Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Item No. 18 - Amend. No. 2 PSA Engineering Resources So. Cal (ERSC)
City Council Agenda Report City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 21-386 Agenda Date: 10/26/2021 Status: Approval FinalVersion: 1 File Type: Council Consent Calendar In Control: City Council / Successor Agency Agenda Number: 18) Amendment No. 2 to the Professional Services Agreement with Engineering Resources of Southern California (ERSC) Approve and authorize the City Manager to execute Amendment No. 2 to the Professional Services Agreement with Engineering Resources of Southern California (ERSC) for an additional $672,625 for the current Fiscal Year, bringing the total contract amount for Fiscal Year 2021-22 not to exceed $847,625. Page 1 City of Lake Elsinore Printed on 10/21/2021 REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Jason Simpson, City Manager Prepared by: Remon Habib, City Engineer Date: October 26, 2021 Subject: Amendment No. 2 to the Professional Services Agreement with Engineering Resources of Southern California (ERSC) Recommendation Approve and authorize the City Manager to execute Amendment No. 2 to the Professional Services Agreement with Engineering Resources of Southern California (ERSC) for an additional $672,625 for the current Fiscal Year bringing the total contract amount for FY 21-22 not to exceed $847,625. Background On June 23, 2020, the City Council approved the Professional Services Agreement in the amount not to exceed $100,000 annually, with ERSC for engineering plan check services. On April 13, 2021, City Council approved Amendment No. 1 for an additional $75,000 annually due to an increase in development. The Engineering Department, as a part of the development process, requires a review of private development projects for compliance with Conditions of Approval, City Ordinances, City Standards, Clean Water Compliance , and the Subdivision Map Act. Discussion The developer of VTTM 28214 requested expedited plan checks for WQMP, Rough Grading, Street Improvement, and TM 28214-9. Engineering staff determined that all plans should go to one reviewer in order to effectuate an efficient and expediated review. ERSC was selected and they structured an expedited review schedule to meet the Tentative Map 28214-9 expiration date on 1/13/2022. The map is anticipated to be presented to City Council for approval at the November 9, 2021 meeting. Fiscal Impact There is no direct financial impact to the General Fund as the services being provided are funded 100% through the developer’s plan check fees. Sufficient funds have been approved in the budget for this amendment. Amendment No. 2 to the Agreement with ERSC October 26, 2021 Page 2 of 2 Exhibits Exhibit A – Amendment No. 2 Exhibit B – Amendment No. 1 Exhibit C – Original Agreement Exhibit D – Proposal AMENDMENT NO. 2 TO AGREEMENT FOR PROFESSIONAL SERVICES Engineering Resources of Southern California (ERSC) Engineering Plan Check Services This Amendment No. 2 to Agreement for Professional Services is made and entered into as of 10/26/2021, by and between the City of Lake Elsinore, a municipal corporation (“City), and Engineering Resources of Southern California, a California Corporation (“Consultant”). RECITALS A. The City and Consultant have entered into that certain Agreement for Professional Services dated as of 6/23/2020, (the “Original Agreement”). Except as otherwise defined herein, all capitalized terms used herein shall have the meanings set forth for such terms in the Original Agreement. B. The Original Agreement provided for compensation to Consultant in an amount of One Hundred Thousand dollars ($100,000.00). C. The Original Agreement had a term of 3 (three) years, commencing on 7/1/2020 and ending on 6/30/2023. D. Amendment No. 1, approved April 13, 2021, provided for an increase in compensation in an amount not to exceed Seventy-Five Thousand dollars ($75,000). E. The parties now desire to increase the payment for such services in accordance with Consultant’s Proposal dated June 1, 2020 attached as Exhibit A to the Original Agreement and as set forth in this Amendment No 2. NOW, THEREFORE, in consideration of the mutual covenants and conditions set forth herein, City and Consultant agree as follows: 1. Section 2, Compensation, of the Original Agreement as amended by Amendment No.1 is hereby amended to add the following: Notwithstanding the foregoing, for purposes of Amendment No. 2, compensation to be paid to Consultant in accordance with the Schedule of Charges set forth in Consultant’s Proposal (Exhibit A) for Fiscal Year 2021- 2022 shall not exceed Eight Hundred Forty-Seven Thousand Six Hundred Twenty-Five Dollars ($847,625) without additional written authorization from the City Council. Except for the changes specifically set forth herein, all other terms and conditions of the Original Agreement as amended by Amendment No. 1 shall remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this Amendment No. 2 to be executed on the respective dates set forth below. “CITY” CITY OF LAKE ELSINORE, a municipal corporation “CONSULTANT” Engineering Resources of Southern California (ERSC) City Manager Date: President Date: __ ATTEST: City Clerk APPROVED AS TO FORM: City Attorney Director of Administrative Services EXHIBIT A-2 CONSULTANT’S PROPOSAL [ATTACHED] AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL SERVICES Engineering Resources of Southern California (ERSC) Engineering Plan Check Services This Amendment No. 1 to Agreement for Professional Services is made and entered into as of 4/13/2021, by and between the City of Lake Elsinore, a municipal corporation (“City), and Engineering Resources of Southern California, a California Corporation (“Consultant”). RECITALS A. The City and Consultant have entered into that certain Agreement for Professional Services dated as of 6/23/2020, (the “Original Agreement”). Except as otherwise defined herein, all capitalized terms used herein shall have the meanings set forth for such terms in the Original Agreement. B. The Original Agreement provided for compensation to Consultant in an amount of One Hundred Thousand dollars ($100,000.00). C. The Original Agreement had a term of 3 (three) years, commencing on 7/1/2020 and ending on 6/30/2023. D. The parties now desire to amend the scope of services and increase the payment for such services as set forth in this Amendment No 1. NOW, THEREFORE, in consideration of the mutual covenants and conditions set forth herein, City and Consultant agree as follows: 1. Section 1, Scope of Services, of the Original Agreement is hereby amended to add the following: Consultant shall also perform the services described in Consultant’s 6/1/2020 Proposal (attached to this Amendment No. 1 as Exhibit A-1). Consultant shall provide such services at the time, place, and in the manner specified in Exhibit A-1, subject to the direction of the City through its staff that it may provide from time to time. 2. Section 2, Compensation, of the Original Agreement is hereby amended to read in its entirety as follows: Notwithstanding the foregoing, for purposes of Amendment No. 1 and the term thereof, compensation to be paid to Consultant shall be in accordance with the Schedule of Charges set forth in Consultant’s Proposal (referenced collectively as Exhibit A-1 Amendment No. 1). In no event shall Consultant’s compensation related to Exhibit A-1 to Amendment No. 1 exceed Seventy-Five Thousand dollars ($75,000) without additional written authorization from the City Council. Annual compensation during each renewal term, if any, shall not exceed One Hundred Seventy-Five Thousand Dollars ($175,000). DocuSign Envelope ID: 5F35A03A-9BAF-4272-9E0A-922C90E199E0 Notwithstanding any provision of Consultant’s Proposal to the contrary, out of pocket expenses set forth in Exhibit A-1 respectively, shall be reimbursed at cost without an inflator or administrative charge. Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment. Except for the changes specifically set forth herein, all other terms and conditions of the Original Agreement shall remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this Amendment No. 1 to be executed on the respective dates set forth below. “CITY” CITY OF LAKE ELSINORE, a municipal corporation “CONSULTANT” Engineering Resources of Southern California (ERSC) City Manager Date: President Date: __ ATTEST: City Clerk APPROVED AS TO FORM: City Attorney Risk Manager Attachments: Exhibit A-1 – Consultant’s Proposal DocuSign Envelope ID: 5F35A03A-9BAF-4272-9E0A-922C90E199E0 4/19/2021 | 4:59 PM PDT 4/19/2021 | 11:17 PM PDT 4/20/2021 | 12:39 PM PDT4/21/2021 | 5:30 PM PDT 4/22/2021 | 8:34 AM PDT EXHIBIT A-1 CONSULTANT’S PROPOSAL [ATTACHED] DocuSign Envelope ID: 5F35A03A-9BAF-4272-9E0A-922C90E199E0 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 AGREEMENT FOR PROFESSIONAL SERVICES Engineering Resources of Southern California (ERSC) Engineering Plan Check Services This Agreement for Professional Services (the "Agreement") is made and entered into as of June 23, 2020, by and between the City of Lake Elsinore, a municipal corporation ("City") and Engineering Resources of Southern California, Inc., a Corporation ("Consultant"). RECITALS A. The City has determined that it requires the following professional services: Engineering plan check services as part of the development process. B. Consultant has submitted to City a proposal, dated June 1, 2020, attached hereto as Exhibit A ("Consultant's Proposal") and incorporated herein, to provide professional services to City pursuant to the terms of this Agreement. C. Consultant possesses the skill, experience, ability, background, certification and knowledge to perform the services described in this Agreement on the terms and conditions described herein. D. City desires to retain Consultant to perform the services as provided herein and Consultant desires to provide such professional services as set forth in this Agreement. AGREEMENT 1. Scope of Services. Consultant shall perform the services described in Consultant's Proposal (Exhibit A). Consultant shall provide such services at the time, place, and in the manner specified in Consultant's Proposal, subject to the direction of the City through its staff that it may provide from time to time. 2. Time of Performance. a. Time of Essence. Time is of the essence in the performance of this Agreement. The time for completion of the professional services to be performed by Consultant is an essential condition of this Agreement. Consultant shall prosecute regularly and diligently the professional services contemplated pursuant to this Agreement according to the agreed upon performance schedule in Consultant's Proposal (Exhibit A). b. Performance Schedule. Consultant shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the Consultant's Proposal (Exhibit A). When requested by Consultant, extensions to the time period(s) specified may be approved in writing by the City Manager. C. Term. Unless earlier terminated as provided elsewhere in this Agreement, this Agreement shall continue in full force and effect for a period commencing on July 1, 2020 and ERSC Exhibit A.docx Pagel DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 ending June 30, 2023. The City may, at its sole discretion, extend the term of this Agreement on a 12-month basis not to exceed 2 additional twelve (12) month renewal terms by giving written notice thereof to Consultant not less than thirty(30)days before the end of the contract term, such notice to be exercised by the City Manager. 3. Compensation. Compensation to be paid to Consultant shall be in accordance with the fees set forth in Consultant's Proposal (Exhibit A), which is attached hereto and incorporated herein by reference. In no event shall Consultant's annual compensation exceed One Hundred Thousand Dollars ($100,000.00) without additional written authorization from the City. Notwithstanding any provision of Consultant's Proposal to the contrary, out of pocket expenses set forth in Exhibit A shall be reimbursed at cost without an inflator or administrative charge. Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment. 4. Method of Payment. Consultant shall promptly submit billings to the City describing the services and related work performed during the preceding month to the extent that such services and related work were performed. Consultant's bills shall be segregated by project task, if applicable, such that the City receives a separate accounting for work done on each individual task for which Consultant provides services. Consultant's bills shall include a brief description of the services performed, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Consultant no later than forty-five (45) days after receipt of the monthly invoice by City staff. 5. Background Checks. At any time during the term of this Agreement, the City reserves the right to make an independent investigation into the background of Consultant's personnel who perform work required by this Agreement, including but not limited to their references, character, address history, past employment, education, social security number validation, and criminal or police records, for the purpose of confirming that such personnel are lawfully employed, qualified to provide the subject service or pose a risk to the safety of persons or property in and around the vicinity of where the services will be rendered or City Hall. If the City makes a reasonable determination that any of Consultant's prospective or then current personnel is deemed objectionable, then the City may notify Consultant of the same. Consultant shall not use that personnel to perform work required by this Agreement, and if necessary, shall replace him or her with a suitable worker. 6. Suspension or Termination. a. The City may at any time, for any reason, with or without cause, suspend or terminate this Agreement, or any portion hereof, by serving upon the Consultant at least ten (10)days prior written notice. Upon receipt of such notice, the Consultant shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement such suspension or termination shall not make void or invalidate the remainder of this Agreement. b. In the event this Agreement is terminated pursuant to this Section, the City shall pay to Consultant the actual value of the work performed up to the time of termination, provided that the work performed is of value to the City. Upon termination of the Agreement pursuant to this Section, the Consultant will submit an invoice to the City, pursuant to Section entitled "Method of Payment" herein. Page 2 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 7. Plans, Studies, Documents. a. Ownership of Documents. All plans, studies, documents and other writings prepared by and for Consultant, its officers, employees and agents and subcontractors in the course of implementing this Agreement, except working notepad internal documents, shall become the property of the City upon payment to Consultant for such work, and the City shall have the sole right to use such materials in its discretion without further compensation to Consultant or to any other party. Consultant shall, at Consultant's expense, provide such reports, plans, studies, documents and other writings to City upon written request. City shall have sole determination of the public's rights to documents under the Public Records Act, and any third- party requests of Consultant shall be immediately referred to City, without any other actions by Consultant. b. Licensing of Intellectual Property. This Agreement creates a nonexclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant shall require that all subcontractors agree in writing that City is granted a nonexclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were prepared by design professionals other than Consultant or provided to Consultant by the City. City shall not be limited in any way in its use of the Documents & Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. C. Confidentiality. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other Documents &Data either created by or provided to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant. Such materials shall not, without the prior written consent of City, be used by Consultant for any purposes other than the performance of the services under this Agreement. Nor shall such materials be disclosed to any person or entity not connected with the performance of the services under this Agreement. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use City's name or insignia, photographs relating to project for which Consultant's services are rendered, or any publicity pertaining to the Consultant's services under this Agreement in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of City. 8. Consultant's Books and Records. a. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant to this Agreement. Page 3 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 b. Consultant shall maintain all documents and records which demonstrate performance under this Agreement for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Agreement. C. Any records or documents required to be maintained pursuant to this Agreement shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Manager, City Attorney, City Auditor or a designated representative of these officers. Copies of such documents shall be provided to the City for inspection at City Hall when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon,the records shall be available at Consultant's address indicated for receipt of notices in this Agreement. d. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Consultant's business, City may, by written request by any of the above-named officers, require that custody of the records be given to the City and that the records and documents be maintained in City Hall. Access to such records and documents shall be granted to any party authorized by Consultant, Consultant's representatives, or Consultant's successor-in-interest. 9. Independent Contractor. a. Consultant is and shall at all times remain as to the City a wholly independent contractor pursuant to California Labor Code Section 3353. The personnel performing the services under this Agreement on behalf of Consultant shall at all times be under Consultant's exclusive direction and control. Neither City nor any of its officers, employees, or agents shall have control over the conduct of Consultant or any of Consultant's officers, employees, or agents, except as set forth in this Agreement. Consultant shall not at any time or in any manner represent that it or any of its officers, employees, or agents are in any manner officers, employees, or agents of the City. Consultant shall not incur or have the power to incur any debt, obligation, or liability whatsoever against City, or bind City in any manner. b. Notwithstanding any other federal, state and local laws, codes, ordinances and regulations to the contrary and except for the fees paid to Consultant as provided in the Agreement, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits. 10. PERS Eligibility Indemnification. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS)to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. 11. Interests of Consultant. Consultant (including principals, associates and professional employees) covenants and represents that it does not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered Page 4 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 by this Agreement or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Consultant's services hereunder. Consultant further covenants and represents that in the performance of its duties hereunder no person having any such interest shall perform any services under this Agreement. Consultant is not a designated employee within the meaning of the Political Reform Act because Consultant: a. will conduct research and arrive at conclusions with respect to his/her rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal agreement monitoring; and b. possesses no authority with respect to any City decision beyond rendition of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).) 12. Professional Ability of Consultant. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall therefore provide properly skilled professional and technical personnel to perform all services under this Agreement. All work performed by Consultant under this Agreement shall be in accordance with applicable legal requirements and shall meet the standard of quality ordinarily to be expected of competent professionals in Consultant's field of expertise. 13. Compliance with Laws. a. Consultant shall comply with all local, state and federal laws and regulations applicable to the services required hereunder, including any rule, regulation or bylaw governing the conduct or performance of Consultant and/or its employees, officers, or board members. b. Consultant represents that it has obtained and will maintain at all times during the term of this Agreement all professional and/or business licenses, certifications and/or permits necessary for performing the services described in this Agreement, including a City business license. 14. Licenses. Consultant represents and warrants to City that it has the licenses, permits, qualifications, insurance and approvals of whatsoever nature which are legally required of Consultant to practice its profession. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement, any licenses, permits, insurance and approvals which are legally required of Consultant to practice its profession. Consultant shall maintain a City of Lake Elsinore business license. 15. Indemnity. Consultant shall indemnify, defend, and hold harmless the City and its officials, officers, employees, agents, and volunteers from and against any and all losses, liability, claims, suits, actions, damages, and causes of action arising out of any personal injury, bodily injury, loss of life, or damage to property, or any violation of any federal, state, or municipal law or ordinance, to the extent caused, in whole or in part, by the willful misconduct or negligent acts or omissions of Consultant or its employees, subcontractors, or agents, by acts for which they could be held strictly liable, or by the quality or character of their work. The foregoing obligation of Consultant shall not apply when (1) the injury, loss of life, damage to property, or violation of Page 5 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 law arises from the sole negligence or willful misconduct of the City or its officers, employees, agents, or volunteers and (2)the actions of Consultant or its employees, subcontractor, or agents have contributed in no part to the injury, loss of life, damage to property, or violation of law. It is understood that the duty of Consultant to indemnify and hold harmless includes the duty to defend as set forth in Section 2778 of the California Civil Code. Acceptance by City of insurance certificates and endorsements required under this Agreement does not relieve Consultant from liability under this indemnification and hold harmless clause. This indemnification and hold harmless clause shall apply to any damages or claims for damages whether or not such insurance policies shall have been determined to apply. By execution of this Agreement, Consultant acknowledges and agrees to the provisions of this Section and that it is a material element of consideration. 