HomeMy WebLinkAboutPC Reso No 2015-45 (5.5.15)RESOLUTION NO. 2015-45
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL OF
THE CITY OF LAKE ELSINORE ADOPT FINDINGS THAT RESIDENTIAL
DESIGN REVIEW NO. 2015-01 IS CONSISTENT WITH THE WESTERN
RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN
(MSHCP)
WHEREAS, Ryland Homes, has filed an application with the City of Lake Elsinore
requesting approval of Residential Design Review No. 2015-01 for the construction of a
70 single-family detached residential development including a model home for Plan 3 to
be added to an existing model home complex and associated improvements for property
located within Tract 31920-12 of the Summerly development of the East Lake Specific
Plan Amendment No. 6 (the "Project"); and,
WHEREAS, Section 6.0 of the MSHCP requires that all discretionary projects
within an MSHCP criteria cell undergo the Lake Elsinore Acquisition Process ("LEAP")
and Joint Project Review ("JPR") to analyze the scope of the proposed development and
establish a building envelope that is consistent with the MSHCP criteria; and,
WHEREAS, Section 6.0 of the MSHCP further requires that the City of Lake
Elsinore adopt consistency findings demonstrating that the proposed discretionary
entitlement complies with the MSCHP cell criteria, and the MSCHP goals and objectives;
and,
WHEREAS, pursuant to Lake Elsinore Municipal Code (LEMC) Chapter 17.184
(Design Review) the Planning Commission has been delegated with the responsibility of
making recommendations to the City Council pertaining to the residential design review;
and,
WHEREAS, the East Lake Specific Plan Amendment No. 6 is partially covered by
two distinct MSHCP criteria cells: approximately three (3) acres of the East Lake Specific
Plan Amendment No. 6 are within cell 4846 and approximately three tenths (0.3) of an
acre are within cell 4937; and,
WHEREAS, the Project site within the boundaries of East Lake Specific Plan
Amendment No. 6 that are covered by the aforementioned cell sites; and,
WHEREAS, on May 5, 2015 at a duly noticed public hearing the Planning
Commission has considered evidence presented by the Community Development
Department and other interested parties with respect to this item.
PLANNING COMMISSION RESOLUTION NO. 2015-45
PAGE 2OF5
NOW THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The Planning Commission has considered the Project and its
consistency with the MSHCP prior to recommending that the City Council adopt Findings
of Consistency with the MSHCP.
SECTION 2. That in accordance with the MSHCP, the Planning Commission
makes the following findings for MSHCP consistency:
The Project is a project under the City's MSHCP Resolution, and the City
must make an MSHCP Consistency finding before approval.
Pursuant to the City's MSHCP Resolution, the Project must be reviewed for
MSHCP consistency, which review shall include an analysis of the Project's
consistency with other "Plan Wide Requirements." The Project is located
within the East Lake Specific Plan (ELSP) area, specifically within the ELSP
Amendment No. 6 area. Prior to the City's adoption of the MSHCP, there were
a series of meetings between the County of Riverside, U.S. Fish and Wildlife
Service, and California Department of Fish and Game to discuss
conservation measures within the ELSP and to decide how to ensure
development within the ELSP could proceed consistently with the MSHCP
and with the U. S. Army Corps of Engineers Section 404 permit. It was
determined that a target acreage of 770 acres was warranted for MSHCP
conservation in the back basin area of the City.
The Project site is within the ELSP and is covered by that conservation
agreement. Part of the conservation agreement also included a requirement
that projects in the back basin area be consistent with the other "Plan Wide
Requirements" set forth in the following sections of the MSHCP: Protection of
Species Associated with Riparian/Riverine Areas and Vernal Pool Guidelines
(MSHCP, § 6.1.2), Protection of Narrow Endemic Plant Species Guidelines
(MSHCP, § 6.1.3), Additional Survey Needs and Procedures (MSHCP, §
6.3.2), Urban/Wildlands Interface Guidelines (MSHCP, § 6.1.4), Vegetation
Mapping (MSHCP, § 6.3. 1) requirements, Fuels Management Guidelines
(MSHCP, § 6.4), and payment of the MSHCP Local Development Mitigation
Fee (MSHCP Ordinance, § 4). The Project has been reviewed in light of
these sections and is consistent therewith.
2. The Project is subject to the City's LEAP and the County's Joint Project
Review processes.
The ELSP MSCHP consistency determination was submitted to the County
of Riverside in October 2003, prior to the initiation of the City's LEAP and
County's Joint Project Review process. Nevertheless, both the City and
PLANNING COMMISSION RESOLUTION NO. 2015-45
PAGE 3OF5
Dudek (acting on behalf of the County) agreed that the Project was consistent
with the MSHCP due to the extensive acreage set aside for conservation.
