Loading...
HomeMy WebLinkAboutItem No. 15 Hunsaker and Associates, Inc. AgreementCity Council Agenda Report City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 19-150 Agenda Date: 5/14/2019 Status: PassedVersion: 1 File Type: Council Consent Calendar In Control: City Council / Successor Agency Agenda Number: 15) Hunsaker and Associates, Inc. Agreement Authorize the City Manager to execute the Professional Services Agreement in the amount of $201,700.00, plus a 10 percent contingency. Page 1 City of Lake Elsinore Printed on 5/9/2023 Page 1 of 2 REPORT TO CITY COUNCIL To:Honorable Mayorand Members of the City Council From:Grant Yates, City Manager Prepared By: Remon Habib, City Engineer Date:May 14, 2019 Subject:Professional Civil Engineering Services to Provide Final Engineering for Summerhill Drive Interim Extension Recommendation Approve and Authorize the City Manager to execute an Agreement for Professional Design Servicesin the amount of $201,700to Hunsaker and Associates, Inc., plus an additional 10% contingency,in final form as approved by City Attorney. Background The Agreementwill authorize Hunsaker and Associates to start the design of a two-lane roadway for Summerhill Drive Extension. The design will provide plans to go out for bid and construction to extend Summerhill Drive to Greenwald Ave. On January 8th, 2019, Council approved a Professional Services Agreement withGlenn Lukos Associates for the Biological and Regulatory Support for the Summerhill Extension project. Both consultants will work in tandem to provide all professional services necessary to complete a constructible design package with compliance with regulatory requirements. Discussion Hunsaker and Associates will provide civil engineering designnecessary for the construction of a two-lane roadway extending Summerhill Drive to Greenwald Ave. The design services will address, trafficsignal, hydrology, storm drain improvements, grading, geotechnical and all other engineering disciplines required to complete a constructible design. The length of the roadway extension is estimated to be around 4,200 ft in length. The design includes preparing Record of Survey and the identification of Right of Way (ROW) impacts and preparing plats and legal descriptions for the ROW needed. Fiscal Impact Professional Services Agreementwill result into a cost of $201,700 plus an additional 10% in contingency. Page 2 of 2 Exhibits A –Agreement B -Proposal AGREEMENTFOR PROFESSIONALSERVICES HunsakerandAssociates EngineeringConsultingServices ThisAgreement forProfessionalServices(the“Agreement”)ismadeandenteredintoas ofMay14,2019,byandbetweentheCityofLakeElsinore,amunicipalcorporation(‘‘City")and HunsakerandAssociates, Inc.,a("Consultant"). RECITALS A.TheCityhasdeterminedthatitrequiresthefollowingprofessionalservices:Design ServicesfortheSummerhillDriveInterimExtension. B.ConsultanthassubmittedtoCityaproposal,datedMay6,2019,attachedhereto asExhibitA(“Consultant’sProposal”)andincorporatedherein,toprovideprofessionalservices to Citypursuant tothetermsofthisAgreement. C.Consultantpossessestheskill,experience,ability,background,certificationand knowledgetoperformtheservicesdescribedinthisAgreementonthetermsandconditions describedherein. D.CitydesirestoretainConsultanttoperformtheservicesasprovidedhereinand Consultantdesiresto providesuchprofessionalservicesasset forthinthisAgreement. AGREEMENT 1.ScopeofServices.Consultantshallperformtheservicesdescribedin Consultant’sProposal(ExhibitA).Consultantshallprovidesuchservicesatthetime,place,and inthemannerspecifiedinConsultant’sProposal(ExhibitA),subjecttothedirectionoftheCity throughitsstaff thatitmayprovidefromtimetotime. 2.TimeofPerformance. a.TimeofEssence.Timeisoftheessenceintheperformanceofthis Agreement.ThetimeforcompletionoftheprofessionalservicestobeperformedbyConsultant isanessentialconditionofthisAgreement.Consultantshallprosecuteregularlyanddiligently theprofessionalservicescontemplatedpursuanttothisAgreementaccordingtotheagreedupon performancescheduleinConsultant’sProposal(ExhibitA). b.PerformanceSchedule.Consultantshallcommencetheservicespursuant tothisAgreementuponreceipt ofawrittennoticetoproceedandshallperformallserviceswithin thetimeperiod(s)establishedintheConsultant’sProposal(ExhibitA).Whenrequestedby Consultant,extensionstothetimeperiod(s)specifiedmaybeapprovedinwritingbytheCity Manager. c.Term.UnlessearlierterminatedasprovidedelsewhereinthisAgreement, thisAgreementshallcontinueinfullforceandeffectforaperiodofone(1)year,commencingon May14,2019andending onJune30,2020.TheCitymay,atitssolediscretion,extendtheterm ofthisAgreementona12-monthbasisnottoexceedtwo(2)additionaltwelve(12)monthrenewal SummerhillDriveExtensionExhibitAAgreement.docx Page1 Page2 termsbygivingwrittennoticethereoftoConsultantnotlessthanthirty(30)daysbeforetheend ofthe contract term,suchnoticetobeexercisedbythe CityManager. Consultantherebyagreesandacknowledgesthatanyandallworkor servicesperformedpursuanttothisAgreementshallbebasedupontheissuanceofaprojecttask orderbytheCity.Consultantacknowledgesthatitisnotguaranteedanyminimumorspecific amountofworkorservicesasallworkorservicesshallbeauthorizedthroughtaskorderissued bythe City. 3.Compensation.CompensationtobepaidtoConsultantshallbeinaccordance withthefeessetforthin Consultants’Proposal(ExhibitA),whichis attachedheretoand incorporatedhereinbyreference.InnoeventshallConsultant’scompensationexceed Two HundredandOneThousandSevenHundreddollars($201,700)withoutadditionalwritten authorizationfromtheCity.NotwithstandinganyprovisionofConsultant’sProposaltothe contrary,outofpocketexpensessetforthinExhibitAshallbereimbursedatcostwithoutan inflatororadministrativecharge.PaymentbyCityunderthisAgreementshallnotbedeemeda waiverofdefects,evenifsuchdefectswere knowntotheCityat thetimeofpayment. 4.MethodofPayment.ConsultantshallpromptlysubmitbillingstotheCity describingtheservicesandrelatedworkperformedduringtheprecedingmonthtotheextentthat suchservicesandrelatedworkwereperformed.Consultant’sbillsshallbesegregatedbyproject task,ifapplicable,suchthattheCityreceivesaseparateaccountingforworkdoneoneach individualtaskforwhichConsultantprovidesservices.Consultant’sbillsshallincludeabrief descriptionoftheservicesperformed,thedatetheserviceswereperformed,thenumberofhours spentandbywhom,andadescriptionofanyreimbursableexpenditures.Cityshallpay Consultantnolaterthanforty-five(45) daysafterreceiptofthemonthlyinvoicebyCitystaff. 5.Reserved. 6.SuspensionorTermination. a.TheCitymayatanytime,foranyreason,withorwithoutcause,suspend orterminatethisAgreement,oranyportionhereof,byservingupontheConsultantatleastten (10)dayspriorwrittennotice.Uponreceiptofsuchnotice,theConsultantshallimmediatelycease allworkunderthisAgreement,unlessthenoticeprovidesotherwise.IftheCitysuspendsor terminatesaportionofthisAgreementsuchsuspensionorterminationshallnotmakevoidor invalidatetheremainder ofthisAgreement. b.IntheeventthisAgreementisterminatedpursuanttothisSection,theCity shallpaytoConsultanttheactualvalueoftheworkperformeduptothetimeoftermination, providedthattheworkperformedisofvaluetotheCity.UponterminationoftheAgreement pursuanttothisSection,theConsultantwillsubmitaninvoicetotheCity,pursuanttoSection entitled“MethodofPayment” herein. 