16. Insurance Requirements. a. Insurance. Consultant, at Consultant's own cost and expense, shall procure and maintain, for the duration of the contract, unless modified by the City's Risk Manager, the following insurance policies. i. Workers' Compensation Coverage. Consultant shall maintain Workers' Compensation Insurance and Employer's Liability Insurance for his/her employees in accordance with the laws of the State of California. In addition, Consultant shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California for all of the subcontractor's employees. Any notice of cancellation or non-renewal of all Workers' Compensation policies must be received by the City at least thirty (30)days prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Consultant for City. In the event that Consultant is exempt from Worker's Compensation Insurance and Employer's Liability Insurance for his/her employees in accordance with the laws of the State of California, Consultant shall submit to the City a Certificate of Exemption from Workers Compensation Insurance in a form approved by the City Attorney. ii. General Liability Coverage. Consultant shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit. Required commercial general liability coverage shall be at least as broad as Insurance Services Office Commercial General Liability occurrence form CG 0001 (ed. 11/88) or Insurance Services Office form number GL 0002 (ed. 1/73) covering comprehensive General Liability and Insurance Services Office form number GL 0404 covering Broad Form Comprehensive General Liability. No endorsement may be attached limiting the coverage. Page 6 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 iii. Automobile Liability Coverage. Consultant shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000)combined single limit for each occurrence. Automobile liability coverage must be at least as broad as Insurance Services Office Automobile Liability form CA 0001 (ed. 12/90) Code 1 ("any auto"). No endorsement may be attached limiting the coverage. iv. Professional Liability Coverage. Consultant shall maintain professional errors and omissions liability insurance appropriate for Consultant's profession for protection against claims alleging negligent acts, errors or omissions which may arise from Consultant's services under this Agreement, whether such services are provided by the Consultant or by its employees, subcontractors, or sub consultants. The amount of this insurance shall not be less than one million dollars ($1,000,000) on a claims-made annual aggregate basis, or a combined single limit per occurrence basis. b. Endorsements. Each general liability and automobile liability insurance policy shall be with insurers possessing a Best's rating of no less than A:VII and shall be endorsed with the following specific language: i. Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, the protection offered by all policies, except for Workers' Compensation, shall bear an endorsement whereby it is provided that, the City and its officers, employees, servants, volunteers and agents and independent contractors, including without limitation, the City Manager and City Attorney, are named as additional insureds. Additional insureds shall be entitled to the full benefit of all insurance policies in the same manner and to the same extent as any other insureds and there shall be no limitation to the benefits conferred upon them other than policy limits to coverages. ii. This policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers. Any insurance maintained by the City, including any self-insured retention the City may have, shall be considered excess insurance only and shall not contribute with it. iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company. iv. The insurer waives all rights of subrogation against the City, its elected or appointed officers, officials, employees or agents. V. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents or volunteers. vi. The insurance provided by this Policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the City. Page 7 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 C. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the City's option, Consultant shall demonstrate financial capability for payment of such deductibles or self-insured retentions. d. Certificates of Insurance. Consultant shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Certificates of such insurance shall be filed with the City on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with the City at all times during the term of this Agreement. 17. Notices. Any notice required to be given under this Agreement shall be in writing and either served personally or sent prepaid, first class mail. Any such notice shall be addressed to the other party at the address set forth below. Notice shall be deemed communicated within 48 hours from the time of mailing if mailed as provided in this section. If to City: City of Lake Elsinore Attn: City Manager 130 South Main Street Lake Elsinore, CA 92530 With a copy to: City of Lake Elsinore Attn: City Clerk 130 South Main Street Lake Elsinore, CA 92530 If to Consultant: Engineering Resources of Southern California (ERSC) Attn: John Mathew Brudin, PE 1861 W. Redlands Blvd Redlands, CA 92373 18. Assignment and Subcontracting. The parties recognize that a substantial inducement to City for entering into this Agreement is the professional reputation, experience and competence of Consultant and the subcontractors listed in Exhibit B. Consultant shall be fully responsible to City for all acts or omissions of any subcontractors. Assignments of any or all rights, duties or obligations of the Consultant under this Agreement will be permitted only with the express consent of the City. Consultant shall not subcontract any portion of the work to be performed under this Agreement except as provided in Exhibit B without the written authorization of the City. If City consents to such subcontract, Consultant shall be fully responsible to City for all acts or omissions of those subcontractors. Nothing in this Agreement shall create any contractual relationship between City and any subcontractor nor shall it create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise is required by law. 19. Waiver. Waiver of a breach or default under this Agreement shall not constitute a continuing waiver of a subsequent breach of the same or any other provision under this Agreement. 20. Litigation Expenses and Attorneys' Fees. If either party to this Agreement commences any legal action against the other party arising out of this Agreement, the prevailing party shall be entitled to recover its reasonable litigation expenses, including court costs, expert witness fees, discovery expenses, and attorneys' fees. Page 8 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 21. Mediation. The parties agree to make a good faith attempt to resolve any disputes arising out of this Agreement through mediation prior to commencing litigation. The parties shall mutually agree upon the mediator and share the costs of mediation equally. If the parties are unable to agree upon a mediator, the dispute shall be submitted to JAMS or its successor in interest. JAMS shall provide the parties with the names of five qualified mediators. Each party shall have the option to strike two of the five mediators selected by JAMS and thereafter the mediator remaining shall hear the dispute. If the dispute remains unresolved after mediation, either party may commence litigation. 22. Prohibited Interests. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom. 23. Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. 24. Prevailing Wages. Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Consultant agrees to fully comply with all applicable federal and state labor laws (including, without limitation, if applicable, the Prevailing Wage Laws). It is agreed by the parties that, in connection with the Work or Services provided pursuant to this Agreement, Consultant shall bear all risks of payment or non-payment of prevailing wages under California law, and Consultant hereby agrees to defend, indemnify, and hold the City, and its officials, officers, employees, agents, and volunteers, free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. The foregoing indemnity shall survive termination of this Agreement. 25. Severability. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 26. Controlling Law Venue. This Agreement and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Agreement shall be held exclusively in a state court in the County of Riverside. 27. Authority to Enter Agreement. Consultant has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to Page 9 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 make this Agreement and to bind each respective party. The City Manager is authorized to enter into an amendment or otherwise take action on behalf of the City to make the following modifications to the Agreement: (a) a name change; (b) grant extensions of time; (c) non- monetary changes in the scope of services; and/or (d) suspend or terminate the Agreement. 28. Counterparts. This Agreement may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties hereto. In approving this Agreement, it shall not be necessary to produce or account for more than one such counterpart. 29. Entire Agreement; Incorporation; Conflict. This Agreement contains the entire understanding between the parties relating to the obligations described herein. All prior or contemporaneous understandings, agreements, representations and statements, oral or written, are superseded in total by this Agreement and shall be of no further force or effect. Consultant's Proposal is incorporated only for the description of the scope of services and/or the schedule of performance and no other terms and conditions from such proposal shall apply to this Agreement unless specifically agreed to in writing. In the event of conflict, this Agreement shall take precedence over those contained in the Consultant's Proposal. 30. Amendments. This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney. [Signatures on next page] Page 10 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the date first written above. "CITY" CITY OF LAKE ELSINORE, a municipal "CONSULTANT" corporation Engineering Resources of Southern California (ERSC), a DocuSigned by: DocuSigned by: 7/9/2020 � 10:20 AM DT �., a bmkvu 7/9/2020 10:20 AM PDT Grant Yates, City Manager By: John Mathew Brudin, PE Its: President ATTEST: DocuSigned by: 7/9/2020 10:20 AM PDT City Jerk APPROVED AS TO FORM: F2DocuSigned by: 6t-",4rr.4U 7/9/2020 1 10:20 AM PDT City rney DocuSigned by: 6Vu 7/9/2020 1 10:20 AM PDT LS0 T Risw,manager Attachments: Exhibit A— Consultant's Proposal Exhibit B — List of Subcontractors Page 11 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 EXHIBIT A CONSULTANT'S PROPOSAL [ATTACHED] EXHIBIT A EngineeriVIResourcesof • 4ern California Proposal for Professional As-Needed Plan Check Services for Engineering Department CITY OF LAKE LSII02 `�C)I�E r�-'�=? DREAM E,�CT RE M E Submitted: June 1 , 2020 `'"" ._ June 1, 2020 Corporate Office: 1861 W. Redlands Blv City of Lake Elsinore Redlands, • 2373 130 South Main Street '• info@erscinc.com Lake Elsinore, CA 92530 Local Office: Attn: Engineering Department 41593 Winchester '• 200 Suite Temecula, CA • •0 RE: Proposal for Professional As-Needed Plan Check Services for EvaluationPeriod Engineering Department Mr. Matt Brudin, PE President, Project Man•0• :•0 Dear Mr. Habib, matt@erscinc.com Engineering Resources of Southern California (ERSC) is submitting qualifications to the City of Lake Elsinore as a qualified, experienced consultant to provide Plan Check Consulting Services for Private and Public Projects. ERSC has served the City as a Plan Check consultant since 2016. In that time Lake Elsinore has seen unprecedented growth in development activity. With this growth, ERSC was able to meet the demand of development submittals for approval in the City while aiding the City's team during staff, procedural, and environmental transitions. ERSC is ready and able to continuing providing the City with services that exceeds staff expectations into the next contract period. ERSC was founded in 1996 to provide engineering services to the public sector. The firm has delivered a proven record in Plan Checking to numerous Cities throughout Southern California. The key staff assigned to your project have served your City as well as clients with similar projects Plan Checking assignments. Being local to the Inland Empire, ERSC maintains valued working relationships and valuable experience working within various design criteria, and within the related various departments within the region's diverse range of public agencies. Project Understanding The City of Lake Elsinore is preparing to continue its growth into one of Riverside County's best communities. As Lake Elsinore continues to develop, the staff of the City are assembling a qualified team to assist in facilitating that growth while adhering to all applicable regulations and protecting the interests of the City as well as its residents and stakeholders. ERSC's Plan Checking capabilities fit well with the goals of the City. In addition, we currently provide similar On-Call Services for many Cities and Agencies within the vicinity of Lake Elsinore: • City of Colton - On-Call Plan Checking Services • City of Chino - Plan Check and City Surveyor Services • City of Highland - On-Call Plan Checking, Inspection, and Engineering Services • City of Banning - Plan Check and Inspection Services • City of Beaumont- Plan Check and Inspection Services • City of Palm Springs - Plan Check, Project Management, and Design Services • City of Rialto - On-Call Plan Checking Services Project Manager John M. Brudin, PE will serve as the Project Manager during the term of the project. Mr. Brudin has provided oversight of plan checking and construction inspection projects throughout numerous municipalities for over 30 years. He is well versed in review of all types of civil improvement plans as they relate to development, capital improvements, and their related supporting documents including geotechnical reports, hydrology studies, and water quality management plans. Mr. Brudin has served as Project Manager for ERSC's contract in the City of Lake Elsinore since 2016. ERSC's Stand-Out Capabilities and Knowledge Integrated - ERSC's team has become integrated in the City of Lake Elsinore's Plan Checking processes and procedures to act as a seamless extension of City staff. Experienced - ERSC's familiarity with municipal plan checking and inspection processes, practices, Redlands,1861 W.Redlands Blvd. I and requirements. Advanced - ERSC's experience in electronic review, transmittal, and receipt of plan check projects. Nearby- ERSC's local office is nearby in the City of Temecula. The ERSC team provides to you timely, responsive resolutions to issues of local significance while protecting the City's goals. The individual signing this proposal has contractual responsibility with the City of Lake Elsinore and is authorized to bind ERSC to the terms of the proposal. ERSC confirms receipt of all addenda and that all information submitted is true and correct. This proposal is valid for a period not less than 90 Days from the date of submittal. ERSC has no concerns identified with the City's Professional Services Agreement. Please contact me by phone at(909)890-1255 or by email at matt@erscinc.com for any questions or clarifications as a result of this submittal. We look forward to the opportunity to continue our work with the City of Lake Elsinore and thank you for the opportunity to submit a proposal. Respec fully submitted, John 1V1. Brudin, PE President, Project Manager 0 . T4 le Contents ExecutiveSummary.................................................................................................................................. 1 ScopeOf Services..................................................................................................................................... 4 ProjectTeam........................................................................................................................................... 15 FirmExperience ..................................................................................................................................... 41 ._� # •.,ram Y _ :-,�-. __ Utly ummary Engineering Resources of Southern California, Inc. (ERSC)was formed in 1996 with the asset purchase of NBS/Lowry, Inc. Since formation, ERSC has been committed to serving the Southern California region's public sector such as Special Districts, Regional Agencies, and Municipalities. ERSC currently staffs over 37 engineers, designers, construction observation personnel, and administrative support staff in four offices located in Redlands, Palm Desert, Temecula, and Irvine. ERSC Capabilities ERSC's capabilities are both the reason for and result of our history of providing professional Our Locations services and solutions to agencies throughout the public sector. Our range of in-house capabilities allows us to meet the needs of clients throughout San Bernardino County 1861 W.Redlands Blvd. the life of any potential project: Redlands,CA 92373 • Water/Wastewater Engineering Riverside County Construction Management and Inspection 41593 Winchester Road,Ste.211 Temecula,CA92590 Civil Site Design • Transportation Engineering Coachella Valley 77-564 Country Club Drive,Ste.128 • Independent Plan Review Palm Desert,CA 92211 Flood Control and Drainage Engineering • Water Quality/NPDES Grange County 15 Hubble,Ste.200-B Traffic Engineering I rvi ne,CA 92618 Survey and Mapping • Environmental Services ERSC Professionals The strength behind ERSC is our staff of qualified and experienced engineers, designers, construction observation personnel,and administrative support staff.We strive to match the exceptional skills,technical abilities, character, and attitude of our team members to the needs of our clients. ERSC staff work daily to create partnerships with our clients to transform their projects from the broadest level of general scope to final planning, design, implementation and construction resolution. Many ERSC professionals have significant previous experience as municipal and public agency employees. As a result, ERSC can approach your project with first-hand knowledge of agency culture and how any agency envisions the planning and processing of a well-executed project. ERSC Reliability We believe that our long-standing service to a variety of public agency clients throughout California, many on a continuous basis throughout our 24 years in business, is a testimonial to the quality of services we provide. Many of our clients have continually sought our services since our first year of business. Throughout years of service, ERSC has developed significant financial resources and organizational J�A IAA IMIV Executive Summary efficiencies. Development of proficiencies in these areas has allowed ERSC to continually deliver projects that routinely exceed client expectations. Plan Checking Capabilities ERSC has provided plan checking and special study review since 1996. ERSC's plan checking clients include municipalities, government agencies, and special districts throughout the region. Many of these clients have extended service agreements to retain our services outside of the original contract period. These clients benefit from the expertise of our team as we have processed plan checks for thousands of projects throughout our different clients in the region. ERSC and the City of Lake Elsinore ERSC has served the City of Lake Elsinore as a plan check consultant since 2016. As a vendor to the City of Lake Elsinore, ERSC has been a part of facilitating the enormous growth the City has experienced. We have been able to learn the special staff, procedural, and environmental requirements of the City that only comes with long term experience working with an agency. ERSC has also served the City and local agencies in different capacities since 2016. Our team recently completed on-site and offsite improvements for the La Laguna RV Park and is currently in design of a new parking lot for EVMWD as well as completing a WQMP for the City's waste processing facility. The ERSC team is confident in our ability to seamlessly transition to a new contract in the City with outstanding service and continue to build a relationship that will continue for many years to come. ERSC Corporate Information Engineering Resources of Southern California, Inc. 1861 W. Redlands Blvd. Redlands, CA 92373 ERSC Insurance Coverage Levels Contact Information Professional $ 1.0 Million Per Occurrence; John M. Brudin, PE Liability $2.0 Million Aggregate 1861 W. Redlands Blvd. Redlands, CA 92373 Telephone: (909) 890-1255 ext. 103 Automobile $ 1.0 Million Combined Single Limit Fax: (909) 890-0995 Email Address: matt@erscinc.com ERSC confirms its ability to obtain all City requested insurance Type of Entity coverage and licenses. Corporation Organized in California Number of Employees ERSC maintains a staff of 37 professionals throughout 4 offices in Southern California. Federal Employer I.D. Number. 