Loading...
HomeMy WebLinkAbout16770 LAKESHORE DR_ (2) 1 - �1 I� GRADING INSPECTION AND COMPACTION REPORT FOR BUILDING PADS 0" RTH RCIESTT NORTH1nHREE (3) ACRES _ OF LOT 3, BLOCK B, TRACT 17 LAKESRORE DRIvE, T ' EST OR RIVERSIDE DRIVE LAKE ELSINORE, r;A1-IFORNIA -- RECEIVED — JUN 16 1983 CONDUC':ED FOR STELLREC2IT DEVELOPMENT Deft. of Bldg, C Safety 16591 GRAHAM STREET HUNTiNGTON BEACh, CALIFOR141A 92649 f•�r W.O. 367902 JUNE 14 , 198:3 714 634 nu���a -2092 (213) 852-4710 lJ�s 92806 1631-1� S ( I ux, ' treet „ .. r.:t AIXCTION ENGINEERING Jame 14 , 1983 W.O. 367902 Stellrecht Development 16591 Graham Street Huntington Beach, California 92649 Subject: Grading Inspection and Compaction Report for Building k ads Only Commercial Development i Northwest Three (3) Acmes of Lot 3 , Block B, Tract 17 Lakeshore Drive , Just Wr.z;t of Riverside Drive Lake Elsinore, California Gentlemen: Forwarded herewith is the Compaction Report on the above referenced project. The results of the compaction tests are sh%w, on Table I. The locations of the tests are shown on the accompanying plot plan. Laboratory Standard: (ASTM:D-1557-70) 4 inch dia. mold; 1/30 cu.ft.vol. , 5 layers - 25 blows per laver; 10 A. hammer dropped. 18 inches Soil Optimum Flax. Dry Dens! t y Type Clascificatioil Moisture x Lbs . !Cu. Ft., I SILT, sandy with 10.0 125.0 gravel, BROWN AI CLAY, silty, slightly 9. 0_ 127. 0 sandy with gravel , BROWN III CLAY, sandy, DARK BROWN 14 . 0 117 .5 IV Decomposed Granite/SAID 10. 0 128.0 4 i The grading operation was conducted from April 8 , 1983 through May 11� , 1983. Supervision was provided during this period utilizing the rr�port issued by ACTION ENGINEERING CONSULTANTS dated August 20, 1983, Work Order No. 367901 . 4 5 Y 1630-G Soutii Sunkist at..Anaheim.Ca.92806 (213)852.4710 (714)634.2092 i Ste"llrecht Development 0. 367902 Page 2 A 0 - W Prior to the placement of fill soils, alI vegetation and debris wary removed f-om the site. The existing loose surficial soils were excavated to competent material. The exposed surface was scarified, moisture conditioned and reconipacted to ninety (90%) percent of the Laboratory Standard. The fill, soils were placed in six (6") :nch lifts, moisture conditioned ar_d compacted in a like manuier. The native soil classifies its SAND, fine, slightly clayey, and is suitable for the support ".: the fill and the proposed structures. CO=naction was obtained by z:,,:uematic rolling. A water hose was used for moisture control. The relative compaction percent was determined by the Sand Cone Metliod (ASTM:D-155'v-70) and the Nuclear Method (Test Method No. Calif. 231F) . these tests wTe;-e taken a minimum of every 500 cubic yards placed and every two (2 ' ) feet in cepth of file placed. The maximum depth of fill placed was ten (10' ) feet. The potential expansion of the soil was determined in accordance wit:, Section 29 of the U.P.C. 1973 edition. Results are as follows : Soil Expansion Expansion Type Index Potential 28 Low IV 0 Veiy Low �1 t ire ;proposed structures shall be supported by isolated and continuous spread footings played a minimum depth of eigh:een (18") inches below lcwest ajdacent finish grade utilizing a recommended safe bearing; value o. 1400 pounds per square foot and 1200 pounds per square foot , respect- ively. This value is for dead plus live load and may be increased by one-third (1/3) for total including seismic and wind loads where allowed by node. Increases in bearing capacity for increases in footing dimensions are tabulated below: 1630-G South Sunkist Street Maheim, Calrfxrna 92806 (714) 634-2092 (213) 852-4710 Stellrecht Development Page 3 ' � W.O. 36790 Minimum Minimum Bearing Increase Depth Width Value De th Width Maximum (Inches) (inc es) ('psi) (Ps t) (psf, t) _ -' Continuous 18 12 1200 230 125 2400 - solai.;ed 18 18 1400 235 125 2800 Footings should not be poured until authorization to do s-, as been obr,airied from the Building Inspector. Excavations may bem2de and forms set before approval of the report at the owner's risk. Expansive soil recommendations, outlined on the accompanying Plate A, should be incorporated into the building design. s hereby certify that the subject grading was supervised by me and the vork was done in full compliance with the Grading Ordinance of the City of Lake Elsinore and in accordance with best accepted and !.he applicable chapter of the U.B.C. Practice. REGULATORY COMV1J-!NCE All =..its , fills o.- ro p cessing of original ground under the purview of this report have been completed under the inspection of and with welt-ctive testing by ACTION ENGINEERING CONSULTANTS and found to be in cocnpi:tr0Ce - ith the Grading Cede of the Ciry of Lake Elsinore . The completed work has been reviewed and is considered adequate for the development now planned, Our findings were made and recommendations prepared :Lr_ accor_ ``=nce with generally accepted professional engineering pract-ces, riruf i no further warranty is implied nor male. -is report is subject to review by the controlling authorities fc,r t =is project. Ae appreciate this opportunity to be of service to you. Respectfully submitted: AC':�I,O'NEN�GIJNEERING LCNSln>TIANTS b-�iCE A. PACKARD RCE 13801 C_CE PRESIDENT - ENGINEERING FIELD I MSCANN FD SERVICES LM:sb 1630-G South Sunkist Street Anaheim, California 92806 (714) 634-2092 (213) 352-47in I DEPTH U MpISTUF�E DRY UNIT WEIGHT T1fOPE rOMPACTiON D TEST �- BELOW FINISH OO FF LOCATION GRADE(FT.) (PERCENT) (LBS./CU. F�T•) TEST N0. - c�S- .