HomeMy WebLinkAboutEnvironmental Signature 4-15-20 (Signed) 4. Identify any other related permits and other public approvals required for this project including
those required by the City, regional,State, Federal agencies, not including approvals from the City,
fire department,sheriff's department,and Elsinore Valley Municipal Water District.
Is any part of the Project,on-or off-site,located within a Criteria Cell pursuant to the Multiple
Species Habitat Conservation Plan (MSHCP)?If so,what are the Criteria Cell#(s)? If not known,
please enter all APNs at the following website to run a report,and include the report with
submittal of this form:http://www.rctima.org/online/content/rcip report generator.aspx
The City is a Lead Agency under CEQA,and is required under State law to ensure compliance.All projects
are subject to a review under the California Environmental Quality Act(CEQA)and will consist of one(1)
or more of the following:
• If not exempt,preparation of technical studies will be required to support determination of
appropriate CEQA process,as described below.
• Determination by Planning Division that all project impacts are less than significant,or can
be mitigated to less than significant. As such,the City will direct preparation of a Negative
Declaration (ND)or Mitigated Negative Declaration (MND).
• Determination by Planning Division that at least one(1)project impact cannot be mitigated
to less than significant levels. As such,the City will direct preparation of an Environmental
Impact Report(EIR).
All CEQA documents must be prepared either by City Staff OR by a qualified, City-approved
consultant under direct contract with the City,but funded by the Applicant.
Depending on the environmental impacts potentially resulting from your project,technical studies that
may be required,but are not be limited,include:
• Air Quality Analysis
• Noise Study
• Traffic Impact Analysis
• Geotechnical Study
• Phase I Environmental Site Assessment(Hazardous Materials)
• Hydrology Study or Conceptual Drainage Plan
• Conceptual Water Quality Management Plan
• Biological Resources Study(also used to support MSHCP consistency work)
• Cultural Resources Study
CERTIFICATION
I hereby certify that the statements furnished above and in the attached exhibits present the data and
information required for this initial evaluation to the best of my ability, and that the facts, statements,
and information presented are true and correct to the best of my knowledge.
SIGNATURE: DATE: 04/16/20
2