33-0718153 CA Dept. of Industrial Relations Number 1000017460 Years in business 24 years J�"A A Mau 2 Executive Summary Firm Experience with Work of a Similar Nature ERSC has been providing the service described in the RFP for 24 years. Our team has been involved in plan check for development related plans, maps, and studies since 2003. Below is a sample of ERSC clients related to Plan Checking for Development projects. Full project descriptions for projects demonstrating our experience are included in the Appendix of this proposal. ERSC Sample Municipal Services Clients Client Duration Services Provided City of Lake Elsinore 2016 - Present On-Call Plan, WQMP, Geotechnical Review City of Banning 2019 - Present On-Call Plan Check and Inspection City of Beaumont 2017 - Present On-Call Plan and WQMP Check City of Chino 2016 - Present On-Call Plan and WQMP Check City of Colton 2003 - Present On-Call Plan Check City of Garden Grove 2010 - Present Development Review and Mapping Plan Check City of Highland 2003 - Present Development Review, Plan Check, and Inspection City of La Mirada 2016— Present On-Call Project Management and Inspection City of Ontario 2018— Present Plan Check for Traffic Projects City of Palm Springs 2002 - Present On-Call Plan and Map Check City of Rialto 2020 - Present On-Call Plan Checking Services City of Tustin 2006 - Present Overflow and Expedited Plan for CIP/Development Specialized Training ERSC staff are professional engineers and scientists with educations, licenses, and training related to their individual fields of specialization. Please see the Key Personnel and Resumes included within this submittal for detailed information regarding the ERSC team. Subconsultants ERSC will not use subconsultants for this project. References Completed Work in Southern California Agency Contact Name Title Address Telephone No. Email City of Lake Rita Thompson Sr. Eng. 130 S Main St. (951)674-3124 rhompson@Lake-Elsinore. Elsinore Tech Lake Elsinore, CA 92530 Ext. 248 org City of Chino Chris City 13220 Central Ave. (909)334-3417 cmagdosku@cityofchino.org Magdosku, PE Engineer Chino, CA 91710 City of Palm Rick Minjares Sr. Eng. 3200 E Tahquitz (760)323-8299 Rick.Minjares@palmsprings- Springs Tech. Canyon Way ca.gov Palm Springs, CA 92262 City of Carlos Asst. Public 27215 Base Line St. (909)864-8732 czamano@cityofhighland.org Highland Zamano, PE Works Highland, CA 92346 Director City of Banning Kevin D. Sin, Sr. Civil 99 E Ramsey St. (951)922-3140 ksin@banningca.gov PE Engineer Banning, CA 92220 City of Laurie Miller Mgmt. 550 E 6th St (951)769-8520 Imiller@ci.beaumont.ca.us Beaumont Analyst Beaumont, CA 92223 ext. 326 City of Colton Victor Ortiz, City 650 N La Cadena Dr. (909)514-4210 vortiz@coltonca.gov PE Engineer Colton, CA 92324 J AAA_ IMIDU 3 co of Work Project Understanding ERSC understands the City is seeking qualified plan check engineers to review the City of Lake Elsinore's potential private and public development projects. ERSC is confident we can provide service that exceeds expectations and provides cost-effective solutions to fulfill any potential assignment. Special Considerations Specific to the City of Lake Elsinore, ERSC has found that there are some special circumstances that may regularly impact plan checking of projects: Standards and Codes Private and public improvement plans submitted to ERSC of plan check will be evaluated based on numerous standards and codes. Documents guiding the plan check process include: • Caltrans Highway Design Manual, Traffic Manual, Standard Specifications • Riverside County Standard Plans • Riverside County Flood Control and Water Conservation District Hydrology Manual and Design Guidelines • California Manual of Uniform Traffic Control Devices (CAMUTCD) • Greenbook Standard Plans and Specifications for Public Works Construction • California Best Management Practices Handbook for storm water BMP's • NPDES Municipal Separate Storm Sewer System (MS4) Permit • RCFCD Drainage Master Plan • Santa Ana Region Water Quality Management Plan Guidance & Template • SWQCB General Permits— Construction, Scrap Metal, Industrial, etc. • United Stated Army Corps of Engineers Lake Management Project Permit • Lake Elsinore Encroachment Permit Application Package • Engineering Design Guidelines Manual for the Preparation and Checking of Street Improvement • Chapter 15.72 of the Lake Elsinore Municipal Code for Grading and Erosion Control • Most recent edition of the California Building Code • Chapter 15.64 & 15.68 of the Lake Elsinore Municipal Code for Flood Plain Management • Chapter 16 of the Lake Elsinore Municipal Code for Subdivision Development • Chapter 14.8 of the Lake Elsinore Municipal Code for Storm Water Management • City General Plan and Specific Plans • City General and Specific Plan Transportation Elements Correspondence with Other Departments ERSC has found coordination with other City Departments necessary in recent assignments. Specific to the City of Lake Elsinore will be the need to coordinate certain items with the City's other departments such J�AAA_ Itnibb 4 Scope of Work as Community Development for Planning items or Public Safety for Fire Department for their individual requirements in plan check. Lake Elsinore Lake Elsinore is the largest natural freshwater lake in Southern California. As the termination point of the San Jacinto River, the lake relies largely on rainfall with additional recycled water inflows from Elsinore Valley Municipal Water District treatment facilities. The lake is a valuable resource managed for recreational and environmental purposes. The City owns and operates many different aspects of the lake including an RV park, launch ramp, and aeration system. Army Corps of Engineer's coordination is expected in review of project's that impact the Waters of the United States which include the lake and some tributary channels. ERSC will review projects in the City keeping this valuable local resource in mind. Unique Water Quality Management Plans (WQMP) Water Quality Management Plan (WQMP) be prepared for all projects within the Region the meet the Priority Development Project categories and thresholds listed in the Water Quality Management Plan Guidance Document for the Santa Ana Region. Typically, a Project Specific WQMP will be seen twice during the approval process for any priority project. First, during the entitlement phase as a Preliminary WQMP (PWQMP) and, again, during the development of construction documents as a Final WQMP (FWQMP). During the entitlement phase, the PWQMP is reviewed to ensure adequate planning and compliance with the Guidance Document, proper application of the hierarchy of LID Site Design Best Management Practices and that funding, inspection and long-term maintenance of the BMP's is considered and properly thought through. Additional consideration is given to certain nuances to the WQMP, the "50% Rule" and "Highest/Best Use", are built in where applicable. Section 1.1.2 of the WQMP describes the requirement for projects where impervious surfaces are being removed and replaced or added to existing projects and how that project should address treating runoff generated on the replaced or new impervious surfaces. Further, Section 2.4.4 describes the need to avoid the use of infiltration-based BMP's for projects tributary to Lake Elsinore. In this case, the use of infiltration based BMP's is considered counterproductive to the overall watershed goals and , therefore, projects are required to treat and release onsite runoff. For projects with a PWQMP, the review of the FWQMP is limited. Overall, the FWQMP will be reviewed to ensure conformance with the PWQMP, translation of the elements of the PWQMP into the final of the project and inclusion of the properly completed Owner's Certification and that fully executed maintenance and transfer agreements are provided. Elsinore Valley Municipal Water District (EVMWD) EVMWD serves the areas within the City with potable, waste, and recycled water services. With the EVMWD's influence in the development of the City, ERSC will closely coordinate plan checking with the consideration of the District. As a separate entity, EVMWD will be responsible for review of Offsite Sewer, Water, and Recycled Water plans to their own requirements. ERSC recognizes that items like on-site sewer systems, water meters, hydrants and other items will be reviewed as they impact a project's compatibility with City requirements. Transportation Corridors Interstate 15 and State Route 74 border or transect the City in various directions. Permitting by Caltrans J�"A A_ Itnibb 5 Scope of Work is required for work performed in the and adjacent to the State's right-of-way. ERSC has navigated Caltrans' process in numerous projects and will utilize this experience during the review of projects for the City of Elsinore. Most recently in the City, ERSC coordinated with CalTrans during widening and traffic signal modifications along Riverside Drive for the construction of the La Laguna RV Park. Planning Documents Development in numerous areas of the City is driven in part by the requirements of various specific plans. Specific Plans governing development in the City of Lake Elsinore include: • Alberhill Ranch • Alberhill Villages • Canyon Creek/Summerhill • Canyon Hills • Canyon Hills Estates • The Cape of Good Hope • Cottage Lane • The Diamond • Downtown Elsinore • East Lake • Elsinore City Center • La Laguna Estates • Lakeshore Village • Murdock Alberhill Ranch • Nichols Ranch • North Peak • Outlet Center • Ramsgate • Spyglass Ranch • Terracina • Tuscany Hills • The Village at Lakeshore Existing development within the Specific Plans areas varies by location and,in some cases,implementation of the specific plan requirements may be driven by redevelopment. ERSC is currently involved in the implementation of large specific plans in Elsinore as well as the Cities of Chino, Rialto, Banning, and Palm Springs. Digital Plan Checking ERSC has been performing plan checking electronically for almost a decade. Our staff are ready and able to adapt to any system that the City may elect to use, our staff are currently using Bluebeam REVU and ShareFile in the City of Lake Elsinore. Digital Markups ERSC currently performs markups in a digital format for all plan checks in Lake Elsinore. Our team receives documents through ERSC's electronic system and distributes internally to an engineer. The review is completed entirely in Bluebeam REVU which allows for accurate scaling and detailed markups. ERSC also summarizes comments in a word document for an itemized list of all comments and completes the check lists provided in the City's Design Manual.This entire package is transmitted J�"A A IMIDU 6 Scope of Work to the developer's engineer for revisions and to the City for internal use. Electronic Transmittals ERSC currently administers electronic transmittal of projects through our own internal ShareFile system. Each project for plan check is saved to ERSC networks and added to the ShareFile suite in project specific folders. ERSC provides via email a web link to download the project's plan check documents. In the same correspondence, ERSC also provides the engineer a link to upload revised documents for re-submittal. The ShareFile program is entirely web based so no additional software is needed. Through this system, ERSC can provide individual user access to the City and Design Engineers to access Ws nr RM.1 47-1 ITIPM11111111MSear redlined plans, plan check documents and ERSC's nnRSC Inc,I Fngineermr RK.,, �, tracking information related to plan checking. This system is in used with many of ERSC's plan check assignments • '"' `' and is successful in reducing time required in completing a review, eliminating costs associated with hand delivery, CLIENT LOGIN and establishes transparency in the process for all parties. ERSC has established a detailed instruction set for use r� by the City and Design Engineers that outlines electronic system access, login, setup, retrieval, submittal, and other important areas. You can view the login landing page by visiting www.erscinc.com and clicking on"CLIENT LOGIN" at the top right corner of the page. Coordination If electronic plan checking is not available or desirable, ERSC recognizes that time is of the essence during the plan check process. Therefore, ERSC is typically available to pick up process electronic submittals from City offices same or next day. Conflicts of Interest By matter of corporate decision, ERSC does not provide engineering services to private developers. ERSC focuses solely on the public sector. We do not anticipate any conflicts of interest in providing services to the City in plan review. Technical Approach and Work Plan Understanding As your plan check consultant, ERSC is ready and able to provide to you an objective, independent, and impartial review of project submittals. This typically includes comprehensive review of CIP and development projects as well as their associated improvement plans and studies. The review period of any project within the City is reviewed against engineering design theory, City/Applicable Design Standards, Ordinances, Conditions, and other requirements as applicable. ERSC offers flexibility in our approach to match the needs of City of Lake Elsinore. Approach ERSC has become well versed in the many special nuances that must be observed by anyone processing J�M A A IMIDU 7 Scope of Work plans and studies for approval with ERSC's plan check clients. Documents such as the State Subdivision Map Act, Standard Specifications for Public Works Construction, Americans with Disabilities Act requirements, and the California Building Code are applicable. Other facets of a particular project, such as water quality or traffic improvements, are governed by the Construction General Permit, MS4 Permit, the WQMP guidance document, California Best Management Practices Handbook for storm water BMPs, Manual on Uniform Traffic Control Devices, the State of California Highway Design Manual, Caltrans standard specifications & standard drawings, Riverside County Standard Plans and Specifications, Riverside County Hydrology Manual, SWQCB General Permits, and the United Stated Army Corps of Engineers Permit requirements are applied respectively and where applicable. Local guidance documents such as the City Grading Notes for Improvement Plans, City Encroachment Permit Application Package, City Municipal Code, City General Plan, and City Specific Plan Elements are also applied when appropriate. ERSC staff understands the importance of ensuring that all Conditions of Approval are incorporated into the design of the project to confirm how the Developer or Engineer have complied with the requirements of the City's Planning Commission and the City Council to mitigate the impacts of the project.This requires a complete and thorough review of Conditions of Approval imposed by the Community Development, Fire, Public Works, and Engineering Departments. General Items Applied to Improvement Plan, Map, and Special Study Review Prior to review, ERSC will: Review initial submittal package for completeness. Request additional information/supporting documents. Research and review files for past projects near or adjacent to current project. Verify ownership. View site aerials and photos with Google Earth or GIS and review conditions onsite and adjacent improvements. Prepare notes. Initiate review of plans and supporting documents. Verify drawing content per City guidelines including title block, file number, RCE signature block, benchmark, and proper drafting technique. Verify compliance with conditions of approval. Verify WQMP template. • Verify general notes and content, construction notes, quantities. Include project title, list utility companies with contact information,vicinity and index map, legal description,APN, site ownership, and address. Verify references to standard drawings and details in construction notes. • Compliance with applicable provisions of the City's Standards and local Civil Engineering industry design standards and conformance to all local ordinances, policies and procedures. • Compliance with applicable Specific Plans and Community Plan design requirements. • Review of engineering design principals and requirements, which includes plan check of cross section and profiles, right-of-way lines, construction limits, and center line control. • Review of special studies including, but not limited to, drainage, water quality, geotechnical, structural (including but not limited to structural analysis of bridge structures) and traffic studies. The studies will be checked to assure they are conceptually sound and meet City, County and State Standards. • Review of format, which includes plan check of general notes, construction notes, drawing and utility legends, benchmark, basis of bearing, construction quantities, vicinity map, location map, standard sheet and title block, north arrow etc. • Recommendation of accurate construction quantities and engineering's cost estimate for bonding purposes or Landscape Maintenance District formation. • Conformance to City's preferred format and layout. • Add to database for access by all involved parties. J�AAA ICBM 8 Scope of Work Specific Items Applied to Improvement Plan, Map, and Special Study Review Plan check for civil engineering design plans, survey related documents, and special studies will be performed by applying the below items to each assignment: Grading Plans Verify conformance with City guidelines and geotechnical report; show boundary information, easements, and adjacent lot numbers; show street dimensions, existing utilities, sewer lateral and water meter; review and verify perimeter conditions; cross reference with street and drainage plans and final map; verify compliance with California Building Code for grading and accessibility;verify minimum slope requirements and drainage control at top of slope; verify slopes, top of grate and invert elevations on drains; verify retention basin and BMP's, show building locations/setbacks; show critical elevations, i.e. high points, thresholds, verify location of perimeter walls and retaining walls; show top of wall and finished surface at critical points. For commercial grading verify parking design per City standards; verify the accessible path of travel, parking, and signage; verify driveway/lane widths, fire access, and structural section. For all grading plans, verify conformance with FEMA requirements. Storm Drain Plans Verify size and design flow per City's master plan, if applicable; design per Flood Control standards; verify alignment, geometrics, and stationing; show existing utilities (OH/UG); show catch basins, manholes/ junction structures and inlet/outlet structures with details when required; show, obtain, and/or verify drainage easements; show invert elevations at inlet/outlet, structures, and grade breaks; verify design flow and street capacity with hydrology study; show HGL, flow rate, and velocity for main line and lateral; coordinate with hydraulic calculations; verify coordination with regulatory agencies as required. Storm drain plans will be checked against hydrology and hydraulic calculations to verify their design accuracy as required by the City Standards and coordinated with the City's Storm Drain Mater Plan for the design of mater planned lines. Street Plans and Alignment Review Verify design speed, geometrics, and cross section; show typical section with cross fall and dimensions; verify minimum/maximum street grades and cul-de-sac design; verify structural section (AC/CMB); verify bearings, curve data (centerline and curb) and stationing; show stations/elevations at intersections, EC/ BC and ECR/BCR; verify "join" elevations extend topography; show saw cut line and feathered paving; provide supplemental cross sections for widening; show driveway approaches and cross gutters; show drainage devices, easements, and lot lines/numbers. In the profile, show existing/proposed profile at centerline, curb left & right; show stations at begin/end construction, intersection, EC/BC and even stations; show slope, elevations at critical points and grade breaks; show the location, length, and PI for vertical curves; show projection and length of curb returns/verify design; profile "grade to drain" and show elevations. Hydrology and Hydraulics Calculations Verify compliance with Flood Control methods and City requirements; verify design criteria; review and verify critical design values; review and verify model input/output and content of hydrology map; and verify narrative content. For hydraulic calculations, verify mainline, lateral and catch basin design flow, review and verify model input/output; verify methods of analysis; review design methods of catch basins, hydraulic structures and outlet protection; review maximum velocity,junction losses, freeboard and outlet conditions; and verify hydraulic data on storm drain plans. J�AAA IMIDU 9 Scope of Work Water Quality Management Plans Verify storm water management requirements applicable to the project, source control/site design, pollutant controls and hydromodification management; review performance requirements for source control and site design BMP's, storm water pollutant control BMP's and hydromodification management BMP's. For a Standard WQMP verify project information and ownership, construction storm water BMP's, post construction source control BMP's and post construction site design BMP's. For Priority Development Projects, verify onsite pollutant control BMP's or combination BMP's, BMP selection process and BMP sizing necessary to meet storm water pollutant control standards. Hydromodification Management Verify applicability and exemptions; determine impact to course sediment yield areas; verify compliance with post project runoff flow control standards; verify low flow threshold and basis for flow control facilities design; evaluate integration of flow control measures and pollutant control BMP's; verify drawdown time; evaluate necessity for in-stream rehabilitation. Storm Water Pollution Prevention Plans Verify proper format and content; verify QSD certification and Legally responsible person, verify SWPPP requirements and content of Notice of Intent; review and verify project information, risk level determination and non-storm water discharges; review and evaluate best management practices and BMP inspection & maintenance requirements; review training requirements and responsible parties; review & evaluate monitoring and reporting requirements, sampling, analysis, and QA/QC requirements; review references documents. Erosion and Sediment Control Plans Verify plan adheres to City requirements; Verify WDID Number; Verify perimeter protection; Verify Inlet protection; Check BMPs with CASQA recommendations; Verify retention basin and BMPs, show building locations/setbacks perimeter walls and retaining walls; Verify stabilized construction entrance; Verify equipment staging areas; Verify materials storage areas; Ensure offsite inlet protection where applicable. Tentative Maps, Final Maps, Mergers, Lot Line Adjustments and Survey Related Documents Check to assure compliance with applicable provisions of the State Subdivision Map Act, Land Surveyor's Act, City Municipal Code, Conditions of Approval and other City requirements, and all other applicable state statutes and local ordinances; Review of map sheets for centerline control, lot closure calculations, mathematical accuracy, surveyor notes and symbols, monumentation per City Standards, & survey procedures; Review of boundary retracement procedures & title reports; Review of format statements and certificates; Monitor of coordination response to Civil Engineers / Land Surveyors; Conformance to City's preferred format and layout; Verify conformance to City's Subdivision Map Review Checklist. ERSC's designated Principal Surveyor will act as City Surveyor to sign documents as necessary. Title Reports Review title report to confirm that the legal description, ownership, vesting, trustees and beneficiaries are correctly shown; Review title insurance exceptions to confirm that rights of way and easements are correctly listed and plotted; Verify that applicable rights of way, easements and mineral rights are correctly listed as signature omissions; Verify that subdivider has requested non-interference letters from public entities and public utility companies. J�AAA IMIDU 10 Scope of • Legal Descriptions, Easement Documentation, Other Recordable Documents Review title report, Schedule B documents and vesting deed; verify compliance with City application requirements; reviewing legal description for accuracy and proper acknowledgment of record and easement documents; review and verify closure calculations, review plat for proper identification of R/W, lot lines, easements and location of existing structures and utilities. For easement or R/W vacations, coordinate with local utility companies. Traverse Calculations Review traverse calculations of retracement surveys, boundary surveys, and for proposed lots and parcels. Linear closure precision will be checked for conformance with City mapping standards. Boundary measurements and areas shown on maps and legal descriptions will be checked against the traverse calculations. Soils Reports and Geotechnical Reports Review and comment on private project Geotechnical and Geology Reports including but not limited to items such as soil stability, soil composition, liquefaction, compaction, foundations, etc.; Review road structural calculations and any trench backfill recommendations; Development of Geotechnical and Geology Reports for limited special public projects, as well as peer review of geotechnical and geology reports; Prepare review comments and conditions of approval of soils reports in a written format that is acceptable to the City; Review responses to review comments provided by the developer's soils engineer; Work with developer's soils engineer to resolve issues generated by review comments; Attend meetings with the City, developers, builders, engineers, and consultants in a timely manner to resolve issues generated during the report review process or during construction; Review soils reports submitted by the developer's soils engineer for proposed changes during grading; Provide technical support to the City for geotechnical engineering and geologic related issues on an as-needed basis; Provide grading inspection services on an as-needed basis to ensure compliance with City approved plans and standards. Traffic Scoping Agreement Verify project location and scope; revive project scenarios; verify/review study intersections and roadway segments; review traffic