7.OwnershipofDocuments.Allplans,studies,documentsandotherwritings preparedbyandforConsultant,itsofficers,employeesandagentsandsubcontractorsinthe courseofimplementingthis Agreement,exceptworkingnotepadinternaldocuments,shall becomethepropertyoftheCityuponpaymenttoConsultantforsuchwork,andtheCityshall havethesolerighttousesuchmaterialsinitsdiscretionwithoutfurthercompensationto Consultantortoanyotherparty.Consultantshall,atConsultant’sexpense,providesuchreports, plans,studies,documentsandotherwritingstoCityuponwrittenrequest.Cityacknowledges Page3 that anyuseofsuchmaterialsinamanner beyond theintendedpurposeas setforthhereinshall beatthesoleriskoftheCity.Cityfurtheragreestodefend,indemnifyandholdharmless Consultant,itsofficers,officials,agents,employeesandvolunteersfromanyclaims,demands, actions,losses,damages,injuries,andliability,directorindirect(includinganyandallcostsand expensesinconnectiontherein),arisingoutoftheCity’suseofsuchmaterialsinamannerbeyond the intendedpurposeasset forthherein. a.LicensingofIntellectualProperty.ThisAgreementcreatesanonexclusive andperpetuallicenseforCitytocopy,use,modify,reuse,orsublicenseanyandallcopyrights, designs,andotherintellectualpropertyembodiedinplans,specifications,studies,drawings, estimates,andotherdocumentsorworksofauthorshipfixedinanytangiblemediumof expression,includingbutnotlimitedto,physicaldrawingsordatamagneticallyorotherwise recordedoncomputerdiskettes,whicharepreparedorcausedtobepreparedbyConsultant underthisAgreement("Documents&Data").Consultantshallrequirethatallsubcontractors agreeinwritingthatCityisgrantedanonexclusiveandperpetuallicenseforanyDocuments& DatathesubcontractorspreparesunderthisAgreement.Consultantrepresentsandwarrants thatConsultanthasthelegalrighttolicenseanyandallDocuments&Data.Consultantmakes nosuchrepresentationandwarrantyinregardtoDocuments&Datawhichwerepreparedby designprofessionalsotherthanConsultantorprovidedtoConsultantbytheCity.Cityshallnot belimitedinanyway initsuseoftheDocuments& Dataatanytime, providedthat anysuchuse notwithinthe purposesintendedbythisAgreementshallbeat City’ssolerisk. b.Confidentiality.Allideas,memoranda,specifications,plans,procedures, drawings,descriptions,computerprogramdata,inputrecorddata,writteninformation,andother Documents&DataeithercreatedbyorprovidedtoConsultantinconnectionwiththeperformance ofthisAgreementshallbeheldconfidentialbyConsultant.Suchmaterialsshallnot,withoutthe prior writtenconsentofCity,beusedbyConsultantforanypurposesotherthantheperformance oftheservicesunderthisAgreement.Norshallsuchmaterialsbedisclosedtoanypersonor entitynotconnectedwiththeperformanceoftheservicesunderthisAgreement.Nothing furnishedtoConsultantwhichisotherwiseknowntoConsultantorisgenerallyknown,orhas becomeknown,totherelatedindustryshallbedeemedconfidential.Consultantshallnotuse City’snameorinsignia,photographsrelatingtoprojectforwhichConsultant’sservicesare rendered,oranypublicitypertainingtotheConsultant’sservicesunderthisAgreementinany magazine,tradepaper,newspaper,televisionorradioproductionorothersimilarmediumwithout the priorwrittenconsent ofCity. 8.Consultant’sBooksandRecords. a.Consultantshallmaintainanyandallledgers,booksofaccount,invoices, vouchers,canceledchecks,andotherrecordsordocumentsevidencingorrelatingtochargesfor services,orexpendituresanddisbursementschargedtoCityforaminimumperiodofthree(3) years,orforanylongerperiodrequiredbylaw,fromthedateoffinalpaymenttoConsultantto thisAgreement. b.Consultantshallmaintainalldocumentsandrecordswhichdemonstrate performanceunderthisAgreementforaminimumperiodofthree(3)years,orforanylonger periodrequiredbylaw,fromthe dateofterminationor completionofthisAgreement. c.Anyrecordsordocumentsrequiredtobemaintainedpursuanttothis Agreementshallbemadeavailableforinspectionoraudit,atanytimeduringregularbusiness hours,uponwrittenrequestbytheCityManager,CityAttorney,CityAuditororadesignated Page4 representativeoftheseofficers.CopiesofsuchdocumentsshallbeprovidedtotheCityfor inspectionatCityHallwhenitispracticaltodoso.Otherwise,unlessanalternativeismutually agreedupon,therecordsshallbeavailableatConsultant’saddressindicatedforreceiptofnotices inthisAgreement. d.WhereCityhasreasontobelievethatsuchrecordsordocumentsmaybe lostordiscardedduetodissolution,disbandmentorterminationofConsultant’sbusiness,City may,bywrittenrequestbyanyoftheabove-namedofficers,requirethatcustodyoftherecords begiventotheCityandthattherecordsanddocumentsbemaintainedinCityHall.Accessto suchrecordsanddocumentsshallbegrantedtoanypartyauthorizedbyConsultant,Consultant’s representatives,orConsultant’ssuccessor-in-interest. 9.IndependentConsultant.ItisunderstoodthatConsultant,intheperformanceof theworkandservicesagreedtobeperformed,shallactasandbeanindependentConsultant andshallnot act asanagentoremployeeoftheCity. 10.PERSEligibilityIndemnification.IntheeventthatConsultantoranyemployee, agent,orsubcontractorsofConsultantprovidingservicesunderthisAgreementclaimsoris determinedbyacourtofcompetentjurisdictionortheCaliforniaPublicEmployeesRetirement System(PERS)tobeeligibleforenrollmentinPERSasanemployeeoftheCity,Consultantshall indemnify,defend,andholdharmlessCityforthepaymentofanyemployeeand/oremployer contributionsforPERSbenefitsonbehalfofConsultantoritsemployees,agents,or subcontractors,aswellasforthepaymentofanypenaltiesandinterestonsuchcontributions, whichwouldotherwisebetheresponsibilityofCity. Notwithstandinganyotherfederal,stateandlocallaws,codes,ordinancesand regulationstothecontrary,Consultantandanyofitsemployees,agents,andsubcontractors providingserviceunderthisAgreementshallnotqualifyfororbecomeentitledto,andhereby agreeto waiveanyclaimsto,anycompensation, benefit,oranyincidentofemploymentbyCity, includingbutnotlimitedtoeligibilitytoenrollinPERSasanemployeeofCityandentitlementto anycontributiontobepaidbyCityforemployercontributionand/oremployeecontributionsfor PERSbenefits. 11.InterestsofConsultant.Consultant(includingprincipals,associatesand professionalemployees)covenantsandrepresentsthatitdoesnotnowhaveanyinvestmentor interestinrealpropertyandshallnotacquireanyinterest,directorindirect,intheareacovered bythisAgreementoranyothersourceofincome,interestinrealpropertyorinvestmentwhich wouldbeaffectedinanymannerordegreebytheperformanceofConsultant’sservices hereunder.Consultantfurthercovenantsandrepresentsthatintheperformanceofitsduties hereunder nopersonhavinganysuchinterest shallperform anyservicesunder thisAgreement. Consultantisnot a designatedemployeewithinthe meaningofthePoliticalReformAct becauseConsultant: a.willconductresearchandarriveatconclusionswithrespecttohis/her renditionofinformation,advice,recommendationorcounselindependentofthecontroland directionofthe Cityor ofanyCityofficial, other thannormalagreement monitoring;and b.possessesnoauthoritywithrespectto any Citydecisionbeyondrendition ofinformation, advice,recommendationorcounsel.(FPPCReg. 18700(a)(2).) Page5 12.ProfessionalAbilityofConsultant.Cityhasreliedupontheprofessionaltraining andabilityofConsultanttoperformtheserviceshereunderasamaterialinducementtoenterinto thisAgreement.Consultantshallthereforeprovideproperlyskilledprofessionalandtechnical personneltoperform allservicesunderthisAgreement.AllworkperformedbyConsultant under thisAgreementshallbeinaccordancewithapplicablelegalrequirementsandshallmeetthe standardofqualityordinarilytobeexpectedofcompetentprofessionalsinConsultant’sfieldof expertise. 13.CompliancewithLaws.Consultantshallusethestandardofcareinitsprofession to complywithallapplicablefederal, stateandlocallaws,codes,ordinancesandregulations. 