Loading...
HomeMy WebLinkAboutItem No. 11 - Increase of PO CIP Project Z20024 - SRCity Council Agenda Report City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 22-220 Agenda Date: 6/14/2022 Status: Approval FinalVersion: 1 File Type: Council Consent Calendar In Control: City Council / Successor Agency Agenda Number: 11) Increase Purchase Order with Braemar Building to Design, Fabricate, and Deliver a Storage Building for Launch Pointe Recreation Destination & RV Park (CIP Project #Z20024) Approve and authorize the City Manager to increase the Purchase Order (PO) for Braemar Building to an amount not-to-exceed $71,696.70 for the purchase of a storage building for Launch Pointe Recreation Destination & RV Park (CIP Project #Z20024). Page 1 City of Lake Elsinore Printed on 6/9/2022 Page 1 of 2 REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Jason Simpson, City Manager Prepared by: Shannon Buckley, Assistant City Manager Date: June 14, 2022 Subject: Increase Purchase Order with Braemar Building to Design, Fabricate, and Deliver a Storage Building for Launch Pointe Recreation Destination & RV Park (CIP Project #Z20024) Recommendation Approve and authorize the City Manager to increase the Purchase Order (PO) for Braemar Building to an amount not-to-exceed $71,696.70 for the purchase of a storage building for Launch Pointe Recreation Destination & RV Park (CIP PROJECT #Z20024). Background Since the opening of Launch Pointe Recreation Destination & RV Park, use and occupancy have been strong. As a result, the need to maintain the entire park has increased. Adding maintenance equipment and machinery has been a necessity to sustain park maintenance operations. In short, the maintenance operation has outgrown the original building storage capacity. At this point, additional building storage is needed to house equipment and machinery that is utilized daily. Storing this equipment and machinery inside a secure building ensures operational readiness and protects the equipment and machinery from the outside elements. On August 24, 2021, City Council Authorize the City Manager to purchase the Services to Design, Build and Deliver a Storage Building from Braemar Building Systems for $35,966.00 for Launch Pointe Recreation Destination & RV Park. During the building design, it was determined to add a mezzanine to the building and obtain better utilization of the building space. Discussion The existing maintenance storage building was designed, built, and delivered by Braemar Building Systems and is an excellent storage facility. The additional building will be matching and provide the needed storage expansion and simultaneously maintain a clean matching design appearance. Covered storage can benefit the City in many ways and provide needed versatility to the operation by having everything you need close by. Increase PO for LP Storage Building (CIP Project #Z20024) Page 2 of 2 This increase will improve the storage capacity by adding a second-story mezzanine with staircase access. Below are additional benefits to the Launch Pointe Recreation Destination & RV Park storage operation: Equipment Storage The benefit here will be the storage of both large stationary pieces of equipment that you need to be protected from the outdoor elements and also, storage for movable, drivable machinery such as the equipment used at offsite projects. Covered Storage The covered pavilion will be easily accessible by loaders, trucks, and nearly all wheeled vehicles in the City’s Fleet as they drive right into the pavilion and gather what they need. Plus, it keeps your material safe from all weather conditions. Bulk storage items of different sizes and different amounts of things will be easily stored and completely manageable under the pavilion. Improving Operational Efficiency The City maintenance effort must keep workflow moving to have a high level of achievement. And having this workspace is the best way to do that. Management can designate workflow and any operational requirements so that field processes become streamlined and easy for day-to-day operations, special events, or one-time situations. Fiscal Impact Public Work’s Storage Building Design, Fabricate and Deliver a Storage Building Project (CIP PROJECT #Z20024) is included in the Fiscal Year 21/22 – 25/26 Capital Improvement Plan (CIP) budget. Exhibits A – Quote http://www.braemarbuildings.com Note: Delivery: Your building has been scheduled for fabrication and will deliver: Monday June 13, 2022. Shipping and delivery is subject to the terms and conditions as set forth in the Purchase Order and Limited Warranty. 1 truck building components 8.75% Tax: Total : $5,768.70 Sub-Total : Notify Braemar Building Systems immediately of any discrepancy The following outlines the outstanding balance owed on your building which can be paid by either prepaying the amount to Braemar Building Systems, or when the building arrives on site. If terms other than C.O.D. with certified funds were arranged at the time of sale, they should already be reflected below. Please make all cheques payable to Braemar Building Systems. No materials will be unloaded until the driver receives your cheque. Terms of Payment :Certified Funds on Less Deposit : $65,928.00 $71,696.70 $65,928.00 Lake Elsinore, CA 92530 Tel.:951-764-2417 Fax: City / State / Zip:Lake Elsinore, CA 92562 City / Prov./ P.C. Tel.:951-764-2417 Fax: Customer Name:City of Lake Elsinore Address:130 S. Main St.Address:32040 Riverside Dr. Delivery Confirmation 925 W. Kenyon Ave, Suite 6, Englewood, Colorado 80110 Tel : (303) 788-9991 – Fax : (303) 788-9996 3149 Haldimand Road 9, York, Ontario N0A 1R0 Job Number:T21-279Tel: (905) 772-1462 – Fax: (905) 772-1533 Ship to:Launch Pointe RV Resort Braemar Building Systems will be in contact with you to notify you of the anticipated date of shipment arrival. The driver may also contact you prior to arrival for specific instructions or directions to the site. It is the responsibility of the Buyer to unload the material, and in most cases a forklift is required (or other equipment). Contact Braemar Building Systems if you need specific information regarding weight, dimensions, etc. It is the Buyer's responsibility to inventory the material as it is unloaded. The driver will provide you with construction drawings and inventory instructions. Any damaged materials must be noted on the driver's Bill of Lading. Failure to note damages or report shortages within 3 days will result in denial of all claims. Please call 1-866-382-5115 if you have any questions regarding your shipment. Original Contract Amount : Contact:Gus Papagolos Contact:Gus Papagolos $13,185.60 $58,511.10 This form must be signed and returned to Braemar Building Systems via FAX at (905) 772-1533 before your order will be shipped. Signature: Date: Balance : Delivery