forecasting for existing conditions, future growth, ambient growth and related projects; review/verify future changes to the transportation network; verify methodology; and, verify trip generation and distribution. Traffic Impact Analysis Confirm approval of scoping agreement; verify project characteristics; evaluate traffic forecasts and supporting data; review/verify existing conditions; review future conditions without the project including intersections and roadway segment analyzes; review future conditions with the project including intersections and roadway segments analyzes; and, review the transportation management plan. Signing and Striping Plans Gather all available information including `as-builts' and Conditions of Approval to adjacent existing improvements and future developments to provide a coordinated review. Review plans against current traffic engineering design standards, guidelines and practices; City standards for street construction; City's Guidelines for Bicycle Facilities; adhere to the Caltrans Highway Design Manual, Caltrans Traffic Manual, CA MUCTD and Caltrans Standard Plans and Specifications. J�AAAIDU 11 IM Scope of Work Construction Detour Plans Review plans against current traffic engineering design standards, guidelines and practices; adhere to the Caltrans Highway Design Manual, Caltrans Traffic Manual, CA MUCTD and Caltrans Standard Plans and Specifications; Sign legend to be provided; Review schedule and duration; Ensure special provisions for schools and other facilities are met. Engineering Cost Estimates Verify format adheres to City requirements; Verify all information called out for construction is included; Check quantities against plan; Verify construction notes correspond; Verify correct unit costs; Ensure contingency included; Provide civil engineer's stamp and signature. Structural Review Review and recommend approval of layout and profile for retaining walls. Review Geotechnical report and recommendations; review/verify design methods and assumptions; verify design criteria, i.e., bearing pressure, passive pressure, wind loads; review and verify calculations and factor safety, verify footing dimensions, steel and grout requirements; subdrain requirements and location. Review and recommend approval for bridge structural calculations and alignment. Verify and evaluate existing/ proposed improvements, verify field conditions and constraints, review/evaluate geotechnical data, limits of flooding, review alignment/geometry for compliance with accepted criteria, Caltrans requirements; review deck profile, bean and girder design/placement; review design and location/spacing of spread footings/pilings; review design and location of abutments and wing/retaining walls; review design of approach roadways and evaluate drainage and drainage mitigation; coordinate regulatory requirements, permitting and mitigation. Traffic Signal and Interconnect Plans Review and recommend approval of new traffic signal installations and traffic signal modifications including: review of proposed and verification of existing intersection geometrics, lane configuration and improvements; review/verification of existing utilities,subsurface and overhead obstructions;verify general notes, construction notes and standard plan references; review pole locations, mast arm lengths and ADA compliance; review/evaluate conduit layout and sizing, pull box locations; verify controller location and type, service connection and pedestal location, review pole and equipment schedule, conductor schedule and phase diagram; verify location of loop detectors or video detection zones; review/verify directional and warning signage, street name signs (illuminated v. non illuminated); review and verify vehicle storage (que), striping, pavement markings and advanced warnings. Street Light Plans and Voltage Drop Calculations Verify conformance with the City's Public Works Standards, Standard Specifications for Street Lights and drafting standards; Verify location at intersections, along roadways and placement within median islands; Verify pole spacing and illumination requirements; Verify pole height, mast arm length and luminaire;Verify foundation requirements and location, pedestal location, service points and availability of service; Verify conduit layout, size and material; Verify circuit design; Calculate voltage drop throughout system/circuit. Onsite Domestic and Recycled Water Improvements Verify minimum velocity and slope requirements; verify pipe material and class; verify meter, restraint and AR/AV calculations; verify compliance with CDPH separation requirements; verify alignment and stationing; show existing utilities (OH/UG); show stations and elevations at cleanouts, valves, fittings, and fire hydrants; verify cross-connection requirements; show easements. J�"A A IMIV 12 Scope of • Onsite Sewer Improvements Verify minimum velocity and slope requirements; verify minimum lateral slopes; verify compliance with CDPH separation requirements; verify alignment and stationing; show existing utilities (OH/UG); verify minimum cover and maximum manhole spacing; show stations and elevations at manholes, cleanouts and laterals; show easements. Sewer plans shall be coordinated with the City's Sewer Master Plan for design of master plan lines. Landscape and Irrigation Plans Verify compliance with City guidelines and ordinances; review/verify existing water system pressure and flow data; review meter size and calculations and location; verify cross-connection protection; verify location of controller, rain sensor and service pedestal; review pipe sizes and supporting calculations; review systems layout including head and emitter location; review location, size and configuration of anti- siphon valves and gate valves; review soils tests and method of soil preparation; review and confirm plant palette and plant spacing; review and confirm ground cover type and spacing; review and confirm street trees, spacing and tree grate location; confirm shrub and tree planting methods; verify sight distance requirements; confirm proper use of edge treatments, root barriers and rock mulch. For Landscape Maintenance District plans verify compliance with the Guidelines and Specifications for Landscape Development, Landscape Architecture Development Plan Requirements and Irrigation, Planting and Maintenance Requirements. Supplemental Engineering Services ERSC can usually provide these services free-of charge because of their small demand. Occasionally, a larger request will generate a more labor-intensive response, at which time ERSC staff will provide the potential below services to the City. City Surveyor ERSC acts as City Surveyor for numerous Cities in the Southern California region. As such, ERSC's Principal Surveyor will continue to provide this service to the City of Lake Elsinore. ERSC's representative will sign and stamp maps on behalf of the City of Lake Elsinore Traffic Analysis Preparation of related plans, documents, and technical studies on the impact and mitigations related to traffic circulation in compliance with the City's TIA Guidelines. ERSC staffs registered traffic engineers and transportation design personnel that can field these tasks with compliance to all city and local requirements. Traffic Control Preparation of all temporary street, lane, shoulder and sidewalk closures. Temporary traffic control plans differ based roadway classification and closure type which may require the preparation of detour plans in addition to the actual closure. ERSC staffs registered traffic engineers and transportation design personnel that can field these tasks with compliance to all city and local requirements. Other Traffic Related Review Items ERSC's traffic and transportation group hosts registered civil and traffic engineers in the State of California. J�AAA IMIDU 13 Scope of Work This group will provide any additional support necessary to the City. Project Review Schedule The project schedule will be determined and maintained by the project applicant. The project review schedule shall be as stated in the RFP and as outlined below: Submittal Standard Plan Review Plan Submittal First Submittal 10 Working Days Electronic Subsequent Submittals 15 Working Days For expedited project review, the following schedule will apply. Expedited Plan Review Plan Pickup Expediting Fee 50% of Standard Plan Review As soon as possible 125% Standard Fee City Responsibilities ERSC expects the City to provide assignment of plan checking tasks to the ERSC project manager or to the assigned project administrator. The City will need to provide all documentation regarding the project in order for ERSC to complete a thorough review. ERSC does not require use of any City property to complete this project. J�M A A_ IMIDU 14 When establishing a consulting team, our goal is to provide potential clients with the opportunity to work with engineers and technicians that understand the environment in which they work.This requires a thorough knowledge of the Client's policies, practices and procedures while, also, understanding the project requirements, budget limitations and goals. Our management team will be supported by staff engineers and technicians with equally significant experience related to Plan Checking Services. Registered Professionals Assigned to this Project Name CA Registration Years Experience Availability John M. Brudin, PE C41836 34 20% Moe Ahmadi, PE C58784 30 15% Jorge Biagioni, PE C33751 40 50% Reza Toorzani, PE C74906 34 25% Craig Brudin, QSP QSP 26269 7 25% Steven Latino, PE, TE C73430 15 15% Erik Howard, PE, PLS C55318, PLS 7648 29 15% Robert 011erton LS7731 25 25% Lilia Guerrero 21 50% Dale Roberson 20 50% ERSC team members are familiar with the demands, expectations, and accountability required to successfully execute projects in a public works environment. The expertise of ERSC's individual team members in municipal engineering and public works disciplines is well renowned in local agencies,as evident bythe numberof municipalities that have continued to utilize ERSC's services year after year. Summaries of ERSC's proposed staff, as well as their qualifications, certifications, and recent assignments are available herein for your review. Staff Selection ERSC's project team has been formed based on familiarity, experience, and merit in completed projects similar to those described in the RFP. ERSC understands that we are an extension of your team, therefore we make our engineers, engineering technicians and administration team easily accessible and available to you. In selecting staff which have previously navigated the strategies in researching and identifying utility conflicts, coordination with regulatory/permitting agencies, minimizing traffic impacts, review of hydraulic requirements, constructability analysis, and building code interpretation, ERSC aims to provide a team who can provide a complete project with flexibility to meet the requirements and expectations of the City. John M. Brudin, PE— Project Manager Over the past 30 years, Mr. Brudin has been involved in a number of complex planning, design and construction projects. His ability to effectively communicate with agency personnel and team members provides the vital link between client and consultant and ensures that the goals of each project are met. Mr. Brudin has a broad base of experience in various disciplines including site design for public institutional facilities. Mr. Brudin has recently led and completed numerous capital engineering projects. With his level of expertise in completing similar projects, Matt will provide guidance to the team and offer support during complicated scenarios. J�AAA_ IMID 15 Project T- Matt has also served as Project Manager during ERSC's current plan checking contract with the City of Lake Elsinore. Robert 011erton, PLS - City Surveyor Mr. 011erton has over 25 years of experience in leading survey related tasks. Robert has served many ERSC plan check clients and acts as the City surveyor in the Cities of Colton, Palm Springs, Beaumont, Banning, and Highland. Robert also has previous experience serving as a contractor Survey consultant to the County of Riverside, providing counter support and signing survey related documents on behalf of the County. Robert is well versed in the application of the Subdivision Map Act. Robert will be responsible for acting as the City Surveyor in Lake Elsinore while also providing review of survey related documents for projects in the City. Lilia Guerrero - QA/QC Ms. Guerrero has more than 21 years of design, project management and plan checking experience. 15 of those years was focused on the design and review of private and public developments including public street improvements, water systems, storm drain and sanitary sewer. Ms. Guerrero's expertise is in utility relocation projects, right-of-way rights, asset management and land development. Lilia will be responsible for providing QA/QC to each document before it is submitted. She will also manage schedule on a daily basis to ensure on-time delivery. Steven Latino, PE, TE -Traffic/Transportation Steven brings a unique perspective to the ERSC team as he has spent time in both the Public and Private sector as a Civil Engineer. Steve's perspective allows our team to protectively manage projects to avoid issues during planning and engineering design. Steve will perform oversight of traffic/transportation related documents as they relate to development in the City. Erik Howard, PE, PLS -Water Infrastructure/Survey Support For over 30 years Mr. Howard has been involved in the design and construction management of complex water and wastewater infrastructure projects throughout Southern California. The ERSC team will rely on Erik's knowledge to complete the review of water, wastewater, and recycled water plans sponsored by developers in the City. Erik will also provide back up support to Mr. 011erton in the review of survey related documents. Moe Ahmadi, PE - Drainage/Hydrology Mr. Ahmadi is an expert in the field of flood control and drainage engineering. As a part of the plan check team serving the City of Lake Elsinore, Moe will oversee and perform the review of hydrology/hydraulics and storm drain design as it relates to development in the City. Moe is knowledgeable in the modeling programs used in drainage design. Steve Wilson, CPESC, QSP/D Mr. Wilson is a former City of Ontario employee responsible for the administration and oversight of the City's NPDES efforts. Steve was the leader of the committee to develop the WQMP template for the Santa Ana Region. His knowledge of these documents in the Santa Ana region is unmatched and especially in the greater Inland Empire Area. J�"A A_ IMIDU 16 Project T- CITY OF ink LADE ' LSII`LOR.E rM DREAM EXTREME 1Pm■7 A A lcn%lb John M. Brudin,PE Project Manager Lilia Guerrero Engineer IV, QA/QC Cassandra Silva Admin. II, Project Administration Steve Latino, PE, TE, MBA Craig Brudin, QSP Sr. Principal Engineer, Traffic/Transportation Sr. Engineering Associate, Grading/Improvement Moe Ahmadi, PE Plans Sr. Principal Engineer, Drainage/Hydrology Robert 011erton, PLS Erik Howard, PE, PLS Principal Surveyor, Survey/City Surveyor Sr. Principal Engineer, Water/Wastewater/Survey Dale Roberson Reza Toorzani, PE Engineering Assoc. III, Grading/Improvement Plans Engineering V, Soils/Geotechnical/Structural Maurice Cruz Jorge Biagioni, PE Engineering Assoc. III, Traffic/Transportation Principal Engineer, Grading/Improvement Plans Stephen Wilson, QSD/CPESC Sr. Engineering Associate, NPDES/WQMP J�■'�A A ICI��V 17 John Brudin, - • Education Over the past 34 years, Mr. Brudin has been involved in a BS, Civil Engineering, large number of complex planning, design and construction Loyola Marymount University, projects for public agencies. His ability to effectively Los Angeles, CA communicate with agency personnel and team members provides the vital link between client and consultant that Registrations / Certifications will ensure that the goals of each development review and CA, Civil Engineer No. C41836 plan check project assignment are met. Mr. Brudin has a QSD/QSP No. 00707 broad base of experience in various disciplines including site development, streets and roads, grading and drainage, water Affiliations & sewer, and flood control facilities. American Public Works Association Mr. Brudin has served as a District Engineer for the Lake Floodplain Management Association Hemet Municipal Water District and as a Project Manager for "as-needed" professional engineering plan check services for Areas of Expertise several cities in the Orange, Riverside and San Bernardino Water/Wastewater Engineering County areas. Under these contracts, he has managed Flood Control Engineering development review and plan check services for land Project Management development and capital projects, including grading, water, Quality Control sewer, drainage, traffic signal and street improvement plans. Map checking was also provided under these contracts. Similar Project Experience: On-Call Plan Check Services, City of Lake Elsinore—Project Manager responsible for oversight of the plan check team during civil engineering plan check services provided to the City of Lake Elsinore since 2016. As part of an on-call contract with the City, ERSC provides review of the following plans and documents: Traffic Signal Plans; Improvement Plans; Grading Plans; Final Maps and Parcel Maps; Dedications, Easements; Vacations, Quitclaims; Parcel Mergers; Lot Line Adjustments; WQMP Submittals; Hydrology and Hydraulic Studies/Reports; HEC-5 Studies; Traffic Analyses, Studies, Reports; Soil/Geotechnical Studies/Reports; Alquist Priolo Studies/State Submittals; Erosion Control Designs; Review of Technical Specifications for Proposed Improvements within City Road Rights of Way. General Plan Check Services, City of Chino—Project Manager responsible for oversight of the plan check team during general plan check services to the City of Chino since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise Grading Plans, Wet Utility, Plans (e.g. Sewer, Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations, Water Quality Management Plans (WQMPs), Survey documents and maps, and oils Reports, for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont — Project Manager responsible for oversight of the plan check team during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. On-Call Plan Check and Inspection Services, City of Banning—Project Manager responsible for oversight of the plan check team during plan check and inspection services of residential and development projects. Plan check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as needed. J�AAA IMIDU 18 John Brudin, - • Plan Checking and Project Management, City of Palm Springs— Project Manager responsible for oversight of the plan check team during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. J�"A A_ IDU 19 IM Steve Latino, PE, TE, MBA I Sr. Principal Engineer Education Mr.Latino's 16 year professional career has focused on providing BS, Civil Engineering, Purdue University, services as a local municipal employee. This includes work in West Lafayette, IN the areas of: Traffic and Transportation, Capital Improvement Projects(both design and construction management), and Land MBA, Business Administration Development. Before joining ERSC in 2017, he most recently University of Redlands, Redlands, CA served as the Engineering Director/City Engineer for the City of Hemet where he oversaw a department of 8 staff members. Registrations / Certifications He was responsible for all aspects of municipal engineering CA, Civil Engineer No. C73430 during his tenure at the City of Hemet, including: the review CA, Traffic Engineer No. 2902 and approval of public infrastructure plans, land development review, traffic and transportation related design and planning, Affiliations as well as CIP management and delivery. American Public Works Association Institute of Transportation Engineers Due to his extensive time served in the Public Sector, Mr. Latino is very knowledgeable of local regulations as well as working Areas of Expertise with various agencies including Western Riverside Council of Quality Assurance/Quality Control Governments (WRCOG), Riverside County Transportation Municipal Fiber Optic Design Services Commission (RCTC), San Bernardino County Transportation Traffic and Transportation Authority (SBCTA), and Caltrans. He is well versed in project Municipal Engineering delivery and the challenges projects face due to local, regional and statewide regulatory requirements. With his experience prior to Hemet in the City of Ontario, Mr. Latino is familiar with both Riverside and San Bernardino Counties. His ability to design and review plans includes intuition that can easily be overlooked by someone who may not have delivered a municipal project from start to finish. Additionally, he is very familiar with the assembly of construction specifications and bid packages and is well versed in the Greenbook: Standard Specifications for Public Works Construction as well as the Caltrans Standard Specifications. Select Project Experience: On-Call Plan Check Services, City of Lake Elsinore — Project Engineer responsible for the review of traffic related documents during civil engineering plan check services provided to the City of Lake Elsinore since 2016. As part of an on-call contract with the City, ERSC provides review of the following plans and documents: Traffic Signal Plans; Improvement Plans; Grading Plans; Final Maps and Parcel Maps; Dedications, Easements; Vacations, Quitclaims; Parcel Mergers; Lot Line Adjustments; WQMP Submittals; Hydrology and Hydraulic Studies/Reports; HEC-5 Studies;Traffic Analyses, Studies, Reports; Soil/Geotechnical Studies/Reports; Alquist Priolo Studies/State Submittals; Erosion Control Designs; Review of Technical Specifications for Proposed Improvements within City Road Rights of Way. On-Call Civil Engineering and Plan Check Services, City of Colton — Project Engineer responsible for review of traffic related documents during Engineering and Plan Check services in the City. ERSC works closely with City staff in the review of grading, street improvements, hydrology studies, soils reports, WQMP, SWPPP, lot line adjustments, and parcel maps. ERSC also provides on-call engineering services, such as the design for the La Cadena and 8th Street Intersection Reconfiguration. General Plan Check Services, City of Chino — Project Engineer responsible for review of traffic related documents during general plan check services to the City of Chino since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise Grading Plans, Wet Utility, Plans (e.g. Sewer,Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations, Water Quality Management Plans (WQMPs), Survey documents and maps, and oils Reports, for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont— Project Engineer responsible _J�nnn Itnibb 20 Steve Latino, PE, TE, MBA I Sr. Principal Engineer for review of traffic related documents during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. On-Call Plan Check and Inspection Services, City of Banning — Project Engineer responsible for review of traffic related documents during plan check and inspection services of residential and development projects. Plan check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as needed. On-Call Plan Check and Construction Inspection Services,City of Highland—Project Manager responsible for oversight of the plan check team during an on-call professional services agreement with the City of Highland. ERSC provides contract plan check and inspection services for the construction of public works and privately funded improvements, including site improvements, street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements. ERSC