14.Licenses.ConsultantrepresentsandwarrantstoCitythatithasthelicenses, permits,qualifications,insuranceandapprovalsofwhatsoevernaturewhicharelegallyrequired ofConsultanttopracticeitsprofession.ConsultantrepresentsandwarrantstoCitythat Consultant shall,atitssolecostandexpense,keepineffect orobtainatalltimesduringtheterm ofthisAgreement,anylicenses,permits,insuranceandapprovalswhicharelegallyrequiredof Consultanttopracticeitsprofession.ConsultantshallmaintainaCityofLakeElsinorebusiness license. 15.Indemnity. a.Indemnification for Professional Liability. To the fullest extent permitted by law, Consultant shall indemnify, defend and hold harmless City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, to the extent they arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct ofthe Consultant. Consultant’s duty to defend shall consist of reimbursement of defense costs incurred by City in direct proportion to the Consultant’s proportionate percentage of fault. Consultant’s percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant’s percentage of fault, the parties agree to mediation with a third party neutral to determine the Consultant’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the City. b.Indemnification for Other Than Professional Liability.Other than in the performance of professional services and to the full extent permitted by law, Consultant shall indemnify, defend and hold harmless City, and any and all of its employees, officials and agents from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including attorneys’ fees and costs, court costs, interest, defense costs, and expert witness fees), where the same arise out of, are a consequence of, or are in any way attributable to, in whole or in part, the performance of this Agreement by Consultant or by any individual or entity for which Consultant is legally liable, including but not limited to officers, agents, employees or sub-consultants of Consultant. Consultant shall not be liable to third parties for any liability exempted by statute. c.General Indemnification Provisions. Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this section from each and every sub-consultant or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required here, Consultant agrees to be fully Page6 responsible according to the terms of this section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth here is binding on the successors, assigns or heirs of Consultant and shall survive the termination of this Agreement or this section. 16.InsuranceRequirements. a.Insurance.Consultant,atConsultant’sowncostandexpense,shall procureandmaintain,forthedurationofthecontract,unlessmodifiedbytheCity’sRiskManager, thefollowinginsurancepolicies. i.Workers’CompensationCoverage.Consultantshallmaintain Workers’Compensation InsuranceandEmployer’s Liability Insurancefor his/her employeesinaccordancewiththelawsofthe StateofCalifornia.In addition,Consultantshall requireeachsubcontractorstosimilarlymaintainWorkers’CompensationInsuranceand Employer’sLiabilityInsuranceinaccordancewiththelawsoftheStateofCaliforniaforallof thesubcontractor’semployees.Anynoticeofcancellationornon-renewalofallWorkers’ CompensationpoliciesmustbereceivedbytheCityatleastthirty(30)dayspriortosuch change.TheinsurershallagreetowaiveallrightsofsubrogationagainstCity, itsofficers, agents,employeesandvolunteersforlossesarisingfromworkperformedbyConsultant forCity.In theeventthatConsultantisexemptfromWorker’sCompensationInsuranceand Employer’sLiabilityInsuranceforhis/heremployeesinaccordancewiththelawsofthe StateofCalifornia,ConsultantshallsubmittotheCityaCertificateofExemptionfrom WorkersCompensationInsuranceinaformapprovedbytheCityAttorney. ii.GeneralLiabilityCoverage.Consultantshallmaintaincommercial generalliabilityinsuranceinanamountnotlessthanonemilliondollars($1,000,000)per occurrenceforbodilyinjury,personalinjuryandpropertydamage.Ifacommercialgeneral liabilityinsuranceformorotherformwithageneralaggregatelimitisused,eitherthe generalaggregatelimitshallapplyseparatelytotheworktobeperformedunderthis Agreementorthegeneralaggregatelimitshallbeatleasttwicetherequiredoccurrence limit.Requiredcommercialgeneralliabilitycoverageshallbeatleastasbroadas InsuranceServicesOfficeCommercialGeneralLiabilityoccurrenceformCG0001(ed. 11/88)orInsuranceServicesOfficeformnumberGL0002(ed.1/73)covering comprehensiveGeneralLiabilityandInsuranceServicesOfficeformnumberGL0404 coveringBroadFormComprehensiveGeneralLiability.Noendorsementmaybeattached limitingthecoverage. iii.AutomobileLiabilityCoverage.Consultantshallmaintainautomobile liabilityinsurancecoveringbodilyinjuryandpropertydamageforallactivitiesofthe Consultantarisingoutoforinconnectionwiththeworktobeperformedunderthis Agreement,includingcoverageforowned,hiredandnon-ownedvehicles,inanamountof notlessthanonemilliondollars($1,000,000)combinedsinglelimitforeachoccurrence. AutomobileliabilitycoveragemustbeatleastasbroadasInsuranceServicesOffice AutomobileLiabilityformCA0001(ed.12/90)Code1(“anyauto”).Noendorsementmaybe attachedlimitingthecoverage. iv.Professional Liability Coverage.Consultant shall maintain professional errors and omissions liability insurance appropriatefor Consultant’s professionforprotectionagainstclaimsallegingnegligentacts,errorsoromissionswhich mayarisefromConsultant’sservicesunderthisAgreement,whethersuchservicesare providedbytheConsultantorbyitsemployees,subcontractors,orsubconsultants.The Page7 amountofthisinsuranceshallnotbelessthanonemilliondollars($1,000,000)ona claims-madeannualaggregatebasis, or a combinedsinglelimitperoccurrencebasis. b.Endorsements.Eachgeneralliabilityandautomobileliabilityinsurance policyshallbewithinsurerspossessingaBest’sratingofnolessthanA:VIIandshallbe endorsedwiththefollowingspecificlanguage: i.TheCity,itselectedorappointedofficers,officials,employees, agentsandvolunteersaretobecoveredasadditionalinsuredwithrespecttoliability arisingout ofworkperformedbyoronbehalfoftheConsultant, includingmaterials,partsor equipment furnishedinconnectionwithsuchworkoroperations. ii.Thispolicyshallbeconsideredprimaryinsuranceasrespectsthe City,itselectedorappointedofficers,officials,employees,agentsandvolunteers. AnyinsurancemaintainedbytheCity,includinganyself-insuredretentiontheCitymay have,shallbeconsideredexcessinsuranceonlyandshallnot contributewithit. iii.Thisinsuranceshallactforeachinsuredandadditionalinsuredas thoughaseparatepolicyhadbeenwrittenforeach,exceptwithrespecttothelimitsof liabilityoftheinsuringcompany. iv.TheinsurerwaivesallrightsofsubrogationagainsttheCity,its electedor appointedofficers, officials,employeesor agents. v.Anyfailuretocomplywithreportingprovisionsofthepoliciesshall notaffectcoverageprovidedtotheCity,its electedorappointedofficers,officials, employees,agentsorvolunteers. vi.TheinsuranceprovidedbythisPolicyshallnotbesuspended, voided,canceled,orreducedincoverageorinlimitsexceptafterthirty(30)dayswritten noticehasbeenreceivedbythe City. c.DeductiblesandSelf-InsuredRetentions.Anydeductiblesorself-insured retentionsmustbedeclaredtoandapprovedbytheCity.AttheCity’soption,Consultantshall demonstratefinancialcapabilityforpayment ofsuchdeductiblesorself-insuredretentions. d.CertificatesofInsurance.Consultantshallprovidecertificatesofinsurance withoriginalendorsementstoCityasevidenceoftheinsurancecoveragerequiredherein. CertificatesofsuchinsuranceshallbefiledwiththeCityonorbeforecommencementof performanceofthisAgreement.Currentcertificationofinsuranceshallbekeptonfilewiththe Cityatalltimesduringtheterm ofthisAgreement. 