�./S-& /3.6 //8.6 /D! SEE S/LE7�H B D-8.5 — — 9`-�- -- /oe � _ qA1 y-mac:-� s- /s rod --- �-- ID qA1 /7.0 /07 q0 /c.9 93 - -� — /.S- 2a /a.o liG.n TABL E I ��- - DEPTH OF TENS MOISTURE DRY UNIT WEIGHT SOlL RELATIVE DATE OF BELOW FINISH (�FRCENT) (L$S./CL'. FT.) TYPE COMPACTION TEST TEST NCI. LGCATIO`' I GRADE(FT.) - /i 6Y' LS G F S1� :��x �/D. D ��- — ter.-Al- 9-3 /0817 9� /�3. -Z- /CR 83 . _ — - Gl n ` 7. 0 1z3.6 -r '7 7 93 90 7 ( TABLE I W.O. .3b 7 96a �.,-���ENGIIVEEi�ING �A 'mot r x/Q31fJ/Q � E xsLs _• X/JS x/!7 xlo3 x//� xr - dClDZ x�q7 ,r�r4 • .rY��✓ xJZ S xs�v 11/21 3CrA8 X//3 I � a HdeLE J6 P- 0 LOCATION Of COMPACTION THMow X = COMPACTION TEST PREPARED FOR S-2c5•� Al er .S'?�rELL/12EC.�T bEVLCZ-0A1E/17- ACTION LOOKas�taENGINEERIE'..�?P017 9��a CONSULTANTS -------------- ACTION ENGINEERING J October 7 , 1982 W.O. 367901-A Stellrecht Construction. 15691 Graham Avenue thintington Beach, California 92648 Subject: PaNsment Section for Parkittg Lot - Commercial Developmeht on %:he Northwest Three (3) Acres of Lot 3, Block B, Tract 17 , Lake Elsinore, California Gentlemen: At your request, an R-value determination was performed mi a representative sample of the proposed subgra,."ie soils at the sub ect s�.te. Results of this R-value determination (R�:, )) , together svich assumed Traffic Indices (71) of 3.5 for parking and 5 .0 f03: driveways , were used to determine the following recomme. ded pavement sections : Gravel Area TI Equivalent_ A.C. A.B. SuhRrade Parking 3.5 1 .00, 3" 4" *12" Driveways 5.0 1 .44' 311 911 *1211 *Compacted to a mininnzm of 90% relative compaction We appreciate this opportunity to be of service to you. Respectfully submitted: ACTION ENGINEERING CONSULTANTS /?,RC NORY-01 B. THORNHILL BRUCE A. PACKARD RCE 13801 PRESIDENT VICE PRESIDENT - ENGINEERING HhP : sb 1630•G South Sunkist St..Anaheim.Ca.92806 (213)852-4710 (714)634.2092 I � t: I r b '�1 's 1 tti... I :f .t tw �• r r a i :•:.lit: + .t f t 1. < l�j 1 y � t ��. �y� / •,1: .9 P:- ...1i9 i1:' •'.1 � � E�,d/�� � $ , .\ } til� {f M .• T i. 1t1 i 1� SIr Ii f i` 1� ! ',S � t.�`}\�� Action Engineering/Lake Elsinore -4- Project No. 992-072 depth belor which liquefaction can occur. The ;year surface soils do not appear to be subject to lique- faction even if saturated. Earthquake Induced Landslides: No existing landslides which could be reactivated by earthquake forces ire present on the site. No imminent slides were observed on the subject property or on immediately adjacent propc.rti_es. Tsunamis: The site is located approximately 25 miles from the ocean, at an elevation of 1310 feet above sea level, which precludes it from the effects of a seismic sea wave . Seiches: Lake Elsinore is more than 3� mile south of the site and :some 30 feet below the site. The lake is relatively shallow with a large open area south of the \ lake. Such geometry and topography does not lend itself to the phenomena of seiches. CONCLUSIONS Because no faults are presently known to exist beneath the site , the probability of ground surface rupture is considered remote. It is concluded that the proposed site development is feasible from the engineering. geology poir.t of view. Respectfully Submitted, BASELINE CONSULTANTS, INC. j RPC./iiC (8) Action Engineering Cons. % c gar P. EC .ill . Cousinaau, I F +iC Action"Eag neering/Lake Elsii.,kore -3- Project No. 992-072 SEISMICITY Table One and elate 3, attached, have been developed From various sources to show the distance to known active faults in Southern California considered pertinent to the site. The sources of information include prominEnt text- books on geology and seismicity, state and county publica- tions, as well as data disseminated by both public and private agL.ncies involved with earth faake measuring and monitor=.ng. While not all sources agree to all items due to the "state of the art' at the present -rime, the tables and plates included in this report are brlieved to present a fair and reasonable evaluation of the available data. Plotted or estimates: epicenters or recorded larger magni- tude earthquakes, which have taken place in Southern California since 1769 , are also presented on Plate 3. • GROUNDWATER Soil Test borings performed by action P.ngineeriny indicates that groundwater levels are in excess of 50 feet below the site surface. SECONDARY SEMNIAIC HAZARDS LFioliefaction ; Ground failure due to liquefaction is considered highly unlikely since groundwater lies at a � � Ground sluff I� - -- 0 25 50 7' 100 125 i 175 2 0 225 2 0 275 300 325 350 3 5 4 4 0 I Dar*brown, porous loose, s/c/ayey,silty, fine . AND----grades to clayey,fine SAND-e-grades tc stiff, fia& Svfld C A Y . y 4 — Brown, mod compact, silty, fine to medium SAIVD---*.grades to sl clayey, eiltyD free to medium S�4IV0 y 7— Tan, Com.pact, silty,fine SAND -0-grades firmer k.,W;v W, , Bottom of trench _ 1U= 30, GRAPHIC LOG OF EXPLORATORY TRENCH SCALES 111=2' PROPOSED STELLBECHT DEVELC "MERY L.AKESHORE DRIVE; ELSINORE, CALIFORNIA ,-ALE As noted JAPPROVED BY TD� BY / DATE. 8-82 BASELINE CONSULTANTS INC. JAAWiNG NUMBER PROJ. 99 2-0 72 2 � trosT 1aAs�6F. . �I - 1 '+ L s f.: �.. 420 A i North 400 1 Auproximate • 1 1 4 � wof ExploratorTrench :w.• -.�. 250 h � 200 1 t•. ,w3t i•F150 yr I + r t,. 4 • l 10 1 50 10501 Riverside Lakeshore Drive ti Robert • - Stellbecht • • 1 .