Loading...
HomeMy WebLinkAboutItem No. 3 - PA 2017-25City Council Agenda Report City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: TMP 22-427 Agenda Date: 9/20/2022 Status: Approval FinalVersion: 1 File Type: Planning Public Hearing In Control: Planning Commission Agenda Number: Item No. 3 Planning Application No. 2017-25 (Terracina) - A Request to modify a previously approved Design Review application to change the floor plans and plotting of various single-family residential units in Vesting Tentative Tract Map No. 36557 Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING PLANNING APPLICATION NO. 2017-25 (RESIDENTIAL DESIGN REVIEW NO. 2022-05) TO MODIFY FLOOR PLANS AND PLOTTING OF VARIOUS PLANS FOR THE PREVIOUSLY APPROVED DESIGN REVIEW AND RELATED IMPROVEMENTS FOR 402 SINGLE-FAMILY RESIDENTIAL UNITS LOCATED WITHIN VESTING TENTATIVE TRACT MAP NO. 36557 OF THE TERRACINA SPECIFIC PLAN. Page 1 City of Lake Elsinore Printed on 10/4/2022 Page 1 of 3 REPORT TO PLANNING COMMISSION To: Honorable Chairman and Members of the Planning Commission From: Damaris Abraham, Planning Manager Prepared by: Kevin Beery, Associate Planner Date: September 20, 2022 Subject: Planning Application No. 2017-25 (Terracina) – A request to modify a previously approved Design Review application to change the floor plans and plotting of various single-family residential units in Vesting Tentative Tract Map No. 36557 Applicant: Kurt Bausback, KB Home Coastal Inc. Recommendation Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING PLANNING APPLICATION NO. 2017-25 (RESIDENTIAL DESIGN REVIEW NO. 2022-05) TO MODIFY FLOOR PLANS AND PLOTTING OF VARIOUS PLANS FOR THE PREVIOUSLY APPROVED DESIGN REVIEW AND RELATED IMPROVEMENTS FOR 402 SINGLE-FAMILY RESIDENTIAL UNITS LOCATED WITHIN VESTING TENTATIVE TRACT MAP NO. 36557 OF THE TERRACINA SPECIFIC PLAN. Project Location The project is located southwesterly of Interstate 15 on the north side of existing Lakeshore Drive between Dryden Street and Terra Cotta Road within the Terracina Specific Plan (APNs: 378-040- 004, 378-040-012, 389-180-002, 389-180-001, 378-040-006, 378-040-007, 378-040-005, 389- 241-019 to 389-241-024, and 389-241-013). Background On July 14, 2015, the City Council approved Mitigated Negative Declaration (MND) No. 2015-01, Specific Plan No. 2012-03 (Terracina), General Plan Amendment No. 2012-03, Zone Change No. 2012-05, Tentative Tract Map (TTM) No. 36577, and Vesting Tentative Tract Map (VTTM) No. 36557 for the subdivision of 150.8 acres into 452 single-family residential lots, one 5.1-acre (4.3- acre net) park site, seven landscape lots, four open space lots, one sewer lift station, and three water quality and drainage basin lots. On August 8, 2017, the City Council approved a six-year extension of time to July 14, 2023 for VTTM 36557, which represents the final extension allowed by the Subdivision Map Act and the Lake Elsinore Municipal Code (LEMC). PA 2017-25/RDR 2022-05 (Terracina) 09/20/2022 Page 2 of 3 On July 23, 2019, the City Council approved Revision No. 1 to VTTM 36557, which revised the previously approved tentative map to include a phasing plan and to relocate the public park due to conflict with an existing 30-inch water line. The revision relocated the public park within Phase 1 area (Village 3), reduced the total number of residential lots by two, and allowed the tract map to be developed in seven (7) phases. The applicant has stated that only 402 out of 450 approved residences will be built at this time due to cost constraints associated with constructing necessary water supply infrastructure in Village 1 (Phase 7). On April 5, 2022, the Planning Commission approved Residential Design Review No. 2021-04 proposing the architectural design, preliminary plotting, conceptual landscaping, conceptual wall and fence plan and related tract improvements for the construction of 402 detached single-family residential units in VTTM 36557. The lot sizes for VTTM 36557 range in size from 4,603 square feet to 23,566 square feet and are 7,232 square feet on average. The project included 12 floor plans, six plans for 4,500+ sq. ft. lots and six plans for 5,000+ sq. ft. lots (ranging in size from 1,445 square feet to 3,092 square feet) and five architectural styles (Spanish, Craftsman, Tuscan, Farmhouse, and French Country). Project Description Residential Design Review No. 2022-05 proposes to modify the previously approved floor plan types and plotting for various units in the tract. Because the current application proposes to alter a project which previously received design review approval from the Planning Commission, the proposed modification must be reviewed by the Planning Commission in a similar manner as a new application pursuant to Lake Elsinore Municipal Code (LEMC) Section 17.415.050.J. The proposed modifications include:  New floor plans for 5,000+ lot units as follows: o Plan 1 floor area decreased from 1,751 to 1,547 square feet o Plan 2 floor area decreased from 2,035 to 1,751 square feet o Plan 3 building height decreased from two stories to one story, floor area decreased from 2,227 to 2,035 square feet o Plan 4 floor area decreased from 2,526 to 2,227 square feet o Plan 5 floor area decreased from 2,772 to 2,461 square feet o Plan 6 floor area decreased from 3,092 to 2,526 square feet  New plotting for 5,000+ sq. ft. lot units  Minor plotting adjustments for 4,500 sq. ft. lot units  Increased driveway length on several lots to accommodate longer vehicles Analysis Planning Division staff has reviewed the application and determined the proposed modifications meet the R-1 district development standards of the Terracina Specific Plan. Furthermore, the revised plot plan maintains an adequate mix and variation of plan types thereby avoiding repetition in the streetscape with respect to building architecture. The application is not proposing modifications to the previously approved building styles, tract fencing or tract landscaping. The City’s Design Review Committee consisting of staff from Planning, Building and Safety, Fire, and Engineering has reviewed the proposed modifications and does not recommended changes to the previous conditions of approval. PA 2017-25/RDR 2022-05 (Terracina) 09/20/2022 Page 3 of 3 Environmental Determination Pursuant to CEQA Guidelines Section 15162, staff has determined that the proposed project would not have a significant effect on the environment and no new environmental documentation is necessary because all potentially significant effects have been adequately analyzed in an earlier mitigated negative declaration (MND). All potentially significant impacts have been avoided or mitigated pursuant to the earlier MND and none of the conditions described in Section 15162 exist. MND No. 2015-01 (SCH # 2013091083) was adopted by the City Council on July 14, 2015. Approval of the Project will not change density or intensity of use. The proposed application is only proposing to modify the previously approved floor plan types and plotting for various units in the tract. No substantial changes which require major revisions to the MND exist and no new information of substantial importance which require revisions to the earlier MND exist. Therefore, no further environmental documentation is necessary. MSHCP Consistency The Project is consistent with the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP). The Project is not located within an MSHCP Criteria Cell area. The Project complies with all other applicable requirements of the MSHCP. Furthermore, t his application only consists of modifications to the previously approved floor plan types and plotting of various units a planned single-family residential development. Exhibits A – RDR Resolution B – Conditions of Approval C – Vicinity Map D – Aerial Map E – Modified Design Review Package RESOLUTION NO. 2022- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING PLANNING APPLICATION NO. 2017-25 (RESIDENTIAL DESIGN REVIEW NO. 2022-05) TO MODIFY FLOOR PLANS AND PLOTTING FO VARIOUS PLANS FOR THE PREVIOUSLY APPROVED DESIGN REVIEW AND RELATED IMPROVEMENTS FOR 402 SINGLE-FAMILY RESIDENTIAL UNITS LOCATED WITHIN VESTING TENTATIVE TRACT MAP NO. 36557 OF THE TERRACINA SPECIFIC PLAN Whereas, on April 5, 2022, the Planning Commission (Commission) approved Planning Application No. 2017-25 (Residential Design Review No. 2021-04) proposing the design and construction of 402 single-family residential units, preliminary plotting, conceptual landscaping, conceptual wall and fence plan, and related improvements located within Vesting Tentative Tract Map (VTTM) No. 36557 (Project). The project is located southwesterly of Interstate 15 on the north side of existing Lakeshore Drive between Dryden Street and Terra Cotta Road within the Terracina Specific Plan (APNs: 378-040-004, 378-040-012, 389-180-002, 389-180-001, 378-040-006, 378-040-007, 378- 040-005, 389-241-019 to 389-241-024, and 389-241-013); and, Whereas, Kurt Bausback, KB Homes Inc., filed an application (Residential Design Review No. 2022-05) with the City of Lake Elsinore (City) requesting modification of Residential Design Review No. 2021-04 to change the floor plans and plotting of various single-family residential units in VTTM 36557; and, Whereas, Section 6.0 of the Multiple Species Habitat Conservation Plan (MSHCP) requires that all discretionary projects within a MSHCP Criteria Cell undergo the Lake Elsinore Acquisition Process (LEAP) and the Joint Project Review (JPR) to analyze the scope of the proposed development and establish a building envelope that is consistent with the MSHCP criteria; and, Whereas, Section 6.0 of the MSHCP further requires that the City adopt consistency findings demonstrating that the proposed discretionary entitlement complies with the MSHCP Criteria Cell, and the MSHCP goals and objectives; and, Whereas, pursuant to the California Environmental Quality Act (Cal. Pub. Res. Code §§ 21000 et seq.: CEQA) and the State Guidelines for Implementation of CEQA (14 C.C.R. §§ 15000 et seq.: CEQA Guidelines), public agencies are expressly encouraged to reduce delay and paperwork associated with the implementation of CEQA by using previously prepared environmental documents when those previously prepared documents adequately address the potential impacts of the proposed project (CEQA Guidelines Section 15006); and, Whereas, CEQA Guidelines Section 15162 establishes the standard to be used when determining whether subsequent environmental documentation is necessary and provides that when an environmental document has already been adopted for a project, no subsequent environmental documentation is needed for subsequent entitlements which comprise the whole of the action unless substantial changes or new information are presented by the project; and, Whereas, Mitigated Negative Declaration No. 2015-01 (SCH #2013091083) for the Terracina Specific Plan was adopted in 2015 and evaluated environmental impacts that would result from maximum build-out of the specific plan and VTTM 36557, which contemplated development of single-family residential development; and, PC Reso. No. 2022-____ Page 2 of 5 Whereas, the project does not present substantial changes or new information regarding the potential environmental impacts of development; and, Whereas, pursuant to Section 17.415.050 (Major Design Review) of the Lake Elsinore Municipal Code (LEMC), the Commission has been delegated with the responsibility of reviewing and approving, conditionally approving, or denying any alteration of a project for which there has been a design review approval; and, Whereas, on September 20, 2022 at a duly noticed Public Hearing, the Commission has considered evidence presented by the Community Development Department and other interested parties with respect to this item. