HomeMy WebLinkAboutItem No. 17 - SB-1 Main Street FY 2022-23City Council Agenda Report
City of Lake Elsinore 130 South Main Street
Lake Elsinore, CA 92530
www.lake-elsinore.org
File Number: ID# 22-255
Agenda Date: 6/28/2022 Status: Approval FinalVersion: 1
File Type: Council Consent
Calendar
In Control: City Council / Successor Agency
Agenda Number: 17)
SB-1 Main Street Pavement Resurfacing Project Fiscal Year 2022-23
Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE, CALIFORNIA,
ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2022-2023 FUNDED BY SB 1: THE ROAD
REPAIR AND ACCOUNTABILITY ACT OF 2017
Page 1 City of Lake Elsinore Printed on 6/23/2022
Page 1 of 2
REPORT TO CITY COUNCIL
To: Honorable Mayor and Members of the City Council
From: Jason Simpson, City Manager
Prepared By: Remon Habib, City Engineer
Date: June 28, 2022
Subject: SB-1 Main Street Pavement Resurfacing Project Fiscal Year 2022-23
Recommendation
Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, ADOPTING A LIST OF PROJECTS FOR THE FISCAL YEAR 2022-2023
FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
Background
Bucknam Infrastructure Group, Inc. performed a Pavement Assessment in 2021. Based on their
pavement condition survey, the pavement condition indexes were rated on a scale from 0 to
100, depicting the condition of the existing pavement. The following are resurfacing
recommendations based on the pavement condition:
Reconstruction
AC Grind and Overlay
Slurry Seal / Cape Seal
Discussion
The Main Street pavement resurfacing project will include an AC grind and overlay. The
following areas for the project are as follows:
Street Name From To Treatment
1 Main Street South of I-15 SB
Ramps Lakeshore Drive AC Grind and
Overlay
The estimated cost for the Main Street resurfacing is $1,476,128. The projects from the above
list will go out to bid once SB-1 funding is secure. The City of Lake Elsinore’s projected SB-1
allocation for FY 2021-2022 is $1,434,098.
SB-1 Downtown Pavement Resurfacing Project FY 21/22
June 22, 2021
Page 2 of 2
Fiscal Impact
The funding allocation for the Main Street Pavement Resurfacing Project will be from the
available SB-1 funds, with the remainder being funded from Measure A funds.
Exhibits
A - Resolution
B - Project Map
RESOLUTION NO.2022-_______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2022-2023
FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5,
Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April
2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of the City of Lake Elsinore are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
WHEREAS, the City of Lake Elsinore must adopt by resolution a list of projects proposed
to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA),
created by SB 1, which must include a description and the location of each proposed project, a
proposed schedule for the project’s completion, and the estimated useful life of the improvement;
and
WHEREAS, the City of Lake Elsinore, will receive an estimated $1,434,098 in RMRA
funding in Fiscal Year 2022-2023 from SB 1; and
WHEREAS, this is the sixth year in which the City of Lake Elsinore is receiving SB 1
funding and will enable the City of Lake Elsinore to continue essential road maintenance and
rehabilitation projects, safety improvements, repairing and replacing aging bridges, and
increasing access and mobility options for the traveling public that would not have otherwise been
possible without SB 1; and
WHEREAS, the City of Lake Elsinore has undergone a robust public process to ensure
public input into our community’s transportation priorities/the project list; and
WHEREAS, the City of Lake Elsinore used a Pavement Management System to develop
the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective
projects that also meet the community priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City of Lake Elsinore maintain and
rehabilitate approximately one (1) mile of one (1) street within the Downtown area of the City of
Lake Elsinore this year and hundreds of similar projects into the future; and
WHEREAS, the 2020 California Statewide Local Streets and Roads Needs Assessment
found that the City’s streets and roads are in an “at-risk” condition and this revenue will help us
increase the overall quality of our road system and over the next decade will bring our streets and
roads into a “good” condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co-benefits regionally and statewide.
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City Council
of the City of Lake Elsinore, State of California, as follows:
1. The foregoing recitals are true and correct.
2. The following list of newly proposed projects will be funded in-part or solely with Fiscal
Year 2022-2023 Road Maintenance and Rehabilitation Account revenues:
The Main Street Rehabilitation Project will consist of AC grind and overlay. The project is
located in the downtown area of the City of Lake Elsinore, in Riverside County, California. The
useful life of the project is expected to be around 10 years with design to be anticipated in
January 2023 and construction to be completed in June 2023.
Street Name From To Treatment
1 Main Street South of I-15
SB Ramps
Lakeshore Drive AC Grind and
Overlay
PASSED AND ADOPTED at a regular meeting of City Council of the City of Lake Elsinore,
California this _______ day of _______, 2022:
__________________________________
Timothy J. Sheridan
Mayor
Attest:
________________________________
Candice Alvarez, MMC
City Clerk
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF LAKE ELSINORE )
I, Candice Alvarez, MMC, City Clerk of the City of Lake Elsinore, California, do hereby certify that
Resolution No. 2022-_____ was adopted by the City Council of the City of Lake Elsinore,
California, at the Regular meeting of _____, and that the same was adopted by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
____________________________
Candice Alvarez, MMC
City Clerk
GRIND AND OVERLAY
MAIN STREET STREET
RESURFACING PROJECT
SB-1 - FY 22-23