�7 Lakeshore Drive Lake Elsinore, California ^a � �. aj ��}� � i .r T. 1{t. � � er .. � � F F x S:�'x' y'•(f; � 111 - � �t v fin'', f' .. .. � ` � � � • � ., .. vl't 00. PRELIMINARY SOILS ENGINEERING INVESTIGATION AND GEOLOGIC SEISMIC REPORT FOR PROPOSED CO10 ERCIAL DEVELOPMENT ON THE NORTHWEST 3 ACRES OF' LOT 3, BLOCK B, TRACT 17 , LAKE ELSINORE, CALIFORNIA CONDUCTED FCR: STEL;,RECHT CONSTRUCTION 15691 GRArW4 AVENUE HUNTINGTON BEACH, CALIFORNIA 92648 W.U. 367901 AUGUST 20 , 1982 -- RECEIVED JANOr , 1GJ Dept. c( Faldii• 3& 1630-G South Sunkist Street Anaheim California 92806 (714) 634-2092 (213) 852 .1710 � At ENGINEERING r August 19, 1932 W.O. 367901 Stellrpcht Construction 15691 Graham Avenue Huntington BeacE, California 92648 Subject: Preliminary Soils Engineering Investigation and Geologic Seismic Report for Proponed Commercial Development on the Northwest 3 Acres of Lop 3 , Block B, Tract 17 , Lake Elsinore, California Gentlemen: Pursuant to your request, a Preliminary Soils Engineering Investigation and Geologic Seismic Report was performed at the subject site. The purpose of the investigation was to determine the general engineering characteristics of the soils and geologic aspects on and underlying the site and to provide specific recommendations for the design of foundations and retaining structures. A Geology and Seismicity Report, prepared by Baseline Consultants , =s attache,.' and considered a part of this 'Preliminary Investigation, The proposed development will be single story frame and block const 1, u..r_tion over slab rn grade. The structural loads are not known at this time , but for the purpose of this report, they are assumed at the twenty-five (25) kip range for column loads and wall loads in the range of two (2) kips per lineal foot. SITE CONDITIONS The subject site is a nearly level, rectangular, three (3) acre parcel in the vicinity of the northwest corner of Lakeshore Drive ind Riverside Drive in Lake Elsinore. At the time of our investigation, the subject site was a vacant field essentially in it' s natural state covered with annual grasses . 1630-G South Sunkist St..Anaheim.Ca.92606 (213)852.4710 (714)634•Z092 gtellrech':: Construction W.O. 367901 Fgge 2 Am FIELD INVI STIGA;ION A field investigation was performer! on July 29, 1982, consisting of the excavation_ of one (?) seismic trer:ch the length of the site by tractor mounted backhoe equipment and cne (1) hnll.ow stem auger boring at locations shown on the attached plan. As the test boring and trench were advanced, the soils were visually classified by the Field Engineer, A summary of the boring and trench are attached (Table I) . Undisturbed samples for detailed testing in our laboratory were obtained by pushing or driving a sampling spoon into the maten al. A solid barrel-.type spooii i4as used having an inside diameter of 2.50 inches with a tapered cutting tip at the lower end and a ball valve at the upper end. The barrel is lined with thin brass rings , each one (1") inch in length. The spoon penetrated int+., the soil below the depth of boring approximately twelve (12") inches. T3-r+ central portion of this sample was retained for testing. All samples 'n their naturhl field condition were sealed in air-tight containers anti transported to the laboratory. PILL CONDITIONS Fill material was not encountered on the subject s1te. 'NATURAL CONDITIONS 'natural around encountered in the test boring classifies as SAND, very fine , silty, slightly clayey, underlain by SAND, fine to medium, 51,;.ghtly _kK--RATOR•Y TESTING Sear tests were made with a direct shear machine of the strain conLrO l Lv-pz in which the rate of strain is 0.05 inches per minute. The machine is designed that tests may be performed ensuring a minimum of disturbance f_er~ the field conditions. SE turated specimens were subjected to shear =de-r various normal loads. The results of tests , based on ultimate values , are presented on Plate A and tabulated below: 1630-G South Sunkist Street Anaheim, California 92806 (714) 634.2092 (213) 852-4710 ZZLI Z' li � i 5tellre-at Construction J.O. 367901 Page, 3 Seitsmic Depth f.:i Cohesion Angle of Intornal lrsrtch Lbs./Sri. Ft. Friction (Degrees) South End 3 150 25 North En.i 3 300 20 Consol:i;ia .:.,.n tests were pe:'Lormed on in-situ moisture .and saturated specimer,b c+ typical soils. The consolidometer, like the direct shear machine, is cesi3ned to rece4-ve the specimens in the field condition. . Porous stones , placed at the top of the specimens, permit the free flow of water into or from the specimens during the test. Succe-ssive load increments were applied to the top of the specimen and progreasive and final load s-.ttlemen'_s under each increment were recorded to an accuracy of 0.0001 inch. The final settlaments.-so obtained are plotted to determine the cir-ves shown on Plate B. Expansion tests were performed on typioa? specimens of _natural soile. These tests were performed in accordance with the procedures outlinwd in 'O.B.C. Standard 29-2. Results of these tests are presented in Table I and indicate the soil. to exhibit-.a low to medium expansion potential. Particle size analyses were performed on samples obtained by using the standard selves hyrodometer in accordance with ASTM:D-422-72. The particle size distribution curves so obtained axe presented on Plates i, F, G, H and I, CONCLUSIONS AND RECO10ENDATIONS On the basis of our investigation, development of the site as proposed is considered feasible from a soils engineering standpoint provided that the recommendations stated herein are incorporated in the design of foundation systems and are implemented in the. field. An evaluation of potential liquefaction of the soil conditions encountered at: the site was performed applying the s4irplified procedure r developed by Seed and Idriss (1971) The evaluation was based on Standard Penetration field results , laboratory analysis of field samples , a"-id approximations with regard to determination of significant stress cycles and cyclic shear stresses cs.asi.nS liquefaction tinder field conditions . 