also provides plan checking services for all parcel and tract maps, as well as hydrology review. Plan Checking and Project Management, City of Palm Springs— Project Engineer responsible for review of traffic related documents during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. On-Call Traffic Plan Check Services, City of Ontario - Project Manager responsible for oversight of the plan check team during the review of Traffic related plans and documents such as traffic signal plans, signing and striping plans, street lighting plans, and voltage drop calculations. _J�nnn IMIV 21 GuerreroLilia I Engineer Education Ms. Guerrero joined ERSC in 2019, bringing over 21 years of MS, Project Management, Northwestern design, project management and plan checking experience. University, Evanston, IL 15 of those years was focused on the design and review of private and public developments including public street BS, Civil Engineering, Sonora Institute of improvements,water systems,storm drain and sanitary sewer. Technology, Sonora Mexico Ms. Guerrero's expertise is in utility relocation projects, right- of-way rights, asset management and land development. Areas of Expertise Lilia also has 9 years of project management experience Project Management overseeing infrastructure projects on transmission corridors Utility Relocation and commercial sites. Right-of-Way Rights Asset Management Land Development Similar Project Experience: On-Call Plan Check Services,City of Lake Elsinore—Project Engineer responsible for QA/QC and schedule management during civil engineering plan check services provided to the City of Lake Elsinore since 2016. As part of an on-call contract with the City, ERSC provides review of the following plans and documents: Traffic Signal Plans; Improvement Plans; Grading Plans; Final Maps and Parcel Maps; Dedications, Easements; Vacations, Quitclaims; Parcel Mergers; Lot Line Adjustments; WQMP Submittals; Hydrology and Hydraulic Studies/Reports; HEC-5 Studies; Traffic Analyses, Studies, Reports; Soil/Geotechnical Studies/Reports; Alquist Priolo Studies/State Submittals; Erosion Control Designs; Review of Technical Specifications for Proposed Improvements within City Road Rights of Way. On-Call Civil Engineering and Plan Check Services, City of Colton—Project Engineer responsible for QA/ QC and schedule management during Engineering and Plan Check services in the City. ERSC works closely with City staff in the review of grading, street improvements, hydrology studies, soils reports, WQMP, SWPPP, lot line adjustments, and parcel maps. ERSC also provides on-call engineering services, such as the design for the La Cadena and 8th Street Intersection Reconfiguration. General Plan Check Services, City of Chino — Project Engineer responsible for QA/QC and schedule management during general plan check services to the City of Chino since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise Grading Plans, Wet Utility, Plans (e.g. Sewer,Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations, Water Quality Management Plans (WQMPs), Survey documents and maps, and oils Reports, for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont — Project Engineer responsible for QA/QC and schedule management during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. On-Call Plan Check and Inspection Services, City of Banning — Project Engineer responsible for QA/QC and schedule management during plan check and inspection services of residential and development projects. Plan check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as needed. On-Call Plan Check and Construction Inspection Services,City of Highland—Project Engineer responsible for QA/QC and schedule management during an on-call professional services agreement with the City of Highland. ERSC provides contract plan check and inspection services for the construction of public works J�"A A Itnibb 22 GuerreroLilia I Engineer and privately funded improvements, including site improvements, street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements. ERSC also provides plan checking services for all parcel and tract maps, as well as hydrology review. Plan Checking and Project Management, City of Palm Springs — Project Engineer responsible for QA/ QC and schedule management during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. _J�nnn IMIDU 23 • - Ahmadi, Sr. PrincipalEngineer Education Over the past 30 years Mr. Ahmadi has actively participated BS, Civil Engineering, Texas A&M in the preparation of numerous feasibility studies, design University College Station, TX reports, construction plans, specifications and cost estimates for drainage and flood control facilities throughout Southern MS, Civil Engineering Construction California.Mr.Ahmadi is experienced with numerous computer Management, Texas A&M programs including AutoCAD 2019, CiviICAD Hydrology University, College Station, TX programs, Water Surface Profile Gradient (WSPG), and HEC-RAS flood plain analysis software. Registrations / Certifications He is also experienced in preparation of Stork Water Prevention CA, Civil Engineer No. C58784 Plan (SWPPP) as required by the NPDES Industrial General QSD/QSP No. 00706 Permit and the Construction General Permit (CGP), which identify BMPs used to reduce or eliminate potential pollutant Affiliations discharges in storm water runoff. Under his direction, plans American Society of Civil Engineers for various residential, commercial, and industrial projects National Society of Prof. Engineers in the Counties of Riverside, San Bernardino, and Orange have been prepared.As part of the requirements of the CGP, Areas of Expertise Mr. Ahmadi has provided SWPPP services to address new Water Resources Engineering requirements. This work included Data Submitter services, Flood Control Engineering conducting the risk assessment; an evaluation of a project's Hydraulics and Hydrology sediment risk and receiving water risk, and then determining Erosion Control the overall Risk Level for traditional projects, or LUP Type for linear utility projects, and assisting clients to register and submit applications in the SMARTS System to obtain the applicable WDID numbers from the SWQCB prior to construction. Similar Project Experience: On-Call Plan Check Services, City of Lake Elsinore — Project Engineer responsible for oversight and review of drainage related plans and studies during civil engineering plan check services provided to the City of Lake Elsinore since 2016. As part of an on-call contract with the City, ERSC provides review of the following plans and documents: Traffic Signal Plans; Improvement Plans; Grading Plans; Final Maps and Parcel Maps; Dedications, Easements; Vacations, Quitclaims; Parcel Mergers; Lot Line Adjustments; WQMP Submittals; Hydrology and Hydraulic Studies/Reports; HEC-5 Studies; Traffic Analyses, Studies, Reports; Soil/Geotechnical Studies/Reports; Alquist Priolo Studies/State Submittals; Erosion Control Designs; Review of Technical Specifications for Proposed Improvements within City Road Rights of Way. On-Call Civil Engineering and Plan Check Services, City of Colton — Project Manager responsible for oversight of the plan check team during Engineering and Plan Check services in the City. ERSC works closely with City staff in the review of grading, street improvements, hydrology studies, soils reports, WQMP, SWPPP, lot line adjustments, and parcel maps. ERSC also provides on-call engineering services, such as the design for the La Cadena and 8th Street Intersection Reconfiguration. General Plan Check Services, City of Chino — Project Engineer responsible for oversight and review of drainage related plans and studies during general plan check services to the City of Chino since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise Grading Plans, Wet Utility, Plans (e.g. Sewer, Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations, Water Quality Management Plans (WQMPs), Survey documents and maps, and oils Reports, for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont — Project Engineer responsible for oversight and review of drainage related plans and studies during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP J�"A A_ Itnibb 24 • - Ahmadi, Sr. PrincipalEngineer projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. On-Call Plan Check and Inspection Services, City of Banning—Project Engineer responsible for oversight and review of drainage related plans and studies during plan check and inspection services of residential and development projects. Plan check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as needed. On-Call Plan Check and Construction Inspection Services, City of Highland—Project Engineer responsible for oversight and review of drainage related plans and studies during an on-call professional services agreement with the City of Highland. ERSC provides contract plan check and inspection services for the construction of public works and privately funded improvements, including site improvements, street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements. ERSC also provides plan checking services for all parcel and tract maps, as well as hydrology review. Plan Checking and Project Management,City of Palm Springs—Project Engineer responsible for oversight and review of drainage related plans and studies during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. J�"A A_ IMIDU 25 Education Robert has over 30 years of professional experience in BS, Civil Engineering, University of land surveying for municipal agencies. He has managed California at Riverside, Riverside, CA a wide variety of land survey projects including surveys Registrations / Certifications for topographic mapping, geodetic control, right-of-way, CA, Land Surveyor No. 7731 boundary, and construction projects. Training Most recently, Robert's responsibilities include the AutoCAD management and coordination of construction staking MicroStation contracts for civil engineering projects, boundary surveys,title ArcGIS analysis,topographic mapping, detailed design surveys,ALTA Surveys and mapping. As a plan check engineer, Robert is Areas of Expertise responsible for all coordination and checking for improvement Survey plans and maps/ survey documents. Robert signs all survey Right-Of-Way documents for approval following review. Since joining ERSC, Legal Descriptions Robert's wide range of skills and background have enabled Mapping ERSC to provide clients with localized and personalized CAD Operation service, keeping true to ERSC's philosophy of dedication to customer service and satisfaction. Similar Project Experience: On-Call Plan Check Services, City of Lake Elsinore — Principal Surveyor responsible for the oversight of review of survey documents during civil engineering plan check services provided to the City of Lake Elsinore since 2016. As part of an on-call contract with the City, ERSC provides review of the following plans and documents: Traffic Signal Plans; Improvement Plans; Grading Plans; Final Maps and Parcel Maps; Dedications, Easements; Vacations, Quitclaims; Parcel Mergers; Lot Line Adjustments; WQMP Submittals; Hydrology and Hydraulic Studies/Reports; HEC-5 Studies; Traffic Analyses, Studies, Reports; Soil/Geotechnical Studies/Reports; Alquist Priolo Studies/State Submittals; Erosion Control Designs; Review of Technical Specifications for Proposed Improvements within City Road Rights of Way. On-Call Civil Engineering and Plan Check Services, City of Colton — Principal Surveyor responsible for oversight of review of survey documents during Engineering and Plan Check services in the City. ERSC works closely with City staff in the review of grading, street improvements, hydrology studies, soils reports, WQMP, SWPPP, lot line adjustments, and parcel maps. ERSC also provides on-call engineering services, such as the design for the La Cadena and 8th Street Intersection Reconfiguration. General Plan Check Services, City of Chino — Principal Surveyor responsible for oversight of review of survey documents during general plan check services to the City of Chino since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise Grading Plans, Wet Utility, Plans (e.g. Sewer, Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations, Water Quality Management Plans(WQMPs), Survey documents and maps, and oils Reports,for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont— Principal Surveyor responsible for oversight of review of survey documents during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. On-Call Plan Check and Inspection Services, City of Banning — Principal Surveyor responsible for oversight of review of survey documents during plan check and inspection services of residential and J�AAA ICBM 26 Robert 011erton, PLS I Principal - • development projects. Plan check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as needed. On-Call Plan Check and Construction Inspection Services, City of Highland — Principal Surveyor responsible for oversight of review of survey documents during an on-call professional services agreement with the City of Highland. ERSC provides contract plan check and inspection services for the construction of public works and privately funded improvements, including site improvements, street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements. ERSC also provides plan checking services for all parcel and tract maps, as well as hydrology review. Plan Checking and Project Management, City of Palm Springs — Principal Surveyor responsible for oversight of review of survey documents during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. J�"A A IMIDU 27 Craig Brudin, QSP I Sr. Engineering • - Education Mr. Brudin has been with the Engineering Resources team BS, Environmental Policy & Management since 2014. He joined our team after spending the initial BA, Business Managerial Studies years of his career under the employment of a prominent Coachella Valley engineering firm. Since joining ERSC, he Registrations / Certifications has become a valuable member of ERSC's project team CA, QSP No. 26269 providing plan review services to the Cities of Hemet and CESSWI No. 4852 Palm Springs. While providing these services he has gained extensive working knowledge of the local grading manuals, Affiliations ordinances and design guidelines, the site accessibility CASQA requirements in Chapter 11 of the California Building Code, sewer design guidelines and the preparation and evaluation Areas of Expertise of erosion control plans. Erosion and Sediment Control In various Cities, he is responsible for the review of mass Water Quality and rough grading plans, residential precise grading plans, Improvement Plan Check grading plans for residential development, & commercial development projects,sewer improvement plans,and erosion control plans. He also provides coordination of these efforts with the design engineer and the City's Planning Department. In addition, he is responsible for implementation of ERSC's electronic plan checking services. Craig has created and implemented the process for many ERSC clients and Scan confront the typical challenges before they arise in coordination efforts. Similar Project Experience: On-Call Plan Check Services, City of Lake Elsinore — Project Engineer responsible for the review of improvement and grading plans during civil engineering plan check services provided to the City of Lake Elsinore since 2016. As part of an on-call contract with the City, ERSC provides review of the following plans and documents: Traffic Signal Plans; Improvement Plans; Grading Plans; Final Maps and Parcel Maps; Dedications, Easements; Vacations, Quitclaims; Parcel Mergers; Lot Line Adjustments; WQMP Submittals; Hydrology and Hydraulic Studies/Reports; HEC-5 Studies; Traffic Analyses, Studies, Reports; Soil/Geotechnical Studies/Reports; Alquist Priolo Studies/State Submittals; Erosion Control Designs; Review of Technical Specifications for Proposed Improvements within City Road Rights of Way. On-Call Civil Engineering and Plan Check Services, City of Colton — Project Engineer responsible for review of improvement and grading plans during Engineering and Plan Check services in the City. ERSC works closely with City staff in the review of grading, street improvements, hydrology studies, soils reports, WQMP, SWPPP, lot line adjustments, and parcel maps. ERSC also provides on-call engineering services, such as the design for the La Cadena and 8th Street Intersection Reconfiguration. General Plan Check Services, City of Chino — Project Engineer responsible for review of improvement and grading plans during general plan check services to the City of Chino since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise Grading Plans, Wet Utility, Plans (e.g. Sewer, Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations,Water Quality Management Plans(WQMPs), Survey documents and maps, and oils Reports,for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont — Project Engineer responsible for review of improvement and grading plans during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. _J�nnn IMRDU 28 Craig Brudin, QSP I Sr. Engineering • - On-Call Plan Check and Inspection Services, City of Banning—Project Engineer responsible for review of improvement and grading plans during plan check and inspection services of residential and development projects. Plan check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as needed. On-Call Plan Check and Construction Inspection Services, City of Highland—Project Engineer responsible for review of improvement and grading plans during an on-call professional services agreement with the City of Highland. ERSC provides contract plan check and inspection services for the construction of public works and privately funded improvements, including site improvements, street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements. ERSC also provides plan checking services for all parcel and tract maps, as well as hydrology review. Plan Checking and Project Management, City of Palm Springs— Project Engineer responsible for review of improvement and grading plans during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. J�"A A IMIV 29 Erik Howard, PE, PLS I Sr. Principal Engineer Education Erik Howard has 29 years of complex project surveying, BS, Civil Engineering, engineering and management experience civil engineering California State Polytechnic Univ., including below ground waterlines, welded steel reservoirs, Pomona, CA well and booster pumping plants, groundwater recharge facilities, and street improvements including records Registrations / Certifications searches, surveying, utility verification, design, review, CA, Civil Engineer No. C53318 preparation of contract documents(construction drawings and CA, Professional Land Surveyor No. 7648 specifications), and construction observation (inspection). His civil engineering portfolio includes site design and access Affiliations roadway design for various civil projects including site California Land Surveyors Association selection and evaluation, hydrology studies, determination American Water Works Association of grading requirements, piping layout, utility relocation, and American Society of Civil Engineers cost estimates. Areas of Expertise His professional surveying portfolio includes preparation of Water/Wastewater Engineering records-of-survey,legal descriptions,conveyance documents, Project Management topographic surveying, construction staking, boundary Forensic Evaluations surveying, and monumentation. He has also performed Survey/Geomatics contract administration and construction management for Quality Control various projects, as well as provided expert witness services, legal testimony, and assisted in forensic studies on an as- needed basis. Similar Project Experience: General Plan Check Services, City of Chino—Project Engineer responsible for review of water/wastewater plans and survey documents during general plan check services to the City of Chino since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise Grading Plans, Wet Utility, Plans (e.g. Sewer, Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations, Water Quality Management Plans (WQMPs), Survey documents and maps, and oils Reports, for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont — Project Engineer responsible for review of water/wastewater plans and survey documents during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. Plan Checking and Project Management, City of Palm Springs, CA— Project Engineer responsible for review ofwater/wastewater plans and survey documents during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. J�"A A_ Itnibb 30 Jorge Biagioni, . - - Mr. Biagioni joined ERSC in 2018 and brings almost 40 years Education of municipal engineering experience to the ERSC team. Mr. BS, MS, Civil Engineering, Biagioni has a diverse range of knowledge having served both UNR, Argenita public and private entities throughout the region. In his past assignments, his responsibilities have included the following: Registrations / Certifications • Review of new projects, and preparation of conditions of CA, Civil Engineer No. C33751 QSD/QSP No. 21220 approval. • Review and preparation of final maps, legal descriptions Areas of Expertise and easement documents. Land Development Review • Prepared staff reports for City Council meetings. Municipal Engineering • Project coordination with other departments (Planning, CIP Management Building & Safety, and Finance). • Review and coordination of CIP projects for municipalities. • Prepared CIP plan, Grading Ordinance and revision of City Standards for the City of Hemet. • Coordination with Federal and State agencies (FEMA, Caltrans, DWR, DFW, etc.). • Preparation of complex hydrology studies and design of storm drain systems. • Designed the Master Plan of Drainage for John Wayne Airport in Orange County. • Prepared network analysis for the Master Plan of Sewer for the City of Upland. • Designed street improvements, water, sewer and storm drain systems. • Provided plan check services for several municipalities. • Managed the inspection activities for the cities of Hemet and Chino Hills. • Interfaced with developers, contractors, design teams and local agencies. • Review and process of cost estimates, bonds and other securities. • Prepared proposals for public works projects. • Managed engineering consulting offices in Orange and Riverside counties. Select Project Experience: On-Call Plan Check Services, City of Lake Elsinore—Project Engineer responsible for improvement plans, grading plans, and survey related documents during civil engineering plan check services provided to the City of Lake Elsinore since 2016. As part of an on-call contract with the City, ERSC provides review of the following plans and documents: Traffic Signal Plans; Improvement Plans; Grading Plans; Final Maps and Parcel Maps; Dedications, Easements; Vacations, Quitclaims; Parcel Mergers; Lot Line Adjustments; WQMP Submittals; Hydrology and Hydraulic Studies/Reports; HEC-5 Studies; Traffic Analyses, Studies, Reports; Soil/Geotechnical Studies/Reports; Alquist Priolo Studies/State Submittals; Erosion Control Designs; Review of Technical Specifications for Proposed Improvements within City Road Rights of Way. On-Call Civil Engineering and Plan Check Services, City of Colton — Project Engineer responsible for improvement plans, grading plans, and survey related documents during Engineering and Plan Check services in the City. ERSC works closely with City staff in the review of grading, street improvements, hydrology studies, soils reports, WQMP, SWPPP, lot line adjustments, and parcel maps. ERSC also provides on-call engineering services, such as the design for the La Cadena and 8th Street Intersection