASTRUCTURE
Third Street Drainage Improvements—Phase III ........................................................................................................................................................................... 122
PARKS
Alberhill Villages Sports Park ............................................................................................................................................................................................................ 124
Lake Revitalization Planl .................................................................................................................................................................................................................. 126
Splash Pads ........................................................................................................................................................................................................................................ 128
94
ACTIVE TRANSPORTATION/COMMUTER BASED ACCESS PLAN
95
PROJECT TITLE:ACTIVE TRANSPORTATION/COMMUTER BASED ACCESS PLAN
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10057
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:COMMUNITY SERVICES
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 191$ 191$
DESIGN 188,300 188,300
CONSTRUCTION 17,500,000$ 17,500,000
TOTALS:188,491$ -$ -$ -$ -$ -$ 17,500,000$ 17,688,491$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
DAG FUND (107)3,684$ 3,684$
SUSTAINABILITY GRANT (FUND 500)134,446 134,446
CAPITAL IMPROVEMENT FUND (500)50,362 50,362
UNSPECIFIED 17,500,000$ 17,500,000
TOTAL FUNDING:188,491$ -$ -$ -$ -$ -$ 17,500,000$ 17,688,491$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project complies with the following adopted Plans and Policies: Maintain the system of bike lanes and multi use trails throughout the City.
Encourage the implementation of the network of Class I, II, and III bike lanes on all development projects through construction of the facility as described
in the Bike Lane Master Plan and/or the Trails Master Plan.
The Active Transportation plan is complete. Implementation will begin when all funding sources are identifed.
This project installation of a Class I Multi-Use Path and sidewalk along the northeastern shore of Lake Elsinore, connecting the communities of Lakeside
Village, Downtown Lake Elsinore and East Lake.
FUTURE
OPERATION & MAINTENANCE COSTS:
96
EAST LAKE CIRCULATION
97
PROJECT TITLE:EAST LAKE CIRCULATION
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10053
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:IV
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 100,000$ 100,000$
DESIGN 388,667 388,667
CONSTRUCTION 9,700,018 9,700,018
TOTALS:-$ -$ -$ -$ -$ -$ 10,188,685$ 10,188,685$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 10,188,685$ 10,188,685$
TOTAL FUNDING:-$ -$ -$ -$ -$ -$ 10,188,685$ 10,188,685$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Construct four (4) lane road to provide access and circulation for the East Lake Specific Plan and Diamond Specific Plan.
To improve access and stimulate economic development projects.
Planning stage; depends on timing of Development Projects.
FUTURE
OPERATION & MAINTENANCE COSTS:
98
LA STRADA EXTENSION
99
PROJECT TITLE:LA STRADA EXTENSION
PROJECT TYPE:CIRCULATION
PROJECT NO.:TBD
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:IV
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
RIGHT OF WAY 1,897,000$ 1,897,000$
ADMINISTRATION 285,921 285,921
DESIGN 763,370 763,370
ENGINEERING 1,908,425 1,908,425
CONSTRUCTION 24,018,849 24,018,849
TOTALS:-$ -$ -$ -$ -$ -$ 28,873,565$ 28,873,565$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
LA STRADA RBBD 28,873,565$ 28,873,565$
TOTAL FUNDING:-$ -$ -$ -$ -$ -$ 28,873,565$ 28,873,565$
FUTURE FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
This project will extend La Strada west to Camino Del Norte with 2 lanes in each direction along its entire length with a painted median.
Extending La Strada will provide a secondary fire access route for residents in the Summerhill/La Strada corridor, as well as, potentially provide a
connection to the future Franklin Interchange.
This project will be completed when funding is identified.
100
LAKE STREET WIDENING
101
PROJECT TITLE:LAKE STREET WIDENING
PROJECT TYPE:CIRCULATION
PROJECT NO.:TBD
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:IV
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
RIGHT OF WAY 1,305,000$ 1,305,000$
ADMINISTRATION 250,000 250,000
DESIGN 4,000,000 4,000,000
ENGINEERING 1,500,000 1,500,000
CONSTRUCTION 29,013,909 29,013,909
TOTALS:-$ -$ -$ -$ -$ -$ 36,068,909$ 36,068,909$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 36,068,909$ 36,068,909$
TOTAL FUNDING:-$ -$ -$ -$ -$ -$ 36,068,909$ 36,068,909$
FUTURE FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Lake Street is already a major thoroughfare off the I-15 Freeway. Once the project is completed, it will serve as the main entrance into Alberhill Villages
and the northern gateway to the City.