1630-G Soath Sunkist Street Anaheln;,W.fynm 92806 -(714) 634-2092 U13)852.4710 U1T'-SSl Stellrecht Construction W.O. :367901 Page, 4Ip \ The potential for liquefaction is considered highly unlikely. GFADING The seismic trench and bore hole indicate the upper three (3) to five (3' ) feet of soils to be generally loose and prone to consolidation, hence, unsuitable in their present cordi-ion for structural support. Ovexexcavation and recompaction of these soils in accordance with the attached "Specifications for Grading" is recommended. The southern third of the site contains the deepest loose soils. All grading and/or foundation plans shall be reviewed by the Soils Engineer. FOUNDATIONS The proposed structures shall be supported by isolated and continuous spread footings placed a minimum depth of eighteen (18") inches below lowest adjacent finish grade utilizing a recommended iafe bearing value of 1400 pounds per square foot and 1200 pounds per square foot, respect- ively. This value is for dead plus live load and may be increased by one-third (1/3) for total including seismic and wi- d loads where allowed by code. Increases in bearing capacity for increas= _ in footing dimensions are tabulated below: Minimum Minimum Bearing Increase =y_ la Depth Width Value Ds th Width Maximum (inches) (inc�ies) (p— - (ps ft) (psf t) Continuous 18 12 1200 230 125 2400 isolated 18 18 140n 235 125 2800 El'PA'SIVE SOILS Results of expansion tests indicate that the near surface soils have a low to medium expansion potential. The medium recommendations on the accompanying Expansive Soil Recommendations , Plate C, should be considered in design of foundations and slabs. g 1630-G snuth Sunkist Street Anflheim, California 92806 (714) 639 2092 (213) 851-4710 /2 7­40M � A �itellrecht Cork s':truction- W.O. 367901 Page S S'E77LEMBIT 7be maximum anticipated total settlement is on the order of one-half (1/2") of an inch. Differential settlements are expected to be less than one-fourth (1/4") of an inch, measured between adjacent structural elements, SUBSIDENCE AND SNRINKAC E Subsidence over the site is anticipated • o be on the order of 0. 20 feet;. Shrin1kaige of reworked riaterials should be in the range of fifteen (15%) percent. 1ATERAL DESIGN Lateral restraint at the base of footings and on slabs uLay be assumed to be the product of the dead load and a coefficient of friction of 0.40. Passive pressure on the face of footings may also be used to resist lateral forces.. A passive pressure of zero at the surface of finished grade, increasing at the rate of 250 pounds per square foot of depth to a maximum value of 2500 pounds per square foot may be used for natural soil and compacted fill at this site. If passive pressure and friction are combined when evaluating the lateral resistance , t'"le value of the passive pressure should be limited to two-thirds (2/3) of the values given above. FLOOR SLABS Slabs on grade should be designed according to recomm-­.idations for medium expansive conditions , as shown on Plate C. Care should be exercised to ensure that reinfircing mesh is placed in the center cf the slab. The soil should be kept moist prior to cast-ing the slab. hjvjver , if the soils at grade become disturbed during construction, the, should be brought to approximately optimum moisture content and be rolled to a firm, unyielding condition prior to placing; concrete. 1630-G South Sunkist Street Anaheim, California 92806 (714) 634-2092 (213) 852.4710 U � f + S+ccllrechr Crns+truction ti.b. 1679O1 Paget In areas where -a moisture sensitive floor covering will be used, a vapor barrier consisting of a p;las:�ic file (6 mil polyvinyl chloride or equivalent) should be used. The vapor barrier should be properly lapped valid sealed. Since the vapor barrier will prevent moisture from draining frog; fresh concrete, a better concrete finish can usually be obtatined if at Least too (211) inches of sand is spread over the vapor barrier prior to placiement of concrete. GE.NE:RAL INFORMATION This report presents recommendations pertaining, to the subject site based on the assumption that the subsurface conditions do not devinte appreciably from '.::hone disclosed by our exploratory excavations. our recommendations ,,re based on the technical information gathered, our understanding of the proposed construction, and our experience in the geotechnical field. We do not guarantee the performance of the project. , only that our �ngiueering work and judgements meet the standard of care, of our profession at this time. In view of t'ae general conditions in the area, the possibility of different local soil conditions cannot be discounted. Any deviations or unexpected conditions observed during construction should be brought to the attention of the Geotechnical 'engineer. in this way, any reouired supplemental recommendations can be made with a minimum of delay to the project. If the proposed construction will differ from our present understr;.i,ding of the