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1: The Commission has reviewed and analyzed the proposed Project pursuant to the California Planning and Zoning Laws (Cal. Gov. Code §§ 59000 et seq.), the Lake Elsinore General Plan (GP), the Terracina Specific Plan, and the LEMC and finds and determines that the proposed Project is consistent with the requirements of California Planning and Zoning Law and with the goals and policies of the GP, Terracina Specific Plan, and the LEMC. Section 2: That in accordance with the MSHCP, the Commission makes the following findings for MSHCP consistency: 1. The Project is a project under the City’s MSHCP Resolution, and the City must make an MSHCP Consistency finding before approval. Pursuant to the City’s MSHCP resolution, the project must be reviewed for MSHCP consistency, consistent with the Protection of Species Associated with Riparian/Riverine Areas and Vernal Pool Guidelines (MSHCP, Section 6.1.2), Protection of Narrow Endemic Plant Species Guidelines (MSHCP, Section 6.1.3), Additional Survey Needs and Procedures (MSHCP, Section 6.3.2), Urban/Wildlands Interface Guidelines (MSHCP, Section 6.1.4), Vegetation Mapping (MSHCP, Section 6.3.1) requirements, Fuels Management Guidelines (MSHCP, Section 6.4), and payment of the MSHCP Local Development Mitigation Fee (MSHCP Ordinance, Section 4). The project has been reviewed in light of these sections and is consistent therewith. 2. The Project is subject to the City’s LEAP and the County’s Joint Project Review processes. The proposed project is not located within an MSHCP Criteria Cell area. Therefore, no formal LEAP submittal was required as part of the approval of Vesting Tentative Tract Map (VTTM) 36557. However, the project is still required to comply with “Other Plan Requirements” provisions. The project complies with these provisions as described below. 3. The Project is consistent with the Riparian/Riverine Areas and Vernal Pools Guidelines. The previously approved VTTM 36557 was determined to be consistent with the Riparian/Riverine and Vernal Pool Guidelines as set forth in Section 6.1.2 of the MSHCP. The scope and nature of the project have not been modified from that which was previously approved and is therefore consistent with the Riparian/Riverine Areas and Vernal Pools Guidelines. PC Reso. No. 2022-____ Page 3 of 5 4. The Project is consistent with the Protection of Narrow Endemic Plant Species Guidelines. The previously approved VTTM 36557 was determined to be consistent with the Protection of Narrow Endemic Plant Species Guidelines as set forth in Section 6.1.3 of the MSHCP. The project has not been modified from that which was previously approved and is therefore consistent with the Protection of Narrow Endemic Plant Species Guidelines. Additionally, authorized by previous approval, the entire project site is being graded and any plant species which may have existed on the site have been removed and replaced with development. Therefore, the project is consistent with the guidelines. 5. The Project is consistent with the Additional Survey Needs and Procedures. The previously approved VTTM 36557 was determined to be consistent with the Additional Survey Needs and Procedures as set forth in Section 6.3.2 of the MSHCP. The project has not been modified from that which was previously approved under VTTM 36557, and the entire project site has been graded pursuant to previously issued permits. Therefore, the project is consistent with the Additional Survey Needs and Procedures of the MSHCP. 6. The Project is consistent with the Urban/Wildlands Interface Guidelines. The previously approved VTTM 36557 was consistent with the Urban/Wildlands Interface Guidelines as set forth in Section 6.1.4 of the MSHCP. Because the project has not been modified from that which was previously approved under VTTM 36557, no further MSHCP review is necessary, and therefore the project is consistent with the Urban/Wildlands Interface Guidelines. 7. The Project is consistent with the Vegetation Mapping requirements. The previously approved VTTM 36557 was determined to be consistent with the Vegetation Mapping requirements as set forth in Section 6.3.1 of the MSHCP. Mapping was conducted as part of the biological surveys for the original project. The project has not been modified from that which was previously approved and therefore is consistent with the Vegetation Mapping requirements. 8. The Project is consistent with the Fuels Management Guidelines. The previously approved VTTM 36557 was determined to be consistent with the Fuels Management Guidelines as set forth in Section 6.4 of the MSHCP. The project site is not within or adjacent to conservation areas where the Fuels Management Guidelines would be required. The project has not been modified from that which was previously approved and therefore is consistent with the Fuel Management Guidelines. 9. The Project will be conditioned to pay the City’s MSHCP Local Development Mitigation Fee. As a condition of approval, payment of the City’s MSHCP Local Development Mitigation Fee will be required prior to issuance of building permits. 10. The Project overall is consistent with the MSHCP. The project overall is consistent with all applicable provisions of the MSHCP. Section 3: The Commission finds and determines that no new CEQA documentation is necessary. The Project comprises the whole of an action that was analyzed in the previously adopted Mitigated Negative Declaration No. 2015-01 (SCH #2013091083). Approval of the PC Reso. No. 2022-____ Page 4 of 5 Project will not change density or intensity of use. The proposed application is only proposing to modify the previously approved floor plan types and plotting for various units in the tract.. Therefore, no further environmental review is necessary. Section 4: That in accordance with Section 17.415.050.G of the LEMC, the Commission makes the following findings regarding Planning Application No. 2017-25 (Planning Design Review No. 2022-05): 1. The Project, as approved, will comply with the goals and objectives of the General Plan and the zoning district in which the project is located. The project site is located within the Terracina Specific Plan and has a land use designation of Low-Medium Density Residential. The project constitutes build out of previously approved VTTM 36557 that was found to comply with the goals and objectives of the General Plan and the Terracina Specific Plan. The project does not propose an increase in density of development than what was previously approved. Furthermore, the proposed modifications to the previously approved floor plan types and plotting meet the R-1 district development standards of the Terracina Specific Plan. 2. The Project complies with the design directives contained in the Terracina Specific Plan and all applicable provisions of the LEMC. The project is appropriate to the site and surrounding developments. The proposed architectural styles will create a distinctive street scene within the project site. Sufficient setbacks and onsite landscaping have been provided thereby creating interest and varying vistas. Furthermore, the revised plot plan maintains an adequate mix and variation of plan types thereby avoiding repetition in the streetscape with respect to building architecture. In addition, safe and efficient on-site circulation would be achieved. 3. Conditions and safeguards pursuant to Section 17.415.050.G.3 of the LEMC, including guarantees and evidence of compliance with conditions, have been incorporated into the approval of the Project to ensure development of the property in accordance with the objectives of Section 17.415.050. Pursuant to Section 17.415.050.E of the LEMC, the project was considered by the Planning Commission at a duly noticed Public Hearing held on September 20, 2022. The project, as reviewed and conditioned by all applicable City divisions, departments, and agencies, was found to be consistent with the objectives of Section 17.415.050. Section 5: Based upon the evidence presented, both written and testimonial, and the above findings, the Commission hereby finds that the project is consistent with the MSHCP. Section 6: Based upon the evidence presented, the above findings, and the Conditions of Approval imposed upon the project, the Commission hereby approves Planning Application No. 2017-25 (Residential Design Review No. 2022-05). Section 7: This Resolution shall take effect immediately upon its adoption. PC Reso. No. 2022-____ Page 5 of 5 Passed and Adopted on this 20th day of September, 2022. Matthew Dobler Chairman Attest: ___________________________________ Damaris Abraham Planning Manager STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF LAKE ELSINORE ) I, Damaris Abraham, Planning Manager of the City of Lake Elsinore, California, hereby certify that Resolution No. 2022-__ was adopted by the Planning Commission of the City of Lake Elsinore, California, at a regular meeting held on September 20, 2022 and that the same was adopted by the following vote: AYES: NOES: ABSTAIN: ABSENT: Damaris Abraham Planning Manager Applicant’s Initials: _____ Page 1 of 21 CONDITIONS OF APPROVAL (New text underlined and deletions in strikethrough) PROJECT: PA 2017-025/RDR 2021-004/RDR 2022-005 PROJECT NAME: Terracina PROJECT LOCATION: APNs 378-040-004, 378-040-012, 389-180- 002, 389-180-001, 378-040-006, 378-40-007, 378-040-005, 389-241-019 to 389-241-024, 389-241-013 APPROVAL DATE: April 5, 2022 (Modifications Approved by Planning Commission on September 20, 2022) EFFECTIVE DATE: May 6, 2022 EXPIRATION DATE May 6, 2024 GENERAL 1. Planning Application No. 2017-25 (Residential Design Review No. 2021-04 and 2022-05) proposes the design and construction of 402 single-family residential units, preliminary plotting, conceptual landscaping, conceptual wall and fence plan, and related improvements located within Vesting Tentative Tract Map (VTTM) 36557 (Project). The Project proposes twelve floor plans (ranging in size from 1,445 square feet to 3,092 2,526 square feet) and five architectural styles (Spanish, Craftsman, Tuscan, Farmhouse, and French Country). The lot sizes for VTTM 36557 range in size from 4,603 sf to 23,566 sf and are 7,232 sf on average. The Project is located southwesterly of Interstate 15 on the north side of existing Lakeshore Drive between Dryden Street and Terra Cotta Road within the Terracina Specific Plan (APNs: 378-040-004, 378-040-012, 389-180-002, 389-180-001, 378-040-006, 378-40- 007, 378-040-005, 389-241-019 to 389-241-024, and 389-241-013). 2. The applicant shall defend (with counsel acceptable to the City), indemnify, and hold harmless the City, its Officials, Officers, Employees, Agents, and its Consultants (Indemnitees) from any claim, action, or proceeding against the Indemnitees to attack, set aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or legislative body concerning approval, implementation and construction of PA 2017-25/RDR 2021-04/RDR 2022-05, which action is bought within the time period provided f or in California Government Code Sections 65009 and/or 66499.37, and Public Resources Code Section 21167, including the approval, extension or modification of PA 2017-25/RDR 2021- 04/RDR 2022-05 or any of the proceedings, acts or determinations taken, done, or made prior to the decision, or to determine the reasonableness, legality or validity of any condition attached thereto. The Applicant's indemnification is intended to include, but not be limited to, damages, fees and/or costs awarded against or incurred by Indemnitees and costs of suit, claim or litigation, including without limitation attorneys' fees, penalties and other costs, liabilities and expenses incurred by Indemnitees in connection with such proceeding. The City will promptly notify the applicant of any such claim, action, or proceeding against the City. If the project is challenged in court, the City and the applicant shall enter into formal defense and indemnity agreement, consistent with this condition. 3. Within 30 days of project approval, the applicant shall sign and complete an "Acknowledgment of Conditions" and shall return the executed original to the Community Development Department for inclusion in the case records. Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 2 of 21 PLANNING DIVISION 4. The Project shall lapse and become void two (2) years following the date on which the design review became effective, unless one of the following: (1) prior to the expiration of two years, a building permit related to the design review is issued and construction commenced and diligently pursued toward completion; or (2) prior to the expiration of two years, the applicant has applied for and has been granted an extension of the design review approval pursuant to subsection (b) of Lake Elsinore Municipal Code (LEMC) Section 17.415.050(I). Notwithstanding conditions to the contrary, a design review granted pursuant to LEMC Chapter 17.415 shall run with the land for this two-year period, subject to any approved extensions, and shall continue to be valid upon a change of ownership of the site, which was the subject of the design review application. 5. All mitigation measures identified in Mitigated Negative Declaration No. 2015-01 (SCH # 2013091083) shall be adhered to. 6. The applicant shall comply with the provisions of the Terracina Specific Plan and the conditions of approval of Vesting Tentative Tract Map No. 36557 Revision No. 1. 7. The applicant shall provide all project-related on-site and off-site improvements as described in the Terracina Specific Plan document and these Conditions of Approval. 8. Future development shall comply with these Conditions of Approval and those provisions and requirements contained in the Terracina Specific Plan document. 9. All Conditions of Approval shall be reproduced on page one of building plans prior to their acceptance by the Building and Safety Division, Community Development Department. All Conditions of Approval shall be met prior to the issuance of a Certificate of Occupancy. 10. All future development proposals shall be reviewed by the City on a project-by-project basis. If determined necessary by the Community Development Director or designee, additional environmental analysis will be required. 11. Any proposed minor revisions to approved plans shall be reviewed and approved by the Community Development Director or designee. Materials and colors as depicted in the approved Design Review Package shall be used unless minor modifications are approved by the Community Development Director or designee or major modifications are approved by the Planning Commission. 12. The following architectural details shall be provided:  All front fence returns shall be decorative masonry walls. Vinyl or steel (tubular steel) gates are allowed in order to allow access to rear yards.  The applicant shall provide four-sided articulation. Architectural enhancements and treatments shall be provided on all residential elevations (front, rear and side) visible from streets and other public views.  All fireplaces shall be natural gas fireplaces only. No wood burning fireplaces shall be allowed. Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 3 of 21 13. The applicant shall provide a flat concrete pad or area a minimum of 3'- 0" by 7'- 0" adjacent to the dwelling for the storage of the City trash barrels. The storage pad or area shall conceal the trash barrels from public view, subject to the approval of the Community Development Director or designee. Precise grading plans shall identify the location of the aforementioned flat area and air conditioning units. 14. The building addresses (in numerals at least four inches high) shall be displayed near the entrance and easily visible from the front of the unit and public right -of-way. The applicant shall obtain street addresses for all production lots prior to issuance of building permit. 15. The applicant shall pay all applicable City fees, including but not limited to Development Impact Fees (DIF) per LEMC Section 16.74, Transportation Uniform Mitigation Fees (TUMF), Traffic Infrastructure Fees (TIF), Area Drainage Fees, Capital Im provement Impact/Mitigation Fees, and Plan Check fees, at the rate in effect at the time the application for VTTM 36557 was deemed complete plus inflationary increases in effect at time of payment. a. TUMF: Rate/Per Dwelling Unit. Due prior to occupancy; amount payable based on fee at time the application for VTTM 36557 was deemed complete, plus inflationary increases and such other reasonable increases in effect at time of payment as contemplated under LEMC Section 16.83.040, subpart C. b. TIF: Rate/Per Dwelling Unit. Due prior to occupancy; amount payable based on fee at the time the application for VTTM 36557 was deemed complete plus inflationary increases in effect at time of payment as provided by Resolution No. 2002-22. c. Public Building Facilities Fee: Rate/Per Dwelling Unit. Due prior to occupancy; amount payable based on fee at the time the application for VTTM 36557 was deemed complete plus inflationary increases in effect at time of payment as provided by Resolution No. 2005-96. d. Fire Facilities Fee: Rate/Per Dwelling Unit. Due prior to occupancy; amount payable based on fee at the time the application for VTTM 36557 was deemed complete plus inflationary increases in effect at time of payment as provided by Resolution No. 2006- 69. e. Library Facilities Fee: Rate/Per Dwelling Unit. Due prior to occupancy; amount payable based on fee at the time the application for VTTM 36557 was deemed complete. f. MSHCP Fee: Due prior to occupancy; amount payable based on fee at the time the application for VTTM 36557 was deemed complete plus inflationary increases in effect at time of payment as provided by LEMC Section 16.85.090. g. Area Drainage: The project lies within West Lake Elsinore (approx. acres 23) and Nichols SW (approx. acres 128). Area Drainage due at grading permit; amount payable based on fee at time vesting map application was deemed complete, plus inflationary increases in effect at time of payment as provided by LEMC Section 16.72.060. Current Rates: West Lake Elsinore – $5,955/gross acre; Nichols SW - $6,080/ gross acre 16. If any of the conditions of approval set forth herein fail to occur, or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City shall have the right to revoke or modify all approvals herein granted, deny or further condition issuance of all future building permits, deny revoke, or further condition all certificates of occupancy issued under Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 4 of 21 the authority of approvals herein granted; record a notice of violation on the property title; institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. Prior to Recordation of Final Tract Map(s) 17. All lots shall comply with minimum standards contained in the Terracina Specific Plan. 18. A precise survey with closures for boundaries and all lots shall be provided per the LEMC. 19. Street names within the subdivision shall be approved by the Community Development Director or Designee. 20. All improvements shall be designed by the applicant's Civil Engineer to the specifications of the City of Lake Elsinore. 21. The applicant shall meet all requirements of Elsinore Valley Municipal Water District (EVMWD). 22. Prior to recordation of a Final Map, the applicant shall initiate and complete the formation of a Homeowner’s Association (HOA) which shall be approved by the City, recorded, and in place. All Association documents shall be submitted for review and approval by City Planning and Engineering and the City Attorney; and upon City approval shall be recorded. Such documents include the Articles of Incorporation for the Association and Covenants, Conditions and Restrictions (CC&Rs). a. At a minimum, all recreation and park areas, all natural slopes and open space, all graded slopes abutting public street rights-of-way which are not part of residential lots, up slopes from public rights-of-way within private lots and all private streets, and all drainage basins shall be maintained by the HOA. b. CC&Rs shall prohibit front-yard microwave satellite antennas. c. CC&Rs shall prohibit the use of water-intensive landscaping and require the use of low water use landscaping pursuant to the provisions of LEMC Chapter 19.08 (Water Efficient Landscape Requirements), as adopted and any amendments thereto. Prior to Issuance of Grading Permits/Building Permits 23. The applicant shall obtain all necessary State and Federal permits, approvals, or other entitlements, where applicable, prior to each phase of development of the project. 24. Prior to issuance of building permit, the applicant shall submit a letter of verification (will-serve letter) to the City Engineer, for all required utility services. 25. Prior to issuance of building permit, the applicant shall prepare a Final Wall and Fence Plan addressing the following:  Show that a masonry or decorative block wall will be constructed along the entire tract boundary.  Show materials, colors, and heights of rear, side and front walls/fences for proposed Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 5 of 21 lots.  Show that front return walls shall be decorative masonry block walls. Front return wood fences shall not be permitted.  Show the location of all wood, vinyl or steel (wrought iron or aluminum) gates placed within the front return walls.  Show that side walls for corner lots shall be decorative masonry block walls.  Show that those materials provided along the front elevations (i.e. brick, stone, etc.) will wrap around the side elevation and be flush with the front return walls.  Off-site block wall shall be provided to comply with Vesting Tentative Tract Map Condition of Approval No. 121a. 26. All signage shall be subject to Planning Division review and approval prior to installation. 27. The applicant shall submit for review and approval by the Building Division building plans that are designed to current UBC and adopted codes and meet all applicable Building and Safety Division requirements. a. Driveways shall be constructed of concrete per Building and Safety Division standards. 28. The applicant shall prepare a list of proposed street names for review and approval by the Planning, Building, and Fire Departments of the City. 29. Provisions of the City's Noise Ordinance (LEMC Chapter 17.176) shall be satisfied during all site preparation and construction activity. Site preparation activity and construction shall not commence before 7:00 AM and shall cease no later than 5:00 PM, Monday through Friday. Only finish work and similar interior construction may be conducted on Saturdays and may commence no earlier than 8:00 am and shall cease no later than 4:00 p.m. Construction activity shall not take place on Sunday, or any Legal Holidays. 30. The applicant shall comply with all applicable City Codes and Ordinances. 31. Prior to issuance of building permit, building plans for the Model Home Complex shall comply with all American Disabilities Act (ADA) requirements, including provision of a handicapped- accessible bathroom. 32. Construction phasing shall be implemented in accordance with the approved Phasing Plan which avoids construction traffic from entering occupied neighborhoods within the tract. 33. A cash bond in the amount of $1,000 shall be required for the Model Home Complex. This bond is to guarantee removal of the temporary fencing material, parking lot, etc. that have been placed onsite for the Model Home Complex. The bond will be released after removal of the materials and the site is adequately restored, subject to the approval of the Community Development Director or designee. 34. A cash bond in the amount of $1,000 shall be required for any garage conversion of the model(s). Bonds will be released after removal of all temporary materials and the site is adequately restored, subject to the approval of the Community Development Director or designee. Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 6 of 21 35. A cash bond in the amount of $1,000 shall be required for any construction trailers used during construction. Bonds will be released after removal of trailers, subject to the approval of the Community Development Director or designee. 36. The applicant shall pay school fees to the Lake Elsinore Unified School District prior to issuance of each building permit. 37. The project shall connect to sewer and meet all requirements of the Elsinore Valley Municipal Water District (EVMWD). The applicant shall submit water and sewer plans to the EVMWD and shall incorporate all district conditions and standards. 38. All mechanical and electrical equipment associated with the residences shall be ground mounted. All outdoor ground or wall mounted utility equipment shall be consolidated in a central location and architecturally screened behind fence returns, subject to the approval of the Community Development Director, prior to issuance of building permit. 39. All front yards and side yards on corner lots shall be properly landscaped with automatic (manual or electric) irrigation systems to provide 100 percent plant coverage using a combination of drip and conventional irrigation methods. Construction Landscape & Irrigation drawings shall be prepared, reviewed and approved by the City's Landscape Architect Consultant and the Community Development Director or designee. A Cost Estimate for materials and labor shall also be submitted for review and approval. A Landscape Plan Check fee will be charged prior to final landscape approval based on the Consultant's fee, inspection, permit and administration fees.  The applicant shall replace any street trees harmed during construction, in conformance with the City's Street Tree List, at a maximum of 30 feet apart and at least 24-inch box in size.  Perimeter walls shall be protected by shrubs and other plantings that discourage graffiti.  The applicant shall ensure a clear line of sight at ingress/egress points by providing plantings within 15 feet of ingress/egress points whose height does not exceed three feet and whose canopy does not fall below six feet.  The landscape plan shall provide for California native drought-tolerant ground cover, shrubs, and trees. Special attention shall be given to use of Xeriscape or drought resistant plantings with combination drip irrigation system to prevent excessive watering.  No front-yard grass turf landscaping will be installed.  All landscape improvements shall be bonded with a ten percent (10%) Faithful Performance Bond of the approved estimated labor and materials cost for all planting. The bond shall remain in effect for one year from Certificate of Occupancy.  All landscaping and irrigation shall be installed within an affected portion of any phase at the time a certificate of occupancy is requested for any building.  All Model Homes shall be Xeriscaped and signage provided identifying Xeriscape landscaping. Xeriscape is a method of landscape design that minimizes water use by: 1) Implementing hydrozones; Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 7 of 21 2) Minimizes high water-use plant material as identified by Water Use Classifications of Landscape Species (WUCOLS) (such as turf) and incorporates water-efficient (“drought-tolerant” / climate-appropriate) plants; 3) Requires an efficient irrigation system that includes: a. ET-Based (“Smart irrigation”) controller(s) with weather-sensing, automatic shut-off and seasonal adjustment capabilities; b. Efficient irrigation water application through use of: i. Low-volume point-source irrigation (such as drip irrigation and bubblers) for all shrub planter areas (maximum of 3:1 slope) with a minimum irrigation efficiency of 0.90 ; and/or ii. Spray or rotor-type nozzles for areas a minimum of eight (8) feet wide, for slopes 3:1 and greater, AND with a minimum irrigation efficiency of 0.71. 4) Improvement of soil structure for better water retention; and 5) Application of mulch to hinder evaporation.  The Final landscape plan shall be consistent with any approved site and/or plot plan.  The Final landscape plan shall include planting and irrigation details.  All exposed slopes in excess of three feet in height within the subject tract and within private lots shall have a permanent irrigation system and erosion control vegetation installed, as approved by the Planning Division, prior to issuance of certificate of occupancy.  All landscaping and irrigation shall comply with the water-efficient landscaping requirements set forth in LEMC Chapter 19.08 (Water Efficient Landscape Requirements) as adopted and any amendments thereto. 40. The applicant shall place a weatherproof 3’ x 3’ sign at the entrance to the project site identifying the approved days and hours of construction activity and a statement that complaints regarding the operation can be lodged with the City of Lake Elsinore Code Enforcement Division (951) 674-3124. The sign shall be installed prior to the issuance of a grading permit. PUBLIC WORKS DEPARTMENT/ ENGINEERING DIVISION General 41. All utilities except electrical over 35 KV shall be placed underground, as approved by the serving utility. Arrangements for relocation of utility company facilities (power poles, vaults; etc.) out of the roadway or alley shall be the responsibility of the property owner or his agent. 42. The applicant shall install permanent bench marks to Riverside County Standards and at a location to be determined by City Engineer. 43. Street lighting and landscaping on public right-of-way shall be maintained by a maintenance assessment district LLMD 1. The project will annex into LLMD #1 prior to first building permit issuance. Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 8 of 21 44. All open space and slopes except for public parks and schools and flood control district facilities, outside the public right-of-way will be owned and maintained by either a home owner’s association or private property owner. Adequate access through the developed road system and / or open spaces shall be provided for maintenance and delineated on grading plans. 45. Construction traffic shall use Terra Cotta Road via Nichols Road to minimize impacts to existing residents. 46. 10-year storm runoff shall be contained within the curb and the 100-year storm runoff shall be contained within the street right-of-way. When either of these criteria are exceeded, drainage facilities shall be provided. Grading 47. A grading plan signed and stamped by a Calif. Registered Civil Engineer shall be required. 48. Prior to commencement of grading operations, developer is to provide to the City with a map of all proposed haul routes to be used for movement of export material. All such routes shall be subject to the review and approval of the City Engineer. Haul route shall be submitted prior to issuance of a grading permit. Hauling in excess of 5,000 CY shall be approved by City Council. (LEMC 15.72.065) 49. All export material shall be discharged into a legal disposal site. No permittee shall process, including, but not limited to, crush, sift, or segregate, excavated earth materials on site for export and commercial sale without first obtaining a permit pursuant to Chapter 14.04 LEMC regarding surface mining and reclamation. (LEMC 15.72.065) 50. All grading shall be done under the supervision of a geotechnical engineer and he shall certify all slopes steeper than 2 to 1 for stability and proper erosion control. All manufactured slopes greater than 30 feet in height shall be contoured. 51. All drainage facilities in this tract shall be constructed to Riverside County Flood Control District Standards. Adequate and safe access for maintenance of detention/water quality basins shall be provided. 52. All storm drain plans connecting to Riverside County Flood Control facilities will be approved by RCFC, and an encroachment permit from RCFCD will be required. 53. All compaction reports, grade certifications, monument certifications (with tie notes delineated on 8 ½ x 11” Mylar) shall be submitted to the Engineering Division before final inspection of public works improvements will be scheduled and approved. 54. A precise survey with closures for boundaries and all lots shall be provided per the LEMC. 55. In accordance with the City’s Franchise Agreement for waste disposal & recycling, the applicant shall be required to contract with CR&R Inc. for removal and disposal of all waste material, debris, vegetation and other rubbish generated during cleaning, demolition, clear and grubbing or all other phases of construction. 56. Drainage from the project site shall be released from the project site in a safe manner as approved by the City Engineer including but not limited to release to natural channels, public Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 9 of 21 facilities and/or drainage easements existing on adjacent properties or new letters of drainage acceptance. 57. All natural (historic, pre-development) drainage traversing the site shall be conveyed through the site, or, shall be collected and conveyed to a safe and appropriate discharge point by a method approved by the City Engineer. 58. Applicant shall obtain all necessary off-site easements for any off-site grading, if needed, from the adjacent property owners prior to final map approval. Improvements 59. All Public Works requirements shall be complied with as a condition of development as specified in the Lake Elsinore Municipal Code (LEMC) prior to final map approval. 60. An Encroachment Permit shall be obtained prior to any work in City right-of-way. 61. Terra Cotta Road shall be graded and used as construction access prior to precise grading activity. Prior to building permits, Terra Cotta Road shall be paved, with final lift of asphalt to be placed at completion of building activity. 62. All existing accesses for ingress/egress to Terra Cotta Road from abutting properties must be maintained. 63. Construct Terra Cotta Road at its full width section as a Secondary Highway with a 90’ Right of Way from Lakeshore Drive north to the northern boundary of the project. Construction of full improvement of Terra Cotta may be staged as approved by the City Engineer. 64. Construct the extension of Terra Cotta Road from the north project boundary to Nichols Road with a 32’ paved roadway width, including a 4’ graded shoulder on the north and south bound sides, as approved by the City Engineer. 65. Construct the extension of Hoff Avenue from the west project boundary to Terra Cotta Road with a 32’ half width, with a paved half width section as approved by the City Engineer. 66. Install a traffic signal at the intersection of Terra Cotta Road (NS) and Nichols Road (EW) including the following lane geometry: 1 NB left, 1 NB right, 1 EB through, 1 EB right, 1 WB left, 1 WB through, to include the storage length per the project traffic study, width and transitions per City Standards. Fair share mitigation in lieu of construction may be accepted with the amount approved by the City Engineer. 67. Construct Lakeshore Drive adjacent to the project site at its ultimate half width section (60’), including sidewalk and parkway improvements consistent with the adjacent improved sections of Lakeshore Drive and additional 14’ width for a NB right turn lane on Lakeshore at Terra Cotta Road in conjunction with development. 68. Install a full intersection traffic signal at all legs of the off-set intersection of Lakeshore Drive and Terra Cotta Road as designed by the Project’s Traffic Engineer and reviewed and approved by the City Engineer. 69. Construct Dryden Street adjacent to the project site at its ultimate half width section, Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 10 of 21 including sidewalk and parkway improvements in conjunction with development. 70. Install a traffic signal at the intersection of Lakeshore Drive and Dryden Street. 71. Construct Stoddard Street adjacent to the project site at its ultimate half width section, to include sidewalk and parkway improvements in conjunction with development. 