Loading...
HomeMy WebLinkAbout200 GRAHAM_ 99-286200 WEST GRAHAM 99 -286 1 OF 5 VN17K1f%IPF- c r- SHr--TH "\16' n oNE HyUtZ FI{ir-- P-A. ED WALL (TYP) rte mom mat ow a1R E1 ILBO M 1'47 RRII A201 7970 9RAL1110 ROM 1. TILL naAnIEDO PBIWSIOF arLau FuK 4,spPTl61l IOyw ,.na Al K IF[gl Imi.1fM. 1/1 069AMCC AT Hos W -11 OAea VO ll K 3 DOMiMJdR wAL'OS S,1R TO SE LOnfm 18i ORCO) N A.I.I. ggasaD ITl p. TO CaaNS/4NTS aN THE U11A"CW wAaa. 4 _"'W t tA n°Ar`I w A a POeatelp WISMAL c sainKENT ENDS Cta t0 ANp 7IAlafKUI/AplTDO T A A "Oft WTd1aeTlNa AT Tr i M,O, QCh ii TS CM ALL 8414 else{ /KAfF1L 11 TISHi MAI't 11 AL STpeL TO 01 BALVANISIR. 1 ML MAILS@ ' rom V MAE END F 4M ia1ANRE` pt AWIVIIIII AL 10. ALL ANME. SCAN. Amu . mallow IIILCnI T' i3A•Iz c 1E I L I NG I 8- DOOR STANDARD RECESED COOLER ¢ LLAMPSS( TYP•) T -BAR CEILING 10: -0' HEIGHT — II SHEETMETAL014CEILING 0 Lill" 4 1-BAR CEILING 101-T HEIGHT I 11' I'q b SHEET METAL T•BAR CEILING CEILING 8'-0' H °IGHT 10' -0' HEIGHT Lee-- 2 -DOOR emu GYP. BOARD CEILING 8' -0' HEIGHT t 2 %4 FLUORESCENT , LIGHT FIXTURE BATH GYP. BOARD STANDARD CEILING RECESSED__ S' -0' g' -0' HEIGHTRECESSED 9W.) SOFFIT T— C ]LING I HT ENTRANCE T-BAR CEILING E COMI 10' -0' HEIGHT FI REFLECTED CEILING PLAN SCALE: 1!4" to 1' -0' NO ?E•: I'IP -i` DI -06,K4 CHALL 6JE PROVIDED A4, ROQuI1zE -P f3Y 706.2.1 f1 1 G nKE LSrUp2 GgQWASH 3vIOY 2oc• v•ti'AHAM gpy-'- - ->57• 4 A1LC. EGS /.t/oRJL I 1 DATE Of P", bCIL OCONDITIONED FLOOR AJtEA I ITp CLIMATE ONE lO qq TO DUILDLNGTYPE Ia NONRESIDEMUL HIOH RUSE RESIDENTLAL HOTEUMOTEL GUEST ROOM PHASE OF CONSTRUCTION ® """& CONSTRUCTION ADDITION p ALTERATION UNCONDITIONED In'e amc-u METHODOFENVE—re, U COS:PONENT ® OVERN.L ENVELOPE PERFORMANCE COa1PLIANCE OF / hIS M' ieate of compliance hsls Nt budding eatures an perform®ce'peel ¢atlons need to comply with Title 24, Pans Iand6oftheCalifomiaCodeof1ogul3!iom. This eenincate applies only to building envelope requirements. The documentation prepuce hereby ctn:fts that the documentation Is accurate and complete. Oa R 3'10 -99 no principa' Envelope Designer herebycettifies that the proposed building design represented in this set of constructidn documents is consistent with the other compliance forms and worksheets, with the specifications, and with env other slations submitted with this pcm"app;ication. The proposed building has been designed to meet the envelope torrents contained in sections 110,116 through 118, and 140, 142, 143, or 149 of Title 24, Pan 6. Please check one: I hereby affirm that I am eligible unetrthe provisions of Divisici 7 of the Business and Professions Code to sign this document as the person responsible fer its preparation; and that 1 am a civil Engineer or Architect. I affirm that I am eligible under the exemption to Division 7 of the Bueiness and Professions Code by section 5537.2 of the Business and Professions Code to sign this document as the person . esponsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contacted to perform. 