Loading...
HomeMy WebLinkAboutItem No. 04 PWCA Maples & Assoc. Change Order No. 1 RV Resort RehabCity Council Agenda Report City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 17-781 Agenda Date: 8/28/2018 Status: PassedVersion: 1 File Type: Council Consent Calendar In Control: City Council / Successor Agency Agenda Number: 4) Change Order No. 1 - Public Works’ Construction Agreement with Maples and Associates for the Installation of Insulation, Drywall, and Paint for the Community Hall at the RV Resort Rehabilitation Project (CIP PROJECT #Z40007) Authorize the City Manager to execute Change Order No. 1 in the not to exceed amount of $52,550.57 in such final form as approved by the City Attorney. Page 1 City of Lake Elsinore Printed on 2/16/2023 REPORT TO CITY COUNCIL To:Honorable Mayor and Members of the City Council From:Grant Yates, City Manager Prepared by:Jason Simpson, Assistant City Manager Date:August 28, 2018 Subject:Change Order No. 1 -Public Works’ Construction Agreement with Maples and Associates for the Installation of Insulation, Drywall, and Paint for the Community Hall at the Campground Rehabilitation Project (CIP PROJECT #Z40007) Recommendation Approve and authorize the City Manager to execute Change Order No. 1 in the not to exceed amount of $52,550.57 with Maples and Associates the Installation of Insulation, Drywall, and Paint for the Community Hall at the Campground Rehabilitation Project (CIP PROJECT #Z40007), in final form as approved by the City Attorney. Background Construction bid documents were prepared and the project was advertised for bid in accordance with the requirements set forth in the California Public Contract Code. On December 15, 2017, the City posted on PlanetBids the notice inviting bids for the insulation, drywall, and paint for the Community Hall at the Campground Rehabilitation Project (CIP PROJECT #Z40007). In May 2018, the insulation, drywall and paint work began. Discussion The scope of additional work contained in this Change Order is requested to complete additional interior and exterior finishes to the Community Hall. The Change Order was necessitated by contractor work elements listed below: Fabricate and deliver and Install Metal and Glass railing along the outside perimeter of the Balcony, and on both sides of the chimney and along the top of the building stairs (L Shape) Metal railing will be made of 2" x 6 3/4" Tube Steel fabricated to (2) 2" X 1/4" upright flat bars. Metal Rail will be power coated to match existing glass mullions color. Concrete Core Drilling Railing Furnish Deliver and Install Railing along existing stair case. Change Order 1 - Insulation, Drywall & Paint (Community Hall August 28, 2018 Page 2 Following the approval of this Change Order, the fabrication and installation of the railing in the Community Hall will be scheduled in conjunction with the construction process and begin once the building framing in completed. Fiscal Impact The cost of this Change Order No. 1 to the Installation of Insulation, Drywall, and Paint Agreement for the Campground Rehabilitation Project is included in the Fiscal Year 18/19 – 23/24 Capital Improvement Plan (CIP) budget. Exhibits A: Change Order No. 1 B: Cost Detail CHANGE ORDER NO. 1 TO PUBLIC WORKS CONSTRUCTION AGREEMENT WITH MAPLES AND ASSOCIATES FOR RV RESORT REHABILITATION PROJECT CIP PROJECT NO. Z40007 INSTALLATION OF INSULATION, DRYWALL, AND PAINT (COMMUNITY HALL) THIS CHANGE ORDER NUMBER 1 is made and entered into as of August 28, 2018 by and between the City of Lake Elsinore, ("City"), and Maples and Associates Inc. ("Contractor”). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows: 1. This Change Order is made with respect to the following facts and purposes: a. On February 13, 2018 the City and Contractor entered into an agreement entitled Agreement for Public Works Construction with Maples and Associates for the installation of Insulation, Drywall and Paint for the Community Hall at the RV Resort Rehabilitation Project (CIP PROJECT #Z40007). b. The parties now desire to increase the agreement amount for an additional fifty two thousand five hundred and fifty dollars and fifty seven cents ($52,550.57) and amend the Agreement as set forth in this Amendment. 2. Compensation of the Agreement is hereby amended to increase the amount that the City agrees to pay the Contractor fifty two thousand five hundred and fifty dollars and fifty seven cents ($52,550.57) for a total not-to-exceed amount of one hundred seventy five thousand three hundred seventy six dollars and fifty seven cents ($175,376.57). 3. Except for the changes specifically set forth herein, all other terms and conditions of the Agreement shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their respective authorized officers, as of the date first above written. “CITY” CITY OF LAKE ELSINORE, a municipal corporation Grant Yates, City Manager ATTEST: _______ City Clerk APPROVED AS TO FORM: City Attorney “CONTRACTOR” Maples and Associates. Mike Maples, Owner Proposal Proposal Date:8/1/2018 Number:08012018 Client: City of Lake Elsinore 130 South Main Street Lake Elsinore, Ca 92530 Gus Papagolos Job Location Launch Point Community Hall 32040 Riverside Drive Lake Elsiniore, Ca 92530 REP Mike Project:07172018 Community Hall Balcony Railing Total 24977 Washington Avenue, Suite J Murrieta, CA 92562 951-491-9562 Item Description Total Railing Furnish Deliver and Install Metal and Glass railing along the outside perimeter of the Balcony, on both sides of the chimney and along the top of the Stairs (L Shape) Metal railing will be made of 2" x 6 3/4" Tube Steel fabricated to (2) 2" X 1/4" upright flat bars. Metal Rail will be power coated to match existing glass mullions color. Price includes: Core Drilling, necessary hardware to install glass panels. 36,878.20 Railing Furnish Deliver and Install Railing along existing stair case. 15,672.37 $52,550.57