Loading...
HomeMy WebLinkAboutTR31920-1 pg.5 TRACT BOUNDARY ------- RIGHT OF WAY LOT LINE TOP&TOE OF SLOPE C - CUT AND FILL LINE F -1250- PROPOSED CONTOUR -1250 - EXISTING CONTOUR t EXISTING POWER POLE PAD=XXXX PAD ELEVATION 55 LOT NUMBER DAYLIGHT LINE 9 J 2Z SHEET FLOW RATE 5 [/ 6'1 NT+ /� GRADED SWALE STREET CENTERLINE \ / / SWALE HIGH POINT FLOWLINE CONSTRUCTION NOTE + P r EXIST.2" DIA. r L C7 31920 65 / MONITORING WELL 1`L°+ / / MIN ABANDON IN PLACE(TYP.)PER SOILS REPORT / r FUTURE STORM DRAIN PER SEPARATE PLANS PROPOSED STORM DRAIN PER STREET IMPROVEMENT PLANS O TC TOP OF CURB FL FLOWUNE ELEV.GB GRADE F GRATE BREAK FS FINISH SURFACE y / / PAD=128 LP LOW POINT 1 /\ // // HP HIGH POINT WINV. INVERT OF PIPE = N 9 / NOTE: PROPOSED STORM DRAIN IS SHOWN FOR STORM DRAW ASSOCIATED WITH 17 0 THE BACKBONE CONSTRUCTION AND THESE GRADING PLANS FUTURE 9 STORM DRAIN LINES WILL BE CONSTRUCTED AS PART OF EACH PAD=1270.3 L°f INDIVIDUAL TRACT BY SEPARATE BUILDERS IN THE FUTURE. W �, �p OF , ,ti+ 16 PAD=f270.6 CONSTRUCTION NOTES D -CONSTRUCT STREET UNDERCUT PER STREET SECTION ON SHEET 2 �? 6 2 -REMOVE EXISTING RIP RAP WITHIN GRADING LIMITS R/W &-CONSTRUCT 5'X10'RIP RAP PAD PER DETAIL ON SHEET 2 I*=12i 6o--CONSTRUCT DOWN DRAIN PER DETAIL ON SHEET 2 I / I TEMPORARY rRAC / \�N 2% I 2% SLOPE r 1 1Y LIM- \ ,\, N \\ \ Z' Y GEXIST ROUND \ SECTION B-B r NOT TO SCALE FL �N / PAD=12 0.6 .� -f.. , VARIES VARIES FINISH GRADE NISH GRADE J� o. SECTION C-C GRAPHIC SCALE NOT TO SCALE ° R0 10 80lw ( IN FELT) 1 inch= 40 fG Vr)b 6V I,2/s/Is ENGINEERING GEOLOGIST SOILS ENGINEER OWNER REVISIONS: PREPARED UNDER SUPERVISION OF: SCALE: JM WI LSON MI KAMI CITY OF LAKE ELSINORE Q�oTLSs/ SOILWORKS, INC. SOILWORKS, INC. McMILLIN SUMMERLY, LLC W CORPORATION o ,r SCOTT M.WLSON DATE SHEET 5 T EARTH SCIENCES GROUP EARTH SCIENCES GROUP PA BOX DATE BOX 85104 H �' RCE NO.49884 EXP. 9-30-14 ' 3 PETERS CANYON T., 949-679-0090 ROUGH GRADING 350 FISCHER AVENUE 350 FISCHER AVENUE SAN DIEGO, CA 92186-5104 NO.49884 THESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH THE RVINEICA 92606 F: 949-679-0091 DIAMOND DRIVE DDA PHASE C OF 8 s COSTA MESA, CA 92626 COSTA MESA, GA 92626 T(619) 794-1252 * EXp.O/b/1� * APPROPRIATE CONDITIONS OF DEVELOPMENT AND/OR CITY AND BENCHMARK: �p i(� MARK DESCRIPTION j.YAllR. DALE 'fl, STATE L PERMIT CAN BE ISSUED. RIVERSIDE BENCHMARK N0.BM E-3-70.ELEV.1279.829. BRASS DISC IN CONCRETE POST 72'NOR1H OF'T 'RACT NO. 31920-1 FILE NO. CEREAL STREET. PH: 714-668-5600 PH: 714�68-5600 F(619) 336-3010Dp\\ INTERSECTION OF CORYDON STREET AND MISSION TRAIL 27'EAST OF THE CENTERLINE OF MISSION TRAIL DESIGNED BY: WMC DRAWN BY: WMC BASIS OF BEARING: WWW.soi Iworksinc.com CHECKED BY: S.WIILSON PROJECT MANAGER:S.MLSON ATE H ESKANDARI,RCE 3390,INTERIM DIR.OF PUBLIC WORKS DATE INIERSELICTIONSF OF C Fl S7REETEIAND STONEMAN SiREEi DMO RUFMxENiBm3�AN�D p,�BEING SEmC RUNE