1 affirm that 1 am eligible under the exemption to Division 3 of the Business and Professions Cade by section of the Coda to sign this document as the person responsible for its preparation; and for the following reasons: Li CISIVELOPEMANDATORYMEASURCS ndicate location on plans of Note 9!ock for Mandatory Measures A- I or Deviled ulstruaions on the use of 0i, r.d rT Energy Efficiency Standard' compliance forms. please refer to Lhe rue1.d1mial \fanml ehed by the Califomia Enngy Cor.,min:;e. 1: Required on plans for all Subn MIs. Pun 2 may be incorporated in schedules on plans. N-V"""•2: Used for all submituu: choose ap;mpcate version depending on method of envelope compliance. IEnvJ: Optional. Use ifddauh J -1- re cot used. Choose appropriate version for assembly U•valu to be alcuh!rd ! Nonresidential Compliance Form Sam:ay 1996 ERTIFICATE OF COMPLIANCE (P2rt2of2) QEN-1 OPA(1UESURFACkS- a R'samnat ane fR rJiili 'Trrar.iSi4liI.fiDlgitaII6I4.Yi It rloa.•II I! U[ 0..:'.0.•::.r II It INa. waa/. MrWI I na SvtM• /re Cri:int o. -r na, t•.:! .av U et -OrIL Lrr vtA i ; P— 11 WOOD i 7YPICAL Ell l I wFVU% %%A)IC rZO .UIi l.)AL:! N ' \ NI N,O) CNIIA)C'I GLALI1111YL )U:.:U r:LLi 1e1%s IMtW.YSOa.nt) I SHADE II CREDIT' I! ,eC'-7 -1: s' :: tllrorLu WIn1DlpLts -1 i 1.1 METAL /JO ji YESlI C- LEAR -. - i N1LI1:11111 )iC I)UUe I..ALII. FN,')IC TI'Y )NILIGIIT )IATCNIAL GLALI)G t1Yl )VIC.v II!_'v I le4r 1SI, 1^. II YANCS iI IMrw.ww/rlr^ IC'ur.rlulit.utl ! IC:ry _-•.E ei •'tiv a r[UroL l,r iii I ll, i. r.nresidentia'. CC•n'I "'e Fenn N, 1 REVISIONS: IBYA II a JW FESSE a W Z j — LL J W W J a~O Z V O q I J N CL CIDN O OPA MO V LLOW W W Z D Q IL W OO r Q ORM UJ W Ix L" V W Z-1% N Q J J1? a W0WW Y3x 3gNgo DATE: 04/24/99 SCALE: DRAWN BY: E.G. SHEET A4 of 30' MIN, I B CkC r 5C T J Boor 2x HMCK gl.pcKlh EXTLRaOR L.Uh•f1 p.S . STULLA I8 eyPovAg p TYPE . It RII INSULATION 2xb STUD NDTE' prIkWwAI -L Tb 4oNTINVI TO VN17K1f%IPF- c r- SHr--TH "\16' n oNE HyUtZ FI{ir-- P-A. ED WALL (TYP) rte mom mat ow a1R E1 ILBO M 1'47 RRII A201 7970 9RAL1110 ROM 1. TILL naAnIEDO PBIWSIOF arLau FuK 4,spPTl61l IOyw ,.na Al K IF[gl Imi.1fM. 1/1 069AMCC AT Hos W -11 OAea VO ll K 3 DOMiMJdR wAL'OS S,1R TO SE LOnfm 18i ORCO) N A.I.I. ggasaD ITl p. TO CaaNS/4NTS aN THE U11A"CW wAaa. 4 _"'W t tA n°Ar`I w A a POeatelp WISMAL c sainKENT ENDS Cta t0 ANp 7IAlafKUI/AplTDO T A A "Oft WTd1aeTlNa AT Tr i M,O, QCh ii TS CM ALL 8414 else{ /KAfF1L 11 TISHi MAI't 11 AL STpeL TO 01 BALVANISIR. 1 ML MAILS@ ' rom V MAE END F 4M ia1ANRE` pt AWIVIIIII AL 10. ALL ANME. SCAN. Amu . mallow IIILCnI T' i3A•Iz c 1E I L I NG I 8- DOOR STANDARD RECESED COOLER ¢ LLAMPSS( TYP•) T -BAR CEILING 10: -0' HEIGHT — II SHEETMETAL014CEILING 0 Lill" 4 1-BAR CEILING 101-T HEIGHT I 11' I'q b SHEET METAL T•BAR CEILING CEILING 8'-0' H °IGHT 10' -0' HEIGHT Lee-- 2 -DOOR emu GYP. BOARD CEILING 8' -0' HEIGHT t 2 %4 FLUORESCENT , LIGHT FIXTURE BATH GYP. BOARD STANDARD CEILING RECESSED__ S' -0' g' -0' HEIGHTRECESSED 9W.) SOFFIT T— C ]LING I HT ENTRANCE T-BAR CEILING E COMI 10' -0' HEIGHT FI REFLECTED CEILING PLAN SCALE: 1!4" to 1' -0' NO ?E•: I'IP -i` DI -06,K4 CHALL 6JE