72. The developer shall be responsible for acquiring right-of-ways in which the developer or the City has no legal title or interest. If the developer is unsuccessful in acquiring such right-of- ways, the City could assist the developer in the Eminent Domain process at developer’s cost. 73. Costs of General Plan circulation improvements and signalization may be at a minimum partially reimbursable through the City’s Traffic Impact Fee Program. (TIF) 74. Some of the improvements shown on the Map and/or required by these conditions are located offsite on property which neither the City nor the subdivider may have no title or interest to permit the improvements to be made without acquisition of title or interest. The subdivider shall pay all costs for acquisition of title or interest. 75. A Calif. Registered Civil Engineer shall prepare street and drainage improvement plans and specifications. Improvements shall be designed and constructed to City of Lake Elsinore Standards, latest edition, and City Codes (LEMC titles 12. and 16.). Street improvement plans shall show existing and future profiles at centerline of street; at top of curb and at centerline of the alley. The profiles and contours will extend to 50’ beyond the property limits. 76. Interior streets shall be dedicated and improved as public residential street (40’/50’ with a 3’ PUE). 77. Traffic Signing and Striping plans shall be required with the street improvement plans. Signing and striping shall be installed in accordance with the plans approved by the City Traffic Engineer. Storm Water Management / Pollutant Prevention / NPDES Design 78. The project is responsible for complying with the Santa Ana Region NPDES Permits as warranted based on the nature of development and/or activity. These Permits include: a. General Permit -Construction b. MS4 79. The 2010 SAR MS4 Permit requires implementation of LID Principles and LID Site Design, where feasible, to treat the pollutants of concern identified for the project, in the following manner (from highest to lowest priority) : (Section XII.E.2, XII.E.3,and XII.E.7) 80. Preventative measures (these are mostly non-structural measures, e.g., preservation of natural features to a level consistent with the MEP standard; minimization of Urban Runoff through clustering, reducing impervious areas, etc.) 81. The Project shall ‘Infiltrate, harvest and use, evapotranspire and/or bio-treat the Design Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 11 of 21 Capture Volume (DCV). 82. The Project shall consider a properly engineered and maintained bio-treatment system only if infiltration, harvesting and use and evapotranspiration cannot be feasibly implemented at the project site. 83. Any portion of [the DCV] that is not infiltrated, harvested and used, evapotranspired, and/or biotreated shall be treated and discharged in accordance with the requirements set forth in Section XII.G. 84. The project shall implement LID practices that treat the 85th percentile storm. 85. Project hardscape areas shall be designed and constructed to provide for drainage into adjacent landscape. 86. Hydromodification / Hydraulic Conditions of Concern – The project shall identify potential Hydraulic Conditions of Concern (HCOC) and implement measures to limit disturbance of natural water bodies and drainage systems; conserve natural areas; protect slopes, channels and minimize significant impacts from urban runoff. 87. CEQA – If CEQA identifies resources requiring Clean Water Act Section 401 Permitting, the applicant shall obtain certification through the Santa Ana Regional Water Quality Control Board and provide a copy to the Engineering Division. Construction 88. Both a Storm Water Pollution Prevention Plan (SWPPP) and a Water Quality Management Plan (WQMP) for post construction are required for this project. 89. SWPPP - A copy of the current SWPPP shall be kept at the project site, updated as necessary and be available for review upon request. Projects that are not subject to coverage under the General Permit – Construction will prepare and implement an Erosion and Sediment Control Plan in compliance with the California Building Code and Local Ordinances. 90. Prior to grading or building permit the applicant shall demonstrate that compliance with the permit has been obtained by providing a copy of the Notice of Intent (NOI) submitted to the State Water Resources Control Board and a copy of the letter of notification of the issuance of a Waste Discharge Identification (WDID) Number or other proof of filing to the satisfaction of the City Engineer. 91. Erosion & Sediment Control - Prior to the issuance of any grading or building permit, the applicant shall submit for review and approval by the City Engineer, an Erosion and Sediment Control Plan as a separate sheet of the grading plan submittal to demonstrate compliance with the City’s NPDES Program and state water quality regulations for grading and construction activities. The Erosion and Sediment Control Plan shall identify how all construction materials, wastes, grading or demolition debris, and stockpiles of soil, aggregates, soil amendments, etc. shall be property covered, stored and secured to prevent transport into local drainages or waters by wind, rain, tracking, or dispersion. The plan shall also describe how the project will ensure that all BMPs will be maintained during construction of any future right of ways. A copy of the plan shall be incorporated into the Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 12 of 21 SWPPP as applicable, kept updated as needed to address changing circumstances of the project site, be kept at the project site and available for review upon request. Post Construction 92. A preliminary WQMP shall be submitted during the project entitlement stage. The level of detail in a preliminary Project-Specific WQMP will depend upon the level of detail known about the overall project design at the time project approval is sought. At a minimum, the preliminary Project-Specific WQMP shall identify the type, size, location, and final ownership of Stormwater BMPs adequate to serve new roadways and any common areas, and to also manage runoff from an expected reasonable estimate of the square footage of future roofs, driveways, and other impervious surfaces on each individual lot. 93. The applicant shall use the Water Quality Management Plan for the Santa Ana Region of Riverside County guidance document and template for preparation of both the preliminary and final WQMP. 94. The project shall complete and submit for review and approval to the Engineering Division a final WQMP, incorporating the LID Principles and Stormwater BMPs committed to in the preliminary Project-Specific WQMP. The final WQMP shall be approved prior to issuance of any grading or building permit. 95. Operation and Maintenance (O&M) Plan and Agreement that (1) describes the long-term operation and maintenance requirements for BMPs identified in the BMP Exhibit; (2) identifies the entity that will be responsible for long-term operation and maintenance of the referenced BMPs; and (3) describes the mechanism for funding the long-term operation and maintenance of the referenced BMPs. The City format shall be used. 96. All storm drain inlet facilities shall be appropriately marked “Only Rain in the Storm Drain” using the City authorized marker to prevent illegal dumping in the drain system. 97. Prior to the issuance of a certificate of use and/or occupancy, the applicant shall demonstrate compliance with applicable NPDES permits for construction, industrial/commercial, MS4, etc. to include: 1. Demonstrate that all structural Best Management Practices (BMP’s) described in the BMP Exhibit from the project’s approved WQMP have been implemented, constructed and installed in conformance with approved plans and specifications. 2. Demonstrate that the project has complied with all non-structural BMPs described in the project’s WQMP. 3. Provide signed, notarized certification from the engineer of work that the structural BMP’s identified in the project’s WQMP are installed and operational. 4. Submit a copy of the fully executed, recorded Operations and Maintenance (O&M) Plan for all structural BMPs. 5. Demonstrate that copies of the project’s approved WQMP (with recorded O&M Plan attached) are available for each of the initial occupants (commercial/industrial) or HOA as appropriate. 6. Agree to pay for a Special Investigation from the City of Lake Elsinore for a date twelve (12) months after the issuance of a Certificate of Use and/or Occupancy for the project to verify compliance with the approved WQMP and O&M Plan. A signed/sealed certification from the engineer of work dated 12 months after C of O will be considered in lieu of a Special Investigation by the City. Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 13 of 21 7. Provide a recorded copy of one of the following: a. CC&R’s (they must include the approved WQMP and O&M Plan) for the project’s Home Owners Association. b. A water quality implementation agreement has the approved WQMP and O&M Plan attached; or c. The final approved Water Quality Management Plan and Operations and Maintenance Plan. Final Tract or Parcel Map 98. The developer shall submit for plan check review and approval a final map. 99. Phasing plan, if any, shall be approved by the City Engineer prior to issuance of any permits. 100. Prior to City Council approval of the final Tract Map the developer shall, in accordance with Government Code, have constructed all improvements or have improvement plans submitted and approved, agreements executed and securities posted. 101. Street abandonment shall be processed and approved as part of the final map. 102. Make an offer of dedication for all public streets and easements required by these conditions or shown on the Tentative Map. All land so offered shall be granted to the City, free and clear of all liens and encumbrances and without cost to the city. 103. Applicant shall record CC&R’s for funding, operation and maintenance of slopes and drainage facilities within the project. The CC&R’s shall be approved by the Planning Director and City Engineer prior to recordation of final map. 104. The Final Tract Map or Parcel Map shall include the phasing boundaries consistent with the parcels of the Tentative Tract or Parcel Map. The phasing boundaries or parcels shall be processed as separate tract maps. 105. Underground water rights shall be dedicated to the City pursuant to: the provisions of Section 16.52.030 (LEMC), and consistent with the City’s agreement with the Elsinore Valley Municipal Water District. Prior to Issuance of a Grading Permit 106. Submit grading plans with appropriate security, Hydrology and Hydraulic Reports prepared by a Registered Civil Engineer for approval by the City Engineer. Developer shall mitigate any flooding and/or erosion downstream caused by development of the site and/or diversion of drainage. 107. Provide soils, geology and seismic report including street design recommendations. Provide final soils report showing compliance with recommendations. 108. A seismic study shall be performed on the site to identify any hidden earthquake faults, liquefaction and/or subsidence zones present on-site. A certified letter from a registered geologist or geotechnical engineer shall be submitted confirming the absence of this hazard. 109. The applicant shall obtain all necessary off-site easements for off-site grading and/or Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 14 of 21 drainage acceptance, if needed, from the adjacent property owners prior to grading permit issuance. 110. The developer shall apply for, obtain and submit to the City Engineering Division a letter from Southern California Edison (SCE) indicating that the construction activity will not interfere with existing SCE facilities (aka SCE NIL). 