REPORT TO PLANNING COMMISSION
To: Honorable Chairman and Members of the Planning Commission
From: Damaris Abraham, Planning Manager
Date: May 17, 2022
Subject: Commercial Design Review No. 2019-10 (Vantage Auctions) requesting to
add additional office space, infrastructure and street improvements, paving,
and landscaping to the existing heavy construction equipment auction
facility
Applicant: Brian Moening, Vantage Auctions, Inc.
Recommendation
1. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, FINDING THAT PLANNING APPLICATION NO. 2016-46
(COMMERCIAL DESIGN REVIEW NO. 2019-10) IS CONSISTENT WITH THE WESTERN
RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP);
and,
2. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, APPROVING PLANNING APPLICATION NO. 2016-46
(COMMERCIAL DESIGN REVIEW NO. 2019-10) REQUESTING TO ADD ADDITIONAL
OFFICE SPACE, INFRASTRUCTURE AND RELATED IMPROVEMENTS TO THE
EXISTING HEAVY CONSTRUCTION EQUIPMENT AUCTION FACILITY LOCATED AT 521
SILVER STREET.
Background
On October 3, 2017, the Planning Commission approved Conditional Use Permit No. 2017-08 to
establish a heavy construction equipment auction facility. The applicant is proposing add
additional office space, infrastructure and street improvements, paving, and landscaping to the
existing facility with this application.
Project Location
The approximately 25.84-acre site is located northerly of Flint Street, southerly of Minthorn Street,
easterly of Chaney Street, and westerly of Poe Street and more specifically referred to as 521
Silver Street. (APNs: 377-160-018, 023, 026, 377-180-030, 054, 057, 374-033-029, and 031).
CUP 2019-10 (Vantage Auction)
PC: May 17, 2022
Page 2 of 4
Page 2 of 4
Environmental Setting
EXISTING LAND
USE
GENERAL PLAN ZONING
Project Site Vantage Auctions Limited Industrial Limited Manufacturing (M-1)
North Industrial Public Institutional Public Institutional (P-I)
South Scattered homes High Density Residential High Density Residential (HDR)
East Vacant Public Institutional Public Institutional (P-I)
West Industrial Limited Industrial Limited Manufacturing (M-1)
Project Description
The project site currently functions as a heavy construction equipment auction facility that
conducts up to six (6) auctions per year and contains two (2) office trailers and five (5) containers
functioning as a shop and storage area. The auction yard area also includes parking areas and
an auction tent. The project site is vacant and undeveloped along the eastern and southern
boundary slopes. The proposed project would include modifications to the 17-acre portion of the
existing site by adding additional office space, infrastructure and street improvements, paving,
and landscaping as described in detail below.
Building Summary
The project would add one additional office trailer to the project site as well as street
improvements, utilities, and landscaping. The project would also repair the two existing infiltration
basins and create a new 35 foot driveway leading into the parking lot. Additionally, the
handicapped parking spaces near the office trailers would be paved and a ramp would be added
leading from the viewing tent up to the offices. The project would continue to operate the auction
yard in an open layout with storage areas in the northern portion of the site, auction areas located
in the central and western portions of the site, and parking located at the southwest corner of the
site. The main viewing tent measuring 40’X60’ would remain in the southernmost portion of the
main auction yard.
Parking
The proposed project includes an existing parking area at the southwest corner of the site which
parks 121 vehicles. Additionally, the 15 employee parking spaces near the office trailers would
remain. The project would pave a total of 5 handicapped parking spaces, 2 of which would be
located near the office trailers and 3 of which would be located by the auction viewing tent.
Stormwater Drainage
The project would include maintenance repairs to the two existing infiltration basins. One is
located on the western side of the project site, west of Silver Street and just above the parking
area. The second infiltration basin is located on the eastern side of the project site, just past the
auction yard and at the bottom of the western facing slope.