17.Notices.AnynoticerequiredtobegivenunderthisAgreementshallbeinwriting andeitherservedpersonallyorsentprepaid,firstclassmail.Anysuchnoticeshallbeaddressed totheotherpartyattheaddresssetforthbelow.Noticeshallbedeemedcommunicatedwithin 48hoursfromthetime ofmailingifmailedasprovidedinthissection. IftoCity:CityofLakeElsinore Attn:CityManager 130SouthMainStreet LakeElsinore, CA92530 Page8 Withacopyto:CityofLakeElsinore Attn:CityClerk 130SouthMainStreet LakeElsinore, CA92530 IftoConsultant:HunsakerandAssociates Attn:PaulHuddleston,Jr. 2900AdamsStreet,SuiteA-15 Riverside,CA92504 18.EntireAgreement.ThisAgreementconstitutesthecompleteandexclusive statementofAgreementbetweentheCityandConsultant.Allpriorwrittenandoral communications,includingcorrespondence,drafts,memoranda,andrepresentations,are supersededintotalbythisAgreement. 19.Amendments.ThisAgreementmaybemodifiedoramendedonlybyawritten document executedbybothConsultantandCityandapprovedastoformbythe CityAttorney. 20.AssignmentandSubcontracting.Thepartiesrecognizethatasubstantial inducementtoCityforenteringintothisAgreementistheprofessionalreputation,experienceand competenceofConsultantandthesubcontractorslistedinExhibitB.Consultantshallbefully responsibletoCityforallactsoromissionsofanysubcontractors.Assignmentsofanyorall rights,dutiesorobligationsoftheConsultantunderthisAgreementwillbepermittedonlywiththe expressconsentoftheCity.Consultantshallnotsubcontractanyportionoftheworktobe performedunderthisAgreementexcept asprovidedinExhibitBwithout thewrittenauthorization oftheCity.IfCityconsentstosuchsubcontract,ConsultantshallbefullyresponsibletoCityfor allactsoromissionsofthosesubcontractors.NothinginthisAgreementshallcreateany contractualrelationshipbetween Cityandanysubcontractorsnorshallitcreateanyobligationon thepartoftheCitytopayortoseetothepaymentofanymoniesduetoanysuchsubcontractors other thanasotherwiseisrequiredbylaw. 21.Waiver.Waiverofabreachor defaultunderthisAgreementshallnotconstitutea continuingwaiverofasubsequentbreachofthesameorany otherprovisionunderthis Agreement. 22.Severability.IfanytermorportionofthisAgreementisheldtobeinvalid,illegal, orotherwiseunenforceablebyacourtofcompetentjurisdiction,theremainingprovisionsofthis Agreementshallcontinueinfullforceandeffect. 23.ControllingLawVenue.ThisAgreementandallmattersrelatingtoitshallbe governedbythelawsoftheStateofCaliforniaandanyactionbrought relatingtothisAgreement shallbeheldexclusivelyina statecourtintheCountyofRiverside. 24.LitigationExpensesandAttorneys’Fees.IfeitherpartytothisAgreement commencesanylegalactionagainsttheotherpartyarisingoutofthisAgreement,theprevailing partyshallbeentitledtorecoveritsreasonablelitigationexpenses,includingcourtcosts,expert witnessfees, discoveryexpenses,andattorneys’fees. 25.Mediation.Thepartiesagreetomakeagoodfaithattempttoresolveanydisputes arisingoutofthisAgreementthroughmediationpriorto commencinglitigation.The partiesshall mutuallyagreeuponthemediatorandsharethecostsofmediationequally.Ifthepartiesare unabletoagreeuponamediator,thedisputeshallbesubmittedtoJAMSoritssuccessorin interest.JAMSshallprovidethepartieswiththenamesoffivequalifiedmediators.Eachparty Page9 shallhavetheoptiontostriketwoofthefivemediatorsselectedbyJAMSandthereafterthe mediatorremainingshallhearthedispute.Ifthedisputeremainsunresolvedaftermediation, eitherpartymaycommencelitigation. 26.AuthoritytoEnterAgreement.Consultanthasallrequisitepowerandauthorityto conductitsbusinessandtoexecute,deliver,andperformtheAgreement.Eachpartywarrants that the individualswhohavesignedthisAgreementhavethelegalpower,right, andauthorityto makethisAgreementandtobindeachrespectiveparty.TheCityManagerisauthorizedtoenter intoanamendmentorotherwisetakeactiononbehalfoftheCity tomakethefollowing modificationstotheAgreement:(a)anamechange;(b)grantextensionsoftime;(c)non- monetarychangesinthescopeofservices;and/or(d) suspendorterminatetheAgreement. 27.ProhibitedInterests.Consultantmaintainsandwarrantsthatithasnotemployed norretainedanycompanyorperson,otherthanabonafideemployeeworkingsolelyfor Consultant,to solicitorsecurethisAgreement.Further,Consultantwarrantsthatithasnotpaid nor hasitagreedtopayanycompanyor person,otherthanabonafideemployee workingsolely forConsultant,anyfee,commission,percentage,brokeragefee,giftorotherconsideration contingentuponorresultingfromtheawardormakingofthisAgreement.Forbreachorviolation ofthiswarranty,Cityshallhavetherightto rescindthisAgreementwithoutliability.Forthe term ofthisAgreement,nomember,officeroremployeeofCity,duringthetermofhisorherservice withCity,shallhaveanydirectinterestinthisAgreement,orobtainanypresentoranticipated materialbenefit arisingtherefrom. 28.EqualOpportunityEmployment.Consultantrepresentsthatitisanequal opportunityemployeranditshallnotdiscriminateagainstanysubcontractors,employeeor applicantforemploymentbecauseofrace,religion,color,nationalorigin,handicap,ancestry,sex orage.Suchnon-discriminationshallinclude,butnotbelimitedto,allactivitiesrelatedtoinitial employment,upgrading,demotion,transfer,recruitmentorrecruitmentadvertising,layoffor termination. 29.PrevailingWages.ConsultantisawareoftherequirementsofCaliforniaLabor CodeSection1720,etseq., and1770,etseq., as wellasCaliforniaCodeofRegulations,Title8, Section16000,etseq.,("PrevailingWageLaws"),whichrequirethepaymentofprevailingwage ratesandtheperformanceofotherrequirementson"publicworks"and"maintenance"projects. Consultantagreestofullycomplywithallapplicablefederalandstatelaborlaws(including, withoutlimitation,ifapplicable,thePrevailingWageLaws).Itisagreedbythepartiesthat,in connectionwiththeWorkorServicesprovidedpursuanttothisAgreement,Consultantshallbear allrisksofpaymentornon-paymentofprevailingwagesunderCalifornialaw,andConsultant herebyagreestodefend,indemnify,andholdtheCity,anditsofficials,officers,employees, agents,andvolunteers,freeandharmlessfromanyclaimorliabilityarisingoutofanyfailureor allegedfailuretocomplywiththePrevailingWageLaws.Theforegoingindemnityshallsurvive terminationofthisAgreement. 30.Execution.ThisAgreementmaybeexecutedinseveralcounterparts,eachof whichshallconstituteoneandthesameinstrumentandshallbecomebindingupontheparties whenatleastonecopyhereofshallhavebeensignedbybothpartieshereto.Inapprovingthis Agreement, itshallnotbenecessaryto produceoraccount formorethanonesuchcounterpart. [Signaturesonnextpage] Page10 INWITNESSWHEREOF,the partieshavecausedthisAgreementto beexecutedonthe datefirst writtenabove. “CITY” CITYOFLAKEELSINORE,amunicipal corporation “CONSULTANT” HunsakerandAssociates GrantYates, CityManager ATTEST: By: Its: Deputy CityClerk APPROVEDASTO FORM: CityAttorney Attachments:ExhibitA –Consultant’sProposal Exhibit B –Subcontractor List EXHIBIT A EXHIBITA CONSULTANT’SPROPOSAL (ATTACHED) EXHIBITB EXHIBITB SUBCONTRACTOR LIST TJW Engineering, Inc. –Traffic Engineering ALTA California Geotechnical, Inc. –Geotechnical Engineer HUN SAKE R F & ASSOCIATES I R V I N E, I N C. I N L A N D E M P I R E R E G I O N PLANNING May 6, 2019 ENGINEERING SURVEYING Mr. Remon Habib, PE GOVERNMENT RELATIONS City Engineer CITY OF LAKE ELSINORE 130 South Main Street IRVINE Lake Elsinore, CA 92530 LOS ANGELES PALM DESERT Reference: Unapproved Plans for Summerhill Drive RIVERSIDE SAN DIEGO Subject: Proposal for Professional Civil Engineering Services to Provide Final Engineering for Summerhill Drive interim Extension Dear Mr. Habib: Per your request and directives, Hunsaker& Associates Irvine, Inc. (H&A) is pleased to present this proposal for professional civil engineering services to prepare final FOUNDING PARTNERS engineering, plan and profile for Summerhill Drive. RICHARD HUNSAKER As one of the premier multi-disciplined civil engineering companies within Southern TOM R.McGANNON California, H&A is celebrating over 43 years of providing distinguished professional services to our clients and is distinctly suited to provide technically accurate and JOHN A.MICHLER comprehensive civil engineering to develop the desired roadway for Summerhill Drive DOUGLAS G.5NYDER plan. H&A has assembled a highly educated and experienced professional team, including specialized subconsultants to provide services for the Summerhill Drive plans. A complete listing of our specialized subconsultants for Professional Engineering services is as follows: PRINCIPALS. • TJW Engineering, Inc_ -Traffic Engineering DAVID FRATTONE ALTA California Geotechnical, Inc.