Loading...
HomeMy WebLinkAbout0002_01_PA 2021-11 - SR Page 1 of 7 REPORT TO PLANNING COMMISSION To: Honorable Chairman and Members of the Planning Commission From: Justin Kirk, Assistant Community Development Director Prepared by: Damaris Abraham, Senior Planner Date: January 18, 2022 Subject: Planning Application No. 2021-11 (Lakeside Residential Project) requesting to develop 140-unit gated condominium community on an approximately 34.81 acre site Applicant: Shelly Jordan, Tri Pointe Homes Recommendation 1. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, RECOMMENDING ADOPTION OF A MITIGATED NEGATIVE DECLARATION (ER 2021-02) (SCH NO. 2021110300) FOR PLANNING APPLICATION NO. 2021-11 (ZONE CHANGE NO. 2021-04, TENTATIVE TRACT MAP NO. 38116, AND RESIDENTIAL DESIGN REVIEW NO. 2021-02); 2. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, RECOMMENDING ADOPTION OF FINDINGS THAT PLANNING APPLICATION NO. 2021-11 (ZONE CHANGE NO. 2021-04, TENTATIVE TRACT MAP NO. 38116, AND RESIDENTIAL DESIGN REVIEW NO. 2021-02) IS CONSISTENT WITH THE WESTERN RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP); 3. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, RECOMMENDING APPROVAL OF ZONE CHANGE NO. 2021- 04 ESTABLISHING A PLANNED UNIT DEVELOPMENT (PUD) OVERLAY DISTRICT TO PROVIDE MODIFIED DEVELOPMENT REGULATIONS AND DESIGN STANDARDS FOR THE UNDERLYING R-3 ZONING DISTRICT FOR THE PROPERTY LOCATED AT APNS 379-060-005, 022 AND 027; 4. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, RECOMMENDING APPROVAL OF TENTATIVE TRACT MAP NO. 38116 FOR THE SUBDIVISION OF THE 34.81-ACRE SITE INTO NINE LOTS WITH ONE LOT FOR 140 DETACHED CONDOMINIUMS, ONE RESERVED OPEN SPACE LOT, ONE WATER QUALITY BASIN, TWO RECREATION LOTS, AND FOUR OPEN SPACE LOTS LOCATED AT APNS 379-060-005, 022 AND 027; and, 5. Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, RECOMMENDING APPROVAL OF RESIDENTIAL DESIGN REVIEW NO. 2021-02 PROVIDING BUILDING DESIGNS AND RELATED IMPROVEMENTS PA 2021-11 (Lakeside) PC: 01/18/2022 Page 2 of 7 FOR 140 CONDOMINIUM UNITS FOR TENTATIVE TRACT NO. 38116 LOCATED APNS 379-060-005, 022 AND 027. Project Location The 34.81-acre project site is located along State Route 74 (SR-74) east of the intersection of Riverside Drive and Grand Avenue (APNs 379-060-005, 022 and 027). Environmental Setting EXISTING LAND USE ZONING GENERAL PLAN Project Site Vacant High Density Residential (R-3) and Recreation (R) High Density Residential (HDR) and Recreational (R) North Mobile homes and Open Space High Density Residential (R-3) and Recreation (R) High Density Residential (HDR) and Recreational (R) South Single-Family Residential County of Riverside County of Riverside East Vacant High Density Residential (R-3) and Recreation (R) High Density Residential (HDR) and Recreational (R) West Condominiums Medium Density Residential - VLSP Village at Lakeshore Specific Plan (VLSP) Table 1: Environmental Setting Project Description The Lakeside Residential Project consists of applications for a Zone Change (ZC 2021-04), a Tentative Tract Map (TTM 38116) and a Residential Design Review (RDR 2021-02), which collectively are being processed under Planning Application No. 2021-11. Zone Change No. 2021-04 proposes to establish a Planned Development Unit (PUD) overlay district for the portion of the subject property that is currently zoned High Density Residential (R- 3). The PUD overlay provides modified development regulations and standards for the underlying R-3 zone to allow for greater flexibility and compatibility with the General Plan. Table 2 below provides proposed development standards for this PUD overlay. Development Feature R-3 Zoning Requirement Proposed PUD Modification Minimum lot area for lots over 8,400 square feet 1,815 square feet per unit 2,600 minimum Front setback 15 feet minimum 10 feet minimum Rear setbacks 10 feet 10 feet minimum Lot coverage 60% 31.4% building site coverage Building height 30 feet 24-feet 3-inches Table 2: PUD Overlay Development Standards The PUD also provides design guidelines for siting, building architecture, landscaping, and site maintenance. Tentative Tract Map No. 38116 is proposing to subdivide the 34.81-acre site into nine (9) lots. One (1) 10.94-acre lot for detached 140 condominium