PROVIDED A4, ROQuI1zE -P f3Y 706.2.1 f1 1 G nKE LSrUp2 GgQWASH 3vIOY 2oc• v•ti'AHAM gpy-'- - ->57• 4 A1LC. EGS /.t/oRJL I 1 DATE Of P", bCIL OCONDITIONED FLOOR AJtEA I ITp CLIMATE ONE lO qq TO DUILDLNGTYPE Ia NONRESIDEMUL HIOH RUSE RESIDENTLAL HOTEUMOTEL GUEST ROOM PHASE OF CONSTRUCTION ® """& CONSTRUCTION ADDITION p ALTERATION UNCONDITIONED In'e amc-u METHODOFENVE—re, U COS:PONENT ® OVERN.L ENVELOPE PERFORMANCE COa1PLIANCE OF / hIS M' ieate of compliance hsls Nt budding eatures an perform®ce'peel ¢atlons need to comply with Title 24, Pans Iand6oftheCalifomiaCodeof1ogul3!iom. This eenincate applies only to building envelope requirements. The documentation prepuce hereby ctn:fts that the documentation Is accurate and complete. Oa R 3'10 -99 no principa' Envelope Designer herebycettifies that the proposed building design represented in this set of constructidn documents is consistent with the other compliance forms and worksheets, with the specifications, and with env other slations submitted with this pcm"app;ication. The proposed building has been designed to meet the envelope torrents contained in sections 110,116 through 118, and 140, 142, 143, or 149 of Title 24, Pan 6. Please check one: I hereby affirm that I am eligible unetrthe provisions of Divisici 7 of the Business and Professions Code to sign this document as the person responsible fer its preparation; and that 1 am a civil Engineer or Architect. I affirm that I am eligible under the exemption to Division 7 of the Bueiness and Professions Code by section 5537.2 of the Business and Professions Code to sign this document as the person . esponsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contacted to perform. 1 affirm that 1 am eligible under the exemption to Division 3 of the Business and Professions Cade by section of the Coda to sign this document as the person responsible for its preparation; and for the following reasons: Li CISIVELOPEMANDATORYMEASURCS ndicate location on plans of Note 9!ock for Mandatory Measures A- I or Deviled ulstruaions on the use of 0i, r.d rT Energy Efficiency Standard' compliance forms. please refer to Lhe rue1.d1mial \fanml ehed by the Califomia Enngy Cor.,min:;e. 1: Required on plans for all Subn MIs. Pun 2 may be incorporated in schedules on plans. N-V"""•2: Used for all submituu: choose ap;mpcate version depending on method of envelope compliance. IEnvJ: Optional. Use ifddauh J -1- re cot used. Choose appropriate version for assembly U•valu to be alcuh!rd ! Nonresidential Compliance Form Sam:ay 1996 ERTIFICATE OF COMPLIANCE (P2rt2of2) QEN-1 OPA(1UESURFACkS- a R'samnat ane fR rJiili 'Trrar.iSi4liI.fiDlgitaII6I4.Yi It rloa.•II I! U[ 0..:'.0.•::.r II It INa. waa/. MrWI I na SvtM• /re Cri:int o. -r na, t•.:! .av U et -OrIL Lrr vtA i ; P— 11 WOOD i 7YPICAL Ell l I wFVU% %%A)IC rZO .UIi l.)AL:! N ' \ NI N,O) CNIIA)C'I GLALI1111YL )U:.:U r:LLi 1e1%s IMtW.YSOa.nt) I SHADE II CREDIT' I! ,eC'-7 -1: s' :: tllrorLu WIn1DlpLts -1 i 1.1 METAL /JO ji YESlI C- LEAR -. - i N1LI1:11111 )iC I)UUe I..ALII. FN,')IC TI'Y )NILIGIIT )IATCNIAL GLALI)G t1Yl )VIC.v II!