111. Developer shall execute and submit grading and erosion control agreement, post grading security and pay permit fees as a condition of grading permit issuance. 112. A preconstruction meeting with the City Public Works Inspector (Engineering Division) is required prior to commencement of ANY grading activity. 113. A traffic improvement plan which includes the timing of phased improvements shall be submitted to the City Engineer for review and approval prior to issuance of any grading permits for the project. Secondary access shall be provided for each phase. Prior to Issuance of Building Permit: 114. All Public Works requirements shall be complied with as a condition of development as specified in the Lake Elsinore Municipal Code (LEMC) prior to building permit. 115. Submit a “Will Serve” letter to the City Engineering Division from the applicable water agency stating that water and sewer arrangements have been made for this project and specify the technical data for the water service at the location, such as water pressure and volume etc. Submit this letter prior to applying for a building permit. 116. Pay all Capital Improvement Mitigation fees (LEMC 16.34). 117. The Final Tract Map shall be recorded. 118. Prior to the issuance of the first building permit: Construct Terra Cotta Road at its full width section as a Secondary Highway with a 90’ Right of Way from Lakeshore Drive north to the northern boundary of the project. The City Engineer at his/her discretion may allow for the phased construction of the ultimate improvements. 119. Prior to the issuance of the first building permit: Construct a 5-foot wide sidewalk on the west side of Terra Cotta Road between Lakeshore Drive and Harrison Avenue. 121a. Prior to the issuance of the 200th building permit: In accordance with the attached agreement (Exhibit 1) entered between the developer and the City of Lake Elsinore, in such form as approved by the City Council’s Development Subcommittee, the City Manager or designee, and the City Attorney, the developer shall either: a) Construct a 6-foot high masonry or decorative block wall at the rear of the existing residences located on the west side of existing Terra Cotta Road at the location set forth in the above-referenced agreement, and plant shrubs and/or other plantings that discourage graffiti; or, b) Pay an in-lieu deposit in the amount of $180,000 or such other deposit as may be set forth in the above referenced agreement to cover the cost of the City’s installation of Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 15 of 21 the wall and associated landscaping. The walls shall be constructed of the same materials used to construct the walls along the entire VTTM 36557 tract boundary as required by Condition No. 22, above. The City shall waive all plan check and permit fees associated with the construction of the wall and associated plantings. 120. Prior to the issuance of the first building permit: Construct the extension of Terra Cotta Road from the north project boundary to Nichols Road with a 32’ paved roadway width with paved roadway section approved by the City Engineer. 121. Prior to the issuance of the 300th building permit: The developer shall pay fee in-lieu of construction of future median improvements on Lakeshore Drive. The fee shall be equal to current cost estimate for improvements (including contingency) plus an additional 15% of the total construction cost estimate to cover design and administrative costs. The cost estimate shall be approved by the City Engineer. Prior to Occupancy 122. All compaction reports, grade certifications, monument certifications (with tie notes delineated on 8 1/2” x 11” Mylar) shall be submitted to the Engineering Division before final inspection of off-site improvements will be scheduled and approved. 123. All traffic signing and striping shall be completed in accordance with the approved plans to the satisfaction of the City Traffic Engineer. 124. Prior to the final inspection and occupancy of the 50th dwelling unit: Install a full intersection traffic signal at all legs of the off-set intersection of Lakeshore Drive and Terra Cotta Road. 125. Prior to the final inspection and occupancy of the 150th dwelling unit: Install a traffic signal at the intersection of Lakeshore Drive and Dryden Street. 126. The fair share cost of future improvements as a condition of this development shall be paid, as per tables 9 and 10 of the January 29, 2014 Revised Terracina Traffic Impact Analysis prepared by Kunzman Associates, Inc. (Appendix E of Mitigated Negative Declaration No. 2014-02). This condition implements Mitigation Measure TRA-4 of Mitigated Negative Declaration No. 2014-02. In lieu of Applicant's Fair Share contribution, Applicant shall install improvements outlined in Condition #61. 127. TUMF fees shall be paid. The TUMF fees shall be based on fee at time the application for VTTM 36557 was deemed complete, plus inflationary increases and such other reasonable increases in effect at time of payment as contemplated under LEMC Section 16.83.040, subpart C. 128. All required public right-of-way dedications, easements, dedications and vacations and easement agreement(s) for ingress and egress through adjacent property(ies) shall be recorded with a recorded copy provided to the City prior to final project approval. 129. In the event of damage to City roads from hauling or other construction related activity, Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 16 of 21 applicant shall pay full cost of restoring public roads to the baseline condition. 130. As-built plans for all in-field revisions to approved plan sets shall be submitted for review and approval by the City. The developer/developer/owner is responsible for revising the original mylar plans. 131. All final studies and reports, grade certifications, monument certifications (with tie notes delineated on 8 ½ x 11” mylar) shall be submitted in .tif format on a CD/DVD. Studies and reports include, Soils, Seismic, Hydrology, Hydraulics, Grading, SWPPP, WQMP, etc. 132. All plan sets and recorded maps shall be digitized and provided on CD/DVD as follows: a. Final Map(s) - GIS Shape files* and .tif of recorded map. b. Improvement Plans – GIS Shape files* and .tif of approved as built mylar. c. Grading Plans - .tif of approved as built mylar. *GIS Shape files must be in projected Coordinate System: NAD 83 State Plane California Zone VI U.S. Fleet. COMMUNITY SERVICES DEPARTMENT 133. All open space lots shall be owned and maintained by the Homeowner’s Association (HOA). 134. The 5.1-acre (4.3-acre net) public park (as shown on attached Exhibit 1) shall be included in the Community Facilities District for maintenance and renovation costs. 135. The public park shall include: o An informal sports field o Restroom approximately 300 sq. ft. o On-site parking o 1 cover picnic area with 4 tables o Barbeque, hot ash container o 4 waste containers o Drinking fountain o Half court basketball o 8 benches o One 2-5 year and one 5-12 year playground with shade over the entire play structure o Perimeter walking trail with exercise stations o Park monument sign o Security Lighting o Lockable gate to the parking lot 136. The design of the proposed park site shall provide pedestrian circulation and shall be in compliance with American with Disabilities Act (ADA) requirements. 137. Prior to submittal of construction plans, the developer shall meet with the Director of Communities Services to determine the location and specifications of the park amenities to be provided. The final conceptual design of the park will be approved by the Director of Community Services. 138. Construction plans and specifications for the park shall be reviewed and approved by the Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 17 of 21 Director of Community Services prior to the approval of the final map. 139. The developer shall post security and enter into a park improvement agreement to improve the public park prior to issuance of the first building permit. 140. Construction of the park shall commence pursuant to a pre-construction meeting with the developer, the developer’s construction contractor and City representatives. Failure to comply with the City’s review and inspection process may preclude acceptance of the park by the City. 141. The developer, the developer’s successor or assignee, shall be responsible for all the maintenance of the public park, including the 90-day maintenance period. After successful completion of the 90-day maintenance period following construction, these responsibilities will be accepted by the City. 142. The public park shall be improved and then conveyed to the City free and clear of any liens, assessment fees, or easements that would preclude the City from utilizing the property for public purposes. A policy of title insurance and a soils assessment report shall be provided with the conveyance of the property. 143. The completion of the public park shall be in lieu of any Quimby and park Development Impact Fees (DIF) requirements for the development. 144. The developer, the developer’s successor or assignee, shall be responsible for all maintenance of all open space lots until such time as those responsibilities are provided by the HOA. 145. The public 5.1-acre (4.3-acre net) park shall be completed to the satisfaction of the Community Services Director prior to the issuance of the 100th residential building permit. 146. Class II bicycle lanes for Lakeshore Drive and Terra Cotta Road shall be identified on the street improvements plans and constructed in concurrence with the completion of said street improvements. FIRE PROTECTION PLANNING OFFICE General Conditions 147. Lake Elsinore Fire Protection Planning Office Responsibility - It is the responsibility of the recipient of these Fire Department conditions to forward them to all interested parties. The permit number (as it is noted above) is required on all correspondence. Questions should be directed to the Riverside County Fire Department, Lake Elsinore Fire Protection Planning Division at 130 S. Main St., Lake Elsinore, CA 92530. Phone: (951) 671-3124 Ext. 225. The following fire department conditions shall be implemented in accordance with the Lake Elsinore Municipal Code and the adopted codes at the time of project building plan submittal, these conditions are in addition to the adopted code requirements. 148. Blue Dot Reflectors - Blue retro-reflective pavement markers shall be mounted on private streets, public streets and driveways to indicate location of fire hydrants. Prior to installation, placement of markers must be approved by the Riverside County Fire Dept. Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 18 of 21 149. Minimum Hydrant Fire Flow - Minimum required fire flow shall be 1,000 GPM for 2 hours duration at 20 PSI residual operating pressure, which must be available before any combustible material is placed on the job site. Average spacing between hydrants 500’ and 250’ maximum distance from any point on the street or road frontage to hydrant. S tandard Fire hydrants shall be installed (6”x4”x2-1/2”). 150. Hazardous Fire Area - The proposed project is located high or very high fire zone as adopted in the Lake Elsinore Municipal Code. The project shall adhere to all high fire requirements as prescribed in the Title 24 Codes, any applicable state and local codes pertaining to high fire. The structures shall comply with Chapter 7A of the Building Code and or Section R327 of the California Residential Code. Roofing Materials shall be classified at not less than class “A”. 151. Fuel Modification Plan - Fuel modification plans shall be provided to the Lake Elsinore Fire Protection Planning office. Plans shall include fuels modeling and comprehensive details with regard to the vegetation management plan. The fuels modification zone shall be not less than 100’ from all structures and may be required to be increased. 