HomeMy WebLinkAbout0012_3_ERSC Agreement (CIP Project Z20006) - Exhibit B - Proposal Page | 1 REDLANDS | TEMECULA | PALM DESERT 1861 W. Redlands Blvd., Redlands, CA 92373 T: (909) 890-1255 | F: (909) 890-0995 | erscinc.com 16007009P June 29, 2022 Mr. Gus Papagolos, Project Manager City of Lake Elsinore 130 S Main Street Lake Elsinore, CA 92530 CITY OF LAKE ELSINORE CITY HALL – ALLEY RECONSTURCTION Dear Gus, Engineering Resources of Southern California, Inc. (ERSC), is pleased to provide this proposal for design and preparation of supporting documents related to the City Hall project located on the southeast corner of Graham Avenue and Main Street. ERSC understands that the City of Lake Elsinore intends to construct new city hall facilities at this location and the construction will encroach a upon a portion of an existing alley located to the east of the existing structures. Realignment of the alley will occur across a parking lot east of the existing alignment. The realignment will impact existing overhead power and communications lines, a sewer main, a storm drain, and potentially existing gas facilities. City staff is currently working to resolve the conflict associated with utility poles and overhead power and communications. Therefore, ERSC, will pursue relocation of the remaining infrastructure, such as, the sewer line, storm drain facilities and the gas line. Realignment of the alley will be accomplished through the preparation of a street plan designed in plan view only. The potential location of the new alley is shown on Sheet A101 provided by STK Architecture, Inc. (STK). Per this plan, the proposed footprint for the new city hall extends to east across the alley into a portion of an existing parking lot east of existing alley. The lot is identified as Assessor’s parcel number 373-151-024 and it is our understanding the City currently retains title to the property. Based on topography for the project provided by STK, the relocation of the alley will be uphill from its current location. The impact of this will be the creation of a low point where the existing alley alignment meets the south wall of the proposed building. This will create several challenges including providing adequate drainage at the low point and relocation of gravity systems such as the storm drain and the sewer. Relocation of subsurface infrastructure will be accomplished through coordination with owner of each impacted facility, the city, the Elsinore Valley Municipal Water District, and the Gas company. ERSC will complete the design of the alley relocation and relocation of impacted subsurface infrastructure through completion of the following scope of work Scope of Work Record Data – Prepare and submit written requests for record data and as-built drawings from the City of Lake Elsinore, Lake Elsinore Municipal Water District, and the County of Riverside. Page | 2 1861 W. Redlands Blvd., Redlands, CA 92373 T: (909) 890-1255 | F: (909) 890-0995 | erscinc.com Alley Improvements Prepare plans for the realignment of the existing alley based on STK drawing A101. Construction of the new alley will be designed and prepared based the City of Lake Elsinore, Engineering Division, Plan Preparation and Design Manual dated January 2005, where applicable. Improvements will include a concrete alley with an inverted section to promote drainage, closure of an existing driveway and alley access with curb, gutter and sidewalk, and construction of a new commercial driveway providing access to the new alley location. Storm Drain Relocation Plan Using a combination of record drawings and survey data, prepare plan and profile for the relocation of the drain line located along the existing alley alignment. Capacity of the drain will be determined through the development of capacity calculations for the two inlets within the project limits. Construction drawings will provide for the relocation of the pipeline and details related to the connection to the existing line in the alley and in Graham Street. Hydrology and Hydraulic calculations are excluded from this task. Sewer Relocation Plan Prepare plans for the relocation of approximately 150 feet of sewer line of unknown diameter, along the new alley alignment. These plans will provide for the installation of the sewer main, three (3) manholes and reconnection of identifiable sewer laterals. Plans for the sewer relocation will be designed and prepared based the Elsinore Valley Municipal Water District (EVMWD) Design Standards for the Design and Construction of Potable Water, Recycled Water and Sewer Facilities, Volume 1 dated July 2017. Gas Line Relocation Coordinate