Reconfiguration. General Plan Check Services, City of Chino — Project Engineer responsible for improvement plans, grading plans, and survey related documents during general plan check services to the City of Chino (since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise IMIDU31 Jorge Biagioni, • - - Grading Plans, Wet Utility, Plans (e.g. Sewer, Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations, Water Quality Management Plans (WQMPs), Survey documents and maps, and oils Reports, for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont — Project Engineer responsible for improvement plans, grading plans, and survey related documents during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. On-Call Plan Check and Inspection Services, City of Banning — Project Engineer responsible for improvement plans, grading plans, and survey related documents during plan check and inspection services of residential and development projects. Plan check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as needed. On-Call Plan Check and Construction Inspection Services, City of Highland—Project Engineer responsible for improvement plans, grading plans, and survey related documents during an on-call professional services agreement with the City of Highland. ERSC provides contract plan check and inspection services for the construction of public works and privately funded improvements, including site improvements, street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements. ERSC also provides plan checking services for all parcel and tract maps, as well as hydrology review. Plan Checking and Project Management, City of Palm Springs — Project Engineer responsible for improvement plans, grading plans, and survey related documents during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. J�"A A_ Itnibb 32 Dale Roberson I Engineering Associate III Dale has more than 25 years experience in Civil Engineering Design, Plan Checking, Mapping, Telecommunications, Construction & Project Management, Landfill Engineering, ADA & QSD Site Inspections/Reports, Wastewater, Water Quality, Entitlements, Property Condition Assessments /Reports, and Improvement Plan Processing to Permit. His skill set also includes Process Piping, Survey/ Mapping, Electrical & Industrial Engineering Experience when necessary. Dale's training also includes attendance at Water Quality, Landfill System, Management &Autocad/Softdesk Seminars. He joined ERSC in 2019 and has since worked on projects including Plan Checking for various Cities, Counties and Water Districts across Southern California. Similar Project Experience: On-Call Plan Check Services, City of Lake Elsinore—Project Engineer responsible for improvement plans, grading plans, and survey related documents during civil engineering plan check services provided to the City of Lake Elsinore since 2016. As part of an on-call contract with the City, ERSC provides review of the following plans and documents: Traffic Signal Plans; Improvement Plans; Grading Plans; Final Maps and Parcel Maps; Dedications, Easements; Vacations, Quitclaims; Parcel Mergers; Lot Line Adjustments; WQMP Submittals; Hydrology and Hydraulic Studies/Reports; HEC-5 Studies; Traffic Analyses, Studies, Reports; Soil/Geotechnical Studies/Reports; Alquist Priolo Studies/State Submittals; Erosion Control Designs; Review of Technical Specifications for Proposed Improvements within City Road Rights of Way. On-Call Civil Engineering and Plan Check Services, City of Colton — Project Engineer responsible for improvement plans, grading plans, and survey related documents during Engineering and Plan Check services in the City. ERSC works closely with City staff in the review of grading, street improvements, hydrology studies, soils reports, WQMP, SWPPP, lot line adjustments, and parcel maps. ERSC also provides on-call engineering services, such as the design for the La Cadena and 8th Street Intersection Reconfiguration. General Plan Check Services, City of Chino — Project Engineer responsible for improvement plans, grading plans, and survey related documents during general plan check services to the City of Chino since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise Grading Plans, Wet Utility, Plans (e.g. Sewer, Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations, Water Quality Management Plans (WQMPs), Survey documents and maps, and oils Reports, for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont — Project Engineer responsible for improvement plans, grading plans, and survey related documents during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. On-Call Plan Check and Inspection Services, City of Banning — Project Engineer responsible for improvement plans, grading plans, and survey related documents during plan check and inspection services of residential and development projects. Plan check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as needed. On-Call Plan Check and Construction Inspection Services,City of Highland—Project Engineer responsible for improvement plans, grading plans, and survey related documents during an on-call professional services agreement with the City of Highland. ERSC provides contract plan check and inspection services for the construction of public works and privately funded improvements, including site improvements, J�"A A_ Itnibb 33 Dale Roberson I Fingineering Associate III street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements. ERSC also provides plan checking services for all parcel and tract maps, as well as hydrology review. Plan Checking and Project Management, City of Palm Springs — Project Engineer responsible for improvement plans, grading plans, and survey related documents during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. _J�nnn IMIDU 34 Reza Toorzani, Engineer Education Mr. Toorzani joined the ERSC team in 2003, with more than BS, Civil Engineering, Southern 26 years of rich and extensive experience. He has gained University and A&M College, particular skill in design, and a distinguished reputation for the Baton Rouge, LA overall supervision of large and complicated projects, insuring that the contracted works meets the required specifications. MS, Civil Engineering, New Jersey He has managed several site supervision teams and played Institute of Technology, Newark, NJ a major role in completing projects according to program and within budget. In addition, Mr. Toorzani has practiced Registrations / Certifications as an analyst, designer and site superintendent in the CA, Civil Engineer No. C74906 implementation of major civil infrastructure projects mainly in DE, Civil Engineer No. C13235 the United States and Iran. Since joining the ERSC team, Mr. Toorzani has focused his Affiliations extensive experience and expertise on the design and peer American Concrete Institute review of various structures. His design experience includes large scale solar projects, walls and foundations, reinforced Areas of Expertise concrete box storm drains and substructures and block Construction Management enclosures and small wood framed structures at pump station Structural Engineering and large metal buildings. Has conducted peer review for Structural Analysis conical wind turbine foundations in the City of Palm Springs, Material Analysis Con-Span bridge structures along the Cactus Valley Wash in the City of Hemet and reinforced concrete structures crossing the East Garden Grove/Wintersburg Channel in the City of Huntington Beach. Similar Project Experience: On-Call Plan Check Services, City of Lake Elsinore — Project Engineer responsible for review of soils reports and geotechnical investigations during civil engineering plan check services provided to the City of Lake Elsinore since 2016. As part of an on-call contract with the City, ERSC provides review of the following plans and documents: Traffic Signal Plans; Improvement Plans; Grading Plans; Final Maps and Parcel Maps; Dedications, Easements; Vacations, Quitclaims; Parcel Mergers; Lot Line Adjustments; WQMP Submittals; Hydrology and Hydraulic Studies/Reports; HEC-5 Studies; Traffic Analyses, Studies, Reports; Soil/Geotechnical Studies/Reports; Alquist Priolo Studies/State Submittals; Erosion Control Designs; Review of Technical Specifications for Proposed Improvements within City Road Rights of Way. On-Call Civil Engineering and Plan Check Services, City of Colton — Project Engineer responsible for review of soils reports and geotechnical investigations during Engineering and Plan Check services in the City. ERSC works closely with City staff in the review of grading, street improvements, hydrology studies, soils reports, WQMP, SWPPP, lot line adjustments, and parcel maps. ERSC also provides on-call engineering services, such as the design for the La Cadena and 8th Street Intersection Reconfiguration. General Plan Check Services, City of Chino — Project Engineer responsible for review of soils reports and geotechnical investigations during general plan check services to the City of Chino since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise Grading Plans, Wet Utility, Plans (e.g. Sewer, Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations, Water Quality Management Plans (WQMPs), Survey documents and maps, and oils Reports, for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont — Project Engineer responsible for review of soils reports and geotechnical investigations during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, J�"A A_ Itnibb 35 Reza Toorzani, PE I Engineer and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. On-Call Plan Check and Inspection Services, City of Banning — Project Engineer responsible for review of soils reports and geotechnical investigations during plan check and inspection services of residential and development projects. Plan check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as needed. On-Call Plan Check and Construction Inspection Services, City of Highland—Project Engineer responsible for review of soils reports and geotechnical investigations during an on-call professional services agreement with the City of Highland. ERSC provides contract plan check and inspection services for the construction of public works and privately funded improvements, including site improvements, street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements. ERSC also provides plan checking services for all parcel and tract maps, as well as hydrology review. Plan Checking and Project Management, City of Palm Springs— Project Engineer responsible for review of soils reports and geotechnical investigations during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. J�"A A_ IMIDU 36 Maurice Cruz I Engineering • - III Education Mr. Cruz has over 17 years of experience in the traffic and civil CADD Course & Certification (Specialize engineering field for public and private sectors. Experience in AutoCAD and Micro Station), Westech Traffic Signal Design, ITS, Fiber optic design for traffic signal College, Pomona, 2002 interconnect,and CCTV, Signing and Striping, Street Lighting, Work Zone Traffic Control, Traffic Detour Plan, and Street ITS Standards Training, US DOT's Joint Improvement. Worked on several projects for the cities of Program Office and ITE, June 2004, Los Montebello, Pico Rivera, and Bell Gardens. Preparing street Angeles, California. and traffic improvement plans from start to finish; including Expertise: AutoCAD 2020, Civil 3D, utility information/inventory map request for aboveground MicroStationV8, Corelle Draw, Traffix, 3-D and underground utilities, in collaboration with the city, Drawings, Civil Drafting and project engineers making sure all and any applicable Caltrans, APWA, and MUTCD standards were met. His Affiliations construction comprehension is unique, having started in the Associate Member, Institute of construction trade as an apprentice from an early age, which Transportation Engineers gives him an advantage in understanding constructability and meeting the client's needs. Mr. Cruz Has worked closely with agencies such as Beverly Hills, Moreno Valley, Culver City, Montebello, Bell Gardens, Ontario, Rancho Cucamonga, Pico Rivera, Palmdale, Downey, LADOT, LACDPW, City Council Districts, and Caltrans. Similar Project Experience: On-Call Plan Check Services, City of Lake Elsinore — Project Engineer responsible for traffic and transportation plans and documents during civil engineering plan check services provided to the City of Lake Elsinore since 2016. As part of an on-call contract with the City, ERSC provides review of the following plans and documents: Traffic Signal Plans; Improvement Plans; Grading Plans; Final Maps and Parcel Maps; Dedications, Easements; Vacations, Quitclaims; Parcel Mergers; Lot Line Adjustments; WQMP Submittals; Hydrology and Hydraulic Studies/Reports; HEC-5 Studies; Traffic Analyses, Studies, Reports; Soil/Geotechnical Studies/Reports; Alquist Priolo Studies/State Submittals; Erosion Control Designs; Review of Technical Specifications for Proposed Improvements within City Road Rights of Way. On-Call Civil Engineering and Plan Check Services, City of Colton — Project Engineer responsible for traffic and transportation plans and documents during Engineering and Plan Check services in the City. ERSC works closely with City staff in the review of grading, street improvements, hydrology studies, soils reports, WQMP, SWPPP, lot line adjustments, and parcel maps. ERSC also provides on-call engineering services, such as the design for the La Cadena and 8th Street Intersection Reconfiguration. General Plan Check Services, City of Chino — Project Engineer responsible for traffic and transportation plans and documents during general plan check services to the City of Chino since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise Grading Plans, Wet Utility, Plans (e.g. Sewer, Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations,Water Quality Management Plans(WQMPs), Survey documents and maps, and oils Reports,for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont — Project Engineer responsible for traffic and transportation plans and documents during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. On-Call Plan Check and Inspection Services, City of Banning — Project Engineer responsible for traffic and transportation plans and documents during plan check and inspection services of residential and J�"A A_ Itnibb 37 Maurice Cruz I Fingineering III Associate development projects. Plan check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as needed. On-Call Plan Check and Construction Inspection Services, City of Highland—Project Engineer responsible for traffic and transportation plans and documents during an on-call professional services agreement with the City of Highland. ERSC provides contract plan check and inspection services for the construction of public works and privately funded improvements, including site improvements, street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements. ERSC also provides plan checking services for all parcel and tract maps, as well as hydrology review. Plan Checking and Project Management, City of Palm Springs — Project Engineer responsible for traffic and transportation plans and documents during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. On-Call Traffic Plan Check Services, City of Ontario - Project Engineer responsible for traffic and transportation plans and documents during the review of Traffic related plans and documents such as traffic signal plans, signing and striping plans, street lighting plans, and voltage drop calculations. J�"A A_ IMIDU 38 Stephen Wilson, Engineering • - Education Mr. Wilson joined ERSC in March 2019, bringing over 27 BS, Soil Science with Chemistry Minor, years of public service experience and expertise to our firm. California State Polytechnical University, During his career, he played an integral part in administration, School of Agriculture, Pomona, CA, coordination and implementation of NPDES Permit Programs for the Cities of Chino and Ontario. His background also Registrations / Certifications includes industrial waste inspection services related to Certified Professional in Erosion and wastewater treatment systems and laboratory analysis Sediment Control, Certificate No. 5365 relating to quantitative measurements of fungicide residues QSD/QSP, Certificate No. 20495 on agricultural products. Certified in Hazardous Materials Similar Project Experience: Management On-Call Plan Check Services, City of Lake Elsinore— Project Areas of Expertise Engineer responsible for review of NPDES plans and WQMPs Water Resources Engineering during civil engineering plan check services provided to the Flood Control Engineering City of Lake Elsinore since 2016.As part of an on-call contract Hydraulics and Hydrology with the City, ERSC provides review of the following plans Erosion Control and documents: Traffic Signal Plans; Improvement Plans; Grading Plans; Final Maps and Parcel Maps; Dedications, Easements; Vacations, Quitclaims; Parcel Mergers; Lot Line Adjustments; WQMP Submittals; Hydrology and Hydraulic Studies/Reports; HEC-5 Studies; Traffic Analyses, Studies, Reports; Soil/Geytechnical Studies/Reports; Alquist Priolo Studies/State Submittals; Erosion Control Designs; Review of Technical Specifications for Proposed Improvements within City Road Rights of Way. On-Call Civil Engineering and Plan Check Services, City of Colton — Project Engineer responsible for review of NPDES plans and WQMPs during Engineering and Plan Check services in the City. ERSC works closely with City staff in the review of grading, street improvements, hydrology studies, soils reports, WQMP, SWPPP, lot line adjustments, and parcel maps. ERSC also provides on-call engineering services, such as the design for the La Cadena and 8th Street Intersection Reconfiguration. General Plan Check Services, City of Chino — Project Engineer responsible for review of NPDES plans and WQMPs during general plan check services to the City of Chino since 2016. In the City of Chino, ERSC is commissioned to provide the review of Rough and Precise Grading Plans, Wet Utility, Plans (e.g. Sewer,Water, Storm Drain), Street Improvement Plans, Street Light Plans and Voltage Drop Calculations, Hydrology Studies and Hydraulic Calculations, Water Quality Management Plans (WQMPs), Survey documents and maps, and oils Reports, for private development and capital improvement projects throughout the City. On-Call Plan Check, Inspection and Design Services, City of Beaumont— Project Engineer responsible for review of NPDES plans and WQMPs during civil engineering plan check, design, and inspection services to the City of Beaumont since in 2017. ERSC reviews development projects, CIP projects, and WQMPs. Development plans range from 1-million sqft commercial complexes to multiple lot subdivisions. As an on-call design consultant, ERSC is responsible for paving projects, survey projects, and drainage projects. Most recently, ERSC completed the Highland Springs/1st Drainage project to mitigate erosion and sedimentation issue near a local golf course. On-Call Plan Check and Inspection Services, City of Banning — Project Engineer responsible for review of NPDES plans and WQMPs during plan check and inspection services of residential and development projects. Plan check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as needed. On-Call Plan Check and Construction Inspection Services,City of Highland—Project Engineer responsible J�"A A_ Itnibb 39 Stephen • / Sr. EngineeringAssociate for review of NPDES plans and WQMPs during an on-call professional services agreement with the City of Highland. ERSC provides contract plan check and inspection services for the construction of public works and privately funded improvements, including site improvements, street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements. ERSC also provides plan checking services for all parcel and tract maps, as well as hydrology review. Plan Checking and Project Management, City of Palm Springs— Project Engineer responsible for review of NPDES plans and WQMPs during an on-call professional services agreement with the City of Palm Springs, ERSC provides plan and map checking for the City's development projects. Specific tasks include the review of improvement plans, final subdivision maps, and other survey related documents as prepared by design consultants for accuracy and completeness, conformance to local codes, ordinances, and design standards. Matt Brudin has served as the Project Manager and primary Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. _J�nnn Mau 40 ZZ Ar -= s "�— K -erience ON-CALL PLAN CHECK SERVICES,CITY OF LAKE ELSIN0RE; PROJECTTERM 2016-PRESENT Engineering Resources of Southern California, Inc., has provided civil engineering plan check services to the City of • " City of Lake Elsinore since in 2016. Since that time, the Rita Thompson ERSC team has reviewed almost 200 different projects in the City. pKrthompson@Lake-Elsinore.org As part of an on-call contract with the City, ERSC provides review of Improvement Plans, Grading ERSC Project Team: Plans, Final Maps and Parcel Maps, Dedications, John M. Brudin, PE Stephen Easements, Vacations, Quitclaims, Parcel Mergers, Moe A—di,Ahmadi, - - Lot Line Adjustments, WQMP Submittals, Hydrology Reza Toorzani, PE Lilia Guerrero and Hydraulic Studies/Reports, HEC-5 Studies, Traffic Steven Latino, PE, _ Robert • - ' Analyses/studies/reports, Soil/Geotechnical Studies/ Jorge Cassandra Silva Reports, Erosion Control Designs, Traffic Signal Plans, and other documents. During ERSC's work in the City, our team retained the special information necessary to review WQMPs in the City. WQMPs in the City are subject to different requirements if a project is tributary to the Lake. Our staff retained and applied this knowledge to multiple different submittals to ensure quick plan check turn-arounds. ERSC also uses electronic submittals and review in the City. Our team performs reviews in Bluebeam REVU and transmits to engineers using ERSC's FTP site with access available to City staff. ON-CALL CIVIL ENGINEERING AND PLAN CHECK SERVICES — CITY OF COLTON PROJECT TERM: 2003 - PRESENT Engineering Resources of Southern California, Inc. is City of Colton proud to serve the City of Colton since 2003 with On- Victor - City • __ Call Civil Engineering and Plan Check services. Our • engineers, engineering technicians and administrative team have worked closely with City staff in the review of grading, street improvements, hydrology studies, soils ERSC Project reports, WQMP, SWPPP, lot line adjustments, and parcel John M. Brudin, PE Trent Brudin, EIT maps. Moe Ahmadi, PE BenBooth, Collectively,with the new additions to City staff, ERSC was Steve Latino, PE, Guerrero excited to implement an electronic processing procedure Reza Toorzani, PE Cassandra Silva for plan check review. The ERSC team handles the Jorge Biagioni, scanning of all plan check and supporting documents, helping to eliminate the burden for City staff, which helps project costs and budgets. This new procedure has helped to reduce plan check time and all plan check information is forwarded to the City in downloadable links for the City of Colton's ease and use. J�AAA_ IMIDU 41 Firm Experience ERSC also provides on-call engineering services, such as the design for the La Cadena and 8th Street Intersection Reconfiguration. GENERAL PLAN CHECK SERVICES, CITY OF CHINO; PROJECT TERM 2016- PRESENT ERSC has provided general plan check services to the City of • City of Chino since 2016. Since 2016 ERSC has been Chris - -E, City Engineer able to meet the surge in development activity that the •0. City has experienced. ERSC has adapted to multiple cmagdosku@cityofchino.org staff changes, internal engineering preferences, and many