152. Minimum Access Standards - The following access requirements are required to be implemented to ensure fire department and emergency vehicular access. All roadways shall conform to the City of Lake Elsinore approved roadway standards but in no case shall the minimum fire department vehicular access be less the following provisions: 1. Twenty-four feet (24’) clear width. Where parking is to be provided, each parking side shall be provided with eight (8’) additional feet on each side of the fire department access. 2. Median openings or crossovers between opposing lanes of a divided highway or street shall be located only at approved intersections at intervals of not less than 500 feet. [Ord. 529 § 3.2(F), 1973]. 3. The required all weather vehicular access shall be able to support no less than 70,000 lbs. over 2 axles. 4. Roadway gradient shall not exceed 15% on any access road, driveways, and perimeter roads. 5. Turning Radius shall be 26’ inside and 38’ outside for all access roads. 153. Secondary Access - In the interest of Public Safety, this project shall provide an Alternate or Secondary Access. Said access shall be constructed in accordance to the City of Lake Elsinore Engineering Department standards to accommodate full fire response and community evacuation. Prior to Building Permit Issuance 154. Water System Plans - Applicant and/or developer shall separately submit 2 sets of water system plans to the Fire Department for review. Plans must be signed by a registered Civil Engineer and/or water purveyor prior to Fire Department review and approval. Mylars will be signed by the Fire Department after review and approval. Two (2) copies of the signed and approved water plans shall be returned to the Fire Department before release of a building permit. 155. Prior to Building Construction Verification - This project shall be inspected and approved by the Fire Marshal or designee prior to bringing combustible materials on site. Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 19 of 21 During such inspection all permanent road signs shall be in place, all hydrants shall on operating and approved for use by the water purveyor, and all permanent road surfaces shall be completed including primary and secondary access circulation. Prior to Building Final Inspection 156. Residential Fire Sprinkler Systems for Single family and two-family 13D - Install a complete fire sprinkler system designed in accordance with California Residential Code, California Fire Code and adopted standards. A C-16 licensed contractor must submit plans, along with the current fee, to the Fire Department for review and approval prior to installation. 157. Designated Fire Lanes - The applicant shall prepare and submit to the Fire Department for approval, a site plan designating required fire lanes with appropriate lane painting and/ or signs. DEPARTMENT OF ADMINISTRATIVE SERVICES Annex into CFD 2015-1 (Safety) Law Enforcement, Fire and Paramedic Services CFD 158. Prior to approval of the Final Map, Parcel Map, Residential Design Review, or Conditional Use Permit (as applicable), the applicant shall annex into Community Facilities District No. 2015-1 (Safety) the Law Enforcement, Fire and Paramedic Services Mello-Roos Community Facilities District to offset the annual negative fiscal impacts of the project on public safety operations and maintenance issues in the City. Alternatively, the applicant may propose alternative financing mechanisms to fund the annual negative fiscal impacts of the project with respect to Public Safety services. Applicant shall make a non-refundable deposit of $15,000, or at the current rate in place at the time of annexation toward the cost of annexation, formation or other mitigation process, as applicable. Annex into the City of Lake Elsinore Community Facilities District No. 2015-2 (Maintenance Services) 159. Prior to approval of the Final Map, Parcel Map, Residential Design Review, Conditional Use Permit or building permit (as applicable), the applicant shall annex into the Community Facilities District No. 2015-2 (Maintenance Services) to fund the on-going operation and maintenance of the public right-of-way landscaped areas and neighborhood parks to be maintained by the City and for street lights in the public right-of-way for which the City will pay for electricity and a maintenance fee to Southern California Edison, including parkways, open space and public storm drains constructed within the development and federal NPDES requirements to offset the annual negative fiscal impacts of the project. Alternatively, the applicant may propose alternative financing mechanisms to fund the annual negative fiscal impacts of the project with respect to Maintenance Services. Applicant shall make a non- refundable deposit of $15,000, or at the current rate in place at the time of annexation toward the cost of annexation, formation or other mitigation process, as applicable. MITIGATED NEGATIVE DECLARATION NO. No. 2014-02 (SCH #2013091083) MITIGATION MEASURES 160. The applicant shall comply with the mitigation measures set forth in the Mitigation Monitoring & Reporting Program (MMRP) for Mitigated Negative Declaration No. 2014-02, which was adopted for this project. Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 20 of 21 161. The applicant shall fund the implementation of the Mitigation Monitoring & Reporting Program (MMRP) through every stage of development. The City shall appoint an environmental monitor who shall periodically inspect the project site, documents submitted by the applicant, permits issued, and any other pertinent material, in order to monitor and report compliance to the City until the completion of the project. Terracina PC: April 5, 2022 Conditions of Approval (Modifications Approved PC: September 20, 2022) Applicant’s Initials: _____ Page 21 of 21 I hereby state that I acknowledge receipt of the approved Conditions of Approval for the above- named project and do hereby agree to accept and abide by all Conditions of Approval as approved by the Planning Commission of the City of Lake Elsinore on April 5, 2022 and as modified on September 20, 2022. I also acknowledge that all Conditions shall be met as indicated. Date: Applicant’s Signature: Print Name: Address: Phone Number: LASH AVE NICHOLS RDLAKESHORE DRTERRA COTTA RDCOAL AVE KINGS HWY HOFF AVE GUNNERSON STS T E V E N S A V E RALPH RDDRYDEN STPINNELL STGRAY AVE WOODLAKE STTORN RANCH RDHAGUE STCLEMENT STKALI NA AVEPEARL STPENNSYLVANIA STCARSON AVE HUNT AVEOHIO STDWAN DRSHRIER DRGUNDER AVEWHITE OAK RDWISE STNORRIS STCYPRESS CIR BRIANNA CIR CIMARRON RDDATE STTERRA COTTA RDLASH AVE NICHOLS RDLAKESHORE DRTERRA COTTA RDCOAL AVE KINGS HWY HOFF AVE GUNNERSON STS T E V E N S A V E RALPH RDDRYDEN STPINNELL STGRAY AVE WOODLAKE STTORN RANCH RDHAGUE STCLEMENT STKALI NA AVEPEARL STPENNSYLVANIA STCARSON AVE HUNT AVEOHIO STDWAN DRSHRIER DRGUNDER AVEWHITE OAK RDWISE STNORRIS STCYPRESS CIR BRIANNA CIR CIMARRON RDDATE STTERRA COTTA RDPlanning Application No. 2017-25Residential Design Review No. 2021-04VICINITY MAP PROJECT SITE ´ NICHOLS RDLASH AVE LAKESHORE DRTERRA COTTA RDCOAL AVE KINGS HWY HOFF AVE S T E V E N S A V E GUNNERSON STDOLBEER STBAILEY AVE DRYDEN STA R N O L D A V E GRAY AVE WOODLAKE STHAGUE STKALI NA AVEPEARL STCARSON AVE PENNSYLVANIA STGUNDER AVEISABELLA CIR NORRIS STCYPRESS CIR WOODLAKE RDPIE R R O T T A V ECIMARRON RDJESSICA ST ARNOLD AVE TERRA COTTA RDSource: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS UserCommunityNICHOLS RDLASH AVE LAKESHORE DRTERRA COTTA RDCOAL AVE KINGS HWY HOFF AVE S T E V E N S A V E GUNNERSON STDOLBEER STBAILEY AVE DRYDEN STA R N O L D A V E GRAY AVE WOODLAKE STHAGUE STKALI NA AVEPEARL STCARSON AVE PENNSYLVANIA STGUNDER AVEISABELLA CIR NORRIS STCYPRESS CIR WOODLAKE RDPIE R R O T T A V ECIMARRON RDJESSICA ST ARNOLD AVE TERRA COTTA RDSource: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS UserCommunity Planning Application No. 2017-25Residential Design Review No. 2021-04AERIAL MAP PROJECT SITE ´ 6"6 "6"6"6"6"6"6"6"6"6"6"6"6"6"6"6"6"4684647484950515253545556575859848586878813813917517617817918018118218318418518618718818919019119219319419519619719819920020120220320420520620720820921021121221321421521621721821922022122222322422522622722822923023123223323423523623723823924024124224324424524624724824925025125225325425525625725825926026126226326426526626726826927027127227327427527627727827928028128228328428528628728828929029129229329429529629729829930030130230330430530630730830931031131231331431531631731831932032132232332432532632732832933033133233333433533633733833934034134234334434534634734834935035135235335435535635735835936036136236336450'53.7' GB 50' VC 399.6 380.6 385 390 375 370 380 395.6 399.4 PI 12"12"12"6"6 " 6"TRACT 36557141516171819202122111112113114115116117365366367368369370371372373374375376377378379380381382383384385386387388389390391392393394395396397398399400401402 34567891011122153.7'375370 6"6"6"6"6"6"12"12"12"12"6"6"6"6"6"6"6"6"6"6"6" 6"6"6 " 6" 6"6"6"6"6"6"6"6"6"454PARK4.3 AC131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899100101102103104105106107108109110111112113114115116117118119120121122123124125126127128129130131132133134135136137138139140141142143144145146147148149150151152153154155156157158159160161162163164165166167168169170171172173174175176177178179180181182183184185186187188189190191192229244245246251252253254255256257258260261262263264265266267268269270390391392393394395396397398399 314315316317318319320321322357358359360361362363364 304305322323324325326327328329330331347348349350351352353354355356357 329330 3 3 1 3 3 2 3 3 3 3 3 4 3 3 5 3 3 6 3 3 7 3 3 9 3 4 03413 4 2 3 4 3 3 4 4345346347 2 0 6 2 0 7 2 0 8 2 0 9 2 1 0 2 1 1 2 1 2 2 1 3 2 1 4 21 5 2 1 6 2 1 7 2 1 8 2 1 9 2 2 0 337 338339 271272273274275276277278279280281304305306307308309310311312313 6"6"6"6"6"233234235236281282283284285286287288289290295296297298299300301302303304331332 6"6"222223224225228229230231285286287288289290291292293294295296 6"199200201202203204205206207217218219220221222223224225 236237238239240241242243244245247248249250251252 6"6"6"6"6"6"2252 2 6 2 2 7 2 2 8 2 2 9 2 3 0 2 3 1 2 3 2 2 3 3 23423525025125 2 2 5 3 2 5 4 2 5 5 2 5 6 2 5 7 2 5 8 2 5 9 2 6 1 191192193194195196197198199 6"6"6"52180181182183184185186187245246252253264265266267268269270 53 5 4 186 1 8 7 1 8 8 1 8 9 1 9 0 1 9 1 1 9 2 2 6 0 2 6 1 2 6 2 2 6 3 26 4 385386387388389390391392393394395396397398399400401402 365366367368376377378379380381382383384 365366367368369370371372373374375377 345678910111221 16171819202122 131415107108109110111112 113114115116117118119120121 121122123124125126127128129130131132142143144145146147148149150151157 6"132133134135136137138139140141142143158159176177178179180181245246 3 2 3 3 3 4 3 5 3 6 3 7 3 8 160 1 6 1 1 6 2 15 1 15 2 15 3 15 4 15 5 16 3 16 4 16 5 16 6 16 7 16 8 44140141142154155156157158159167168169170171172173174 3539404142434445469192979899100101102103163 45464748495051878889173174175176182 23 2425 26 27 28 29 30 313233 4647909192939495969798103104105106 484952535455568081828384858687888990183 646566676869707172737475767778798094106 565758596061626364 PORCH3'-8"opt.servicedoor w/stoopd/woven/rangeref.spaceENTRYGARAGEKITCHENGREAT ROOMMASTERBEDROOMBEDROOM3BATH2MASTERBATHwasherspacelinenpantryLAU.tanklesswaterheater35'-0"linen20'-012"20'-0" MIN. CLR.20'-212"20'-0" MIN. CLR.BEDROOM2opt.doorwalk-inclosetdryerspace22'-0"13'-0"63'-0"55'-0"8'-0"34'-6"20'-6"63'-0"33'-912"8'-6"13'-812"35'-0"11'-0"20'-4"4'-8"7'-0"coats5'-0"3'-6"1'-3"3'-0"5'-0"3'-0"Floor Plan 'A'STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577135.1445PLAN 1 PORCH3'-8"opt.servicedoor w/stoopd/woven/rangeref.spaceENTRYGARAGEKITCHENGREAT ROOMMASTERBEDROOMBEDROOM3BATH2MASTERBATHwasherspacelinenpantryLAU.tanklesswaterheater35'-0"linen20'-012"20'-0" MIN. CLR.20'-212"20'-0" MIN. CLR.BEDROOM2opt.doorwalk-inclosetdryerspace22'-0"13'-0"63'-0"55'-0"8'-0"34'-6"20'-6"63'-0"33'-912"8'-6"13'-812"35'-0"11'-0"20'-4"4'-8"7'-0"coats5'-0"3'-6"PORCH3'-8"opt.servicedoor