residences, one (1) 15.65 reserved open space lot, one (1) 1.39-acre water quality basin, two (2) recreation lots (0.77 acres), private streets (4.60 acres), and four (4) open space landscaping lots (0.65 acres). The project will be required PA 2021-11 (Lakeside) PC: 01/18/2022 Page 3 of 7 to form a Home Owner’s Association (HOA) for the maintenance of common areas, private streets, and the detention basin. Table 3 below provides lot summary information: LAND USE LOT NO. ACREAGE Condominium Lots 1 (140 Units) 10.94 Preserved Open Space 2 15.65 Recreation Lots A and B 0.77 Water Quality/Detention Basin C 1.39 Open Space D, E, F and G 0.65 Streets (Private) 4.60 Grand Ave (ROW to be dedicated) 0.81 TOTAL: 34.81 Table 3: Tentative Tract Map 38116 Land Use Summary Residential Design Review No. 2021-02 proposes the design and construction of a gated condominium community with 140 detached two-story condominium units, preliminary plotting, conceptual wall and fence plan, recreation areas, and related amenities and infrastructure on the western portion of the site. The eastern 15.65 acres of the site that is adjacent to the lake would be preserved as natural open space. Floor Plans The project proposes three (3) different detached condominium plans ranging in size from 1,793 sq. ft. to 2,288 sq. ft., as described below:  Plan 1: Two-story 1,793 square foot unit with 3 bedrooms, 2.5 baths, great room, dining room, kitchen, laundry, porch, entry, and a two-car garage.  Plan 2: Two-story 2,021 square foot unit with 3 bedrooms, 2.5 baths, loft, den (optional bedroom 4 and Bath 3), great room, dining room, kitchen, laundry, porch, entry, and a two- car garage.  Plan 3: Two-story 2,288 square foot unit with 4 bedrooms, 2.5 baths, loft (optional bedroom 5), optional den, great room, dining room, kitchen, laundry, porch, entry, and a two-car garage. Plan 1 will account for 47 units (33.5%), Plan 2 will account for 47 units (33.5%), and Plan 3 will account for 46 units (33%). Architecture and Treatments The proposed project would offer three architectural styles and treatments for each of the floor plans, including Spanish Colonial, Santa Barbara, and Craftsman. The following describes each of these architectural styles:  The Spanish Colonial Style includes concrete “S” tile roofs, decorative shutters, vertical windows with wood window trim, and stucco siding and squared entries.  The Santa Barbara Architectural Style includes concrete “S” tile roofs, decorative shutters, vertical windows with wood trim, stucco siding and have a mixture of both squared and rounded entries. PA 2021-11 (Lakeside) PC: 01/18/2022 Page 4 of 7  The Craftsman Architectural Style includes concrete flat tile roofs, vertical windows with wooden trim, stucco siding and squared entries. Spanish Colonial (Elevation A) will account for 47 units (33.5%), Santa Barbara (Elevation B) will account for 46 units (33%), and Craftsman (Elevation C) will account for 47 units (33.5%). In addition, enhanced architectural treatments will be provided on those elevations that are visible from public views along Grand Ave and on corner lots. Conceptual Wall and Fence Plan The project proposes to 6-foot-high concrete masonry wall to be constructed along the project site boundary with Grand Avenue/Riverside Drive/SR-74. Pedestrian and vehicular entry gates would be 6-foot-high metal rolling security gates. Residences would be separated by rear and side yard minimum 6-foot-high vinyl fences. Landscaping Landscaping proposed as part of the project would consist of ornamental trees, vines, shrubs, and groundcovers throughout the common areas of the development, such as along roadways, common walls, water quality basin, and the recreation areas. In addition, street trees would be installed along the proposed sidewalks throughout the project site. The roadway entrance to the project site would have a landscaped median and decorative landscaping to enhance the entrance to the residential neighborhood. Recreation and Open Space The project includes development of two recreation areas in the center of the project site. Recreation Lot A would be 0.44-acre and Recreation Lot B would be 0.33-acre. The recreation areas would include a grassy area/playfield, a tot lot, shade