This project will be completed when funding is identified.
This project will realign and widen Lake Street. This will be a multi-functional corridor, which provides wildlife linkage, meandering pedestrian and bicycle
paths, utility easements, a perennial flowing creek, ponds, and a native re-vegetated landscape. With the landscapes corridors and edges on both sides
of Lake Street, combined with the landscaped roadway median, this Lake Street entry will form a broad canopy of native landscape. Lake Street’s cross
section will vary from 6 to 8 lanes, the 8 lanes occurring near the Temescal Canyon Road intersection and transitioning to 6 lanes as it approaches Nichols
Road. Bike lanes will be provided on both sides of the street. In addition, a new widened bridge will extend over Temescal Creek along Lake Street.
102
MAIN STREET BOLLARDS
103
PROJECT TITLE:MAIN STREET BOLLARDS
PROJECT TYPE:CIRCULATION
PROJECT NO.:
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:COMMUNITY SERVICES
PRIORITY:IV
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CONSTRUCTION 320,000$ 320,000$
TOTALS:-$ -$ -$ -$ -$ 320,000$ -$ 320,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 320,000$ 320,000$
TOTAL FUNDING:-$ -$ -$ -$ -$ 320,000$ -$ 320,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
TBD
This project provides for the design and installation of approximately 88 bollards to execute 11 closures within the unimproved segment of Main Street
between Library Street and Heald Avenue. The project would allow the opportunity for versitility of closures for a variety of events.
This project supports the City's efforts to provide world class programs and events. This project would be a catalyst for future economic development
supported by arts and culture initaitives in the downtown area. These improvements will also reduce City road closure costs for existing events.
The project is expected to be completed when funding is available.
FUTURE
OPERATION & MAINTENANCE COSTS:
104
NICHOLS ROAD IMPROVEMENTS
105
PROJECT TITLE:NICHOLS ROAD IMPROVEMENTS
PROJECT TYPE:CIRCULATION
PROJECT NO.:TBD
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
RIGHT OF WAY 1,800,531$ 1,800,531$
ADMINISTRATION 150,000 150,000
DESIGN 3,600,000 3,600,000
ENGINEERING 1,300,000 1,300,000
CONSTRUCTION 14,955,060 14,955,060
TOTALS:-$ -$ -$ -$ -$ -$ 21,805,591$ 21,805,591$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 21,805,591$ 21,805,591$
TOTAL FUNDING:-$ -$ -$ -$ -$ -$ 21,805,591$ 21,805,591$
FUTURE FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Once completed, Nichols Road will serve as one of the three main east-west links between Lake Street and Lincoln Street. When combined with other
streets and the pedestrian, bicycle paths, an inter-locking modified grid will allow residents and visitors a variety of choices when moving around,
through, and among the Alberhill Villages.
This project will be completed when funding is identified.
This project will widen Nichols Road into a 4 lane divided road with wide medians that link Lake Street and Lincoln Street. There are two distinct cross
sections for Nichols Road. The section that bisects Alberhill Town Center, which employs unique left turn pockets and a wide median; and the section
that extends westerly between Lakeside and Ridgeview Villages. Both sections will have bike lanes and non-adjacent sidewalks along each of their sides
in order to provide a safe and enjoyable experience for the residents.
106
STATE ROUTE 74 WIDENING
107
PROJECT TITLE:STATE ROUTE 74 WIDENING
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10024
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:IV
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
RIGHT OF WAY 5,600,000$ 5,600,000$
ADMINISTRATION 4,745$ 4,745
ENGINEERING 1,500,000 1,500,000
CONSTRUCTION 4,400,000 4,400,000
TOTALS:4,745$ -$ -$ -$ -$ -$ 11,500,000$ 11,504,745$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
GENERAL PROJECTS (FUND 105)4,745$ 4,745$
TUMF (FUND 111)11,500,000$ 11,500,000
TOTAL FUNDING:4,745$ -$ -$ -$ -$ -$ 11,500,000$ 11,504,745$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
The project is expected to be completed when funding is available. Relinquishment funds through negotiations with Caltrans could help fund this
project.
This project will widen State Route 74, West of the I-15 to the Ortega mountains. The widening will increase the number of lanes from 2 up to 6 (A study is
necessary to determine feasibility of more than 4 lanes) and include turn pockets and one traffic signal at the intersection of SR74 (Riverside Drive) and
Grand Avenue.