project, the existing information and possibly new factors may have to be evaluated. Any desig-a changes and the finished Flans 0';ould be reviewed by the Geotechnical Consultant. Of particular import-,.rice would be extending development to new areas , changes in structural loading conditions , postponed development for more than a year, Cr changes in ownership. This report is issued with the understanding that it is the responsibility of the owner, or of his representative , to ensure that the info•rr:4�ation and recommendations contained here are called to the attention of the Architects and Engineers for the project and incorporated into the plans 1630-G South Sunkist Street Anaheim,0hfomia 92806 (714) 634.2092 (213)i352-4710 1 1 _` � .Pagel��ci►I: '�ozlsaructi+on W.O. 367901 a�aad that the\necessary steps are taken to see that the Contractors and S•xbcontractors carry out such recommendations in the field. 2his. report is subject to review by the controlling authorities for this project. aPPreciate this opportunity to be of service to you. Respectfully submitted: ACTION :NGINEERING CONSULTANTS � r 11ORKAN B. THORNHILL PRESIDENT ROI,ANL ACt?*dA STAFF ENGIbMEER BRUCE A- PACKARD RCE 13801 VICE PRESIDENT - 'ENGINEERING RA:ab I 16WG South Su*St Sheet Anaheir►1 ciao is 92806 (714)634-2092 (213)852-4710 i r i - l j �• S � •� a-. 9t •n •%R yr."�• t. ` VA r ..•� �,�i` ram``-d. _. �-ra • f ; t ` t• .� ` 1 .. .. r � .4 � � e � i � 1 .r 4 '1 t � aa �_ c J �t� '1 �}�'1a t.�'b ' }''+ (��', Jc .�.• 7' Y � M..}y��1� � t � t tt f- ti� Y t �,`; ` ��,! � S , r; 4 � s R. y - , ti t. r +T, ;ti• � ' • tf~ t - i 1 r- • f J _ , rii { • t 1 , I do k t1J rt`u f+ C, t� h +.� + ti ._yyF �.. t. + 4 4� t y `J t �/ err � r! ■■r.��1 `' i f •• t f i mom i � � r■��` Mr■. � � ■ + 4 rr■NEW Mas kin �° � �■■ err ■r ■■■rrr �trr MEMO a� i 4 a. t t' ,, � t '� ilk i � ! + � � � k , tS�•`3 ,�� � '�; � � ! 'lr 5- ! ✓` 1 4 i�,'I i c 4 �� � .S f • /'^`♦ !� �: ,: �. # j ti' ;. 1L�+ r��;g &EXPANSIVE_SOIL RECOMMENDATIO W.O. 367901 Very Low low Medium N) h Expansion Index ` 21 5-0 51- Fooring Width 1 story See Body 12" 2 story of Report 15„ 15�� 12" _ 15" Exterior Footing Depti, See Body 1 story of Report 12" 18" 18" 2 story 18" 18" 18" Interior Footing Dept 1 story 12" 12" 12" 18#1 2 story 12" 12" 18" 18" Footing Reinforcement Not Required 2 #4 bars 2 #5 bars 4 44 bars I top 1 top 2 top 1 bottom 1 bottom 2 bottom Slab Thickness 4" Nome. _ 4" Nom. 4" Nom. 4" Actual Slab Reial'orcement Not required 6"x6" 6"x6" l i3 bars on 18" I01f?0 a 6/16 center both way Moisture Barrier (2) bb mil visqueen 6 mil 6 mil 6 mil 1" sand visqueen 1" visqueen I" visqueen 1" sand sand sand 6"x6" #10%=10 Fre Floating Free Floating Garage Reinforcement Not required or 114 slag 6"x6" 611x6" 114 (3) #10/110 06 06� tirade Beam - Garage Not Required Not Require) Same as adj.ntrance Same as adj. _ ext. footing ext. footing (Seabgrade Not Required Not Required 4" coarse 4" coarse ------ sand (4) sand (4) 'resaturation Not Required Above opt. m/c 110% of optimum 1231 of optimum to depth of m/c to depth of /c to depth of footing (No footing footing testing) Nate: (1) The surrounding areas sould be graded so as to ensure drainage away from the building. (2) Concrete floor slab in areas to be covered with moisture sensitive coverings shall be constructed over a E mil plastic membrane. The plastic should be properly lapped. sealed and protected with sand. (3) Quartering of slab should be a;--complished by the use of pre-molded expansion joint material and not by saw cutting. (4) One (1") inch of sand over moisture barrier may be included in this four (4") irtch total . PLATE 1619-G South Sunkist Street Arobei k CarOzfta 92806 (714) 634-2092. (213)852-4710 l fl'• 7 r - { Stellrecht Construction j , TABLE �. y •s 1 - • • - • • SouthLocation Feet Index Potential tt 34 • Trench e � i ' - r k' North Seismic • • V'Ledium Trench t ) f I. 1 I i 5 s'. r • 1California1. I' 1 c r i d{ J' 4 y i SUMMATiv SHEET PROac GECLV41CAL ENCINEERMG "SCRIPT ION CLASSI FICAT IOWDESCR IPTIOW SZL';, sandy, very fine , 1 damp , soft , loose, LIGHT BROWN Z (7- -1z) 3 (36 16) S � SILT, sandy, fine to medium . , 6 medium dense, damp , LIGHT BROWN 7 - 8 �9 - SAND, very fine to medium, 10 silty, very dense, damp , 11 i4 13 i4 5 (6- 6) X Some coarse SAND 16 17 18 G BORING No. 1 SUP.FACE ELEV. Hollow Stem x EQUm.Auger HOLE DIX z LOGGEOIlY Roland Acuna r ►' t 2 w= .�i h w Z' SOB NO. DATE SAECT W = L c E ° 8 367901 18/20/82 D�2 1630-G South SuNu,t Strxt Anaheim Cafdwnia 2 06 4 s 414 aly- A—. r. y. V4 eu �Yf.�5 K A , r �,... .*iL a� s • c.. r i .. • .r- i •.. .��rC./ � r � s- �?�R p � �� _ � a tv. •�� r.r r,1 a r'" jw— s, •. � .t�. "• r . a� } ku f h„ di y- �lz •• � f i l• • _ ,t r t 1 • 1 f 1 t 11 _�.ti _f'_ j •l 1 ,e .li 4�:,• l JI .. a� { r Y � c a a •r l e r a "• t 1 � Lr✓ r 1�+•�4 r r r[ :. �.t' , 1,}�} i Ldt �+ 11 � , - '�✓ � .'i 3 r + / ayL' .i '.,�t t }., � T r � ♦� C' •r N' � 4- � .•'L �i i . '� „�, ' SUMMARY SHEET -- - PROJECT Stg Ir�ertion GEOLOGICAL ENGINEERING DESr-lk*TION CLASSIFICATIONIDESCRIPTION f O � � I 1 t '1 - 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1 � 1 1 1 1 t 1 1 1 1 I I 1 1 i 1 _ 1 1 1 I � 1 +•'1 I �O I Cc U 1 1 I � Z O O ` r-t i,l ¢ EORING No. O v SuRFACE ELEV. Eauly. Backhoe H0LE Dill Z F 2 ► O a 0 W LOGGED ar Roland Acuna ~ 2 �11 ,1 EI V JOS NO. DATE fHf ET c ?