REPORT TO PLANNING COMMISSION
To: Honorable Members of the Planning Commission
From: Grant Yates, City Manager
Prepared by: Jason Simpson, Assistant City Manager
Date: June 2, 2020
Subject: Preliminary Capital Improvement Plan (CIP) Budget for Fiscal Years
2020-21 to 2024-25
Recommendation
ADOPT A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, FINDING THAT THE FISCAL YEAR (FY)2020-21 THROUGH
FY2024-25 CIP CONFORMS TO THE LAKE ELSINORE GENERAL PLAN
Background
By direction of the City Council (Council), City staff updates and maintains a Five-Year CIP in
conjunction with the annual budget cycle. Included in the CIP are construction projects, facility
improvements, and purchases. Utilizing input from Council, staff and the public, provided various
projects were developed and proposed in this Cycle of the CIP. Following the Planning
Commission, staff will schedule the public hearing for June 23, 2020, to bring the FY2020-21 to
FY2024-25 CIP.
CIP Projects have been classified into two types of projects, Construction and Non-Construction
CIP, and four categories: Circulation, Facilities, Infrastructure, and Parks. The Construction CIP
are projects concerning major infrastructure or specific improvement projects. The Non-
Construction CIP are major purchases by the City or recurring street improvements, studies,
plans, or equipment (i.e., annual slurry seal, traffic lights, etc.).
Discussion
This CIP budget document was developed by incorporating input from the Council and key
management team members, based on community comments and feedback received throughout
the year. This team then, through several internal workshops, identified and evaluated community
needs in the areas of roads/streets, bridges, public buildings, parks and recreation facilities
projects. Each proposed project was reviewed and discussed to ensure funding, timing, and
necessity were appropriately addressed. All projects were evaluated by to ensure consistency
Proposed FY2020-21 to FY2024-25 Capital Improvement Plan
June 2, 2020
Page 2
with the City of Lake Elsinore General Plan, while considering the City’s long -term vision as
developed by the Council.
Projects in this document have been scheduled in each of the five fiscal years based on
community needs, as determined by the Council and availability of funding. Additionally, since
many projects in the CIP are conceptual in nature, the general outline for cost estimates provided
in last year’s CIP document was revised and utilized as shown on the Parameters for CIP Budget
Cost page. The Preliminary FY2020-21 to FY2024-25 Capital Improvement Plan identifies 54
projects consisting of 29 Circulation Projects totaling $315,640,811 ($30,070,636 for FY2020-21);
12 Facilities Projects totaling $66,617,052; 5 Infrastructure Projects totaling $7,689,882; and 8
Park Projects totaling $59,229,445. The total cost to complete all of the proposed projects is
$449,177,190 of which $44,053,805 programmed for FY 2020-21. These projects have been
identified as necessary infrastructure for the City, and will require that funding sources be
identified before the projects can commence. Inclusion of those with funding still needed in the
document assists staff with seeking grants and negotiating improvements with potential 3rd
parties. Other key elements to the CIP are:
Projects completed during the last year include:
Camino Del Norte Improvements
Canyon Hills Dog Park
Citywide HVAC Replacement
Dream Extreme Neighborhood Center
Downtown Curb, Gutter and Sidewalk Replacement
Lincoln Street Pavement Rehabilitation
Ongoing Projects include:
Citywide Park Improvements
Downtown Active Transportation – Pottery Court
Downtown Streets Pavement Rehabilitation Phase I
Highway Safety Improvements
I-15/Railroad Canyon Ultimate Interchange
I-15/State Route 74 Interchange
Murrieta Creek Regional Trail Connection
Palomar Multi-Use Trails
Temescal Canyon Road Bridge
New Projects include:
Larson Road Improvements
Sidewalk Survey Program
Sign Inventory
Staging Area Shad Structure
Splash Pads
Proposed FY2020-21 to FY2024-25 Capital Improvement Plan
June 2, 2020
Page 3
Fiscal Impact
None for this action by the Planning Commission, since they are only making a finding in
conformance with the General Plan regarding Proposed CIP for FY2020-21 to 2023-24, which
includes improvements throughout the City. Total CIP cost is $44,053,805 for FY2020-21.
Funding sources include, but are not limited to, development fees from TIF and Area Drainage;
grants including CDBG, Measure-A and Gas Tax; and assessment districts for specific project
areas.
Exhibits:
A CIP Resolution No. 2020 -
B Proposed FY2020-21 to FY2024-25 Capital Improvement Plan