with the Cas Company to effect the relocation of the existing gas line in the alley. ERSC will develop a contact at the Gas Company and provide construction drawings and other support during the development of plans to relocate the existing facility. New Utility Connections ERSC will work with City staff and STK to develop new water and sewer connections to the proposed building. Services will include preparation of various forms and applications, submittal packages and coordination with EVMWD. New utility connections will include a domestic water service, sewer lateral and fire line. Data supporting the design of the domestic water service and sewer lateral will be taken from the plumbing plans for building, Design of the fire line will be based on fire flow test data acquired by ERSC. The fire line design will be supported by hydraulic calculations and will provide for the installation of a fire line, fire department connection, post indicator valve and a new fire hydrant serving the system. Utility Easement Prepare easements over the realigned portion of the alley in favor of the EVMWD for sewer and SCE for underground electric. One legal description and plat will be prepared over the length and width of the new alignment. Individual presentation of the legal description and plat will be prepared for each agency. Project Management – Provide specifications and cost estimates supporting the various plan sets. Specifications will provide information related methods, materials and quality of workmanship and will be based on the “Greenbook.” Specifications specific to each type of construction will be provided to the city of inclusion in the project specifications. Prepare applications and submit plans and supporting Page | 3 1861 W. Redlands Blvd., Redlands, CA 92373 T: (909) 890-1255 | F: (909) 890-0995 | erscinc.com calculations to EVMWD for review and approval. Schedule and attend meetings with the EVMWD and the City of Lake Elsinore prior to initiating design activities, during design as needed, or as requested. Exclusions to this proposal include environmental documents, special studies, geotechnical engineering, traffic engineering, offsite street plans, supplemental cross sections, traffic control plans, horizontal control plans, street light plans, offsite water and sewer plans, utility potholing, water quality documents, landscape architecture, architecture, coordination with power and communications providers, coordination with regulatory agencies, regulatory permits, agency submittal fees, permits and permit fees and post design services Deliverables  Plans, Specifications and Estimates for Alley and Strom Drain relocation per City of Lake Elsinore requirements.  Plans, Specifications and Estimates for sewer relocation per EVMWD requirements.  Design coordination and technical data for the Gas Company during their design effort.  Plans, Specifications and Estimates for installations of a domestic water service, sewer lateral and fire protection system.  Submittal packages for Alley and Storm Drain relocation and installation of the fire system for processing by City staff.  Legal description and plat for sewer and utility easements. Assumptions The proposed services presented herein are based on the following assumptions. 1. City of Lake Elsinore will provide a title report for Assessor’s parcel number 373-151-024. 2. City of Lake Elsinore will provide record drawings for the street improvements on Graham Avenue 3. City of Lake Elsinore will provide record drawings for the storm drain improvements in the alley and Graham Avenue. 4. City of Lake Elsinore will provide copies of record drawings for existing SCE facilities. 5. City of Lake Elsinore will provide submittal and processing of relocations plans for the alley and storm drain. 6. City of Lake Elsinore will provide all application and plan check fees. Fee Estimate Fees and charges associated with the prosecution of the Scope of Services outlined herein are provided below: Record Data $ 1,480 Alley Improvements $ 9,860 Storm Drain Relocation Plan $ 7,200 Sewer Relocation Plan $12,760 Gas Line Relocation $ 6,440 New Utility Connections $12,320 Project Management $ 6,080 Subtotal $64,700 Reimbursable Expenses $ 1,000 Page | 4 1861 W. Redlands Blvd., Redlands, CA 92373 T: (909) 890-1255 | F: (909) 890-0995 | erscinc.com Total $65,700 SCHEDULE A project schedule will be provided upon receipt a written notice-to-proceed. If you have any questions or comments regarding this proposal , please give me a call at (909) 890-1255. Respectfully, Matt Brudin Signed electronically 06.29.2022 Matt Brudin, P.E. Principal MB/mb