Loading...
HomeMy WebLinkAboutItem No. 18 Purchase Sport Field Netting Beacon Athletics McVicker ParkCity Council Agenda Report City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 22-165 Agenda Date: 4/26/2022 Status: Approval FinalVersion: 1 File Type: Council Consent Calendar In Control: City Council / Successor Agency Agenda Number: 18) Purchase of One (1) Pre-Designed and Engineered Sport Field Netting from Beacon Athletics for McVicker Canyon Park Approve and authorize the City Manager to execute a Purchase Order for the purchase of a Pre-Designed and Engineered Sports Field Netting in the amount of $149,195.00 from Beacon Athletics for McVicker Canyon Park. Page 1 City of Lake Elsinore Printed on 4/21/2022 REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Jason Simpson, City Manager Prepared by: Rick De Santiago, Public Works Manager Date: April 26, 2022 Subject: Purchase of One (1) Pre-Designed and Engineered Sports Field Netting from Beacon Athletics for McVicker Canyon Park Recommendation Approve and authorize the City Manager to execute a Purchase Order for the purchase of a Pre- Designed and Engineered Sports Field Netting in the amount of $149,195.00 from Beacon Athletics for McVicker Canyon Park. Background The City’s Municipal Code, Section 3.08.070, allows for commodities and services to “be obtained through a cooperative purchasing program devoted to local government procurement. Staff has researched various Sports Field Netting options and determined the sports field netting available to include the National Buy Board Purchasing Networks. This purchase will provide a ready-to- install sports netting system for McVicker Canyon Park. The netting is needed to screen off arrant and long ball shots from the playing fields bordering the parking lot for approximately 1,150 lineal feet. This prefabricated system is the most economical solution that meets the esthetic and safety demands of the sports park. The Beacon Athletics netting system includes the design, engineering, and shipping of a 35-foot high net system ready for installation upon delivery. Discussion Staff requested proposals and reached buy board purchasing options to satisfy the netting requirements. Two proposals were received and are listed below: Company Amount Beacon Athletics $149,195.00 Sports Specialties $214,715.00 Purchase of One (1) Pre-Designed Sport Field Netting April 26, 2022 Page 2 of 2 Beacon Athletics will design, engineer, ship, including certified structural footings the following netting system:  Base Netting System Pre-Engineered 35' Straight Pole Ball Safety Netting system  Netting 35’H x 1,150’W x 23’ on top of the existing 12’ Chain Link Fence  Powder Coated Black Straight Poles  1-3/4'' Square Mesh Net with Sewn Rope  Binding on Perimeter Edges, Cabling & Hardware Kit,  Designed 23' on Center Pole Spacing Fiscal Impact McVicker’s Canyon Park Project is included in the Fiscal Year 21/22 – 26/27 Capital Improvement Plan (CIP) budget Exhibits A - Beacon Athletics dated 4/14/2022 800-747-5985 | BeaconAthletics.com Beacon Athletics LLC, 8233 Forsythia Street, Suite 120 Middleton, WI, 53562 Project Cost Outline Order # TBD Customer: CITY OF LAKE ELSINORE Date: 04/14/2022 Contact: CHRIS ERICKSON Address: 521 NORTH LANGSTAFF STREET Rep: MIKE BLUNCK City, State: LAKE ELSINORE, CA 92530 Phone: 402-750-5788 Phone: 951-674-5170 Email: MIKEB@BEACONATHLETICS.COM Email: CERICKSON@LAKE-ELSINORE.ORG Project Description and Cost Outline: MCVICKER CANYON PARK BARRIER NET Item Description Qty Cost Outline Barrier Net System Base Netting System: A Beacon Barrier Net System – Baseball. 35’H x 1,150’W. 23’ of netting on top of existing 12’ chain link fence. Complete Package Includes: 8” steel uprights, 1-3/4” mesh net and all attachment hardware. Per: N8148 1 $135,450 Freight Estimated freight cost for project ordered in full: subject to change based on formal quote from Beacon Athletics 1 $8,975 Total Cost Outline $144,475 Cost Outline Notes: 1. Preliminary price range is based on Beacon's experience with similar projects. A firm quote can be prepared on request with detailed specifications of customer's project. 2. Installation is not included. Beacon can assist in recommending installation vendor where applicable. 3. Concrete and footing materials are not included. 4. Installation shop drawings will be prepared upon order confirmation. Price estimate includes 4 hours of design services. 5. Customer is responsible for unloading all materials upon delivery. Beacon Athletics + Project Cost Outline - Page 2 800-747-5985 | BeaconAthletics.com Beacon Athletics LLC, 8233 Forsythia Street, Suite 120 Middleton, WI, 53562 Add-On Services (Optional) Design Services Projects requiring more than 4 hours of design may time incur additional costs $175/hour On-Site Consulting Optimal results include 2-3 days of on-site Beacon consultant during installation. $1,000/day, plus travel costs Engineering Engineering report signed & sealed by licensed Engineer in state of purchase $2,200 - $3,200 Estimated Delivery Timeframe Engineering Stamped Engineering Report - if needed 3-4 weeks Designs/ Drawings Following Engineering Report 1-2 weeks depending on complexity Customer approval required prior to proceed Pole Fabrication Fabricated following customer approval 3-4 weeks after approval Pole Hardware Sent separately. Prepared concurrently with pole fabrication Sent same time as poles Custom Netting Fabricated after poles are installed for accurate measurements 1-2 weeks after measurement Catalog Items Sent per customer request Varies by product