structure, pool, spa, restrooms, lounge chairs, BBQs, benches and picnic benches. Each condominium unit will also have a fenced backyard that will serve as a private open space. In addition, the project includes 15.65 acres of land adjacent to the lake that would be preserved natural open space. Site Access The project would provide two gated driveways to the project site from Grand Avenue/SR-74. A 78-foot-wide main driveway with a landscaped median would be located at Jamieson Street, at the center of the site, and a secondary 26-foot-wide gated driveway would be located at the northwestern corner of the site. All proposed streets within TTM 38116 are private streets and will be maintained by the HOA. Street Improvements The project includes off-site improvements to provide half-width roadway improvements to Grand Avenue/Riverside Drive/SR-74. The project includes widening Riverside Drive / SR-74 to two lanes along the project frontage to meet the future roadway buildout of the Lake Elsinore General Plan and to construct a median to prohibit left-turns onto SR-74/ Riverside Drive from the project site and Jamieson Street. Left-turns to the project site and Jamieson Street would be provided for eastbound and westbound left-turns. The project also includes addition of a striped bike lane, PA 2021-11 (Lakeside) PC: 01/18/2022 Page 5 of 7 streetlights, parkway landscaping, removal of the existing utility poles along Grand Avenue/Riverside Drive/SR-74 fronting the project site and undergrounding the dry utilities. Grading Construction activities include demolition of the existing structures, excavation, grading, and re - compaction of soils. Earthwork for the site is anticipated to require 25,800 cubic yards of cut, 82,000 cubic yards of fill, and 56,200 cubic yards of import. Analysis General Plan Consistency The project site has General Plan land use designations of High Density Residential and Recreational. The High Density Residential land use designation provides for residential densities between 19 and 24 units per net acre. The Recreation land use designation provides for public and private areas of permanent open space and allows for passive and/or active private and public recreation. The project includes 140 detached condominiums with a net density of 23 unit per net acre. Thus, the project would not exceed the allowable High Density Residential density of 24 dwelling units per acre. In addition, 15.65 acres of the project site, which is designated Recreational would be preserved as open space adjacent to Lake Elsinore. Therefore, the project is consistent with the residential and recreation General Plan land use designations for the site. Municipal Code Consistency The project site is zoned as High Density Residential (R-3) and Recreation (R). The R-3 zoning designation allows for residential dwellings at densities of up to 24 dwellings to the net acre. The project includes 140 detached condominiums with a net density of 23 unit per net acre. Thus, the project would not exceed the allowable R-3 density of up to 24 dwelling units per acre. In addition, 15.65 acres of the project site, which is zoned R would be preserved as open space adjacent to Lake Elsinore. Therefore, the project is consistent with the Municipal Code. PUD Overlay The project includes implementation of a Planned Unit Development (PUD) Overlay. Specifically, LEMC Section 17.84.020.G, Permitted Uses of the R-3 zone, requires condominiums to comply with all provisions of Chapter 17.108, Planned Unit Development Overlay District. This project includes ZC 2021-04 (PUD Overlay) to establish a Planned Development Unit (PUD) overlay district for portion of the subject property that is currently zoned High Density Residential (R-3). The PUD overlay provides modified development regulations and standards for the underlying R- 3 zone to allow for flexibility in order to allow for greater flexibility and compatibility with the General Plan. Table 2 above summarizes the proposed development standards for this PUD overlay. The PUD also provides design guidelines for siting, building architecture, landscaping, and site maintenance. The proposed project supports the findings in Section 17.108.060 of the LEMC. The proposed project is consistent and compatible