—Geotechnical Engineer FRED GRAYLEE BRADLEY B.HAY H&A strictly adheres to our policy of non-discrimination against any employee or employment application because of race, color, religion, sex or national origin. We PAUL R.HUDDLESTON,JR possess policies of insurance, which meet or exceed Agency Agreement KAMAL H.KARAM requirements. DOUGLAS L.STALEY Hunsaker & Associates Irvine, Inc. is grateful for the opportunity to submit this KRIS WEBER Proposal. We look forward to working with the City of Lake Elsinore to ensure this JOSEPH E.WIGHTMAN project is engineered in an economical and cost effective manner, in compliance with applicable state law,Agency standards/procedures and policies.Should you have any questions, please do not hesitate to contact me directly at(951) 509-7031. Sincerely, HUNSA ASSO IATES IRVINE, INC. 2900 Adams Street eHuddleston,Suite A-15 (� Riverside,California Jr.92504 (951)352-7200 PH RCE 58020, Exp. 6/30/20 (951)352-6269 FX www.hunsaker.com PH:sm (plproposals%Tract\C0LE PO 111-ph.docx) Exhibit A Professional Civil Engineering Services to Provide Final Engineering for Summerhill Drive Interim Extension SCOPE OF SERVICES H&A has developed a comprehensive scope of services that is anticipated to evolve Summerhill Drive plan and profile that will be acceptable to the City of Lake Elsinore. The scope of services, subject to your approval and based on the general understandings and assumptions herein, will be as follows: ENGINEERING Office Engineering 1. Conduct research of public files for existing and planned infrastructure,survey/ Right-of-Way plat map data, wet and dry utilities, review Client and City provided roadway improvement plans and identifying voids in reference data, etc. 2. Review survey mapping data of record and prepare Roadway Right-of-Way basemap_ 3. Develop Roadway typical section. 4. Prepare earthwork analysis for estimating purposes. 5. Prepare 1"=40' minimum scale storm drain improvements facilities plan to accommodate roadway construction and associated grading improvements including hydraulic calculations and pipeline sizing for new storm drain culvert facilities. 6. Prepare detailed Proforma Quantity and Cost Estimate for road plan including grading and new infrastructure improvements, etc. for project preliminary budgeting purposes. 7. Coordinate with ALTA Geotechnical and TJW Engineering. 8. Attend Client requested City staff meetings including providing civil engineering project coordination/steering consultation services to evolve conceptual Roadway widening plans ready for final engineering design commencement (estimate only: 24 hours). 9. Prepare a hydrology study to size of interim culverts. 10. Prepare and process Summerhill Drive street plans including grading(4,200 LF) (5 sheets). 11. Prepare legals and plats for ultimate street right-of-way, including slope easements. 12. Prepare one record of survey to allow monumentation of final street once complete. 13. Field Verify—Field verify tie-in points at Greenwald and Summerhill Dr. 14. Aerial Targets—Set aerial targets for drone flight (includes drone flight). PH:sm (plproposals\TractICQLE P01 Ri-ph.docx)515118 A-1 Summerhill Drive-Final Engineering Hunsaker 8 Associates Irvine,Inc. City of take Elsinore Exhibit A Scope of Services, cont. 15. Record of Survey—Plan check fees. 16. Specifications—Prepare one set of specifications. 17. ALTA California Geotechnical to provide soils engineering for roadway. 18. TJW Engineering to prepare interim traffic signal for the intersection of Summerhill Drive and Greenwald Avenue. Includes signing and striping plan. PH:sm(plproposals\TractCOLE Pot 131-ph.docx)5/6119 A-2 Summerhill Drive—final Engineering Hunsaker&Associates Irvine, Inc. City o1 Lake Elsinore i ; Exhibit B Professional Civil Engineering Services to Provide Final Engineering Plan for Summerhill Drive Interim Extension GENERAL UNDERSTANDINGS AND ASSUMPTIONS 1. Design for landscape items and appurtenances is not a part of this proposal. 2. Governmental Agency fees or charges are to be the responsibility of the Client. 3. The Engineer's work does NOT include any ecological or environmental CEQA studies work for the Roadway project, City to provide. 4. This proposal does NOT include acoustical studies or separate noise wall mitigation plans. 5. Client or City shall be responsible for any Right-of-Way land acquisition/land quitclaim/acquiring new easements etc. work associated with this project. 6. Traffic Engineering included in this proposal is limited to the intersection of Summerhill Drive and Greenwald Avenue. 7. No retaining wall structural designs are included in this proposal. B. No hazardous materials are assumed to be encountered within the project limits. 9. The following is a summary of the insurance coverages that Hunsaker & Associates Irvine, Inc. provides and is included in our offer of this proposal: General Liability.................... $ 2,000,000 Personal Injury...................... $ 1,000,000 Auto Liability.......................... $ 1,000,000 Professional Liability............. $ 2,000,000 Valuable Papers.................... $ 1,850,000 Upon request, we will provide a Certificate of Insurance for the insurance coverages listed above. Should you require additional coverage,the costs that we incur from our insurance carriers will be invoiced at their direct costs and are not included in our fee quoted within this proposal. 10. Special design issues will be handled on a time and materials basis. Engineering fees for any substantial scope of work changes,discoveries made upon design planning evolution, additions and/or revisions etc., shall be negotiated and agreed upon by the Client and H&A in conjunction with any special issues work. 11. This proposal does not include costs for street lighting plan. PH:sm (plproposals\TraclXCOLE P01 Ri-ph.docx) 8-1 Summerhill Drive-Final Engineering Hunsaker&Associates Irvine, Inc. City of Lake Elsinore Exhibit C �r ► Professional Civil Engineering Services to Provide Final Engineering for Summerhill Drive Interim Extension ENGINEERING FEES Office Engineering 1. Research. ................................................................................. $ 3,000 2. Roadway base map for right-of-way acquisition. ..................... $ 11,000 3. Develop Roadway typical sections. .......................................... $ 3,800 4. Earthwork analysis. .................................................................. $ 4,500 5. Prepare 1"=40' scale storm drain. ............................................ $ 25,000 6. Proforma budget quantity and cost estimate. .......................... $ 6,800 7. Coordinate with consultants. .................................................... $ 5,000 8. City meetings with staff. ............................................................ $ 3,500 9. Hydrology Study. ...................................................................... $ 15,000 10. Plans and Profile including rough grading (5 sheets). ............. $ 45,000 11. Right-of-Way documents. ......................................................... $ 15,000 12. Record of Survey. ..................................................................... $ 12,000 13. Field verify—Field verify tie-in points........................................ $ 4,000 14. Aerial Targets — Set aerial targets for drone flight (including drone flight)................................................................................ $ 7,700 15. Record of survey - Plan check fees for processing record of survey. ....................................................................................... $ 2,500 16. Specifications--Prepare one set of specifications.................... $ 5,000 17. TJW Engineering traffic signal signing and striping proposal. . $ 16,000 18. ALTA California Geotechnicai soils engineering proposal. ...... $ 16.900 Total Office $ 201,700 PH:sm (plproposals\TrachCOLE P01 R1-ph.docx) C-1 Summerhill Drive—Final Engineering Hunsaker&Associates Irvine,Inc. City of Lake Elsinore Exhibit C Engineering Pees, cont. i� All billing will be invoiced monthly at the following rates: Principal ............................................... $180/hour Project Manager .................................. $156/hour Project Engineer/Land Surveyor ......... $144/hour General Office Staff.............................. $138/hour 2-Person Survey Crew......................... $234/hour (used at Engineer's discretion) 3-Person Survey Crew......................... $286/hour(used at Engineer's discretion) These rates will remain in effect until December 31, 2020, at which time they may be changed. Any incidental expenses such as deliveries, reproductions, etc., are included in this proposal and will be billed at H&A costs plus 15%. PH:sm (plproposals\TractICOLE P01 Ri-ph.docx) C-2 Summerhill Drive—Final Engineering Hunsaker&Associates Irvine,Inc. City of Lake Elsinore April 23, 2019 ii TJW ENGINEERING, INC. Mr.Sean Swanson TRAFFIC ENGINEERING& TRANSPORTATION PLANNING HUNSAKER&ASSOCIATES CONSULTANTS Three Hughes Irvine,CA 92618 PROPOSAL: Summerhill Drive Roadway Extension Project Traffic Engineering Plan Design City of Lake Elsinore Dear Mr.Swanson: TJW Engineering, Inc. [TJW] is pleased to submit this proposed agreement to Hunsaker & Associates (Hunsaker) to provide traffic engineering design plans for the proposed Summerhill Drive extension project in the City of Lake Elsinore. The project would require the construction of new roadway connecting Summerhill Drive with Greenwald Avenue to the north,a distance of approximately 4,000-feet. Summerhill Drive would create a signalized t-intersection with Greenwald Avenue. To support the Hunsaker team and the City,TJW is proposing to prepare a traffic signal plan and signing & striping plans for the project. The scope of work anticipated for this project and proposal is as follows: Traffic Signal Plan Design: • Summerhill Avenue and Greenwald Avenue —TJW would prepare a traffic signal design plan for this new, project intersection. It is anticipated that the City would require a westbound left turn lane on Greenwald Avenue. On Summerhill Drive, it would be expected that a left turn lane and a right turn lane would be required. TJW would coordinate with Hunsaker on the final lane configuration. The plan would be drawn to meet City of Lake Elsinore standards. Signing and Striping Plan Design: • Summerhill Drive:TJW would prepare signing and striping plans to accommodate the new roadway, a distance of approximately 4,000-feet. It is anticipated that a 28-foot roadway section will be built.TJW would provide the necessary centerline stripe,edge line striping, and signing for the project. 6 Venture,suite 225 1 Irvine,California 92618 1 t:(949)878-3509 www.tjwengineering.com Mr.Sean Swanson Summerhill Traffic Eng Proposal April 23,2019 Page 2 • Intersection of Summerhill Drive and Greenwald Avenue:as discussed in the traffic signal portion of this proposal, it is anticipated that striping will be needed to accommodate anticipated lane configurations at the intersection.TJW would prepare the plans to match the street improvement plans and traffic signal plans. • Intersection of Summerhill Drive and Ponte Russo.TJW would make modifications to the existing striping on Summerhill Drive south of the Ponte Russo intersection to accommodate the new,fourth leg of the intersection. TJW would coordinate with Hunsaker to prepare the design plans to match the street improvement plans to be submitted as a package to the City for review and approval. The plans would be designed per the standards set forth by the City of Lake Elsinore. In this proposed agreement,TJW has provided the following items to define the project: • Scope of Services • Schedule • Qualifications • Professional Fees • Limitation of Liability • Certificate of Merit • Contract Approval SCOPE OF SERVICES The following items define the scope of services for this proposal. 1. Review the proposed street improvement plans provided by HUNSAKER. 2. Field review the existing conditions at the project site. TJW would review such things as the existing geometry, sight distance, signing, striping, traffic patterns, existing traffic signal equipment and above ground utilities. The findings would be incorporated into the design. 3. Prepare a traffic signal design plan for the Summerhill Drive and Greenwald Avenue intersection.The plan would be drawn a scale of 1"=20'and would be designed to match the street improvements for the project.The plans would be designed per the standards set forth by the City of Lake Elsinore. 4. Prepare signing and striping plans for the streets of Summerhill Drive, Ponte Russo, and Greenwald Avenue.The plans would be drawn using AutoCAD at a scale of V=40'.The plans would be designed per the standards set forth by the City of Lake Elsinore. TJW Engineering,Inc. HA119 Greenwald Summerhill Proposal.docx Mr.Sean Swanson Summerhill Traffic Eng Proposal April 23,2019 Page 3 5. Coordinate with Hunsaker on the project. 6. Submit the plans in concert with Hunsaker to the City of Lake Elsinore and respond to plan check comments by the agencies.TJW would revise the plans and as necessary. 7. Submit signed and sealed plans to the City for signature to complete the project. SCHEDULE TJW anticipates that plan set would be completed in approximately 20 working days in order to submit to HUNSAKER for review/submittal. TJW can begin working on this project immediately if needed. QUALIFICATIONS TJW Engineering, Inc., located in Irvine, California, is a Small Business Enterprise (SBE) in the State of California that specializes in craffc engineering and transportation planning. TJW provides services to a variety of private and public sector clients including cities, counties, architects, civil engineers, commercial and residential developers, school districts, community associations, and other public agencies including Caltrans. This project would be led by Thomas J. Wheat, P.E., T.E. who has over twenty years of project managing and design experience in the traffic engineering profession and has worked extensively in Southern California after coming to California in 2003. Mr. Wheat has prepared and designed hundreds of traffic engineering design plans and transportation studies since opening of TJW Engineering, Inc. in 2010. Mr.Wheat is a Registered Profession Engineer in