� 7901 v � � e �o �'� $ 2G 8Z 21�i2 6 s30 -im Calif - TMW SPECIFICATIONS FOR GRADING CILF aG_ RV. oxiseting vegetation shall be stripped and hauled from the site. ME"WATION ra�r the foundation for -the fill has been cleared, plowed or ace,rified, N.t *hall be disced or bladed until it is Uniform and free from large CaAlds, brought to a proper moisture content and compacted to not: less am ninety (901) percent of the maximum dry density in accordance with 4,M-D-1557-70 (5 layers - 25 blows per layer; 10 lb. hammer - 18" drop, it." diameter mold) . :E'LI RIALS On'-site materials vay be used for the fill, or fill 'Materials shall consist of lmater{i]� approved by the Soils Engineer and may be obtained frrzm the c wawa-ion of banks, borrow pit.- or any ocher approved bource. The naterf:. s urged .should be free of vegetable matter and other dele- terious substances and shall not contain rocks or lumps greater than eight (V) inches in maximum dimension. PLACING SPR-FADING AND COMPACTING FILL MATERIEILS I&era neturai slopes exceed five (5) Horizontal to one (1) vertical , the exposed bedrock shall be benched prior to placing fill. A, key shall be placed at the toe of each fill slope a minimum width of ten (10' ) feet: and a minimum depth of two W) feet. Ile selected fill material shall be placed in layers which, when compacted, shall not exceed six (611) inches in thickness. Each layer shall be spread evenly and shall be thoroughly mixed during t-be spreading *to ensure uniformity of material and moisture of each layer. I"zere the moisture content of the fill material is below the limits specified by the Soils Engineer, water ,shall be added until the =oisture content is as required to Ensure ,horou h bonding ,end thorough compaction. 26WG South&v*g Stmet Anaheim, C&W0rtia 92806 (714) 634-2092 (213)852-17►0 oc � r Page 2 �p iticatio�as� xo.. �r .ng g _ V. ere the moisture content of he fill material is above the limits specified by the Soils Engineer, the fill materials stall be aerated by blading or other satisfactory methods tantil the moi-sture content is as specified. After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to not less than ninety (9O%) percent of the maximum dry density Lit accordance with &S- M:D-1557-70 (5 layers - 25 blow, per layers 10 lb, hammer - 18" drop: 4" diameter mold) or tither density tests which will attain equi.valtzt results. Compaction shall be by sheepsfoot roller, multi-wheel pneumatic tire roller or other types of acceptable rollers. Rollers shall be of such design that they will be able to compact the fill to the specified density. Rolling shall be accomplished waile the fill material is at the specified moisture content. Rolling of each layer shall be continuous over its entire area and the roller shall make sufficient trips to ensure that- the desired density has been obtained. The final surface of the lot areas to receive slabs on grade should be rolled to a dense, smooth surface. The outside of all fill slopes shall be compacted by means of sheapsfoot rollers or other suitable equipment. Compacting operations shayl rye continued until the outer: nine (911) inches of the slope is ea.. "least ninety (9O%) percent compacted. Compacting of the slopes may be done progressively in increments of three (3) to five (5' ) feet of fill height as the fill is brought to grade, or after the fill is brought: to its total height. Field density tests shall be made by the Soils Engineer of the compaction of each layer of fill. Density tests shall be made at intervals not to exceed two (2' ) feet of fill height: provided all layers are tested. Where the sheepsfoot rollers are used , the soil may be disturbed to a depth of several inches and density readings shall be taken in the compacted material below the disturbed surface. When these readings indicate that the density of any layer ni fill or portion thereof is belolo the required ninety (9O%) density, the particular layer or portion ,thal.l, ba reworked until the required density has been obtained• O9G-G SaAh Sunkist Street Anaheim, Calitorrda 928H (714)634.2092 (213)352-4710 Specifications. for Grading Page 3 The grading specifications should be a pain of the project specifica- tf.QAl6. The Soils Engineer shall review the grading plan prior to grading. INSPECTION She Soils Engineer shall provide continuous supervision of the site clearing and grading operation so that he can verify the grading was done in accordance With the accepted plans and sepecif ications. SEASONAL LIMITATIONS No fill materials shall be placed, spread or rolled during unfavorable weather conditions. 167hen work is interrupted by heavy rains, fill operations shall rot be resumed until the field tests by the Soils Engineer indicate the moisture content: and density of the fill are previously specified. 16,30-G South Sunkist Street. Artaheirrr,, Wfornia 92606 (714) 634-2092 (24) 852.4710 Inu- 15307 MINNESOTA AVE- '?OWLS E'Vaw4w" �;4 PARAMOUNT, CALIF. 