_'v I le4r 1SI, 1^. II YANCS iI IMrw.ww/rlr^ IC'ur.rlulit.utl ! IC:ry _-•.E ei •'tiv a r[UroL l,r iii I ll, i. r.nresidentia'. CC•n'I "'e Fenn N, 1 REVISIONS: IBYA II a JW FESSE a W Z j — LL J W W J a~O Z V O q I J N CL CIDN O OPA MO V LLOW W W Z D Q IL W OO r Q ORM UJ W Ix L" V W Z-1% N Q J J1? a W0WW Y3x 3gNgo DATE: 04/24/99 SCALE: DRAWN BY: E.G. SHEET A4 of UST 1Cr3M'41 OM 8E0 "E" REVISIONS BY LAKE ELSINORE CARWASH 200 WEST GRAHAM LAKE ELSINORE, CA 92530 OWNER: ALI SEYEDGAVADI W W PROJECT INFORMATION: GENERAL NOTES: INDEX TO DRAWINGS: U) ARCHITECT: EUROCON GROUP, INC. I. SITE: 1. All work shall be performed In accordance with the Building Cods latest 1994 UBC, UMC, UPC, and 1993 NEC, edition Al- COVER SHEET AZ- SITE PLAN WandInaccordancewithallapplicablelocalandStateCodes. i. A3- FLOOR PLAN GIVI1. ENGINEER: ABDI SAJADI EXISTING USE: CARWASH, GAS STATION a Contractors shell check and verify all conditions and otherwise he sat job site before commencing fo work and shall report any discrepancies to the Architect; otherwise he shall be held responsible for full A4- REFLECTED CEILING PLAN O PROPOSED USE: CARWASH, GAS STATION, knowledge of same. A5- MINI MART ELEVATIONS .,- , !, i,l MECHANICAL ENGINEER: SHAMIM ENGINEERING 0MINI - MART 3. Omissions or conflicts between various elements of the drawings, notes, and details shall be brought A7- ARCHITECTURAL DETAILS A. LOT AREA: to the attention of the Architect and resolved before proceeding with the work. A8- ROOF PLAN EI.ECTRICALENGINEER• SHAMIM ENGINEERING GROSS: 19,430 SO.FT. 4. Notes and details per drawing shall take precedence over these general notes. A9- DISABLED ACCESS DETAILS NET: S. Written dimensions shall takB precedence over scaled dimensions. A10- HEALTH DEPT. NOTES & REQUIREMENTS PLUMBING ENGINEER: SHAMIM ENGINEERINGB. ZONING: C -2 6. The work performed by the various professional Consultants, such as the Structural Engineer and S1 -3 STRUCTURAL P1.4 PLUMBING V 1OO a o C. LANDSCAPING: others shall In no manner alter or modify the Architectural Drawings, unless with the express a y9ppprovetb Z o°, EX STING: theArehltectandowner. M1-4 MECHANICAL z u REO UIRED: 7. Contractor shall consult with representatives of the local Utility Companies concerning available E1 -6 ELECTRICAL 0. o 5— - N PROVIDED: facilities before starting work or connecting to sewer, piping or wiring, etc., and report any problem to j the Architect. 0 F x W aII. BUILDING AREA: S. Contractor shall install temporary toilets before starting job. Z y A. MINI -MART: 1,927 SO. FT. (8,000 ALLOWABLE) 9. Contractor shall construct all on site sidewalks, curbs, drives, ramps, etc. as shown and In accordance with governing regulatolns as required. Verify final grades and slopes before commencing 7 u x n a F ° O Q mjob. W Z S NB. PERCENT OF LOT COVEREGE: 10% o 10. Contractor shall provide barricades as requried by local codes. Pedestrian protection shall also be a W p vInaccordancewithStateandlocalcodes. O p ujz III. PARKING: 11. All materials shall be