Civil Engineering and a Registered Traffic Engineer in the State of California. PROFESSIONAL FEES TJW Engineering,Inc.is proposing to provide the services stated above for the fixed fee amount as follows: Traffic Signal Plan Design: $10,000.00 Signing&Striping Plan Design: $6,000.00 TOTAL $16,000.00 DIN Engineering,Inc. HA119 Greenwald Summerhill Proposal.docx Mr.Sean Swanson Summerhill Traffic Eng Proposal April 23,2019 Page 4 The fee includes emailing PDFs of the plans as well as shipping a wet-signed plan set to the team for their processing through the agencies for each plan check.Additional copies would be billed on a time and material (T&M) basis. It is assumed that pick-up, drop-off, and shipping of plans for agencies' review, above what was stated above, are assumed to be performed by others. If a time and material contract is needed,TJW would provide the client with an estimated budget based on the hourly rates as listed in the attached billing rate document. LIMITATION OF LIABILITY The Client agrees to limit the Design Professional's liability to the Client and to all construction Contractors and Subcontractors on the project, due to the Design Professional's negligent acts, errors, or omissions, such that the total aggregate liability of the Design Professional to all those named shall not exceed $250,000.00 for this project. CERTIFICATE OF MERIT The Client shall make no claim for professional negligence, either directly or by way of a cross complaint against the Consultant unless the Client has first provided the Consultant with a written certification executed by an independent consultant currently practicing in the same discipline as the Consultant and licensed in the State of California.This Certification shall: (a) Contain the name and license number of the certifier; (b) Specify the acts or omissions that the certifier contends are not in conformance with the standard of care for a consultant performing professional services under similar circumstances,and, (c) State in detail the basis for the certifier's opinion that such acts or omissions do not conform to the standard of care. This Certificate shall be provided to the Consultant not less than thirty (30) calendar days prior to the presentation of any claim or the institution of any arbitration or judicial proceeding. This Certificate of Merit clause will take precedence over any existing State law in force at the time of the claim or demand for arbitration. TJW Engineering,Inc. HA119 Greenwald Summerhill Proposal.docx Mr.Sean Swanson Summerhill Traffic Eng Proposal April 23,2019 Page 5 If you have any questions regarding this proposal or project, please feel free to contact me at Thomas @tjwengineering.com or at(949) 878-3509. Sincerely, a Alck ~ Thomas 1. Wheat, P.E.,T.E. President TIW Engineering, Inc. Registered Civil Engineer#69467 Registered Traffic Engineer#2565 CONTRACT APPROVAL This letter can serve as a Memorandum of Agreement and our authorization to proceed with your signature below. HUNSAKER&ASSOCIATES, INC. Approved by: (Signature) (Print) Title: Date: l7W Engineering,Inc. HA119 Greenwald Summerhill Proposal.docx TJW ENGINEERING, INC. STANDARD COMPENSATION SCHEDULE (Effective October 2018) Classification Hourly Rate Principal Traffic Engineer $175.00 Traffic Engineering Manager $150.00 Transportation Planning Manager $150.00 Senior Engineer $130.00 Senior Transportation Planner $130.00 Project Engineer/Planner $90.00-$115.00 Asst. Project Engineer $70.00-$85.00 Senior Technician $85.00 Technician $65.00 Administrative Aide $50.00 GENERAL PROVISIONS OF AGREEMENT 1, The above schedule is for straight time. Overtime will be charged at 1.5 times the standard hourly rate. Hourly rates apply to work time as well as travel time and waiting time,which occur at meetings and public hearings. 2. Unless otherwise stated in the contract, project-related travel, reproduction, and supply costs are billed at cost. Mileage will be billed at prevailing standard mileage rate as determined by the IRS. Subcontractors and other project-related expenses will be billed at cost plus 15% 3. Unless otherwise stated in the contract, invoice will be submitted monthly for work in progress or upon completion of work. Invoices are payable within 30 days of the invoice date.Any unpaid invoice after 30 days shall be subject to a service charge of the maximum interest rate allowed by law or two (2) percent per month whichever is less. 4. Client hereby agrees that the balance in a billing statement is correct and binding unless the client notifies the consultant in writing within fifteen (15) days of the date of billing and informs consultant of the alleged incorrect item. 5. All documents produced as a result of this agreement may be used by TJW Engineering(TJW)without consent from the client. 6. TJW makes no warranty as to his findings except that the work is performed using generally accepted methods. 7. Unless otherwise stated in the contract, the client agrees to limit TJW's liability to the client, due to professional negligent acts,errors,or omissions by the consultant,to the consultant's fee. 8. Any controversy or claim arising out of or relating to this contract, or the breach thereof, shall be settled by arbitration in accordance with the rules of the American Arbitration Association, and Judgment upon the award rendered by the arbitration may be entered in any court having jurisdiction thereof. 6 Venture,Suite 225 1 Irvine,California 92618 1 t:(949)878-3509 f.(949)878-3593 www.tjwengineering.com ALTA CALIFORNIA 470 North Maple Street, Suite 108 GEOTECHMCAL INC. Corona, CA 92880 www.altageatechnical.com HUNSAKER and ASSOCIATES, Inc. April 26, 2019 Inland Empire Region Proposal No. 1-19-036 2800 Adams St.,Suite A-15 Riverside, CA. 92504 Attention: Paul R. Huddleston,Jr. PE, PLS Principal Subject: PROPOSAL FOR GEOTECHNICAL SERVICES Preliminary Geotechnical Investigation & Final Soils Engineering Summerhill Drive Extension,Tuscany Hills City of Lake Elsinore, California References: See Appendix Dear Mr. Huddletton: Alta California Geotechnical, Inc. (Alta) is pleased to present this proposal for geotechnical services in support of the extension of proposed Summerhill Drive, In the City of Lake Elsinore, California. Our services will include: 1) a supplemental subsurface work to develop a Preliminary Geotechnical Investigation report; and 2) provide geotechnical reviews of plans for grading and infrastructure improvements . Alta's proposal is based on your request, review of the site exhibits provided by your office, review of the referenced reports, maps and air photos, online site views using Google Earth and Historical Aerials, our extensive experience with mass graded projects in the City of Lake Elsinore, including Railroad Canyon Road and the Canyon Hills Master Planned Community. Site Description and Proposed Development Proposed Summerhill Drive extends approximately 4,100 feet from it's existing Intersection with Ponte Russo northward to proposed Greenwald Avenue. Summerhill Drive will be graded through vacant, largely natural terrain with variable topography. Slopes range from nearly flat to as steep as 1:1. The road alignment and the surrounding proposed residential development is underlain by surficial deposits of young topsoils and alluvium, and Mesozoic- San Diego Office Corona Office Phone,858.674.8836 Phone-951 509.7090 Proposal No. 1-19-OXX Page 2 April 26, 2019 age metasedimentary bedrock. Landsliding and active faulting