Loading...
HomeMy WebLinkAboutNPDES SFR Conditions of Approval 20180326 - PR#2021-523 NPDES CONDITIONS OF APPROVAL — Gonzales—Rodriquez SFR Stormwater Management / Pollutant Prevention / NPDES Design 1. Project hardscape areas shall be designed and constructed to provide for drainage into adjacent landscape. Construction 2. The project shall implement the City's minimum BMPs during construction in compliance with the Green Building Code for sediment and erosion control are required for this project. 3. Erosion & Sediment Control — Prior to the issuance of any grading or building permit for construction or demolition, the applicant shall submit for review and approval by the City Engineer, an Erosion and Sediment Control Plan as a separate sheet of the grading plan submittal to demonstrate compliance with the City's NPDES Program and state water quality regulations for grading and construction activities. At a minimum, the project shall consider and/or implement the following BMPs (Green Building Code Section 5.106.1.2): Scheduling of construction activity Erosion Control on slopes Preservation of natural features, Perimeter sediment control vegetation & soil Sediment trap or basin to retain Protection of storm drain inlets sediment onsite Drainage swales to control stormwater Wind erosion control flow Good housekeeping BMPs — storage Mulching/hydroseeding to stabilize control of wastes, debris, stockpiles, disturbed soils concrete cleanup, etc. 4. Non-stormwater discharges from the site are a violation of the Lake Elsinore Municipal Code Section 14.08.