with the General Plan and provides an increase in housing opportunities within the City. The proposed Tentative Map and Residential Design Review applications are designed in compliance with the PUD Overlay. The Tentative Map also complies with Chapter 16.24 (Tentative Map) of the LEMC and the Subdivision Map Act. PA 2021-11 (Lakeside) PC: 01/18/2022 Page 6 of 7 The Design Review Committee that includes staff from Planning, Building and Safety, Fire, and Engineering have reviewed the proposed project, and have conditioned the project to ensure compliance with the approved specific plan and the related environmental document. The proposed plotting provides an appropriate mixture of plan and elevation types to ensure variety in the streetscape. AB 52 Tribal Consultations On June 30, 2021, the City provided written notification of the project in accordance with AB 52 to all of the Native American tribes that requested to receive such notification from the City. Staff received requests from Rincon, Pechanga, and Soboba Tribes within the 30-day period, requesting to initiate consultation. Consultation was concluded September 9, 2021 with the Rincon Band of Luiseño Indians. Consultation is still ongoing with the Pechanga Band of Luiseño Indians and the Soboba Band of Luiseño Indians. Mitigation measures have been added to address a concern over the potential for uncovering tribal cultural resources (TCRs) or other tribal‐ affiliated resources during construction of the project. Environmental Determination Pursuant to CEQA Guidelines Section 15063, an Initial Study (Environmental Review No. 2021- 02) was prepared for the project to assess potential environmental impacts. The Initial Study revealed that the project would have potentially significant environmental impacts but those potentially significant impacts could be mitigated to less than significant levels. A Mitigated Negative Declaration (MND) (SCH# 2021110300) was prepared and was made available for public review and comment for a 30-day review period from November 19, 2021 to December 20, 2021.The MND determined that the proposed Project would have potentially significant environmental impacts upon Biological Resources, Cultural and Tribal Resources, and Geology and Soils. These impacts will be mitigated to below a level of significance through compliance with the mitigation measures set forth in the MND. Notice to all interested persons and agencies inviting comments on the MND was published in accordance with the provisions of CEQA, and posted at the Office of the County Clerk of Riverside County and at the State Clearinghouse on November 19, 2021 for a 30-day public comment period. Five (5) comment letters regarding the MND were received during the 30-day public comment period from the Riverside County Flood Control and Water Conservation District (dated December 9, 2021), Riverside Transit Agency (dated December 1, 2021), Rincon Band of Luiseño Indians (dated December 9, 2021), Pechanga Band of Luiseño Indians (dated December 16, 2021), and California Highway Patrol (dated December 22, 2021). Reponses to comments were prepared and are provided in the attached Exhibit H. There were no public comments or changes to the text or analysis contained in the MND that resulted in the identification of any new significant environmental effects. Only clarifications were made to the MND in response to public comments. Therefore, in accordance with Section 15073.5 of the CEQA Guidelines a recirculation of the MND is not warranted. MSHCP Consistency The project is consistent with the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP). The project site is not located in a Criteria Cell and was not required to be processed through the Lake Elsinore Acquisition Process (LEAP) and Joint Project Review (JPR) processes. The project complies with all other applicable requirements of the MSHCP. PA 2021-11 (Lakeside) PC: 01/18/2022 Page 7 of 7 Exhibits A – CEQA Resolution A1 - Mitigation Monitoring and Reporting Program B – MSHCP Resolution C – Zone Change (PUD Overlay) Resolution C1 – PUD Plan D – TTM Resolution E – RDR Resolution F – Conditions of Approval G – IS/MND H – Response to Comments I – Vicinity Map J – Aerial Map K – TTM 38116 L – Design Review Package