HomeMy WebLinkAboutNPDES SFR Conditions of Approval 20180326 - PR#2021-523 NPDES CONDITIONS OF APPROVAL — Gonzales—Rodriquez SFR
Stormwater Management / Pollutant Prevention / NPDES
Design
1. Project hardscape areas shall be designed and constructed to provide for drainage into
adjacent landscape.
Construction
2. The project shall implement the City's minimum BMPs during construction in compliance
with the Green Building Code for sediment and erosion control are required for this project.
3. Erosion & Sediment Control — Prior to the issuance of any grading or building permit for
construction or demolition, the applicant shall submit for review and approval by the City
Engineer, an Erosion and Sediment Control Plan as a separate sheet of the grading plan
submittal to demonstrate compliance with the City's NPDES Program and state water
quality regulations for grading and construction activities. At a minimum, the project shall
consider and/or implement the following BMPs (Green Building Code Section 5.106.1.2):
Scheduling of construction activity Erosion Control on slopes
Preservation of natural features, Perimeter sediment control
vegetation & soil Sediment trap or basin to retain
Protection of storm drain inlets sediment onsite
Drainage swales to control stormwater Wind erosion control
flow Good housekeeping BMPs — storage
Mulching/hydroseeding to stabilize control of wastes, debris, stockpiles,
disturbed soils concrete cleanup, etc.
4. Non-stormwater discharges from the site are a violation of the Lake Elsinore Municipal
Code Section 14.08.