Loading...
HomeMy WebLinkAbout29970 CAMINO DEL NORTE_BLDG-2023-00501 CITY OF PERMIT NUMBER: BLDG-2023-00501 ,� LAKE �1 T C i N O r Issue Date: Expiration: LJ 1 1 1 RE This permit will expire 365 days from the Issue Date or the date of the %tom DREAM EXTREMF last completed inspection. It is the responsibility of the permittee to ` ensure this permit is finaled. Permits that expire will need to be pulled WWW.LAKE-ELSINORE.ORG again and additional fees will be applicable. CITY OF LAKE ELSINORE 130 SOUTH MAIN STREET Permit Type: BUILDING LAKE ELSINORE, CA 92530 Work Classification: ELECTRICAL (951) 674-3124 Permit Status: IN REVIEW PROJECT ADDRESS PARCEL NUMBER: 377200045 29970 CAMINO DEL NORTE Valuation: $300,000.00 LAKE ELSINORE, CA Total Scl Ft: 0 PERMIT CONTACTS ADDRESS PHONE CELL HECATE GRID OWNER (630)200-7952 (630)200-7952 ANDREW RIEBEL UNITECH CONSTRUCTION APPLICANT GROUP Benny Afuta _ UNITECH CONSTRUCTION CONTRACTOR GROUP Benny Afuta SunGrid OWNER (832)338-9367 (832)338-9367 Herman Brumme UNITECH CONSTRUCTION CONTRACTOR (818)919-5342 (323)873-3325 GROUP Neri Escalente DESCRIPTION OF WORK TRACT: LOT: PLAN #: ELECTRICAL PERMIT IS FOR UNDERGROUND WORK, CONDUIT INSTALLETION, WIRING AND TERMINATION ONLY, ALL CONSTRUCTION AND CIVIL WORK WILL BE ON A SEPERATE PERMIT BY OTHERS . THE ORTEGA GRID PROJECT IS A 20 MW BATTERY ENERGY STORAGE SYSTEM (BESS) CONNECTING DIRECTLY TO -SCE's 33 KV ELECTRICAL DISTRIBUTION SYSTEM. THE PROJECT CONSISTS OF LI-ION LFP BATTERY CELLS, MODULES, AND STRINGS CONNECTED TO POWER CONVERSION SYSTEM UNITS WHICH CONVERT THE DC BATTERY POWER TO AC POWER. MEDIUM-VOLTAGE TRANSFORMERS ARE USED TO CONNECT THE NATIVE VOLTAGE OF THE BESS POWER CONVERSION SYSTEM UNITS TO THE INTERCONNECTING GRID VOLTAGE. THE BATTERIES AND POWER CONVERSION SYSTEM UNITS TOGETHER WITH THE BATTERY MANAGEMENT SYSTEM, CONTROLS, CLEAN AGENT FIRE SUPPRESSION SYSTEM, AND BESS LOADS SUCH AS HVAC SYSTEM ARE INCLUDED IN CONTAINERS THAT ARE SHIPPED AND INSTALLED AT SITE AS INTEGRATED BESS UNITS. FEES TOTAL FEES: AMOUNT DUE: BASE BUILDING PERMIT FEE ELECTRICAL SERVICE (>200 AMPS) ELECTRICAL SERVICES UP TO 600 VOLTS(<200 AMPS) GREEN BUILDING FEE PERMIT ISSUANCE FEE PROFESSIONAL DEVELOPMENT FEE PERMIT DETAILED REPORT (BLDG-2023-00501) Note Created By Date and Time Created 1. EMAILED THE CONTACT FOR PERMIT BLDG-2023-00329 TO CRISSY MIRABELLA March 15,2023 9:06 am SEE IF THIS WAS SUPPOSED TO BE THEIR RESUBMITTAL.T PAID PLAN CHECK FEES ON PERMIT BLDG-2023-00329 ALREADY. 2. THE APPLICANT HERMAN CALLED AND STATED THAT THIS CRISSY MIRABELLA March 15,2023 9:17 am FOR ELECTRICAL PORTION ONLY AND PERMIT BLDG-2023-00329 IS FOR THE STORAGE SYSTEM ITSELF. HI SAID THERE NEEDS TO BE TWO PERMITS BECUASE THEY F TIEING INTO SCE GRID. HE REQUESTED TO SPEAK TO BILL EXPLAIN MORE OF WHY SINCE THIS IS NEW TO EVERYONE TRANSFERED HIM TO BILL. 3. THE APPLICANT IS MEETING WITH BILL ON 3/16 AT 9 TO CRISSY MIRABELLA March 15,2023 9:28 am DISCUSS THE ELECTRICAL. Invoice No. Fee Fee Amount Amount Paid $0.00 Total for Irvoicr_, $0.00 Grand Total for Permit $0.00 April 11,2023 Page 2 of 2 PERMIT DETAILED • ' 1 1 1 1 Permit Type BUILDING Project: BATTERY ENERGY STORAGE SY: App Date: 03/14/2023 Work Class: ELECTRICAL District: NA Issue Date: NOT ISSUED Status: IN REVIEW Square Feet: 0.00 Exp Date: NOT AVAILABLE Description: ELECTRICAL PERMIT IS FOR UNDERGROUNC Valuation: $300,000.00 Final Date: NOT FINALED WORK, CONDUIT INSTALLETION,WIRING AN[ TERMINATION ONLY,ALL CONSTRUCTION AI CIVIL WORK WILL BE ON A SEPERATE PERMI BY OTHERS. THE ORTEGA GRID PROJECT IS A 20 MW BATTERY ENERGY STORAGE SYSTEM(BESE CONNECTING DIRECTLY TO SCE's 33 KV ELECTRICAL DISTRIBUTION SYSTEM.THE PROJECT CONSISTS OF LI-ION LFP BATTERY CELLS, MODULES,AND STRINGS CONNECTE TO POWER CONVERSION SYSTEM UNITS WHICH CONVERT THE DC BATTERY POWER AC POWER. MEDIUM-VOLTAGE TRANSFORMERS ARE USED TO CONNECT TI NATIVE VOLTAGE OF THE BESS POWER CONVERSION SYSTEM UNITS TO THE INTERCONNECTING GRID VOLTAGE.THE BATTERIES AND POWER CONVERSION SYSTEM UNITS TOGETHER WITH THE BATTE MANAGEMENT SYSTEM,CONTROLS,CLEAN AGENT FIRE SUPPRESSION SYSTEM,AND BESS LOADS SUCH AS HVAC SYSTEM ARE INCLUDED IN CONTAINERS THAT ARE SHIPP AND INSTALLED AT SITE AS INTEGRATED BESS UNITS. Parcel: 377200045 Main Address: 29970 Camino Del Norte Main 377200047 Lake Elsinore,CA 377200046 CONTRACTOR APPLICANT CONTRACTOR OWNER Benny Afuta Benny Afuta Ned Escalente Herman Brumme 13351 D Riverside Dr Suite: D 450 Sherman Oaks,CA 91423 Home: Home: ( Home: Home: Business: (818)919-5342 Business: { Business: Business: Mobile: � Mobile: (� Mobile: Mobile: OWNER Andrew Riebel Home: Mobile: April 11,2023 Page 1 of 2