The Project has not been modified and was part of the overall ELSP which
has been determined to be consistent with the MSHCP.
3. The Project is consistent with the Riparian/Riverine Areas and Vernal Pools
Guidelines.
The previously approved ELSP Amendment No. 6 was determined to be
consistent with the Riparian/Riverine and Vernal Pool Guidelines as set forth
in Section 6.1.2 of the MSHCP. The scope and nature of the Project have not
been modified from that which was previously approved and is therefore
consistent with the Riparian/Riverine Areas and Vernal Pools Guidelines.
4. The Project is consistent with the Protection of Narrow Endemic Plant
Species Guidelines.
The previously approved ELSP Amendment No. 6 was consistent with the
Protection of Narrow Endemic Plant Species Guidelines as set forth in
Section 6.1.3 of the MSHCP. The Project has not been modified from that
which was previously approved under the ELSP Amendment No. 6.
Additionally, based upon prior approvals, the entire Project site has been
graded and any plant species which may have existed on the site have been
removed and replaced with development. It is for these reasons that the
Project is consistent with the aforementioned guidelines.
5. The Project is consistent with the Additional Survey Needs and Procedures.
The previously approved ELSP Amendment No. 6 was consistent with the
Additional Survey Needs and Procedures as set forth in Section 6.3.2 of the
MSHCP. The Project has not been modified from that which was previously
approved under the ELSP Amendment No. 6, and the entire project site has
been graded pursuant to previously issued permits. The Project is consistent
with the Additional Survey Needs and Procedures of the MSHCP.
6. The Project is consistent with the Urban/Wildlands Interface Guidelines.
The previously approved ELSP Amendment No. 6 was consistent with the
Urban/Wildlands Interface Guidelines as set forth in Section 6.1.4 of the
MSHCP. Because the Project has not been modified from that which was
previously approved under the ELSP Amendment No. 6, no further MSHCP
review is necessary and the Project is consistent with the Urban/Wildlands
Interface Guidelines.
7. The Project is consistent with the Vegetation Mapping requirements.
PLANNING COMMISSION RESOLUTION NO. 2015-45
PAGE 4 OF 5
The previously approved ELSP Amendment No. 6 was consistent with the
Vegetation Mapping requirements as set forth in Section 6.3.1 of the MSHCP.
Mapping was conducted as part of the biological surveys for the original
project. The Project has not been modified from that which was previously
approved and therefore is consistent with the Vegetation Mapping
requirements.
8. The Project is consistent with the Fuels Management Guidelines.
The previously approved ELSP Amendment No. 6 was consistent with the
Fuels Management Guidelines as set forth in Section 6.4 of the MSHCP. The
Project site is not within or adjacent to conservation areas where the Fuels
Management Guidelines would be required. The Project has not been
modified from that which was previously approved and therefore is consistent
with the Fuel Management Guidelines.
9. The Project overall is consistent with the MSHCP.
As stated in No. 1 above, the Project is within the ELSP area which has
previously been determined to be consistent with the MSHCP.
SECTION 3. Based upon all of the evidence presented, the above findings, and
the conditions of approval imposed upon the Project, the Planning Commission hereby
recommends that the City Council find that the Project is consistent with the MSHCP.
SECTION 4. This Resolution shall take effect from and after the date of its
passage and adoption.
PASSED, APPROVED AND ADOPTED this 5t" day of May 2015, by the following
vote:
��_ J_�5� C_ zk_"� - -----
Joh Gra , Chai an
Cit of L e Elsinore I ning Commission
ATTEST:
Richard . MacHott, LEED Green Associate
Planning Manager
PLANNING COMMISSION RESOLUTION NO. 2015-45
PAGE 5 OF 5
STATE OF CALIFORNIA
COUNTY OF RIVERSIDE
CITY OF LAKE ELSINORE SS
I, Richard J. MacHott, Planning Manager of the City of Lake Elsinore, California,
hereby certify that Resolution No. 2015-45 as adopted by the Planning Commission of
the City of Lake Elsinore at a regular meeting held on the 5th day of May 2015, and that
the same was adopted by the following vote:
AYES: VICE CHAIR JORDAN, COMMISSIONER ARMIT,
COMMISSIONER FLEMING, COMMISSIONER RAY
NOES: NONE
ABSTAIN: NONE
ABSENT: CHAIRMAN GRAY
Richard J. M ' Hott, LEED Green Associate
Planning Manager