new and all workmanship shall be performed In accordance with the highest I I h ! A. STANDARD SPACES: 4 standards of each trade. I ` p, J w B. COMPACT SPACES: 0 C. HANDICAP SPACES: 1 12. All electrical, mechanical and plumbing work shall be In accordance with applicable code. Separate D. TOTAL PARKING SPACES REQUIRED: 5 approvals and permits shall be obtained. lull E. TOTAL PARKING SPACES PROVIDED: 5 13. No dangerous chemicals are to be used, processed, produced or stored In the building In excess of Taamountsallowedbyapplicablecodes. Q Al 14. Temporary erection, bracing and shoring shall be required on all beams, walls, etc, adequate to IV. OCCUPANCY: provide full structural stability and safety. Bracing shall .not be removed until elements are fully connected and are capable of supporting the design loads. VA. MINI -MART: M B. NUMBER OF EMPLOYEES PER SHIFT: 3 15. Contractor shall provide allowance for the following permits, Including work required for completion of this IJJ project. 4. Demolition permit B. Excavation and grading permits C. Driveway 0 0permit (If required) V. TYPE OF CONSTRUCTION: 16. Provide membrane vapor barrier on 4" gravel and 2" sand. Provide also Y' sand above membrane below In Soil Engineer's W Vandfloorslab, or accordance with recommendation report. C) .L A. FOOD MART: V -N NOWSPRINKLERED, 17. Exterior doors shall be 1 314" thick and shall have non removable pins. LLI Y o LU 1- STORY, 18' -0" HIGH 18. in toilet e gProvide5minuteairchangeallrooms. 19. The design and plans shall conform to State of California Energy Regulations Title 24. BATS: o2•u-w NOTE: CARWASH PLANS TO BE SUBMITTED 20. Heating, ventilating and air-conditioning shall be designed In accordance with ASHVE standards. For local to specifications, BRAWN Br: s.B. UNDER SEPARATE PERMIT conditions refer ecALs; 21. Where products, eglupment and materials are specified by trade names, It Is Intended that "or equal" shall by the architect. N VICINITY MAPapplyasapproved 22. See the soils - foundation Investigation report for foundation design. Compaction and/or beck 1111 shall be performed In accordance with the soils Engineer's recommendation, or UST 1Cr3M'41 OM 8E0 "E" FRONT ELEVATION (EAST) rl Mai F.— T SIDE ELEVATION -'(NORTH) 01 REAR ELEVATION (WEST) '11,11 l• KK.Ll SIDE ELEVATION (SOUTH) 1' 1; J+, F lA II 1 I" rD It p I 0 3 ul < n Q m z < p w m PL z DW We C, — Job ell A5 II FRONT ELEVATION (EAST) rl Mai F.— T SIDE ELEVATION -'(NORTH) 01 REAR ELEVATION (WEST) '11,11 l• KK.Ll SIDE ELEVATION (SOUTH) 1' 1; J+, F lA II 1 I" rD It p I 0 3 ul < n Q m z < p w m PL z DW We C, — Job ell A5 1 I 2 I g Z vi In, l WI i Ib I d - -- •I . WAY'-- -- IN M ALC^,I Lnll -- -- jl— of TR -hurl I r L ,'7 I 1" PfaruSLn I_STuK'Y \., I to -o il (r-uNl t•'IAKKf1 19LD ` — • tea. f-T• (H I ', ^!4.) J _77'r g 7 GcuJP<wc7 T1. c ou3i. Ti rr. Y IS ]l 1 C-o' ,1r r li _ • G6 -c' T lt•o 2B -b i B 144 nl1CY I .