This project will improve traffic safety, operations, and capacity by minimizing traffic delays and reducing congestion.
FUTURE
OPERATION & MAINTENANCE COSTS:
108
SUMMERHILL DRIVE EXTENSION
109
PROJECT TITLE:SUMMERHILL DRIVE EXTENSION
PROJECT TYPE:CIRCULATION
PROJECT NO.:Z10062
ACCOUNT NO.:500-4110-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:IV
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
RIGHT OF WAY 1,084,000$ 1,084,000$
ADMINISTRATION 162,342 162,342
DESIGN 14,250$ 541,633 555,883
ENGINEERING 165,038 96,397 261,435
CONSTRUCTION 5,490 14,430,030 14,435,520
TOTALS:184,778$ -$ -$ -$ -$ -$ 16,314,402$ 16,499,180$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CAPITAL IMPROVEMENT (FUND 500)162,803$ 162,803$
LA STRADA RBBD 21,975 16,314,402$ 16,336,377
TOTAL FUNDING:184,778$ -$ -$ -$ -$ -$ 16,314,402$ 16,499,180$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Summerhill Drive will be extended north to Greenwald Avenue per the General Plan with 2 lanes in each direction along its entire length and a painted
median.
If extended, it has the potential to complete the connection for residents to Greenwald Avenue and improve safety for residents in the Summerhill/La
Strada corridor.
This project will be completed when funding is identified.
FUTURE
OPERATION & MAINTENANCE COSTS:
110
AQUATICS CENTER
111
PROJECT TITLE:AQUATICS CENTER
PROJECT TYPE:FACILITIES
PROJECT NO.:
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:COMMUNITY SERVICES
PRIORITY:IV
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 200,000$ 200,000$
ENGINEERING 325,000 325,000
DESIGN 325,000 325,000
CONSTRUCTION 18,500,000 18,500,000
FF & E 650,000 650,000
TOTALS:-$ -$ -$ -$ -$ -$ 20,000,000$ 20,000,000$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 20,000,000$ 20,000,000$
TOTAL FUNDING:-$ -$ -$ -$ -$ -$ 20,000,000$ 20,000,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
600,000$ 600,000$
-$ -$ -$ -$ -$ 600,000$ 600,000$
There is no City operated facilities to hold swimming programs. The local high schools are limited on space available for City and community based
activities. The facility will have a recreational component to meet the aquatics needs of the community.
The project is expected to be completed when funding is available.
Development of a state of the art world class 25x50 meter deep water pool that can accommodate for water polo, 50-meter swimming, scuba diving,
high diving recreation and competition that will host regional aquatic events while having a secured location for City sponsored programs.
Z20004
FUTURE
OPERATION & MAINTENANCE COSTS:
112
CITY CIVIC CENTER FACILITIES
113
PROJECT TITLE:CITY CIVIC CENTER
PROJECT TYPE:FACILITIES
PROJECT NO.:Z20006
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:III
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
LAND 84,375$ 84,375$
ADMINISTRATION 225,000$ 225,000
ENGINEERING 399,725 399,725
DESIGN 2,450,275 2,450,275
CONSTRUCTION 20,175,000 20,175,000
FF & E 1,750,000 1,750,000
TOTALS:84,375$ -$ -$ -$ -$ -$ 25,000,000$ 25,084,375$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
CAPITAL IMPROVEMENT (FUND 500)84,375$ 84,375$
UNSPECIFIED 25,000,000$ 25,000,000
TOTAL FUNDING:84,375$ -$ -$ -$ -$ -$ 25,000,000$ 25,084,375$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
900,000$ 900,000$
-$ -$ -$ -$ -$ 900,000$ 900,000$
Project will continue to promote the revitalization of downtown and provide a permanent facility for administrative staff through build-out.
The project is expected to be completed when funding is available.
This project includes the design and construction of a new City administration building and Council Chambers, along with a Community Room in
downtown Lake Elsinore.