90723 (213) C 33-8152 August 11, 1982 Project No. 992-072 Action Engineering Consultants 1630-G south Sunkist Street Anaheim, California 92806 Subject Reference: Robert Stelltecht Project Lakeshore Drive Lake Elsinore, California Gentlemen: This is to report the rs ;ults of a geology and seismicity study of the above referenced property. The subject property is within an area suspected to be unuerlain by traces of an earthquake fault, and generally within the Elsinore Fault Zone. In order to determine whether a trace of a fault is present in the near surface soils , an exploratory trench was excavated along a line crossing most of the proF-�rty, an& the earth materials encountered were carefully examined and logged. Orientation of the trench was made in order to intercept any suspected trace at nearly right angles. Plate 1-A depicts thrf location of the trench relative to the property and nearly st.reats, .chile Plate 2 presents a graphic log of the earth materials encountered in the trench. GEOGRAPHIC Ai:D GEOLOGIC SETTING The property is situated on the east side of Lakeshore Drive; some 110C feet notl. of Riverside Drive, at an average elevation of 1310 feet above: sea level. I Action Engineering/Lake Elsinore -�- I�toject No. 992-072 Plate 1, Vicinity Map, depicts the location of the site relative to surrounding streets, landmarks and general topography. As disclosed by the exploratory trench, the site is immediately underlain by Allu;rial Deposits consisting of sands and clays. These deposits are reported to overlie crystalline basement rocks. FAULTS Major earthquake faults known to exist in Southern California are shown on Plate 3. Table One .lists faults consider- ed "active" , that is, faults which break all formations, including alluvium, have zm observable topographic expression, and have undergone movement accompanied by earthquakes during historic time, or have been so designated as active by the State of California , Division of Mines and Geology. No faults, active or potentially active were observed in the exploratory trench or a:re known to exist within he subject_ property. No faults, offset strata, or indications of past ground movement were apparent in the nat_zLal materials as exposed in the trench. The traces of branches of the Elsinore FaUt are reported to pees some 500 feet westerly and some three miles to the southwest beyond the site. No traces of this fault or any other were encountered in the near surfice deposits of the: subject property. Il08ER PARLEE CIVIL ENGINEER* 2662 B. 20TN ST. #306 CE 10146 mt 1001k SIGNAL 1,1LL, CALIF. 90804 Ph. (213) 494-2662 , COMERCIAL %LDG. FOR S1ELLRECN W.S.S. & ASSOC. DESIGNER DESIGN LOADS PANELIZED ROOF SYSTEM DATE 11-6-62 LOAD AT RAFTERS roofing 3.0 sheathing 1 .2 2x4's @ 24 .__5 5.0 psf D-L . 20 . 0 psf L .L . z5.0 psf T.L . LOAD AT PURLINS load a; rrfters 5. 0 psf D .L . purlins at 2.0 Misr.. 2 . 0 , � P F. L 'S -- RECEiVEw 20.0 29.0 psf T .L . Dr_'Li 0.7, 1982 LOAD AT L! R`uLF; # Dent, of BILZ. & Safety load a; purl ir.s 5.0 psf � • � - glyder 3.0 12 .0 Psf j 12 . ,,sf D.L . 600 s4 f : . area 12 ^ ps ' 400 area 1 ;,sf L .L. 24 .G I,,f � . L . �� •� psf T . L . . . SIG4 STRESS,- STRUCTURAL .7 3 ! :'S AND r L�•`. .� � � �i r:� c � a NO . 1 DO(U- LA_ FIR f - 95 asi N0 2 v3US, AS TiR f - psi "' a5 ►�� ; 1 , ?�� SEAMS AND ST; i , rERS NO . 1 DOUr_AS C i f f w 1 353 : i t' U5 ✓� 1 " 1 , . 1 STRUCTURAL Lli:►4T FRAMIN:, a RUbEkt ly. 1-AkLLE CIVIL E:tGINLEI'COMMERCIAL BLDG. FOR STELLREChT CE 1G146 W.S.b. 6 ASSOC. DESIGNER GLU-LAA BEAM bItIPL£ bLi,M UlvlFUkJn LC,Aiih:.► bEAM NO. 1 MAIN ROUP bLAM TR1bUTARY AREA - 20.0 x 52. 0 = 1rfl4U.0 S.E . LOAD ROOt 20.UUx24 = 460 U 0 .L. ) = 4bU Fit w' —(L. L. ) 240 pit SPAN L = 52.06 f t. f = 2,15b. psi h = 155 psi c, c oet . 1. 25 SUCII(�N MODULUS REQU1RLD S = ` hL x1. 5/tc _ 722. 4 in. cu. MUMI .N'1 OF INERTIA REQUIRED 1r — i, iC(,. 0 kst L/24U L'= cl . spdn ! = 44N �a '+. 5(;1 tL' ) �; = 1 }, jSS. b gib. 4t11 L/-6U AREA RE:VUihtu 4 = 2. (,J tL. A = „ l • _L—tl)xi .5/F,r� = yl. l t���. ENE hEALi'iCN 11,4tiU. 1 'SEARING AREA HL1UlktD = — tb. U:L 5. 125 x .s1. 5 SYMtbC:L 24F `LLL-L AS tali & l,F:r —F11. t.UA:E - NLF 1:3, 34L. 1 A _ " 161.4 1.1;1in tE:.:'Ivh CAP. bEh bEA)w 1. 5 x D. L. a 1. 7 1r+. r ` RflbEltT' H. PARL£E CIVIL ENGINEER Ioi46 COMMERCIAL SI.1X;. FOR CIVIL W-5-8. & ASSOC. DESIGNER � hUO D dZAM DZ61GN SIMPLE bEAM UNIFORM LUAUIN,(i bEAN NU.2 READER AT FRUNT hALL LOAD Roof 5.00X30/1.25- 12V Wall 7.00 x 15 = 1W) beam = lf- % O .L. ) = 241 pif w' tL. L, ) 64 pI f SPAN L 15.5u it. i = 1,2�(�, psi h = 95 psi c , c:oef . = 1 . (,u SECTION kGDULUS REQUIRED S ti WL2x_1/5/fc = - 1+:014ENT OF 1NER7 IA RF.�i(!.l'RED 3 /c• '� i , c U, E = 1,it:t,.i, kSi L/24U L'= cleat span I = 44bwW) /E - - i74. G in. 4th ) x (L ) /E = 1c;LI-. 2 in. 4ih AREA R£QStli�£D it. A - s. i . SL--6) xi. 5/tic = 2o. c sy• lr,, bEAR1N6 A6EA r.E�(�af <.r, b = 5. 2 sy• UbL 4 x 14 NC,. LIDUGLA'o FIR S - 102.4 1 = e7b.4 A - 46. 4 t�idAh! 2.1,• i tiLALEi, Ai HRUNI Lk CUVL�:.: k.ALK MUAD :iaol o. C%(rx 3t; 5 t:L� _ L/ ,:4 i. .. — C:..C S=.is i t i iL 5/ h h ROBERT H. PARLEE SAM 4 CIVIL. ENGINEER CE 10146 CUMN£RCIAL BLDG. FOR STELLREChl' W.S.B. & ASSOC. DESIGNER ROOF JOIST DESIGN JOIST SIZE AND SPACING: 2 x 4 # 2 D.F. @ 240 o/c UNIT LOAD T.L. - 25 psf LIVE LOAD w' a .10 psf SECT. MOD. S x 3. 1 in. cu. MOM. OF INERTIA I w 5. 4 in. 4th STRESS f = 1450. psi COEF. c = 1. 25 E - 1.7 kal MAXIMUM SPAN Center to center Flexure design L a (Sfc/1.5wb) /2 8.60 ft . Deflection design L/240 L m (Ix1000/. 263w'b) 1/3 7.99 ft. MAXIMUP. SPAN 8 `-06 ROOF JOIST DESIGN JOIST SIZE AND SPACINr;. 4 x 12 f 1 D.F. y(,w a/c UNIT LOAD T. L. = 29 psf LIVF. LOAD w 20 SECT. MOD. S s 73. 8 in. cu. M"JM. OF INERTIA I = 415. 3 io . 4tlt STRESS f - 1725. psi COEf'. = 1 . 25 E x 1 . MAXIMUM SPAN Center to center Flexure design L 3 (Sfc/1 . 5wb) 1/2 = 21 .39 ft , Deflection design L/243 L � (Ixl00C/. 263w1b; y 21 . 45 ft. . MAXIMUM SPAN 211- 59 i ROBERT H. PARLEE CIVIL ENGINEER COMMERCIAL BLDG. POR STELLRECHT CE: 111146 w.6.8. i ASSOC:. DESIGNER PAD FOOTING DESIGN �CG. SOIL VALUE USED IN DESIGN 1,200 psL at 12" dcRtr}t FOOTING NO. 1 EACH END OF MAIN G.L.b . LOAD P = 12,48C lb. AREA REQUIRED A I. 15 x I'i � 11.