are not know to occur with the proposed road alignment. The road alignment and the surrounding proposed residential development is covered by a moderate to sparse growth of weeds. The large drainage just north of the Ponte Russo intersection supports large trees and brush. Shallow groundwater may be present in this drainage. Proposed fills are deepest in the large drainage, up to 70 feet in height. Deepest cuts are 40+ feet. The grading concept shows 2:1 fill and cutslopes daylighting through the proposed adjacent residential areas on both sides of the alignment. Drainage culverts will be constructed In canyon areas. Item 1 Preliminary Geotechnical Investigation The purpose of our proposed Preliminary Geotechnical Report is to discuss the onsite geotechnical conditions with respect to the proposed grading and construction, identify site geotechnical constraints (if any), provide specific preliminary geotechnical recommendations for grading and improvement construction, develop a document suitable for processing at the City of Lake Elsinore, and provide information that can be utilized for value engineering and construction cost estimates. To provide site-specific geotechnical information and to supplement the existing geotechnical information (Albus-Keefe, 2004), Alta will undertake a limited subsurface investigation. Our work will utilize a rubber-tire backhoe in alluviated areas to obtain in-place moisture-density data for remedial grading recommendations. Alta will also commission a seismic refraction survey to obtain rippability information in deep bedrock cut areas. Alta proposes the following Scope of Work for the 4,100-foot extension of Summerhill Drive: ➢ Review of maps, literature and air photos pertinent to the site; Perform site geologic mapping; ALTA CALIFORNIA GEOTECMNICAL, INC. Proposal No. 1-19-OXX page 3 April 26, 2019 ➢ Excavate, log and sample twelve (10)to twelve (12) rubber-tire backhoe test pits. Alta will perform in-place moisture/density testing within the test pits, utilizing a Nuclear Gauge, at various intervals in the alleviated drainages to derive remedial grading recommendations; S Commission a six (6) to seven (7)seismic refraction traverses to provide excavatabilty information down depths of necessary bedrock undercuts to facilitate utility construction; D Laboratory testing including: direct shear strength, laboratory maximum dry density and optimum moisture content, expansion index, grain size distribution, and preliminary screening for sulfates, and corrosion potential; R-values Preparation of a geologic map, including the work presented in the previous Investigation; D Summarization of existing site conditions, including ripppability, and onsite soils engineering characteristics; D Seismic hazards evaluation; ➢ Analysis of cut and fill slope stability; Develop remedial grading and grading recommendations; Estimate remedial grading quantities and shrink/swell parameters; Provide code-consistent seismic coefficients for design; Provide design recommendations for retaining walls; 9 Preparation of a report with exhibits summarizing our findings, conclusions and recommendations specific a Grading Plan. This report will be suitable for processing at the City of Lake Elsinore, engineer's cost estimates and contractor bid purposes. Item 2: Final Engineering and Plan Reviews Alta will support Hunsaker and Associates during the final engineering of the Summerhill Drive extension. It is anticipated that the City of Lake Elsinore will require the geotechnical consultant to review the overall rough grading plans and improvements plans prior to issuing a grading permit. Alta's Scope of Services to for our support during final engineering are anticipated to include the following: ALTA CALIFORNIA GEOTECHNICAL, INC. Proposal No. 1-19-OXX page 4 April 26, 2019 ➢ Review of the grading plans with respect to the geotechnical recommendations presented in the Preliminary Geotechnical Report; D Review of improvement plans, including culverts, storm drains, utilities and retaining walls (if any); Preparation of letter-reports with appropriate exhibits summarizing the above mentioned plan reviews; Attendance at team meetings. The estimated costs for provided these services are summarized below. A detailed cost breakdown to provide the above services can be provided upon request. SUMMARY Item 1: Preliminary Geotechnical Report Field Investigation $ 9,400.00 Laboratory Testing $ 1,900.00 Data Analysis and Report Preparation S 2,700.00 Sub Total $ 14,000.00 Item 2: Plan Reviews and Final Engineering $ 2,900.00 TOTAL $ 16,9g0.00 Fees will be billed on a time and materials basis, utilizing the attached FEE SCHEDULE but will not exceed the estimated amount unless the scope of the project changes or without your prior authorization. This proposal assumes that no portion of the work undertaken by Alta would be characterized as "Public Works" by the State Department of Industrial Relations and, therefore, would not fall under the current interpretation of the California prevailing wage law. ALTA CALIFORNIA GEOTECHNICAL, INC. Proposal No. 1-19-OXX page 5 April 26, 2019 Alta California Geotechnical, Inc. appreciates the opportunity to present this proposal. We will be happy to meet with you regarding the project at your convenience. Should you have any questions, please contact the undersigned at our Corona or San Diego offices. Respectfully submitted, Alta California Geotechnic Inc. SCO T A. GRAY DAKID A. MORPH Vice President President Registered Geotechnical Engineer Certified Engineering Geologist AUTHORIZED BY: Title Date Distribution: (1)Addressee Attachment: Fee Schedule SAG/DAM:dam 1-19-OXX,April 26,2019(Geo Services,Summerhill Dr.Extension,Tuscany Hails,Lake Elsinore) ALTA CALIFORNIA GEOTECHNICAL, INC. Proposal No. 1-19-OXX Page 6 April 26, 2019 References Albus-Keefe &Assoc., 2004, Preliminary geotechnical investigation,Tuscany North project, Tentative Tract 31370, City of Lake Elsinore, County of Riverside, California dated February 4, 2004 (J.N. 1243.00). California Division of Mines and Geology, 1980, Alquist-Priolo Special Studies Zones, official map dated January 1, 1980. Morton, D.M. and Weber, F.H., 2003, Preliminary geologic map of the Elsinore 7.' Quadrangle, Riverside County, California: U.S. Geologic Survey, Open File Report OF-2003-281,scale 1:24,000. ALTA CALIFORNIA GEOTECHNICAL, INC. ALTA CALIFORNIA 170 North Maple Street, Suite 108 GEEorECHNICAL INC. Corona, CA 92880 — .-- _ www.altagootachnical.com SERVICE FEE SCHEDULE HOURLY PERSONNEL Project Engineer & Geologist $ 140.00 Registered Civil Engineer & Engineering Geologist $ 120.00 Civil Engineering & Engineering Geology Associate $ 95.00 Senior Soils Technician $ 80.00 Soils Technician $ 72.00 Soils Technicians (prevailing wage) $ 110.00 Deputy Inspection $ 78.00 Deputy Inspection (prevailing wage) $ 110.00 Laboratory Technician $ 70.00 AutoCAD Draftsperson $ 80.00 LABORATORY Max. Den. / Opt, Moist. $ 140.00 "R"-Value $ 275.00 Direct Shear $ 140.00 Concrete Testing $ 40.00113reak Moisture & Density $ 18.00 Density- rock or chunk $ 70.00 A.S.C.E. Swell Index $ 105.00 Atterberg Limits $ 140.00 Consolidation $ 140.00 Full Gradation $ 140.00 Hydrometer $ 53.00 Sieve $ 70.00 Sand Equivalent $ 75.00 Specific Gravity $ 70.00 ADDITIONAL CHARGES Field Vehicles $ 9.001 hr Nuclear Gauge $ 6.00 I hr Equipment Rental quote Reprographics quote Per Diem quote January,2019 San Diego Office - Corona Office Phone:858.674.6636 Phone,951.509.7090