FUTURE
OPERATION & MAINTENANCE COSTS:
114
COMMUNITY CENTER
115
PROJECT TITLE:COMMUNITY CENTER
PROJECT TYPE:FACILITIES
PROJECT NO.:Z20009
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:COMMUNITY SERVICES
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:
PRIOR YEARS
ACTUALS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS
TOTAL
PROJECT COST
RIGHT OF WAY 400,000$ 100,000$ 500,000$
ADMINISTRATION 200,000 200,000 400,000
ENGINEERING 500,000 550,000 1,050,000
DESIGN 600,000 400,000 1,000,000
CONSTRUCTION 2,500,000 2,500,000
FF & E 300,000 250,000 550,000
TOTALS:-$ -$ -$ 2,000,000$ 4,000,000$ -$ -$ 6,000,000$
SOURCE OF FUNDS:
PRIOR YEARS
ACTUALS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS
TOTAL
PROJECT COST
UNSPECIFIED 2,000,000$ 4,000,000$ 6,000,000$
TOTAL FUNDING:-$ -$ -$ 2,000,000$ 4,000,000$ -$ -$ 6,000,000$
FUTURE OPERATION
& MAINTENANCE
COSTS:FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS
TOTAL
PROJECT COST
30,000$ 30,000$ 30,000$ 90,000$
-$ -$ -$ 30,000$ 30,000$ 30,000$ 90,000$
Design and construction of a new community center to support the growth in recreational activities and programming.
Lake Elsinore is lacking in facilities to have traditional and innovative recreational activities. There is only one Community Center in Lake
Elsinore and it is the original one for the community. This is in line with City Council direction to have recreational activities throughout the
community.
The project is expected to be completed when funding is available.
116
MAIN STREET ARCHWAY
Est. 1888
Lake Elsinore Historic Downtown
117
PROJECT TITLE:MAIN STREET ARCHWAY
PROJECT TYPE:INFRASTRUCTURE
PROJECT NO.:
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:COMMUNITY SERVICES
PRIORITY:IV
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 15,000$ 15,000$
ENGINEERING 10,000 10,000
DESIGN 25,000 25,000
CONSTRUCTION 290,000 290,000
TOTALS:-$ -$ -$ -$ -$ -$ 340,000$ 340,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 340,000$ 340,000$
TOTAL FUNDING:-$ -$ -$ -$ -$ -$ 340,000$ 340,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
TBD
This project provides for the design and construction of two Main Street archways that host horizontal landscape style (street banner size, i.e 10' x 3')
hanging LED screens to promote upcoming events, information, wayfinding, etc. (near Library Street and Heald Avenue).
This project supports the City's efforts to improve marketing to the community regarding upcoming community events. These improvements will also
increase City revenues by drawing in more participants to the events and stimulating further economic returns in the downtown area.
The project is expected to be completed when funding is available.
FUTURE
OPERATION & MAINTENANCE COSTS:
118
SENIOR CENTER CORRIDOR
119
PROJECT TITLE:SENIOR CENTER CORRIDOR
PROJECT TYPE:FACILITIES
PROJECT NO.:TBD
ACCOUNT NO.:500-4130-XXXX
DEPARTMENT:COMMUNITY SERVICES
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 2,000$ 2,000$
ENGINEERING 30,000 30,000
DESIGN 20,000 20,000
CONSTRUCTION 280,000 280,000
TOTALS:-$ -$ -$ -$ -$ -$ 332,000$ 332,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 332,000$ 332,000$
TOTAL FUNDING:-$ -$ -$ -$ -$ -$ 332,000$ 332,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
3,000$ 3,000$
-$ -$ -$ -$ -$ 3,000$ 3,000$
Hallway or additional room and hallway built between the Annex and Main building. It will allow staff to control who has access to the Annex and
ensure the safety of our participants. It will allow the seniors to go from building to building without walking through an uneven parking lot and keep
them out of the "elements".
Build an add on between the annex and main building for limited access to the annex to monitor who comes and goes from the building, as well as,
ensures our seniors don’t slip and fall when it raining and they are running back and forth to avoid getting wet.
This project will be completed when funding is identified.
FUTURE
OPERATION & MAINTENANCE COSTS:
120
THIRD STREET DRAINAGE IMPROVEMENT—PHASE III
121
PROJECT TITLE:DRAINAGE IMPROVEMENTS - VARIOUS LOCATIONS
PROJECT TYPE:INFRASTRUCTURE
PROJECT NO.:Z10032
ACCOUNT NO.:500-4120-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 15,000$ 15,000$
ENGINEERING 10,000 10,000
DESIGN 35,000 35,000$ 70,000
CONSTRUCTION 350,000 350,000
TOTALS:-$ 60,000$ 385,000$ -$ -$ -$ -$ 445,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
STORM DRAINAGE FEE (FUND 211)60,000$ 115,000$ 175,000$
UNSPECIFIED 270,000 270,000
TOTAL FUNDING:-$ 60,000$ 385,000$ -$ -$ -$ -$ 445,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
Project design to begin early 2021. Construction will start when funding is identified.
