HomeMy WebLinkAbout13 CORTE MADERA_ 98-00000672 v
13 CORTE MADERA 98-00000672 1 OF 1
jkCite of Lake Elsinore
130 South Main Street
PERMT
i�ERMIT. NO: 98-00000672
DATE: 7/20/98
JOB ADDRESS . . . . . 13 CORE MADERA
DESCRIPTION OF WORK MISCELLA,'QIOUS
OWNER CONTRACTOR
MONTALCINO HOMEBUILDING PARTNE OWNER
4141 JUTLAND DR STE 200
SAN DIEGO, CA 92117
714-351-2455
A•P•# . . . . 363-381--074 7 SQUARE FOOTAGE
OCCUPANCY 0
CONSTRUCTION GARAGE SQ FT 0
VALUATION FIRE SPRNKI.R
500 ZONE . . . . . . R-1
BUILPT_,vG PERMIT
QTY UNIT CHG ITEM CHARGE
BASE FEE 45. 00
1.00 X 5.0000 PROFESSIONAL DEV FEE 5.00
FEE SUMMARY CHARGES PAT1 DUE
PERMIT FEES
ii-U LDING PERMIT 50. 00 . 00 50 . 00
TOTAL 50.00 .00 50 .00
SPECIAL NOTES &_CONDITIONS
CONVERT SALES OFFICE BACK TO GARAGE
Date: 7/23/98 is Receipts 0000394
DEC's
City of lake Elsinore
Please Read and Initial:
Building Safety Division 1. 1 an Ucensed under the provisions of Business and Professional
`r—> Section 7000 el seq.and my license Is In full force.
Post in compicuAis pLa e 2. I,as owner of the property.or my employers w/wages as their sole
compensation will do the work and the structure is not Intended or
on the job offered for sale.
9 1,as owner of the property,am exclusively contracting with licensed
You must furnish PERMIT NUMBER contractors to construct the protect.
ADDRESS for each 4.1 have a certificate of consent toseldnsureoracertificateofWorkers
and the JOB C1A inspection:o: Compensation Insurance or a certified copy thereof.
rA5
l� 5.1 shall not employ any person in any manner so as tobecome subject
Approved plans must be on job to Workers Coompensation laws in the performance of the work for
at all times: which this permit is Issued.
_ Note: If you should become subject to Workers Compensation after
making this certification,you must forthwith comply with such pro-
visions or this permit shall be deemed revoked.
Code Approvals Date Inspector
EL01 Tamp Elec Servicos
PL01 Soil Pipe Underground
EL02 Elec Corduil underground
BPOi Footings
BPO£ Steel Reinforcement
BPO3 Grout
BP04 Slab Grade
PL01 underground Water Pipe
SS01 Rough Septic System
SWOT Cn Site Server _
MP05 Floor Joists
RDg Roof Sheathing
,Wal x Pre-Lath
PLO Rough Rumbing
ELM Sough Electric-Conduit _
EL04 Rou h Electnc-Wm
EL05 Rough Eloctric-T-Bar
FAE01 Rough Mechanical
ME02 Ducts.Venb'ab
P1.04 Pzucih Gas R -Test —
PLO? FlonfOrlUna
OP12 Insulabon —
BP13 Drywall Nailing
BPl l I Lathing&Siding
PL99 Final Plumbing —
EL99 Final Electrical
ME.99 Final Mechanical
BP99 Final Building /e,-0 cr /^'is p�C_T/o,./-P r,✓f TN
Cods Pcol 6 Spa Approvals Date Inspectc, OTHER DEPARTMENT RELEASES
Dep.Inspector Deparunenl Approval required prior to the
P0OI Pool Steel Rein/Foams buildirl being released by tie City
POol Fool Plumbing/Press.Test —
P003 Pre Gunile
_Date Inspector
ELOfi Rough Pool Electric
— Planrnng —_
Sub List Approval
- --' Landscape
P004 Pool Fenci iAccess
- -- Finance
P005 Pie Plesler
— _ En ineerin
PD09 Final POOLS