�6 sq. 1 �. SQUARE Rcul � 3.46 f L. USE; 3'- 6- 5Q. PAL) E'uuj,1luf, 12" ih;U KAI'UkAF.. GkADL A = 12. 3 NO fiLINFLXCING lilru°D EUk ;E" ThICK EUL"IIN(,, MLA-6URED EhUM 't4►p GE' SLAB fGR MONULITHIt; peUli. }C-uI :NG NU. 2 CLNILR PAD EGk BEAM NU. � UtvGElt iC�" SQ. C(iLtr, LGRL 2 x 115bG - �' -AkLA RtQU1hLU M ;, 1 fili lb. 1. 13 x E-� ;s .E • ) = s.G� sq. bQUARL RLiLj 1. 74 L i. USE; 1 '- y- SQ- PAD E'Llf-1 i NG 12- IN'IU NA'i UhAL GRADL A NO hE1N£ORCING E.E.Q-D I LIM KObLit'l 8. HItLE < CIVIL t::<vihEEt2, CE 10146 C'DAMLNC1AL BLDG. FOR SlELLRECHT h.S.t3. 6 ASSOCt„ DESIGNER L..I LI:AL FORCES TYPICAL 20 X 52 UNIT t%ALL \LOCATWN DIWLL OF TR. AREA UNIT LGAD LOAD SEIS. = FORCE WALL SHEAR �' ASSISTING' S'ti h FeRCE (s.f.) (rf f l w. ) (1b. ) CGEF.` (le.) LENGTH (Pki) ELEMENTS A/l REAR L/R 2Ox2E (14+ 0+10) - 12,460x. 186 2,321/6 387 EXT. MALL 8/1 FRONT L/R 2(1r35 (14+ 0+10) - 16,8O0x.186 = :3, 125/4 781 1/ 2" PLYW. LX1 . WALL L/1 CENTER T/b 2Ox35 (14T` 04 10) 16,800x. 186 !. 3,125/49 64 1/2' DRYV,. WALL nALL!, UUi LE ZhRLE CAN bE kLNLVLL I Uh ,Lr,AAN'i 1ME'RUVbMIrNl.S . SHLAli < 200 Ok.Y %ALL NAILING: L)kl%ALL i hAVE t)L 5/.:" DRYWALL r.AY6 6E. ZQULLR NAILS Ai 7" O/C Ahl:Nl n bL Lis EUE< 3/t " 1 LYW(:'�U St:EAIl FAl.ELS 'iu br. 1! 2 A lU AT 15" G/C AhL'11L:h bL,L`lb rUk 1 / c' FLYhL UL tai-:LAi. FAN.* I.!:� bb 1/2. X 10 AT 12" C:/C r i ;Y+� �: _ 'ttGiir. F.'.1't: h.',VI: tt:.. L 1; !.L i•.i �UF. LSE 16n NAILS Al v/C bLUCK 'lU bLUCK ANU hLLi—h '!U l;i.itiib, 'li%lt'LL Li::F Lk A35 Al lb" O/C. ROBERT U. tPARLLE SH'l'. L-Z CIVIL ENGLNEE:kt LE 10146 Cl COMMERCIAL BLDG. FOR STELLTAECHT � i N.S.B. b ASSOC. DE51GNER l ATLRAl FORCES IMLAN NALL DE51GN 4' FT. WIDE 1/2' PL)MO0D NUN-BEARING WALL 11 Fl . NIGH LOAD v a 800 PLF V = 4x600 = 3, 20U Lb. Y O.T.1%. 11 'x3,200 4 35,,�UC1 1 RESISTING %GOIENI WALL 4'x12'xl6x2' _ - 1,536 QOE 2'�c6'p14x2' x - 336 33,328 ' 4 UPLIFT ANChORS: U - 33,328/4xi. 33 = 6,265 Lb. !�IMPSON ANCHQ%tS: USE (Ai SMPSUN HD5 TO 4X4 PC '1 LACH 5l[)L UE .BEAR PANEL WITH (2) 3i4" DIAM. hULlb 4U 4X4 AND (1) 3/4" DIAM, AN(HUR BULT, PER HG5 1 a 3, 61(, E.A. ,j 1,1.'I E NNAI L: U�,w c21 SiMPSUN HD7 ANCKk 'i 4X4, k`ub'i LA(Ai IUF: (J ',hE:Ak: PANLL W';Th l3) ;/b" D1AM. bui.:.' 1V 4X•l ANT) ( i 1 [,iF e.N(:.�lkc E 6,50v Lb. EACH E,E S 1 S^.'i ttiG MOM►EN1 E Ui.i E(.(.i t NG : FTG. 5'xl5Ux2„ 5 ' I ,t , F.� ihEtJhLarkl"� :�itE �� EUk C.U` I'INUk, .ti �s (33, 32b--1, 5"1y}� A . (,u() - , r :er:, A u h/2.2d 1<'UH CcN% lNu(..ub t��.1iN� A - 13x1'sxl - 33 - . Et :;lr• �t�. k'! , 4 'I . s USE (2) NO. F, 6ARS 10P i, 13UT'I'UM (4 'iLlAl.) A .ES ANCh()k BOLTS: SPACING - 61(,xl . : i/ L'06 USE 1/2x:0 ANCHOR bUhab Q 12" U/L MAX. iLYWOOD NAILING: USL 10 d NAILS P 2" U/L h.L(_J.. AND 1 +,i'. iN7F!k3.C1~l3.,- -ALL PLYWOOD EDGE. MEMbl-lib 3" N6m1NAi., Ni1N. "Y I ROBER; H, PARLEE SHT. L-3 CIVIL ENGINEER CE 10146 COMMERCIAL BLDG. FOR STELLRECHT W.S.B. 6 ASSOC. DEEIGNER LATMA:L FORCES DRAG STRUT CONNECTION TO PLYWOOD SHEAR PANEL V 4x600 ■ 3,200 LB. PLATE SPLICE: USE V-0' MIN. LENGTH PLATE SPLICE WITH (3) 5/8' BOLTS. VA = 3x1,000x1.33 = 3,990 LB. > 3,200 { y' ItOt3ERT H. PARLEE stir. L-4 (;►: IU146 CIVIL ENGINEER CUMMURCIAL BLDG. FOR STELLRECHT rl.u.6� 5 ASSOC- DESIGN" I.ATLIZR%L FARCES S..�AR Pp;ltdElr 11ESIGN 12 i T• WIDE 3/8" I,l.l':i()oL' NON ING 11 FT, HIGH -�r'.\!L .a W IA-PAD V 570 pl f U 12x51 U = (,, ti4t; l l;. Y ., k4UIM ' N 13, b24 IiESIS`:iNG MOMENT wall l2'xl2'xl6xb' rf . or fl. 36xl4xb' 4, Abu 4-/le, UPLIFT: U 5$, 3y2/12 - UPLIFT ANCHORS: - 3, 375xI. 33 t3• SIlail✓ ON HD5 ANCHORS UA - ORSIMPSON PA-26 ANCHLhS :;A ="s, lt/OxI• ?3 123 I.A. PLUS 1/2x10 DOLT /" MAX. FROM Bearing area of wl-shcr a Y . -b� l. S`- . 3 sr. In. u 1. 4X385X1. 33 A LE UPLIFT � 4 123 + / �:' - 4, 6 1 > 4, buui IA.. TOTAL ALLGtihr + S:ii.Ai- PANEL. i'W;VIl)E (1) i�:�f: _ i?IrSUN HC.S /\\Cil-;i:S Tl� •i?l i � •.' • �� � - At; ..C:..T ...;LL' M. i 16" Xi" U-S T riP,P A cCii it :3 E-"L'' S I L. _." / !i. �.. :',, i t.' ; t:.•., s - s 1,, •� � ti SILL. US� :, \1 U t 1 pp . �. r• N Ali . I� ..tom•.. .1 - :( .•'vL . � i•.•'(• :i• .J L��;l.....R�. li is l:;`i. j l .. - ... •:l t� �.�.• .. , 0/C IN FGOTINi ;: A _ �I -, —,� •J'.-- i)U'. 7Jt.:l' -.lab lift - •i, C�,u/ ( :�: +:��-i . t . : cm,Lh of ftg . 5 to �cstst up iro)ection beyond Lhcar r.�:/ex - 1 I - b ( cum* . bt.ix�`/ 'xl. l�xltxi �G in. �2' V• Q BARS '1O>✓ AN:.) St.vTTUM r: _ • t/ i V. SHT. L-5 HobEHj* H. PARLEE CIVIL ENGINEER CE 10146 COMMERCIAL BLDG. FOR STE:LLRECHT -- W.S.E-r,- A&bUC- DESIGNER � •�l� t�f ���wn I N \ � 1 1N1'. .',. 1/� S T RUCT• I PLYWOOD /c-• V, .A LA C-30 .-r , 2-I.FV , D►A. 15OLT5 CD Xa i )f 1-r ANCN. LT- n - .a1a.1�. t�Gt.t_Y \r�AtaA• c3n�-T ����.� `1 �. i� ,��; F I.LN1 "WALL II ROBERT H. PARLEE .',ih'i'. L-6 • CIVIL ENGINEER CE 10146 COMMERCIAL BLDG. FOR SZ'ELLRECH`I• W.S.B. & ASSOC. DESIGNER 9'r/� !`s 4��'d1A i ! [ILIM11 __-- iI ♦ --- - - - - It _ - ' 46" STRVCT. I PLYWOOD \ht t t �t Est` Ir . ��0e. ! ` Sa��C IrA�iEL ( see fl.Lo vc�d+N. OR V2.1' 01A. MOLLY s f / PnRAg0t7 i (2 u 4 To F boT� �r AacN..-SOFT 0 MOLL%( p.ARA,- tSOL.T NEAR %ALL ,y . 07; f:1u1L ENGINEER Cfr 1U1�6 COMMERCI AL BLiX, FOR SI LLLRI:CH`i cI, k.S.ts. b ASSOC. DESIGNER ►ws G 1 d Ar i VLYN ,�� .�� �+►t 6� rl�aL rot Lot. ,t'0'�� • 1 ! 1 f•f� I'f 7 L�e -- r•�- �- 1. _. _.�_....�...+� of �( _ -----------.. - 14, IT AL1 LKNA1 L ML'I hUU REAR IVALL