Loading...
HomeMy WebLinkAboutTR 16452 MACHADO & WOODCREST FIELD DENSITY TEST 2-1988 _ LAKESHORE Engineering CONSULTING CIVIL ENGINEERS — February 16, 1988 Project No: 87-365C Client: Mr . Dave Fenton 11682 Tara Circle Santa Ana, Ca. 92705 Attention: Dave Fenton Subject Field Density Test Results Subgrade and base testing for sidewalk and driveway for model units, Tract 16452, Machado Street and Woodcrest Drive, Lake Elsinore Riverside County, Ca. Gentlemen: This is to report the results of our test and observation' s made on the subgrade and base material at the subject site. The opinions and recommendations presented hereafter are based on our tests and engineering judgement as to the contractor' s compliance with the job specifications. GRADING OBSERVATION AND TESTING The rough grading of the driveway and sidewalk Has observed to be performed in the following manner : 1 . The subgrade were scarified a minimum of 12 inches and compacted .o to the desired grade. 2. The minimum acceptable degree of compaction was 90 percent of the maximum density. 3. Maximum density and optimum moisture content was determined by the A. S.T.M. D1556 method . 4. Field density tests were performed utilizing the sandcone method (A. S.T.M. D1556) . 5. The soils used in compacted fills consisted of on-site Silty Sand for subgrade and import Aggregate Base Material. 31678 Railroad Cyn. Rd. • Box 7 •Canyon Lake. CA 92380• (714) 244-2913 February 16, 1988 Project No: 87-365c Page Two Field density tests were made in the subgrade to determine the degree of compaction and moisture content. The field density tests are listed their approvimate locations are shown on Figure 1. Also shown are the limits of earthwork placed during this grading operation. LABORATORY TEST PROCEDURES The procedures outlined in A.S.T.M. Test Methokd D1557-78 were used to determine the compaction characteristics of the fill materials. The results of our laboratory compaction tests are presented below: Soil Type Soil Description Optimum Moisture Max. Dry Density A Silty Sand 10.5% 122. 5 P.C. f. B Aggregate Base 7. 0 140. 0 P.C. F. CONCLUSIONS AND RECOMMENDATIONS Based on final results of the tests, on observations of the — construction procedures used in the field and on our experience, it is our opinion that the subgrade and base fills shown on Figure No. 1 has been placed in accordance with the applicable portions of the job specifications and is considered suituable for its intended use. Our findings have been obtained in accordance with accepted professional engineering practice in the fields of geotechnical engineering. This warranty is in lieu of all other warranties, either express or implied. It has been our pleasure to serve you on this project. If you have any questions, please contact this office at your convenience. Ver r On ENGIN \ ING ki; z W _. `.Fend Y ng, P. =a ONCE \�7442 X�. 'fi-30 88 FY/ 4F CA1.1F SUMMA1tY OF FIELD DL•'NSITY TL''STS 1'l:S'1: DAT LLLVA tL•'1'LRf(pcf) XIMUM FIELD C UF 1'lUN 1:NCL' U1tY RL•'LATIVL NO '1'L'S'1 LOCATIUN ( EeuL)CURVENSITY ,WA'1'L'!t DRY COMPAC- I- ON1'LNT LNSITY 'PION ( ) (pet) ( t.) R114AIZKS At En 1 : ' Subgrade Driveway -'� A 122.5 8.7 92 X 2 11-23 Subgrade A 122.5 7.3 91 X 3 11-23 Base B 140.0 7.6 97 X 4 11-24 Sidc.5clk (subgrade) , A 122.5 8.5 92 5 11-24 Sidewalk , A 122.5 8.0 93 6tl 1-24 Sidewalk (base) B 140.0 4.3 96 71-24 Sidewalk F.G. B 140.0 6.0 95 T LA K E S N O A E Dave Fenton ! A6chado Street and Woodcrest Drive. r Enginedring 7 c•u�,uu Wit �••�•��•• Yr8T-365C ' Da2-16-88 Ta e: l I PLOT PLAN •' _ ✓ _ , V25 , y � Kff �r -- -- -- -. -- ----- --- - r-1 Z 7 A x. IOC. Of 1 Density est. ,;mot J J r = 3 32 1 ; Dame Fenton FLAKESHORE - Streeter Woukrest Engineering = lake Msino=e rCONSULTING CIVIL ENGINEERS Project No: 1Lte figure No: 365 2-16-88 1