Access and Circulation
Access to the project site is currently available via Silver Street and a driveway which runs
perpendicular to Flint Street. The project proposes constructing an additional 35-foot driveway
located west of Silver Street which would lead directly into the parking lot at the southwest corner
of the site.
CUP 2019-10 (Vantage Auction)
PC: May 17, 2022
Page 3 of 4
Page 3 of 4
Infrastructure Improvements
Flint Street, which runs along the southern perimeter of the site, would be paved to a width of 40
feet along 330 feet of the project site frontage.
Water & Sewer Improvements
The proposed Project would include the addition of new 8-inch water and sewer lines in the Silver
Street right-of-way.
Landscaping
The proposed landscaping for this project consists of installing screening landscape along Flint
Street, installing traditional irrigated landscaping around the offices, restoring native vegetation
on the southern slopes by removing non-native species, maintaining and enhancing the existing
pine tree landscaping along the northwestern border, and installing a colorful screening landscape
with temporary irrigation along the northern boundary with the drainage channel.
Operational Characteristics
The project site would continue to operate as a heavy construction equipment auction facility
which holds six auctions per year. Leading up to each auction would be a ramp up phase where
the equipment is delivered to the site and prepared for the sale day. The hours of operation during
the ramp up phase would typically be 8:00 a.m. to 5:00 p.m. and the number of employees would
range from 10 to 18. The next phase, the auction day, would start at approximately 7:00 a.m. with
the sale lasting from roughly 9:00 a.m. to 4:30 p.m. Prior to Covid-19, the sale would typically
draw about 250 bidders per sale. This number would be slightly less now since the applicant has
put effort into developing a more robust online platform for clients. During this phase, the number
of employees would peak at 25. The final phase would consist of collecting payment for the sold
items and assisting buyers with the load out and removal of the items. This phase would operate
typically operate from 8:00 a.m. to 5:00 p.m. with 10 to 18 employees.
Analysis
General Plan Consistency
The Project has a General Plan Land Use Designation of Limited Industrial (LI) and is located in
the Business District. The LI Land Use Designation provides for industrial parks, warehouses,
manufacturing, research and development, public and quasi-public uses, and similar and
compatible uses. The proposed facility is a heavy construction equipment auction facility, which
is similar and compatible with warehousing and manufacturing uses.
Municipal Code Consistency
The current zoning designation for the Project site is Limited Manufacturing (M-1). Per Section
17.136.030.C. of the Lake Elsinore Municipal Code (LEMC), heavy equipment sales and rental is
a permitted use in the M-1 zone subject to an approval of a Conditional Use Permit. Staff has
reviewed the proposed Project with respect to the relevant development standards as identified
in the M-1 and has found it to be consistent.
The Project was also reviewed by Building and Safety, Fire, and Engineering Divisions and
support the Project. Appropriate Conditions of Approval have been included that would mitigate
any potential issues associated with the proposed use.
CUP 2019-10 (Vantage Auction)
PC: May 17, 2022
Page 4 of 4
Page 4 of 4
Environmental Determination
The proposed project is exempt from the California Environmental Quality Act (Cal. Pub. Res.
Code §§21000 et seq.: “CEQA”) and the CEQA Guidelines (14 C.C.R. §§ 15000 et seq.) pursuant
to CEQA Guidelines Section 15301 Existing Facilities. As described in the attached Class 1
Categorical Exemption Checklist (Exhibit D), the project consists of minor alteration to an existing
facility and does not constitute an expansion of use. The project site is partially graded with
temporary trailers, serving as office space, and a parking area serving the auction site. The
existing office trailers are currently served by all needed public service. The project proposes the
addition of an office trailer and various onsite and offsite infrastructure improvements to improve
the functionality of the existing site. These additions to the site would not increase traffic, air quality
emissions, or greenhouse gas emissions over existing conditions. Although the addition of an
office trailer increases the building square footage, the modifications would be considered
negligible and not an expansion of existing uses because the proposed Project results in the same
overall impacts compared to the existing use.