Installation of roadway and drainage improvements on Country Club Blvd/Mill Street from the intersection of Lakeshore Drive to Avenue 2.
This project will direct flows from the hillside down to Lakeshore Drive.
FUTURE
OPERATION & MAINTENANCE COSTS:
122
ALBERHILL VILLAGES SPORTS PARK
123
PROJECT TITLE:ALBERHILL VILLAGES SPORTS PARK
PROJECT TYPE:PARKS
PROJECT NO.:TBD
ACCOUNT NO.:500-4130-XXXX
DEPARTMENT:ENGINEERING
PRIORITY:IV
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 2,000,000$ 2,000,000$
DESIGN 1,000,000 1,000,000
ENGINEERING 1,000,000 1,000,000
CONSTRUCTION 41,000,000 41,000,000
TOTALS:-$ -$ -$ -$ -$ -$ 45,000,000$ 45,000,000$
SOURCE OF FUNDS:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 45,000,000$ 45,000,000$
TOTAL FUNDING:-$ -$ -$ -$ -$ -$ 45,000,000$ 45,000,000$
FUTURE FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
The Alberhill Villages Sports Park is necessary to meet the needs of the community in the Alberhill Villages Specific Plan (AVSP), encourage residents to
utilize the City's parks and continue in the tradition of the Sports Capital of the World.
This project will be completed when funding is identified.
This project is a new 46 acre park facility. The improvements will consist of constructing new soccer and baseball fields, volleyball and basketball courts,
restroooms, picnic areas, concession stand and play areas for children.
124
LAKE REVITALIZATION PLAN
125
PROJECT TITLE:LAKE REVITALIZATION PLAN
PROJECT TYPE:PARKS
PROJECT NO.:Z40025
ACCOUNT NO.:500-4130-XXXX
DEPARTMENT:CITY MANAGER
PRIORITY:I
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
DESIGN 1,000,000$ 1,000,000$
TOTALS:-$ -$ -$ 1,000,000$ -$ -$ -$ 1,000,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 1,000,000$ 1,000,000$
TOTAL FUNDING:-$ -$ -$ 1,000,000$ -$ -$ -$ 1,000,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
-$
-$ -$ -$ -$ -$ -$ -$
The Lake Revitalization Plan will create a pathway to perform critical infrastructure renovations aimed at improving sustainability of Lake Elsinore,
enhancing public access and utilization of the Lake, and supporting new public and private investment around the Lake, including infrastructure
upgrades and land development.
Renovating the Lake is critical to the City's vision of becoming the ultimate lake destination where all can live, work and play, build futures and fulfill
dreams.
The project is contingent on the availability of grant funds. The Enhanced Infrastructure Financing District Feasability Study identified $39.8-$111.1 million to
potentially fund necessary improvements.
FUTURE
OPERATION & MAINTENANCE COSTS:
126
SPLASH PADS
127
PROJECT TITLE:SPLASH PAD INSTALLATION
PROJECT TYPE:PARKS
PROJECT NO.:TBD
ACCOUNT NO.:500-4130-XXXX
DEPARTMENT:PUBLIC WORKS
PRIORITY:II
PROJECT DESCRIPTION:
BENEFIT:
PROJECT STATUS:
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
ADMINISTRATION 25,000$ 25,000$ 50,000$
CONSTRUCTION 1,000,000 1,000,000 2,000,000
TOTALS:-$ -$ -$ 1,025,000$ 1,025,000$ -$ -$ 2,050,000$
PROJECT COST:PRIOR YEARS FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
UNSPECIFIED 1,025,000$ 1,025,000$ 2,050,000$
TOTAL FUNDING:-$ -$ -$ 1,025,000$ 1,025,000$ -$ -$ 2,050,000$
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FUTURE YEARS TOTAL
100,000$ 100,000$ 100,000$ 300,000$
-$ -$ -$ 100,000$ 100,000$ 100,000$ 300,000$
Installation of new splash pads at Summerlake Park and Rosetta Park.
Splash pads are becoming increasingly popular. Adding splash pads to both Summerlake and Rosetta Park will draw more attention to these parks and
alleviate public demand to use Launch Pointe Facilities.
The project will be completed once funding is identified.
FUTURE
OPERATION & MAINTENANCE COSTS:
128