w/stoopd/woven/rangeref.spaceENTRYGARAGEKITCHENGREAT ROOMMASTERBEDROOMBEDROOM3BATH2MASTERBATHwasherspacelinenpantryLAU.tanklesswaterheater35'-0"linen20'-012"20'-0" MIN. CLR.20'-212"20'-0" MIN. CLR.BEDROOM2opt.doorwalk-inclosetdryerspace22'-0"13'-0"63'-0"55'-0"8'-0"34'-6"20'-6"63'-0"33'-912"8'-6"13'-812"35'-0"11'-0"20'-4"4'-8"7'-0"coats5'-0"3'-6"STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577135.1445PLAN 1Floor Plan 'C'Floor Plan 'B' Roof Plans4:124:124:12STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577135.1445PLAN 1 COVEREDPATIOGREAT ROOMMASTERBEDROOM35'-0"walk-incloset22'-0"13'-0"7'-0"Partial Roof Plan 'A' (Spanish)at Covered PatioPartial Floor Planat Covered PatioPartial Roof Plan 'B (Craftsman)at Covered PatioPartial Roof Plan 'C' (Tuscan)at Covered PatioSTORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577135.1445PLAN 1 PORCHopt.servicedoor w/stoopd/woven/rangeref.spaceENTRYGARAGEKITCHENGREAT ROOMMASTERBEDROOMBEDROOM3BATH2MASTERBATHwasherspacelinenpantryLAUNDRYtanklesswaterheaterlinenBEDROOM2dryerspacecoats35'-0"76'-0"28'-0"16'-4"11'-8"39'-0"35'-0"20'-4"10'-8"4'-0"76'-0"68'-0"20'-4"47'-8"8'-0"DEN /OPT. BEDROOM49'-0"22'-6"12'-6"walk-incloset5'-0"opt.doubledoorslowwall1'-0"16'-912"11'-212"Floor Plan 'A'STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577135.1848PLAN 3 PORCHopt.servicedoor w/stoopd/woven/rangeref.spaceENTRYGARAGEKITCHENGREAT ROOMMASTERBEDROOMBEDROOM3BATH2MASTERBATHwasherspacelinenpantryLAUNDRYtanklesswaterheaterlinenBEDROOM2dryerspacecoats35'-0"76'-0"28'-0"16'-4"11'-8"39'-0"35'-0"20'-4"10'-8"4'-0"76'-0"68'-0"20'-4"47'-8"8'-0"DEN /OPT. BEDROOM49'-0"22'-6"12'-6"walk-incloset5'-0"opt.doubledoorslowwall1'-0"16'-912"11'-212"PORCHopt.servicedoor w/stoopd/woven/rangeref.spaceENTRYGARAGEKITCHENGREAT ROOMMASTERBEDROOMBEDROOM3BATH2MASTERBATHwasherspacelinenpantryLAUNDRYtanklesswaterheaterlinenBEDROOM2dryerspacecoats35'-0"76'-0"28'-0"16'-4"11'-8"39'-0"35'-0"20'-4"10'-8"4'-0"76'-0"68'-0"20'-4"47'-8"8'-0"DEN /OPT. BEDROOM49'-0"22'-6"12'-6"walk-incloset5'-0"opt.doubledoorslowwall1'-0"16'-912"11'-212"Floor Plan 'B'STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577135.1848PLAN 3 PORCHopt.servicedoor w/stoopd/woven/rangeref.spaceENTRYGARAGEKITCHENGREAT ROOMMASTERBEDROOMBEDROOM3BATH2MASTERBATHwasherspacelinenpantryLAUNDRYtanklesswaterheaterlinenBEDROOM2dryerspacecoats35'-0"76'-0"28'-0"16'-4"11'-8"39'-0"35'-0"20'-4"10'-8"4'-0"76'-0"68'-0"20'-4"47'-8"8'-0"DEN /OPT. BEDROOM49'-0"22'-6"12'-6"walk-incloset5'-0"opt.doubledoorslowwall1'-0"16'-912"11'-212"PORCHopt.servicedoor w/stoopd/woven/rangeref.spaceENTRYGARAGEKITCHENGREAT ROOMMASTERBEDROOMBEDROOM3BATH2MASTERBATHwasherspacelinenpantryLAUNDRYtanklesswaterheaterlinenBEDROOM2dryerspacecoats35'-0"76'-0"28'-0"16'-4"11'-8"39'-0"35'-0"20'-4"10'-8"4'-0"76'-0"68'-0"20'-4"47'-8"8'-0"DEN /OPT. BEDROOM49'-0"22'-6"12'-6"walk-incloset5'-0"opt.doubledoorslowwall1'-0"16'-912"11'-212"Floor Plan 'C'STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577135.1848PLAN 3 Roof Plans4:124:124:12STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577135.1848PLAN 3 COVEREDPATIO12'-6"22'-6"35'-0"9'-0"KITCHENGREAT ROOMMASTERBEDROOMwalk-inclosetMASTERBATHPartial Floor Planat Covered PatioPartial Roof Plan 'A' (Spanish)at Covered PatioPartial Roof Plan 'B' (Craftsman)at Covered PatioPartial Roof Plan 'C' (Tuscan)at Covered PatioSTORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577135.1848PLAN 3 PORCHGREAT ROOMENTRYKITCHENBEDROOM4GARAGEtanklesswaterheaterBATH3coatspantryd/woven/rangeref.spaceislandopt.servicedoor w/stoopupopenrail54'-0"54'-0"34'-0"20'-0"20' MIN. CLR.20'-0"20' MIN. CLR.19'-612"20'-512"40'-0"15'-512"5'-0"5'-0"34'-0"3'-1112"14'-0"9'-9"5'-2"19'-1"1'-6"5'-0"2'-412"2'-412"1'-0"2'-0"11'-0"8'-0"opt.sinkBEDROOM3linenwalk-inclosetMASTERBATHMASTERBEDROOMBEDROOM2LAUNDRYlinendryerspacewasherspaceopt.doordn /OPT. BEDROOM4LOFTopen tobelowBATH2walk-inclosetlowwalllinen34'-0"43'-0"43'-0"41'-0"1'-0"1'-0"2'-0"34'-0"19'-1"14'-11"12'-1"3'-0"4'-0"STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577234.2397PLAN 6First Floor Plan 'A'Second Floor Plan 'A' PORCHGREAT ROOMENTRYKITCHENBEDROOM4GARAGEtanklesswaterheaterBATH3coatspantryd/woven/rangeref.spaceislandopt.servicedoor w/stoopupopenrail54'-0"54'-0"34'-0"20'-0"20' MIN. CLR.20'-0"20' MIN. CLR.19'-612"20'-512"40'-0"15'-512"5'-0"5'-0"34'-0"3'-1112"14'-11"9'-9"5'-2"19'-1"14'-0"1'-0"5'-0"8'-0"11'-0"opt.sinkBEDROOM3linenwalk-inclosetMASTERBATHMASTERBEDROOMBEDROOM2LAUNDRYlinendryerspacewasherspaceopt.doordn /OPT. BEDROOM4LOFTopen tobelowBATH2walk-inclosetlowwalllinen34'-0"43'-0"43'-0"41'-0"1'-0"34'-0"19'-1"14'-11"6'-6"1'-0"2'-0"12'-7"STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577234.2397PLAN 6First Floor Plan 'B'Second Floor Plan 'B' GREAT ROOMENTRYKITCHENBEDROOM4GARAGEtanklesswaterheaterBATH3coatspantryd/woven/rangeref.spaceislandopt.servicedoor w/stoopupopenrail54'-0"54'-0"34'-0"20'-0"20' MIN. CLR.20'-0"20' MIN. CLR.19'-612"20'-512"40'-0"15'-512"5'-0"5'-0"34'-0"3'-1112"14'-11"9'-9"5'-2"19'-1"PORCH14'-0"1'-0"13'-0"19'-0"opt.sinkBEDROOM3linenwalk-inclosetMASTERBATHMASTERBEDROOMBEDROOM2LAUNDRYlinendryerspacewasherspaceopt.doordn /OPT. BEDROOM4LOFTopen tobelowBATH2walk-inclosetlowwalllinen34'-0"43'-0"43'-0"41'-0"2'-0"34'-0"19'-1"14'-11"STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577234.2397PLAN 6First Floor Plan 'C'Second Floor Plan 'C' Roof Plans4:124:124:12STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577234.2397PLAN 6 MASTERBATHMASTERBEDROOMlinenopt.doorwalk-inclosetlinen34'-0"1'-112"12'-6"20'-412"1'-0"STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577234.2397PLAN 6Partial Roof Plan 'A' (Spanish)at Enhanced Rear ElevationPartial Second Floor Planat Enhanced Rear ElevationPartial Roof Plan 'B (Craftsman)at Enhanced Rear ElevationPartial Roof Plan 'C' (Tuscan)at Enhanced Rear Elevation GREAT ROOMKITCHEN24'-0"10'-0"34'-0"COVEREDPATIO10'-0"STORY:JOB No. :KB Home Southern California/Inland Empire36310 Inland Valley DriveWildomar, CA 92595(951) 691-5300Terracina 4500LAKE ELSINORE, CA425999Rev: November 15, 2021TENTATIVE TRACT MAP 36577234.2397PLAN 6Partial Roof Plan 'A' (Spanish)at Covered PatioPartial First Floor Planat Covered PatioPartial Roof Plan 'B (Craftsman)at Covered PatioPartial Roof Plan 'C' (Tuscan)at Covered Patio SCHEME 2SCHEME 1 SCHEME 7 SCHEME 4 SCHEME 8 SCHEME 5 SCHEME 9 SCHEME 6 SCHEME 3 ROOF BARCELONA California MIssion Blend 1 BCCS 6464 ROOF BARCELONA Charcoal Brown Blend 1 BCCS 1132 ROOF SAXONY SHAKE Forest Green 1 FBCJ 4598 ROOF BARCELONA Cliffside 1 BCCS 3940 ROOF BARCELONA Smokey Topaz 1 BCCS 3181 ROOF SAXONY SHAKE Saddleback Blend 1 FBCJ 3030 ROOF BARCELONA Casa Grande Blend 1 BCCS 6169 ROOF BARCELONA Bronze Pearl 1 BCCS 0300 ROOF SAXONY SHAKE Brown Blend 1 FBCJ 3233 STONE CORONADO Appalachian Fieldstone - Bourbon STONE CORONADO Country Rubble - Grey Quartzite STONE CORONADO Italian Villa - Verona STONE CORONADO Minnesota Fieldstone - Aspen STONE CORONADO Italian Villa - Volterra STONE CORONADO Old World Ledge - Walnut Grove KB Home reserves the right to modify or discontinue any products, colors or styles at any time without prior notice. Displays of options, colors, textures, brick, stone, tile, shutters, roofing materials, siding, surfaces, stain and material combinations viewed on a sample color board may differ from the appearances of the options on homes when viewed in person. Please visit a KB Home model home community to view actual colors textures, materials, and combinations. SPANISH ‘A’ ELEVATIONS CRAFTSMAN ‘B’ ELEVATIONS TUSCAN ‘C’ ELEVATIONS CLAY PIPE Aurora Brown (SW 2837) CLAY PIPE Aurora Brown (SW 2837) CLAY PIPE Aurora Brown (SW 2837) STUCCO KB 1316 White Flour (SW 7102) STUCCO KB 2067 Casa Blanca (SW 7571) STUCCO KB2096 San Antonio Sage (SW 7731) STUCCO 1348 Useful Gray (SW 7050) STUCCO KB 1325 Lanyard (SW 7680) STUCCO KB 1244 Lazy Gray (SW 6254) STUCCO 1230 Townhall Tan (SW 7690) STUCCO KB 1277 Meadowlark (SW 7522) STUCCO KB 1273 China Doll (SW 7517) SIDING Edamame (SW 7729) SIDING Steely Gray (SW 7664) SIDING Tony Taupe (SW 7038) GARAGE FACTORY TAUPE (SW 7038) GARAGE FACTORY BROWN (SW 6006) GARAGE FACTORY BROWN (SW 6006) GARAGE FACTORY BROWN (SW 6006) GARAGE FACTORY BROWN (SW 6006) GARAGE FACTORY GRAY (SW 7660) GARAGE FACTORY BROWN (SW 6006) GARAGE FACTORY ALMOND (SW 7572) GARAGE FACTORY BROWN (SW 6006) FRONT ENTRY / SHUTTERS Rookwood Dark Red (SW 2801) FRONT ENTRY / SHUTTERS Rugged Brown (SW 6062) FRONT ENTRY / SHUTTERS Red Barn (SW 7591) FRONT ENTRY / SHUTTERS Artichoke (SW 6179) FRONT ENTRY / SHUTTERS Cascades (SW 7623) FRONT ENTRY / SHUTTERS Terra Brun (SW 6048) FRONT ENTRY / SHUTTERS Sun Dried Tomato (SW 7585) FRONT ENTRY / SHUTTERS Black Bean (SW 6006) FRONT ENTRY / SHUTTERS Rosemary (SW 6187) SHUTTERS Slate Tile (SW 7624) TRIM Macadamia (SW 6142) FASCIA / TRIM Well-Bred Brown (SW 7027) GABLE END Umber (SW 6146) TRIM Ethereal Mood (SW 7639) FASCIA / TRIM Van Dyke Brown (SW 7041) GABLE END Serious Gray (SW 6256) TRIM Resort Tan (SW 7550) FASCIA / TRIM Java (SW 6090) GABLE END Virtual Taupe (SW 7039) FASCIA Jute Brown (SW 6096) FASCIA / TRIM Oyster Bar (SW 7565) FASCIA Protégé Bronze (SW 6153) FASCIA / TRIM Nuance (SW 7049) FASCIA Smokehouse (SW 7040) FASCIA / TRIM Rookwood Dark Brown (SW 2808) Southern California / Inland Empire Project #425999 August 10, 2021 Terracina 4500 SCHEME 2SCHEME 1 SCHEME 7 SCHEME 4 SCHEME 8 SCHEME 5 SCHEME 9 SCHEME 6 SCHEME 3 ROOF SAXONY SHAKE Saddleback Blend 1 FBCJ 3030 ROOF SAXONY SHAKE Sepia 1 FBCJ 3370 ROOF SHAKE Garnet Blend 1 FBCJ 3182 STUCCO 1265 Wool Skein (SW 6148) BOARD & BATTEN / TRIM Extra White (SW 7006) GARAGE FACTORY WHITE (SW 7656) FRONT ENTRY / SHUTTERS Iron Ore (SW 7069) FASCIA Iron Ore (SW 7069) KB Home reserves the right to modify or discontinue any products, colors or styles at any time without prior notice. Displays of options, colors, textures, brick, stone, tile, shutters, roofing materials, siding, surfaces, stain and material combinations viewed on a sample color board may differ from the appearances of the options on homes when viewed in person. Please visit a KB Home model home community to view actual colors textures, materials, and combinations. SPANISH ‘A’ ELEVATIONS FARMHOUSE ‘B’ ELEVATIONS FRENCH COUNTRY ‘C’ ELEVATIONS STUCCO KB 2032 White Flour (SW 7102) STUCCO KB 1207 Colonial Revival Stone (SW 2827) BOARD & BATTEN Poolhouse (SW 7603) SIDING Rustic Red (SW 7593) GARAGE FACTORY GRAY (SW 7660) GARAGE FACTORY ALMOND (SW 7572) FRONT ENTRY / SHUTTERS Gale Force (SW 7605) FRONT ENTRY / SHUTTERS Jasper (SW 6216) FASCIA / TRIM Alabaster (SW 7008) FASCIA / TRIM Sand Beach (SW 7529) ROOF SHAKE Charcoal Brown Blend 1 FBCJ 1132 ROOF SHAKE Toffee 1 FBCJ 0007 STONE TUSCAN VILLA Coyote STONE TUSCAN VILLA St Anthony STONE MINNESOTA FIELDSTONE Huron STUCCO KB 2092 Ethereal Mood (SW 7639) STUCCO 434 Urban Putty (SW 7532) STUCCO 1020 Navajo White (SW 6126) GARAGE FACTORY ALMOND (SW 7572) GARAGE FACTORY BROWN (SW 6006) GARAGE FACTORY GRAY (SW 7660) FRONT ENTRY / SHUTTERS Black Fox (SW 7020) FRONT ENTRY / SHUTTERS Terra Brun (SW 6048) FRONT ENTRY / SHUTTERS Homburg Gray (SW 7622) FASCIA / TRIM Neutral Ground (SW 7568) FASCIA / TRIM Best Bronze (SW 6160) FASCIA / TRIM Brainstorm Bronze (SW 7033) ROOF SAXONY SHAKE Saddleback Blend 1 FBCJ 3030 ROOF BARCELONA Apple Bark 1 BCCS 0431 STUCCO KB 2067 Casa Blanca (SW 7571) STUCCO 2057 Greek Villa (SW 7551) STUCCO 1285 China Doll (SW 7517) GARAGE FACTORY TAUPE (SW 7038) GARAGE FACTORY BROWN (SW 6006) GARAGE FACTORY ALMOND (SW 7572) FRONT ENTRY / SHUTTERS Lagoon (SW 6480) FRONT ENTRY / SHUTTERS Secret Garden (SW 6181) FRONT ENTRY / SHUTTERS Red Theatre (SW 7584) CLAY PIPE Aurora Brown (SW 2837) CLAY PIPE Aurora Brown (SW 2837) CLAY PIPE Aurora Brown (SW 2837) FASCIA / TRIM Status Bronze (SW 7034) FASCIA / TRIM Van Dyke Brown (SW 7041) FASCIA / TRIM Rookwood Medium Brown (SW 2807) ROOF BARCELONA Red Castle. 1 BCCS 7970 ROOF BARCELONA Smokey Topaz 1 BCCS 3181 Southern California / Inland Empire Project #425999 August 10, 2021 Terracina 5000 & 5500