HomeMy WebLinkAboutItem No. 06 PlainJoe Studios' Change Order No. 2City Council Agenda Report
City of Lake Elsinore 130 South Main Street
Lake Elsinore, CA 92530
www.lake-elsinore.org
File Number: ID# 17-783
Agenda Date: 8/28/2018 Status: PassedVersion: 1
File Type: Council Consent
Calendar
In Control: City Council / Successor Agency
Agenda Number: 6)
Change Order No. 2 - PlainJoe Studios' for the Design and Build of Special Enhancements and
Effects at the Campground Rehabilitation Project (CIP PROJECT #Z40007)
Authorize the City Manager to execute Change Order No. 2 in the amount of $69,582.06.
Page 1 City of Lake Elsinore Printed on 2/16/2023
REPORT TO CITY COUNCIL
To:Honorable Mayor and Members of the City Council
From:Grant Yates, City Manager
Prepared by:Jason Simpson, Assistant City Manager
Date:August 28, 2018
Subject:Change Order No. 2 -PlainJoe Studios' for the Design and Build of Special
Enhancements and Effects at the Campground Rehabilitation Project (CIP
PROJECT #Z40007)
Recommendations
Approve and authorize the City Manager to execute Change Order No. 2 in the amount of
$69,582.06 for the Agreement to PlainJoe Studios' for the Design and Build of branding and
marketing features at the Campground Rehabilitation Project (CIP PROJECT #Z40007).
Background
Staff’s initial discussion with PlainJoe Studios'was to assist with the development of a branding
and marketing concept for the RV Resort Rehabilitation Project. Additional engagements with
PlainJoe Studios’ resulted in farther reaching content-rich, emotionally compelling, and
experiential opportunities to tell the Story of the RV Resort. Key community leaders and staff
worked together to develop the needed branding for the RV Resort Project. The result
conceptualizes and conveys important information about the RV Resort and feeds a dialogue
between campers and the camp ground were they stay. Much of this leads to a static and digital
wayfinding system, signage, unique graphics, exhibition substance, installation of both art and
play elements all with a common branding of the entire RV Resort.
Discussion
The purpose of this agreement is to further the physical development of the conceptual branding
of the RV Resort and to perform the complete design and build of the components. The elements
will provide the foundation to the branding and marketing of the New RV Resort. The overall
design and build components in this scope of work are summarized below as special features in
the RV resort:
Final design, fabrication, and installation of the following:
•Check-In Building Wayfinding
W01 -Area ID "LP Shop"
W02 -"Check In" Stand Off Letters
W03 -Room ID/Blade "Pool"
PlainJoe Studios’ Change Order 2
August 28, 2018
Page 2
•Check-In Building Placemaking
P01 - Quote - Wall Vinyl
P02 – Quote - Wall Vinyl
P03 - Wall Graphic
P04 - Wall Graphic
P05 - Photo Op + Bike
P06 - Launch Pointe Logo
P07 - Graphic (entire wall)
P08 - History Wall
P09 - LP Shop Shelving
The decision to utilize PlainJoe Studios was based on several key and cost driven factors. First,
there ability to perform the required design and build work at a very high level of confidence and
with a proven resume. Second, the need to have a local connection to the Lake Elsinore
community in order fully understand the history of the lake, and local lake and camping
opportunity. (Storyland Studios is a subsidiary of PlainJoe’s studio and is that connection and
location for all the fabrication.) Thirdly, the need for onsite availability without excessive travel
expenses to coordinate the fabrication, construction and installation of the many elements of this
scope of work. Based on this criteria a sole source approach was taken.
Following the approval of this agenda item close coordination will begin on the fabrication and
installation of these elements. Most of these elements will be scheduled for installation towards
the final phases of the park construction. Some of the larger elements (entry arch) will require
additional site development to support the construction of the arch. Others will only need
additional utility coordination.
Fiscal Impact
This funding for this contract change order is included in the Fiscal Year 18/19 Capital
Improvement Plan (CIP) budget.
Exhibits
A – Change Order
2
DATE:
QUANTITY UNIT
Lump Sum 1.00
TOTAL
SUM OF
2
Review by: Initials Date Date
THIS CHANGE ORDER IS APPLICABLE TO:
City Manager:
$69,582.06
Approved by:
Contractor
Change Order No.
Assistant City Manager:
THE AMOUNT OF THE CONTRACT WILL BE (INCREASED) BY THE
$69,582.06
None
$69,582.06CHECK-IN BUILDING RETAIL, PHOTO OP,
SIGNAGE, WALL GRAPHICS, LOGO
CITY OF LAKE ELSINORE
130 S. MAIN STREET
LAKE ELSINORE, CA 92530
(951) 674-3124
August 28, 2018
PROJECT CHANGE ORDER CHANGE ORDER #
UNIT PRICE EXTENSION
CHECK-IN BUILDING RETAIL, PHOTO OP,
SIGNAGE, WALL GRAPHICS, LOGO
ITEM
Authorized by: Jason Simpson TOTAL AMOUNT OF CONTRACT
$618,172.26
QUANTITIES INCREASED
PRIOR TO THIS CHANGE ORDER
CONTRACTOR IS AUTHORIZED TO MAKE THE FOLLOWING CHANGES:
Assistant City Manager
CITY PROJECT #
9/26/2017DATE AWARDED:
PROJECT TITLE: LAUNCH POINTE ACTIVATE THE
CONTRACT AWARDED TO:
PLAINJOE STUDIOS
UNIT PRICE EXTENSIONQUANTITYITEM
QUANTITIES DECREASED
$69,582.06
City of Lake Elsinore Lake Elsinore,California
Launch Pointe Check-In Execution Proposal
(contract #3503)
prepared by
PlainJoe Studios
August 06, 2018
7345 Piute Creek Drive / Corona, CA 92881 / 951.735.4587
Page 1
PlainJoe Studios /City of Lake Elsinore Spatial Storytelling Proposal
August 06, 2018
1 / Scope:
Final design, fabrication, and installation of the following:
•Check In Wayfinding
◦W01 - Area ID "LP Shop"
◦W02 - "Check In" Stand Off Letters
◦W03 - Room ID/Blade "Pool"
•Check In Placemaking
◦P01 - Quote - Steve McQueen
◦P02 - Quote - Evil Kenevil
◦P03 - Wall Graphic
◦P04 - Wall Graphic
◦P05 - Photo Op + Bike
◦P06 - Launch Pointe Logo
◦P07 - Graphic (entire wall)
◦P08 - History Wall
◦P09 - LP Shop Shelving
Page 2
PlainJoe Studios /City of Lake Elsinore Spatial Storytelling Proposal
August 06, 2018
2 / Schedule:
Project life cycles will vary depending on the complexity and overall scope of a project. PlainJoe Studios will
work with you to develop an overall project timeline, detailing major milestones, once the project begins.
3 / Budget and Fees:
Total Project Budget: $69,582.06
•$8,584.42 - Check In Wayfinding
•$32,968.98 - Check In Placemaking
•$12,450.00 - Install
•$2,260.00 - Equipment & Shipping
•$13,318.66 - Design / Project Management
Additional expenses may be incurred over the course of the project life cycle, to be approved by client, as
detailed in the terms and conditions.
All Schedules are pending contract sign dates and kick-off meeting schedules and are subject to change. This proposal and all of
its figures and dates expire within 10 business days of printed proposal date (August 06, 2018).
Description Pri
ce
Fee $69,
582.
06
Page 18
PlainJoe Studios /City of Lake Elsinore Spatial Storytelling Proposal
August 06, 2018
Telling your story.