•.IUrY - ---' — y Q•,\ \ •''. _ o Ili ^ >n A —___ 1 Ih 3 -Y— Tj L TOR .L 11 FJ_i --I . nIJ O:fNrII IC• J _ tr 1:.Tr. VR.I"E 6In i 'b CF Ir.l_.,,vvlLO j Ijl_lotATEO OK1,•t ',JAY , D21"h LInY -ro .;r_ vF_r'luvE_O I _ r;EW SIC -1.1 - I 7 .. C -,clsl i. Ct. 1R lc !S „x ..:.s•n.,Fl . Y PVW C.K Ic,lr y _ u SUS s1,P (u rSk KCLwn7E.D 10 - q f_l_oC,'NTaO (SUS bTOP. IL - E,xIS G L.I CLI To r,t KCIo(nrro . IS _ IIANfrl(nl'I°CO tl':uK ' tin ll 51441 15 _ I -JALIC LSAT 16. KAI-• r', I :ILSLf'rU. rIM. 17_ L1WE OP CAWOPY n(SUVP_, 16_ GAS o13PeNSEK rllH f? Iq. Vun[Rr;r u1.1D Tn,,IkS• zo_ TRAsu. CPuirwcK LI _ K@CY<U” caWTnlllEl` ( IF, rrr; ullCp_0) , Yul 3_ Cf 11TL KE'.Ir>r_NCE -a •r. I:. i,ll)Iy CJi7 . Lq - M eAR1JASH STZ1CTURI_10 St t3. r A' C-14C. :CAOT.OE t-1oOIPICJ7. 2G- IhU arONC. ISL,BUC'QAll PO, REIOU'I> =7 Ex 111'4 Z. f -KWA%H Z.7- cxlSiG PO-"- PALE PK -JLCT DATA : SEE CoVE- 7 . uRI LI,,InI PK•. r'6.KT•r '. olE -. IJCI -J O rr_ICTY UI-IL, nl'•TF ;I. oItDI(stl,l . c , vncWrl r \:nLfsK . r'n rl 1Kct. ,%P- u.1r_cEl-Ll ya- IJFJ• -I u(Mt rl •(KTi r 91 _ r NF- AWLWLT'.avlr;u.T SIaCUhS HGT: 11141 "l KKET 1'I rr •,.1 PT II11, 17 -t i C^I4,r'Y (c.,ur) 1,7" S-: 1'T. (:Z', =G) N(.1. a M t oTnl ur r^KklV[. FKuv10E1D t SQ4CL. I. FIAW O•) } I -r•,K Corar>u.I I :yi >1L (Arz LIAS4 c 4',IL t Safi. PKoPo5t,v r/ = 7-Z. + I11 P,F,.SIT7FJ.1CL t 'SL Of.I Ill :1•Il0 CTOTAI : Z(ca"4 S rl. ) L- T AKLA >. ZZ, QUO ',o. r 1. j LAIJDS4M1J,4G r ''(5a5 — 1 ^i. = jl T{ 4s /ERf\6E a Ir• =1 !,L Iq, t-+ /,. WCCIJpIUC r/iNbrY 4 CAKWASN) I nJ IANNI 11G 1 I rru.r I wino iiroui n an°i'uiaB rc l y swr vav I 1 I I I _ _ _ _ Note: walls to be finished with stucco and painted to match Mart OMMI 15Fj,, ILEVATION P.AS{. ENC-OSUF -f il="ON NeW ABeerlOrYwl 1. TruA erte Y V Irm W flrr deB fkufNry eAUrt pr Ibk rN ea'sm.0k W WIB C.yrU mIIJ BYb uh. e. n..k eKIeYIrt. r.m+.ka.Iln full akrflm 0. vebYk rtppeeU rb) WuwW rr<mm 4f IetYlllrr wl uMM IeNr rI+B Mu`X.r wer tirt amen lemf Y mr w_uf q,Wlp• YYI BW We r rbWw elurtl B. G yYe, W^1ar Y Im uh W W u4k mW e. emwyr. mmrtY rW W fkl rtNblvmml GIIkW D-- 0. /4eawrl' uNU fN0 M OMr N uNY rellknNry t f:l ASiY CBe-tl W W kd N esmAulY MN CBC ClYyur f I. L P-AII ul werN rYrll mn Wm Y UBC 2-N Ne. 1. CerrnY rlWl hem • mlNmum rmrNYM eB•njlY d 1000 rY el L 4Ye l k B1- YerWr MT)•reBrYrfrrtled YCBCYb B. Orul eNB 4 8.000 PBI eJ,Jrm laa r1edJWlrwrmuYSIY.YIB 11. Vr1eW N rnm Y,re[ .uM,Nr mull M Yrle' W q DM•r" V OI.YYn eN Butluy 909 Sop II nEl iIFVISIOHS ` IY i I Jti J 1 I J J 1 1r J r O Q T " e /• uJ Z O ri V nn h C•BI C O T y 011,M] N O Z a < O 0 W US IN U. yL. < Z W L o, sca,e I ° -I•o ao 9•'. I F"A llL'I =.• Al \Cl' \ rI 9.J I.a I +1 -0. I 1'.°+O' J I ) `` t'' f, . I t) " ' = f N .}_—'. P,- 7' t 1- I..1 : , `( I _. _11 1 • r yc I - J- 13Y•UI 1. SITE PLAN: ; d _nw =5 •Pn l :)• t L TOR .L 11 FJ_i --I . nIJ O:fNrII IC• J _ tr 1:.Tr. VR.I"E 6In i 'b CF Ir.l_.,,vvlLO j Ijl_lotATEO OK1,•t ',JAY , D21"h LInY -ro .;r_ vF_r'luvE_O I _ r;EW SIC -1.1 - I 7 .. C -,clsl i. Ct. 1R lc !S „x ..:.s•n.,Fl . Y PVW C.K Ic,lr y _ u SUS s1,P (u rSk KCLwn7E.D 10 - q f_l_oC,'NTaO (SUS bTOP. IL - E,xIS G L.I CLI To r,t KCIo(nrro . IS _ IIANfrl(nl'I°CO tl':uK ' tin ll 51441 15 _ I -JALIC LSAT 16. KAI-• r', I :ILSLf'rU. rIM. 17_ L1WE OP CAWOPY n(SUVP_, 16_ GAS o13PeNSEK rllH f? Iq. Vun[Rr;r u1.1D Tn,,IkS• zo_ TRAsu. CPuirwcK LI _ K@CY<U” caWTnlllEl` ( IF, rrr; ullCp_0) , Yul 3_ Cf 11TL KE'.Ir>r_NCE -a •r. I:. i,ll)Iy CJi7 . Lq - M eAR1JASH STZ1CTURI_10 St t3. r A' C-14C. :CAOT.OE t-1oOIPICJ7. 2G- IhU arONC. ISL,BUC'QAll PO, REIOU'I> =7 Ex 111'4 Z. f -KWA%H Z.7- cxlSiG PO-"- PALE PK -JLCT DATA : SEE CoVE- 7 . uRI LI,,InI PK•. r'6.KT•r '. olE -. IJCI -J O rr_ICTY UI-IL, nl'•TF ;I. oItDI(stl,l . c , vncWrl r \:nLfsK . r'n rl 1Kct. ,%P- u.1r_cEl-Ll ya- IJFJ• -I u(Mt rl •(KTi r 91 _ r NF- AWLWLT'.avlr;u.T SIaCUhS HGT: 11141 "l KKET 1'I rr •,.1 PT II11, 17 -t i C^I4,r'Y (c.,ur) 1,7" S-: 1'T. (:Z', =G) N(.1. a M t oTnl ur r^KklV[. FKuv10E1D t SQ4CL. I. FIAW O•) } I -r•,K Corar>u.I I :yi >1L (Arz LIAS4 c 4',IL t Safi. PKoPo5t,v r/ = 7-Z. + I11 P,F,.SIT7FJ.1CL t 'SL Of.I Ill :1•Il0 CTOTAI : Z(ca"4 S rl. ) L- T AKLA >. ZZ, QUO ',o. r 1. j LAIJDS4M1J,4G r ''(5a5 — 1 ^i. = jl T{ 4s /ERf\6E a Ir• =1 !,L Iq, t-+ /,. WCCIJpIUC r/iNbrY 4 CAKWASN) I nJ IANNI 11G 1 I rru.r I wino iiroui n an°i'uiaB rc l y swr vav I 1 I I I _ _ _ _ Note: walls to be finished with stucco and painted to match Mart OMMI 15Fj,, ILEVATION P.AS{. ENC-OSUF -f il="ON NeW ABeerlOrYwl 1. TruA erte Y V Irm W flrr deB fkufNry eAUrt pr Ibk rN ea'sm.0k W WIB C.yrU mIIJ BYb uh. e. n..k eKIeYIrt. r.m+.ka.Iln full akrflm 0. vebYk rtppeeU rb) WuwW rr<mm 4f IetYlllrr wl uMM IeNr rI+B Mu`X.r wer tirt amen lemf Y mr w_uf q,Wlp• YYI BW We r rbWw elurtl B. G yYe, W^1ar Y Im uh W W u4k mW e. emwyr. mmrtY rW W fkl rtNblvmml GIIkW D-- 0. /4eawrl' uNU fN0 M OMr N uNY rellknNry t f:l ASiY CBe-tl W W kd N esmAulY MN CBC ClYyur f I. L P-AII ul werN rYrll mn Wm Y UBC 2-N Ne. 1. CerrnY rlWl hem • mlNmum rmrNYM eB•njlY d 1000 rY el L 4Ye l k B1- YerWr MT)•reBrYrfrrtled YCBCYb B. Orul eNB 4 8.000 PBI eJ,Jrm laa r1edJWlrwrmuYSIY.YIB 11. Vr1eW N rnm Y,re[ .uM,Nr mull M Yrle' W q DM•r" V OI.YYn eN Butluy 909 Sop II nEl iIFVISIOHS ` IY i I Jti J 1 I J J 1 1r J r O Q T " e /• uJ Z O ri V nn h C•BI C O T y 011,M] N O Z a < O 0 W US IN U. yL. < Z W L o, sca,e I ° -I•o ao 9•'. I F"A f I 0 SECTION A -A w 0 I I t- II 20 — 21.•9. j --- ONE HWRFIRE YIALL - -- I 1 EEQA4i LADDER ROOF ELECTRICAL 12• NSF _ __ -.. _ . -HATCH PANELS APPROVED DRY 8 -DOOR . 4 SHELVING STORAGE \ - - _ —_ -.. f 3O 4 COOLER o, j bi F.S. COUNTER MAX. J• HEIGHT N' iv O j \• NSi APP0.0VED 4F]OOD AIR CURTAIN 1• MICEI MAK , t COURT UTILITY AREA ROOM I I F.S. 0, 'rwL N NSF D LLL. HEIGHT 31• J COMP. O1I mj COFFEE _2 SINK MOP ISLAND I ORIRACKajiII, I 2- DOORjCHEMSTORAGEI, 0' j SHE „rc " 4L1 Y FREEZER MOP I CAL WATER y SINK',,, t---_ d pj HEATERER ABO•JE I' -- 6 ;, ALL AISLES SHALL NOT HARD BE LESS THAN 36 "NIDEIWASH j YU' SINK SLAT / i WALL GONDOLAS 0 PANEL • BATH I o2I, T M YI j UNDER j SEPERATE Q \ qW, PERMIT 6%0" 4 YI fD j W 4iEN SUBWAY BATH COUNTER LAX. - -, I -- _`- HEIGHTU SW X7-6' .r X/ I CASHIER\ \ / Loclil j SLAT WALL ~ - --1 2 —`0 }_5_0 CHAN E PANELS ENTRANCE I O R / B_q• i 9l ' Z OFKICE42' IN HEIGHT O I — B i pO L FLOOR WIT TO OA BE FLUSHH WITH 12 -1• SIDEWALK FINISH FLOOR LEVEL H.C. RAMP O SLOPE 1:20 Dn n• R' n• 47' -9" FLOOR PLAN SCALE: 1/4" = 1' -0" A w0 SECTivN B -B DOOR SCHEDULE SYM. QUANT. MATERIAL ROOM SIZE FINISH REMARKS SIZE FINISH REMARKS 24 '%78'X24• NBRA To FLOOR SINK O 1/4' CLEAR TEMPERED GLASSO1ALUMINIUMSTOREFRONTW-TX --0•%IY4- ALUMINIUM IF H.C. ACCESSIBLUTY' SIGN IN BRAILLE V- rXI0'-0'X114' j BATHS. OFFICE 0' %B % 1 Lt• pAINi TO SELF CLOSER DISABLED ACCESS HARDWAREO ALUMINUM NM (Slt) CRY STORAGEDELIVERY 6' MATCH WALLS SI6 H.C. ACCESSIBILITY SIGN IN BRAILLE O 2 ALUMINIUM COOLER Y-W X 6-r X I V4' ALUMINIUM PROVIDED BY COOLER MANUFACTURER ALL DIMENSIONS TO BE VERIFIED INFIELD EQUIPMENT SCHEDULE SYM. WINDOW SCHEDULE MANUFACTURER MODELN S) M. QUANT. MATERIAL ROOM SIZE FINISH REMARKS 24 '%78'X24• NBRA To FLOOR SINK O COFFEE MACHINE eLOOMFIELD em No LEGS EIGHT PANELS OF tN' CLEAR TEMPERED GLASS O'z O ALUMINIUM STOREFRONT V- rXI0'-0'X114' ALUMINIUM O1 SUBWAY ALUMINIUM STORE FROM 7d %6' -0' X + .- ALUMINUM ONE PANEL OF i/4• CLEA6 TEMPERED GLASS SEMIGLOSS ENAMEL SEM4GLOSS ENAMEL OFFICE/ CHANGE ROOM PAINTED GYP. BOARD 9EMIGLOSS ENAMEL PAINTED GYP. BOARD SEMI.GL059 ENAMEL ALL DIMENSIONS TO BE VERIFIED INFIELD EQUIPMENT SCHEDULE SYM. APPLIENCE MANUFACTURER MODELN TYPE DIMENSIONS(WHD) NOTES O ICE MAKER EU0200 MILE HIGH EQUIPMENT e- LEGS 24 '%78'X24• NBRA To FLOOR SINK O COFFEE MACHINE eLOOMFIELD em No LEGS e'x2s•x +r ON CO UNTER TOP. DRAIN TO FLOOR SINK O BEVERAGE FOUNTAIN I REMCOR ' DB21SBC8 a•LEGS 71'%20'%70' ONCWMERTOP, DRAM TO FLOOR SINN FINISH SCHEDULE ROOM WALLS CEILING FLOOR BASE SALES AREA PAINTED OUP. BOARD PAINTED OUP. BOARD 8'%e' CERAMIC TILE 6' CERAMIC TILE COVED BABE W/ 16' MIN. RAD. FLOOR /WALL JUNCTON SEMIGLOSS ENAMEL SEMIGLOSS ENAMEL LmLITY PAINTED G. BOARD PAINTED GYP. 90MD 0'X6' CERAMIC TILE 6- CERAMIC TILE COVED BASE W/ M' ifFLOOR / WALL JUNCTIONSEMNGLOSSENAMELBEMWAOSSENAMELMIN. RAD. SUBWAY PAINTED GYP. BOARD PAINTED GYP. BOARD B'XB' CERAMIC TILE 8' CERAMIC TILE COVED BASE W/ J/B' MIN. RAD. @FLOOR f WALL JUNCTION SEMIGLOSS ENAMEL SEM4GLOSS ENAMEL OFFICE/ CHANGE ROOM PAINTED GYP. BOARD 9EMIGLOSS ENAMEL PAINTED GYP. BOARDSEMI.GL059 ENAMEL 8'%e' CERAMIC TILE CERAMIC TILE COVED BASE WI JIB' MIN. RAD. ®FLOOR/ WALL JUNCTION 6' CERAMIC TILE COVED BASE W/ LB' DRY STORAGE PAINTED OUP. BOARD SEMIGLOSS ENAMEL PAINTED GYP. BOARDBEMFOLOSSENAMEL 9•X6' CERAMIC TILE MIN. PAD. QFLOOR /WALL JUNCTION BATH 8'X8' CERAMIC TILE 4' 0' HIGH. OVER MOISTURE 0.ESISTAM DRYWALL, PLANTED OUP. BOARD 9'Xe'GERPMIC THE 6• CERAMIC TILE COVED RASE WI YB' MIN. RAD. FLOOR /WALL JUNCTION REMAINING: SEMIGLOSS ENAI.IEL SEMIGLOSS ENAMEL WALK -IN COOLER /FREEZER SHEET METAL SHEET METAL SMOOTNFINISH CEMENT SHEET METAL W /OHEIi.YER CLEAR COAT: NOTE: 8' -'^' HIGH FRP TO BE INSTALLED BEHIND ALL S114KS: 3-COMPARTMENT. MOP, AND PREP. SINKS Z U) Q Z O OW O V) V ~ 10 Z o004X+ Q A U W0 -N r0 Z 0 Z Z N °P 04C wm Z N U 2 M. ° OW O .4 w a Q U wWa U ILI 0 LLj U) Zaw J J xa z Q W ( J W ujw ui Z g R. IS DATE: 02 -Mw" DRAWN BY: E.G. SCALE: SHEET A3 OF