different requirements that the City has adopted ERSC to serve its changing populace. ProjectJohn M. Brudin, PE Stephen Wilson, In the City of Chino, ERSC is commissioned to provide Moe Ahmadi, PE QSD/QSP the review of Rough and Precise Grading Plans, Wet Erik Howard, • Utility, Plans (e.g. Sewer, Water, Storm Drain), Street Reza Toorzani, PE Robert • • Improvement Plans, Street Light Plans and VoltageJorge ' -' ' PE Dale Roberson Drop Calculations, Hydrology Studies and Hydraulic Craig •SP Cassandra Silva Calculations, Water Quality Management Plans (WQMPs), Easements and Right-Of-Way Dedications, Soils Reports, Subdivision Maps, Title Reports, and Closure Calculations, for private development and capital improvement projects throughout the City. ERSC also acts as the City Surveyor, signing maps on the City's behalf while also answering survey related questions that arise in the day-to-day operation of the engineering department. PLAN CHECKING AND PROJECT MANAGEMENT, CITY OF PALM SPRINGS: PROJECT TERM: 2002 - PRESENT Under an on-call professional services agreement City of Palm Springs with the City of Palm Springs, Engineering Resources �Rick e of Southern California, Inc., provides plan and map checking for most of the City's development projects ' p, and construction management and inspection for some of the Capital Improvement Projects throughout the ERSC incorporated area. Project John M. Brudin, -• • Specific tasks include the review of improvement Moe Ahmadi, PE • • - plans, final subdivision maps, and other survey related Reza Toorzani, PE Lilia Guerrero documents as prepared by design consultants for Steven Latino, Robert 011erton accuracy and completeness; conformance to local Jorge Biagioni, PE Silva Cassandra codes,ordinances,and design standards. Further, ERSC Craig Brudin, • SP has provided inspection and construction management services for City-sponsored improvements to streets and drainage facilities. Matt Brudin has served as the Project Manager and Plan Check team member since 2002 and all members of ERSC's current team have provided plan checking to the City under ERSC's contract, which is currently ongoing. PLAN CHECK AND INSPECTION SERVICES, CITY OF BANNING; PROJECT TERM: 2018 - PRESENT Engineering Resources of Southern California, Inc., was recently awarded a contract with the City of Banning to provide plan check and inspection services of residential and development projects. The scope of plan check services includes review of street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. J�AAA ICBM 42 Firm Experience ERSC will also provide conditions of approvals for City projects, as needed. City of Banning ERSC's goal is to provide comprehensive early Kevin D. Sin, PE plan check comments to avoid unexpected project ksin requirements late in the process, employ streamlined ' •" ' �• anaeeoeae roex ou review processes and have a problem solving approach with all interactions. ERSC will review plans, calculations, ERSC Project reports and specifications for compliance with the most John M. Brudin, PE Craig Brudin, Q - recent adopted Federal, State and City regulations and Moe Ahmadi, PE StephenWilson, standards. Once verified that the plans comply with Reza Toorzani, PE Q Q - Steven applicable regulations, ERSC will approve the plans and PE, Guerrero forward them to the City for permit issuance. Jorge Biagioni, PE Cassandra Silva ERSC's inspectors inspect public works improvement projects before, during and/or after construction to insure conformance with Federal, State and City statues, regulations, guidelines, applicable standards, specifications, plans, laws and accepted standard construction practices. Inspectors will be responsible for site photos and reports submitted to the City daily, among other duties in the field. AS-NEEDED TRAFFIC IMPROVEMENT PLAN CHECK, CITY OF ONTARIO; PROJECT TERM 2018 - PRESENT Under a subconsultant agreement with Harris&Associates, Inc., Engineering Resources provides as-needed traffic Harris &Associates improvement plan check services, that includes, but is not Craig Siefert, - limited to: ext. • Craig.Siefert@weareharris.com Review of Signing and Striping, Traffic Signal and Street Light Improvement Plans • Compliance with applicable provisions of the City of ERSC Project Team: Ontario standards, Conditions of Approval, City Plan Steven Latino, PE, TE Maurice Cruz Check Guidelines (Traffic and Transportation Design Lilia Guerrero Cass Silva andra Guidelines). • Verify designs and requirements against any other qualifying documents, including The Ontario Plan (TOP — City's General Plan), Master Plan of Streets and Highways, Specific Plans, CEQA/NEPA Documents (i.e. EIR). • Review of special studies including,but not limited to Traffic ImpactAnalysis(Traffic Studies), Environmental Impact Reports, etc. • Review the general format of the plans against the City's Standard Drawings for title blocks, design criteria, line types/weights, etc. • Check plans against City Plan Check Guidelines and Traffic and Transportation Guidelines. • Work with City staff and Developers/Engineers to achieve approval of public improvements. • Monitor, respond and coordinate with the City of Ontario/Harris &Associates in regards to plans that are not progressing, attend developer related meetings as required and coordination meeting with City Staff. ON-CALL PLAN CHECK AND CONSTRUCTION INSPECTION SERVICES, CITY OF HIGHLAND; PROJECT TERM 2003 - PRESENT Under an on-call professional services agreement with the City of Highland, ERSC provides plan checking services to the City during both development and CIP projects. Grading, street, storm drain, hydrology J�AAA ICBM 43 Firm Experience studies, and WQMPs are regularly reviewed by ERSC on the City's behalf. Survey documents such as lot • • • line adjustments, parcel maps, tract maps, and parcels Assistant Public Carlos •Director mergers are also reviewed by ERSC. Works ERSC also provides contract inspection services for ;•. •;• the construction of public works and privately funded rFor Hz2° czamano@cityofhighland.org improvements. Representative projects include: • Lankershim Avenue Street Improvements ERSC Project Team: • Sterling Avenue Improvements John M. Brudin, - ik Howard, - Steven . PE, TE Lilia Guerrero Highland Basin Drainage Moe Ahmadi, PE Robert 011erton • Victoria Avenue Improvements at 5th Street Jorge Biagioni, PE Cassandra • 2012 Community Development Block Grant Project - Vine Street • Bledsoe Creek Outlet Reconstruction • Olive Street Improvements • Traffic Signal —Various locations • City-Wide Sidewalk Project • 5th Street Bike Lane, Signing and Striping Improvements • Greenspot Road "S" Curve Realignment PLAN CHECK, INSPECTION AND DESIGN SERVICES, CITY OF BEAUMONT; PROJECT TERM 2017 - PRESENT Engineering Resources of Southern California, Inc., City of Beaumont has provided civil engineering plan check, design, and Laurie Miller inspection services to the City of Beaumont since in 2017. As a plan checking consultant,ERSC reviews development BEAUMONT - .-, projects, CIP projects, and WQMPs. Development plans have ranged from 1-Million sqft commercial complexes to ERSC multiple lot subdivisions. ProjectJohn M. Brudin, PE Craig Brudin, QSP As an on-call design consultant, ERSC has been Steven Latino, PE, TE Lilia Guerrero responsible for paving projects, survey projects, and Moe Ahmadi, PE C Silva assandra drainage projects. Most recently, ERSC completed the Jorge Biagioni, - Highland Springs/1 St Drainage project to mitigate erosion and sedimentation issue near a local golf course. ERSC also provides inspectors to the City to be onsite during construction of land development activities in the City. ERSC inspectors regularly ensure work is performed per City standards, ADA accessibility requirements, coordinate material testing, and ensure storm water compliance measures are implemented on behalf of the City. PLAN CHECK AND CONSTRUCTION SERVICES, CITY OF GARDEN GROVE: PROJECT TERM: 2010 - PRESENT Under a municipal services contract with the City of Garden Grove, ERSC provides plan check services, construction management, and inspection services for various street, intersection and storm drain improvement projects. J�AAA ICBM 44 Firm Experience Plan check services include the review of documents for City of Garden Grove all City projects, including but not limited to: William Murray, RE., • Tract Maps Public . Director• WQMP 000 • GARDEN GROVE � •� •- • • - • • • Street Improvements • Right-of-Way Exhibits ERSC Project CC&Rs Steve Latino, Cassandra • Grading, Precise Grading, Erosion Robert Righetti • Hydrology and Water • Storm Drain • Utilities • Survey • Lot Line Adjustments • Legals and Plats Construction management and inspection services include coordination of CIP projects awarded to contractors for compliance with plans and specifications; review of monthly progress pay estimates for compliance with specifications and provide monthly payment recommendations; monitor contractor's progress to ensure project schedules are met; assist and advise District staff with post-construction activities; review, assess and manage claims submitted by contractors. Additional services include the management of projects that require special reporting to state or federal agencies to assure compliance with loan or grant conditions. CIVIL ENGINEERING PLAN CHECK SERVICES, CITY OF HEMET, PROJECT TERM: 2000-2007 & 2015-2018 Engineering Resources of Southern California, Inc., Robert provided civil engineering plan check services to the City of City of Hemet between 2000 to 2007 and 2015 to 2017, x 60 wherein ERSC was commissioned to provide the review """ of private development projects throughout the City. Team members were responsible for verifying the ERSC Project conformance of various construction drawings with the John M. Brudin, • •- Biagioni, City's municipal code, conditions of the approval, grading MoeAhmadi, Craig ' ' Q SP & erosion control manual, standards & specifications " Robert _ RE ' TE Silva for all final subdivision maps and legal documents, Steven Latino, RE, Cassandra commercial & residential grading, street improvements, traffic Signal installations & modifications, signing & striping, storm drain & site drainage plans, supporting hydrology & hydraulic calculations, and engineer's estimates & bond amounts for both public and private improvements. ERSC also provided the review and approval of construction and post construction water quality documents under the Construction General Permit and the MS4 in compliance with the requirements of the Santa Ana Regional Water Quality Control Board. J�AAA ICBM 45 11■ ■� A A Engineering Resources of Southern California DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 DATE(MMIDD/YYYY) A�" CERTIFICATE OF LIABILITY INSURANCE 7$/2g/2o19 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Certificate Department Cavignac&Associates PHONE FAX 450 B Street, Suite 1800 A/C No Ext: 619-744-0574 A/C No):619-234-8601 San Diego CA 92101 ADDRESS: certificates@cavignac.com INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Travelers Property Casualty Company of America 25674 INSURED ENGIRES-01 INSURER B:Trumbull Insurance Company Engineering Resources of Southern California, Inc.1861 W. Redlands Blvd, Bldg 7B INsuRERc: Berkley Insurance Company 32603 Redlands, CA 92373 INSURER 0, INSURER E INSURER F COVERAGES CERTIFICATE NUMBER:2074808737 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR INSD WVD POLICY NUMBER MM/DD/YYYY MM/DD/YYYY A X COMMERCIAL GENERAL LIABILITY Y Y 6802H222963 9/1/2019 9/1/2020 EACH OCCURRENCE $1,000,000 DAMAGES( RENTED CLAIMS-MADE OCCUR PREMISES Ea occurrence) ccurrence) $1,000,000 MED EXP(Any one person) $10,000 PERSONAL&ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY❑ PRO- JECT ❑ LOC PRODUCTS-COMP/OP AGG $2,000,000 OTHER: Deductible $0 A AUTOMOBILE LIABILITY Y Y BA4914L684 9/1/2019 9/1/2020 COMBINED SINGLE LIMIT $ Ea accident 1 000 000 X ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS NON-OWNED PROPERTY DAMAGE $ X HIRED AUTOS X AUTOS Per accident UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ B WORKERS COMPENSATION Y 72WEGGG6371 9/1/2019 9/1/2020 )( PER OTH- AND EMPLOYERS'LIABILITY Y/NI STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ N/A E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 C Professional Liability AEC903355200 9/1/2019 9/1/2020 Ea Claim&Aggreg $2,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Re:Engineering Plan Check Services.Additional Insured coverage applies to General Liability and Automobile Liability for the certificate holder,its elected or appointed officers,officials,employees,agents and volunteers per policy form.Primary coverage applies to General Liability and Automobile Liability per policy form.Waiver of subrogation applies to General Liability,Automobile Liability,and Workers Compensation per policy form.Professional Liability-Claims made form,defense costs included within limit. If the insurance company elects to cancel or non-renew coverage for any reason other than nonpayment of premium Cavignac&Associates will provide 30 days notice of such cancellation or nonrenewal. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Lake Elsinore 130 South Main Street AUTHORIZED REPRESENTATIVE Lake Elsinore CA 92530 ltfllk ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 Policy#BA4914L684 COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO EXTENSION ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GENERAL DESCRIPTION OF COVERAGE—This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general cover- age description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this en- dorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered. A. BROAD FORM NAMED INSURED H. HIRED AUTO PHYSICAL DAMAGE — LOSS OF B. BLANKET ADDITIONAL INSURED USE—INCREASED LIMIT C. EMPLOYEE HIRED AUTO 1. PHYSICAL DAMAGE — TRANSPORTATION EXPENSES—INCREASED LIMIT D. EMPLOYEES AS INSURED J. PERSONAL PROPERTY E. SUPPLEMENTARY PAYMENTS — INCREASED K. AIRBAGS LIMITS L. NOTICE AND KNOWLEDGE OF ACCIDENT OR F. HIRED AUTO — LIMITED WORLDWIDE COV- LOSS ERAGE—INDEMNITY BASIS M. BLANKET WAIVER OF SUBROGATION G. WAIVER OF DEDUCTIBLE—GLASS N. UNINTENTIONAL ERRORS OR OMISSIONS PROVISIONS A. BROAD FORM NAMED INSURED this insurance applies and only to the extent that The following is added to Paragraph A.1., Who Is person or organization qualifies as an "insured" An Insured, of SECTION II —COVERED AUTOS under the Who Is An Insured provision contained LIABILITY COVERAGE: in Section II. Any organization you newly acquire or form dur- C. EMPLOYEE HIRED AUTO ing the policy period over which you maintain 1. The following is added to Paragraph A.1., 50% or more ownership interest and that is not Who Is An Insured, of SECTION II — COV- separately insured for Business Auto Coverage. ERED AUTOS LIABILITY COVERAGE: Coverage under this provision is afforded only un- An "employee" of yours is an "insured" while til the 180th day after you acquire or form the or- operating an "auto" hired or rented under a ganization or the end of the policy period, which- contract or agreement in an "employee's" ever is earlier. name, with your permission, while performing duties related to the conduct of your busi- B. BLANKET ADDITIONAL INSURED ness. The following is added to Paragraph c. in A.1., 2. The following replaces Paragraph b. in B.5., Who Is An Insured, of SECTION II — COVERED Other Insurance, of SECTION IV — BUSI- AUTOS LIABILITY COVERAGE: NESS AUTO CONDITIONS: Any person or organization who is required under b. For Hired Auto Physical Damage Cover- a written contract or agreement between you and age, the following are deemed to be cov- that person or organization, that is signed and ered "autos"you own: executed by you before the "bodily injury" or (1) Any covered "auto" you lease, hire, "property damage" occurs and that is in effect rent or borrow; and during the policy period, to be named as an addi- (2) Any covered "auto" hired or rented by tional insured is an "insured" for Covered Autos your "employee" under a contract in Liability Coverage, but only for damages to which an "employee's" name, with your CA T3 53 02 15 ©2015 The Travelers Indemnity Company.All rights reserved. Page 1 of 4 Includes copyrighted material of Insurance Services Office, Inc.with its permission. DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 Policy#BA4914L684 COMMERCIAL AUTO permission, while performing duties (a) With respect to any claim made or "suit" related to the conduct of your busi- brought outside the United States of ness. America, the territories and possessions However, any"auto" that is leased, hired, of the United States of America, Puerto rented or borrowed with a driver is not a Rico and Canada: covered "auto". (i) You must arrange to defend the "in- D. EMPLOYEES AS INSURED sured" against, and investigate or set- tle any such claim or "suit" and keep The following is added to Paragraph A.1., Who Is us advised of all proceedings and ac- An Insured, of SECTION II —COVERED AUTOS tions. LIABILITY COVERAGE: (ii) Neither you nor any other involved Any "employee" of yours is an "insured"while us- "insured" will make any settlement ing a covered "auto"you don't own, hire or borrow without our consent. in your business or your personal affairs. (iii) We may, at our discretion, participate E. SUPPLEMENTARY PAYMENTS — INCREASED in defending the "insured" against, or LIMITS in the settlement of, any claim or 1. The following replaces Paragraph A.2.a.(2), "suit". of SECTION II — COVERED AUTOS LIABIL- (iv)We will reimburse the "insured" for ITY COVERAGE: sums that the "insured" legally must (2) Up to $3,000 for cost of bail bonds (in- pay as damages because of "bodily cluding bonds for related traffic law viola- injury" or"property damage" to which tions) required because of an "accident" this insurance applies, that the "in- we cover. We do not have to furnish sured" pays with our consent, but these bonds. only up to the limit described in Para- 2. The following replaces Paragraph A.2.a.(4), graph C., Limits Of Insurance, of of SECTION II — COVERED AUTOS LIABIL- SECTION II — COVERED AUTOS ITY COVERAGE: LIABILITY COVERAGE. (4) All reasonable expenses incurred by the (v) We will reimburse the "insured" for "insured" at our request, including actual the reasonable expenses incurred loss of earnings up to $500 a day be- with our consent for your investiga- cause of time off from work. tion of such claims and your defense of the "insured" against any such F. HIRED AUTO — LIMITED WORLDWIDE COV- "suit", but only up to and included ERAGE—INDEMNITY BASIS within the limit described in Para- The following replaces Subparagraph (5) in Para- graph C., Limits Of Insurance, of graph B.7., Policy Period, Coverage Territory, SECTION II — COVERED AUTOS of SECTION IV — BUSINESS AUTO CONDI- LIABILITY COVERAGE, and not in TIONS: addition to such limit. Our duty to (5) Anywhere in the world, except any country or make such payments ends when we jurisdiction while any trade sanction, em- have used up the applicable limit of bargo, or similar regulation imposed by the insurance in payments for damages, United States of America applies to and pro- settlements or defense expenses. hibits the transaction of business with or (b) This insurance is excess over any valid within such country or jurisdiction, for Cov- and collectible other insurance available ered Autos Liability Coverage for any covered to the "insured" whether primary, excess, "auto" that you lease, hire, rent or borrow contingent or on any other basis. without a driver for a period of 30 days or less (c) This insurance is not a substitute for re- and that is not an "auto" you lease, hire, rent quired or compulsory insurance in any or borrow from any of your "employees", country outside the United States, its ter- partners (if you are a partnership), members ritories and possessions, Puerto Rico and (if you are a limited liability company) or Canada. members of their households. Page 2 of 4 ©2015 The Travelers Indemnity Company.All rights reserved. CA T3 53 02 15 Includes copyrighted material of Insurance Services Office, Inc.with its permission. DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 Policy#BA4914L684 COMMERCIAL AUTO You agree to maintain all required or (2) In or on your covered "auto". compulsory insurance in any such coun- This coverage applies only in the event of a total try up to the minimum limits required by theft of your covered "auto". local law. Your failure to comply with No deductibles apply to this Personal Property compulsory insurance requirements will not invalidate the coverage afforded by coverage. this policy, but we will only be liable to the K. AIRBAGS same extent we would have been liable The following is added to Paragraph B.3., Exclu- had you complied with the compulsory in- sions, of SECTION III — PHYSICAL DAMAGE surance requirements. COVERAGE: (d) It is understood that we are not an admit- Exclusion 3.a. does not apply to "loss" to one or ted or authorized insurer outside the more airbags in a covered "auto" you own that in- United States of America, its territories flate due to a cause other than a cause of "loss" and possessions, Puerto Rico and Can- set forth in Paragraphs A.1.b. and A.1.c., but ada. We assume no responsibility for the only: furnishing of certificates of insurance, or a. If that "auto" is a covered "auto" for Compre- for compliance in any way with the laws hensive Coverage under this policy; of other countries relating to insurance. b. The airbags are not covered under any war- G. WAIVER OF DEDUCTIBLE—GLASS ranty; and The following is added to Paragraph D., Deducti- c. The airbags were not intentionally inflated. ble, of SECTION III — PHYSICAL DAMAGE We will pay up to a maximum of $1,000 for any COVERAGE: one"loss". No deductible for a covered "auto" will apply to L. NOTICE AND KNOWLEDGE OF ACCIDENT OR glass damage if the glass is repaired rather than LOSS replaced. The following is added to Paragraph A.2.a., of H. HIRED AUTO PHYSICAL DAMAGE — LOSS OF SECTION IV—BUSINESS AUTO CONDITIONS: USE— INCREASED LIMIT Your duty to give us or our authorized representa- The following replaces the last sentence of Para- tive prompt notice of the "accident" or "loss" ap- graph AA.b., Loss Of Use Expenses, of SEC- plies only when the "accident" or "loss" is known TION III—PHYSICAL DAMAGE COVERAGE: to: However, the most we will pay for any expenses (a) You (if you are an individual); for loss of use is $65 per day, to a maximum of (b) A partner(if you are a partnership); $750 for any one"accident". (c) A member (if you are a limited liability com- I. PHYSICAL DAMAGE — TRANSPORTATION pany); EXPENSES—INCREASED LIMIT (d) An executive officer, director or insurance The following replaces the first sentence in Para- manager (if you are a corporation or other or- graph A.4.a., Transportation Expenses, of ganization); or SECTION III — PHYSICAL DAMAGE COVER- (e) Any "employee" authorized by you to give no- AGE: tice of the"accident"or"loss". We will pay up to $50 per day to a maximum of M. BLANKET WAIVER OF SUBROGATION $1,500 for temporary transportation expense in- The following replaces Paragraph A.5., Transfer curred by you because of the total theft of a cov- Of Rights Of Recovery Against Others To Us, ered "auto"of the private passenger type. of SECTION IV — BUSINESS AUTO CONDI- J. PERSONAL PROPERTY TIONS: The following is added to Paragraph AA., Cover- 5. Transfer Of Rights Of Recovery Against age Extensions, of SECTION III — PHYSICAL Others To Us DAMAGE COVERAGE: We waive any right of recovery we may have Personal Property against any person or organization to the ex- tent required of you by a written contract We will pay up to $400 for "loss" to wearing ap- signed and executed prior to any "accident" parel and other personal property which is: or"loss", provided that the"accident" or"loss" (1) Owned by an "insured"; and arises out of operations contemplated by CA T3 53 02 15 ©2015 The Travelers Indemnity Company.All rights reserved. Page 3 of 4 Includes copyrighted material of Insurance Services Office, Inc.with its permission. DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 Policy#BA4914L684 COMMERCIAL AUTO such contract. The waiver applies only to the The unintentional omission of, or unintentional person or organization designated in such error in, any information given by you shall not contract. prejudice your rights under this insurance. How- N. UNINTENTIONAL ERRORS OR OMISSIONS ever this provision does not affect our right to col- The following is added to Paragraph B.2., Con- lect additional premium or exercise our right of cealment, Misrepresentation, Or Fraud, of cancellation or non-renewal. SECTION IV—BUSINESS AUTO CONDITIONS: Page 4 of 4 ©2015 The Travelers Indemnity Company.All rights reserved. CA T3 53 02 15 Includes copyrighted material of Insurance Services Office, Inc.with its permission. DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 GENERAL PURPOSE ENDORSEMENT POLICY NUMBER: 680-2H222963-19-47 OFFICE PAC ISSUE DATE: 06/21/2019 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CGD361 (03-05) - ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION THIS ENDORSEMENT MODIFIES INSURANCE PROVIDED UNDER THE FOLLOWING: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE NAMES OF ADDITIONAL INSURED PERSON(S) OR ORGANIZATION(S): Any person or organization that you agree in a written contract to include as an additional insured on this Coverage Part, provided that such written contract was signed by you before,and is in effect when, the "bodily injury" or "property damage" occurs or the "personal injury" or "advertising injury" offense is committed. LOCATION OF COVERED OPERATIONS: Any project to which a written contract with the Additional Insured Person(s) or Organization(s) in the Schedule applies. (INFORMATION REQUIRED TO COMPLETE THIS SCHEDULE, IF NOT SHOWN ABOVE, WILL BE SHOWN IN THE DECLARATIONS.) A. SECTION II - WHO IS AN INSURED IS AMENDED TO INCLUDE AS AN ADDITIONALINSURED THE PERSON(S) OR ORGANIZATION(S) SHOWN IN THE SCHEDULE, BUT ONLY WITH RESPECT TO LIABILITY FOR "BODILY INJURY", "PROPERTY DAMAGE", PERSONAL INJURY OR "ADVERTISING INJURY" CAUSED, IN WHOLE OR IN PART, BY: 1. YOUR ACTS OR OMISSIONS; OR 2. THE ACTS OR OMISSIONS OF THOSE ACTING ON YOUR BEHALF; IN THE PERFORMANCE OF YOUR ONGOING OPERATIONS FOR THE ADDITIONAL INSURED(S) AT THE LOCATION(S) DESIGNATED ABOVE. B. WITH RESPECT TO THE INSURANCE AFFORDED TO THESE ADDITIONAL INSURED, CG T8 01 09 19 Page 1 of 2 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 GENERAL PURPOSE ENDORSEMENT POLICY NUMBER: 680-2H222963-19-47 OFFICE PAC ISSUE DATE: 06/21/2019 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CGD361 (03-05) - ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: THE FOLLOWING ADDITIONAL EXCLUSIONS APPLY: THIS INSURED DOES NOT APPLY TO "BODILY INJURY" OR "PROPERTY DAMAGE" OCCURRING, OR "PERSONAL INJURY" OR "ADVERTISING INJURY' ARISING OUT OF AN OFFENSE COMMITTED, AFTER: 1. ALL WORK, INCLUDING MATERIALS, PARTS OR EQUIPMENT FURNISHED IN CONNECTION WITH SUCH WORK, ON THE PROJECT (OTHER THAN SERVICE, MAINTENANCE OR REPAIRS) TO BE PERFORMED BY OR ON BEHALF OF THE ADDITIONAL INSURED(S)AT THE LOCATION OF THE COVERED OPERATIONS HAS BEEN COMPLETED; OR 2. THAT PORTION OF "YOUR WORK" OUT OF WHICH THE INJURY OR DAMAGE ARISES HAS BEEN PUT TO ITS INTENDED USE BY ANY PERSON OR ORGANIZATION OTHER THAN ANOTHER CONTRACTOR OR SUBCONTRACTOR ENGAGED IN PERFORMING OPERATIONS FOR A PRINCIPAL AS A PART OF THE SAME PROJECT. CG D3 61 03 05 Copyright 2005 The St. Paul Travelers Companies, Inc. All rights reserved. Includes copyrighted material of Insurance Services Office, Inc. with its permission. CG T8 01 09 19 Page 2 of 2 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 GENERAL PURPOSE ENDORSEMENT POLICY NUMBER: 680-2H222963-19-47 OFFICE PAC ISSUE DATE: 06/21/2019 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CG2037 (07-04) - ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS THIS ENDORSEMENT MODIFIES INSURANCE PROVIDED UNDER THE FOLLOWING: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE NAMES OF ADDITIONAL INSURED PERSON(S) OR ORGANIZATION(S): Any person or organization that you agree in a written contract to include as an additional insured on this Coverage Part for "bodily injury" or "property damage" included in the products-completed operations hazard, provided that such contract was signed by you before, and is in effect when, the "bodily injury or "property damage" occurs AND; City of Banning, and its officers, officials, employees, agents and volunteers. LOCATION AND DESCRIPTION OF COMPLETED OPERATIONS: Any project to which a written contract with the Additional Insured Person(s) or Organization(s) in the Schedule applies. (INFORMATION REQUIRED TO COMPLETE THIS SCHEDULE, IF NOT SHOWN ABOVE, WILL BE SHOWN IN THE DECLARATIONS.) A. SECTION II - WHO IS AN INSURED IS AMENDED TO INCLUDE AS AN ADDITIONAL INSURED THE PERSON(S) OR ORGANIZATION(S) SHOWN IN THE SCHEDULE, BUT ONLY WITH RESPECT TO LIABILITY FOR "BODILY INJURY", "PROPERTY DAMAGE" CAUSED, IN WHOLE OR IN PART, BY "YOUR WORK" AT THE LOCATION DESIGNATED AND DESCRIBED IN THE SCHEDULE OF THIS ENDORSEMENT PERFORMED FOR THAT ADDITIONAL INSURED AND INCLUDED IN THE "PRODUCTS-COMPLETED OPERATIONS HAZARD". CG 20 37 07 04 CG T8 02 09 19 Page 1 of 2 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 GENERAL PURPOSE ENDORSEMENT POLICY NUMBER: 680-2x222963-19-47 OFFICE PAC ISSUE DATE: 06/21/2019 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CG2037 (07-04) - ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: Copyright ISO Properties, Inc. 2004 CG T8 02 09 19 Page 2 of 2 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 COMMERCIAL GENERAL LIABILITY are in excess of the applicable limit of S. Premium Audit insurance. An agreed settlement means a settlement and release of liability signed by a. We will compute all premiums for this us, the insured and the claimant or the Coverage Part in accordance with our rules claimant's legal representative. and rates. 4. Other Insurance b. Premium shown in this Coverage Part as If valid and collectible other insurance is advance premium is a deposit premium only. available to the insured for a loss we cover At the close of each audit period we will under this Coverage Part, our obligations are compute the earned premium for that period and send notice to the first Named Insured. limited as described in Paragraphs a. and b. The due date for audit and retrospective below. premiums is the date shown as the due date As used anywhere in this Coverage Part, on the bill. If the sum of the advance and other insurance means insurance, or the audit premiums paid for the policy period is funding of losses, that is provided by, through greater than the earned premium, we will or on behalf of: return the excess to the first Named Insured. (i) Another insurance company; c. The first Named Insured must keep records of (ii) Us or any of our affiliated insurance the information we need for premium companies; computation, and send us copies at such times as we may request. (iii)Any risk retention group; or (iv) Any self-insurance method or program, in 6. Representations which case the insured will be deemed to By accepting this policy, you agree: be the provider of other insurance. a. The statements in the Declarations are Other insurance does not include umbrella accurate and complete; insurance, or excess insurance, that was bought specifically to apply in excess of the b. Those statements are based upon Limits of Insurance shown in the representations you made to us; and Declarations. c. We have issued this policy in reliance upon As used anywhere in this Coverage Part, your representations. other insurer means a provider of other The unintentional omission of, or unintentional insurance. As used in Paragraph b. below, error in, any information provided by you which insurer means a provider of insurance. we relied upon in issuing this policy will not a. Primary Insurance prejudice your rights under this insurance. This insurance is primary. If any of the However, this provision does not affect our right other insurance is also primary, we will to collect additional premium or to exercise our share with all that other insurance by the rights of cancellation or renewal in accordance method described in Paragraph b. below. with applicable insurance laws or regulations. b. Method Of Sharing 7. Separation Of Insureds If all of the other insurance permits Except with respect to the Limits of Insurance, contribution by equal shares, we will and any rights or duties specifically assigned in follow this method also. Under this this Coverage Part to the first Named Insured, approach each insurer contributes equal this insurance applies: amounts until it has paid its applicable a. As if each Named Insured were the only limit of insurance or none of the loss Named Insured; and remains, whichever comes first. If any of the other insurance does not b. Separately to each insured against whom permit contribution by equal shares, we claim is made or"suit" is brought. will contribute by limits. Under this g, Transfer Of Rights Of Recovery Against method, each insurer's share is based on Others To Us the ratio of its applicable limit of insurance If the insured has rights to recover all or part of to the total applicable limits of insurance of all insurers. any payment we have made under this Coverage Page 6 of 9 ©2016 The Travelers Indemnity Company.All rights reserved. CG T1 01 01 16 Includes copyrighted material of Insurance Services Office, Inc.with its permission. DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 COMMERCIAL GENERAL LIABILITY occupational therapist or occupational that is available to any of your "employees" therapy assistant, physical therapist or for "bodily injury" that arises out of providing speech-language pathologist; or or failing to provide "incidental medical (b) First aid or "Good Samaritan services" services" to any person to the extent not by any of your "employees" or "volunteer subject to Paragraph 2.a.(1) of Section II — workers", other than an employed or Who Is An Insured. volunteer doctor. Any such "employees" K. MEDICAL PAYMENTS—INCREASED LIMIT or "volunteer workers" providing or failing to provide first aid or "Good Samaritan The following replaces Paragraph 7. of services" during their work hours for you SECTION III —LIMITS OF INSURANCE: will be deemed to be acting within the 7. Subject to Paragraph S. above, the Medical scope of their employment by you or Expense Limit is the most we will pay under performing duties related to the conduct Coverage C for all medical expenses of your business. because of "bodily injury" sustained by any 3. The following replaces the last sentence of one person, and will be the higher of: Paragraph S. of SECTION III — LIMITS OF a. $10,000; or INSURANCE: For the purposes of determining the b. The amount shown in the Declarations of applicable Each Occurrence Limit, all related this Coverage Part for Medical Expense acts or omissions committed in providing or Limit. failing to provide "incidental medical L. AMENDMENT OF EXCESS INSURANCE services", first aid or "Good Samaritan CONDITION— PROFESSIONAL LIABILITY services" to any one person will be deemed to be one "occurrence". The following is added to Paragraph 4.b., 4. The following exclusion is added to Excess Insurance, of SECTION IV — COMMERCIAL GENERAL LIABILITY Paragraph 2., Exclusions, of SECTION I — CONDITIONS: COVERAGES — COVERAGE A — BODILY INJURY AND PROPERTY DAMAGE This insurance is excess over any of the other LIABILITY: insurance, whether primary, excess, contingent or on any other basis, that is Professional Sale Of Pharmaceuticals Liability or similar coverage, to the extent the "Bodily injury" or "property damage" arising loss is not subject to the professional services out of the violation of a penal statute or exclusion of Coverage A or Coverage B. ordinance relating to the sale of pharmaceuticals committed by, or with the M. BLANKET WAIVER OF SUBROGATION — knowledge or consent of the insured. WHEN REQUIRED BY WRITTEN CONTRACT S. The following is added to the DEFINITIONS OR AGREEMENT Section: The following is added to Paragraph 8., Transfer Of Rights Of Recovery Against Others To Us, "Incidental medical services" means: of SECTION IV — COMMERCIAL GENERAL a. Medical, surgical, dental, laboratory, x- LIABILITY CONDITIONS: ray or nursing service or treatment, If the insured has agreed in a written contract or advice or instruction, or the related agreement to waive that insured's right of furnishing of food or beverages; or recovery against any person or organization, we b. The furnishing or dispensing of drugs or waive our right of recovery against such person medical, dental, or surgical supplies or or organization, but only for payments we make appliances. because of: 6. The following is added to Paragraph 4.b., a. "Bodily injury" or "property damage" that Excess Insurance, of SECTION IV — occurs; or COMMERCIAL GENERAL LIABILITY CONDITIONS: b. "Personal and advertising injury" caused by This insurance is excess over any valid and an offense that is committed; collectible other insurance, whether primary, subsequent to the signing of that contract or excess, contingent or on any other basis, agreement. CG D3 79 02 19 ©2017 The Travelers Indemnity Company.All rights reserved. Page 5 of 6 Includes copyrighted material of Insurance Services Office, Inc.with its permission. DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 V. „�, I A THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT - CALIFORNIA Policy Number: 72 WEG GG6371 Endorsement Number: Effective Date: 09/01/19 Effective hour is the same as stated on the Information Page of the policy. Named Insured and Address: ENGINEERING RESOURCES OF SOUTHERN CALIFORNIA INC 1861 W REDLANDS BLVD BLDG 7B REDLANDS CA 92373 We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) You must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work described in the Schedule. The additional premium for this endorsement shall be 2 % of the California workers' compensation premium otherwise due on such remuneration. SCHEDULE Person or Organization Job Description Any person or organization from whom you are required by written contract or agreement to obtain this waiver of rights from us Countersigned by Authorized Representative Form WC 04 03 06 (1) Printed in U.S.A. Process Date: 07/23/19 Policy Expiration Date: 09/01/20 DocuSign Envelope ID:09A6379D-9E9B-4EBE-AD3E-37COE9501962 BUSINESS LICENSE CITY OF LAKE ELSINORE This business license is issued for revenue purposes only and does not grant authorization Administrative Services-Licensing to operate a business. This business license is issued without verification that the holder is 130 South Main Street, Lake Elsinore, CA 92530 subject to or exempted from licensing by the state,county,federal government,or any PH(951)674-3124 other governmental agency. Business Name: ENGINEERING RESOURCES OF SOUTHERN CALIFORI` BUSINESS LICENSE NO. 022943 Business Location: 1861 W REDLANDS BLVD BLDG B Business Type: PROFESSIONAL/ENGINEERS REDLANDS,CA 92373-3119 Owner Name(s): JOHN M BRUDIN Description: CIVIL ENGINEER Issue Date: 7/1/2020 Expiration Date: 6/30/2021 ENGINEERING RESOURCES OF SOUTHERN Ci 1861 W REDLANDS BLVD BLDG B REDLANDS, CA 92373-3119 TO BE POSTED IN A CONSPICUOUS PLACE THIS IS YOUR LICENSE • NOT TRANSFERABLE I PI Engineenin Resources • • _ 1pern California Proposal for Professional As-Needed Plan Check Services for Engineering Department COST PROPOSAL CITY OF LAKE LD?, LSII'i0R1 DREAM EXTREME Submitted: June 1 , 2020 ` " ._ IMIDU (909)890-1255 1 info@erscinc.com I www.erscinc.com June 1, 2020 Corporate Office: 1861 W. Redlands • City of Lake Elsinore Redlands, • 2373 130 South Main Street •1• '•1info@erscinc.com Lake Elsinore, CA 92530 Local • Attn: Engineering Department 41593 Winchester • Suite 200 Temecula, CA 92590 RE: Fee Proposal for Professional As-Needed Plan Check Services EvaluationPeriod Contact: for Engineering Department Mr. Matt Brudin, President, ProjectManager•1• :•1 1 Dear Mr. Habib, matt@erscinc.com Engineering Resources of Southern California (ERSC) is our fees to the City of Lake Elsinore as a qualified, experienced consultant to provide Plan Check Consulting Services for Private and Public Projects. The enclosed fee provides information regarding ERSC's fees to perform Plan Checking Services in the City of Lake Elsinore. The enclosed fees are intended to duplicate those in the RFP. ERSC currently works within the presented fee structure in the City and will be able to seamlessly transition to a new contract without interruption. We have also included ERSC's Schedule of Hourly Billing Rates to be applied during assignments that may require work on a time and materials basis. The ERSC team provides to you timely, responsive resolutions to issues of local significance while protecting the City's goals. The individual signing this proposal has contractual responsibility with the City of Lake Elsinore and is authorized to bind ERSC to the terms of the proposal. ERSC confirms receipt of all addenda and that all information submitted is true and correct. This proposal is valid for a period not less than 90 Days from the date of submittal. ERSC has no concerns identified with the City's Professional Services Agreement. Please contact me by phone at (909) 890-1255 or by email at matt@erscinc.com for any questions or clarifications as a result of this submittal. We look forward to the opportunity to continue our work with the City of Lake Elsinore and thank you for the opportunity to submit a proposal. Respectf submitted, John M. Brudin PE President, Project Manager rws N_"'�..rrt�. - - ram,`-- r � -• .. ,. VON- �Pro , sed I . -,ps ' I. Grading and Drainage Plans The below provides information regarding ERSC's fees to perform Plan Checking Services in the City of Lake Elsinore. The below fees are intended to duplicate those in the RFP. ERSC currently works within the presented fee structure in the City and will be able to seamlessly transition to a new contract without interruption. We have also included ERSC's Schedule of Hourly Billing Rates to be applied during assignments that may require work on a time and materials basis. Cubic Yards Current City Grading Plan Check Fee ERSC Fee 100 Cubic Yards Or Less $200.00 85% 101 — 1,000 Cubic Yards $220.00 For The First 100 Cubic Yards, Plus $50.00 For Each 85% Additional 100 Cubic Yards Or Fraction Thereof X 91% 1,001 — 10,000 Cubic $670.00 For The First 1,000 Cubic Yards, Plus $50.00 For Each 85% Yards Additional 1,000 Cubic Yards Or Fraction Thereof X 91% 10,001 — 100,000 Cubic $1,120.00 For The First 10,000 Cubic Yards, Plus $190.00 For 85% Yards Each Additional 10,000 Cubic Yards Or Fraction Thereof X 91% 100,001 —400,000 $2,830.00 For The First 100,000 Cubic Yards, Plus $110.00 For 85% Cubic Yards Each Additional 100,000 Cubic Yards Or Fraction Thereof X 91% Over 400,000 Cubic $6,130.00 For The First 400,000 Cubic Yards, Plus $110.00 For 85% Yards Each Additional 100,000 Cubic Yards Or Fraction Thereof X 91% Revisions To Approved $450.00 Per Sheet 85% Plans II. Road, Street, and Utility Improvement Plans Subdivision Check Fees 0-$50,000 4.5% 85% $50,000-$300,000 4.0% 85% $300,000-$700,000 3.5% 85% $700,000-$1,000,000 3.0% 85% $1,000,000 And Greater 2.5% 85% Revised Or Redesigned Public Works Improvement Plans $450 Per Sheet 85% Street Lights As Separate Plan Check, Traffic Signing & Striping, $450 Per Sheet 85% Traffic Control, Haul Route Plans (As Part Of Improvement Plan Set) Traffic Control As Part Of Encroachment Permit Application (11 x17) Per Hour Rate for Per attached Review rate sheet. I IC1�1li Proposed Fees Non-Subdivision Check Fees Public Works Improvement Plans-Based On Engineer's Estimate 17.5% 85% III. Other Plan Checks Other Plan Checks Current City Plan ERSC Fees Check Fees Final Tract Map $1,700 + $55 Per Lot 85% Parcel Map $1,600 + $45 Per Lot 85% Redesigned Tract/Parcel Maps In Process $450 Per Sheet 85% Revised Approved Tract/Parcel Maps $450 Per Sheet 85% Lot Line Adjustments-Two Lots Only $400 85% Lot Line Adjustment-More Than Two Lots $500 + $55 Per Lot 85% Dedication: Easement, Right Of Way $440 85% Certificate Of Compliance $450 85% Parcel Merger $400 +$25 Per Lot 85% Street Abandonment/Vacation $1,100 85% Certificate Of Correction $450 85% Water Quality Management Plan (WQMP) Review- Preliminary $1,750.00 85% Water Quality Management Plan (WQMP) Review- Final $1,750.00 85% IV. Traffic Studies Lump Sum Fixed Fee Cost J�"A A Mau Engineering Resources of Southern California, Inc. I Schedule of Rates 2020 Professional Staff Other Direct Expenses President ...................................................$240.00 Vehicle Mileage ................................... $0.70/Mile Vice President ...........................................$215.00 Subconsultant...................................... Cost + 20% Sr. Principal Engineer................................$205.00 Reimbursable Expenses/Charges....... Cost + 15% Principal Engineer.....................................$195.00 Engineer V.................................................$150.00 Forensic Analysis.......................Standard Rate X 2 Engineer IV................................................$135.00 Expert Witness ..........................Standard Rate X 3 Engineer III ................................................$120.00 Engineer II .................................................$105.00 Engineer I ....................................................$95.00 NOTE: All rates are subject to change to reflect annual inflation and cost of living adjustments. Engineering Staff Prevailing Wage Rates are dictated by the California Department of Industrial Relations (CADIR). All Principal Engineering Associate................$185.00 above classifications which are subject to Prevailing Senior Engineering Associate....................$160.00 Wage Rates will be adjusted as revised rates are Engineering Associate V............................$130.00 published by the CADIR. Engineering Associate IV........................... $115.00 Unless otherwise established by contractual Engineering Associate III...........................$105.00 agreement, payment is due any payable upon Engineering Associate II..............................$95.00 receipt. Payment is considered delinquent if not Engineering Associate I...............................$85.00 paid within 30 days of invoice date. If payment is Engineering Aide II ......................................$45.00 not completed within agreed terms, Client agrees Engineering Aide I .......................................$40.00 to pay a service charge on the amount past due at Survey Staff and Services the rate of 11/2% per month (18% per annum). Principal Surveyor.....................................$185.00 Senior Surveyor.........................................$150.00 2-Man Survey Crew (Std Equipment/Truck)...............................$290.00 1-Man Survey Crew (Std Equipment/Truck)...............................$220.00 3rd Man on Survey Crew...........................$120.00 Construction Support Staff Construction Manager...............................$160.00 Resident Engineer.....................................$150.00 Owner's Representative............................$160.00 Sr. Construction Inspector.........................$120.00 Construction Inspector............................... $115.00 Inspector Overtime (Hours 8-12)...............$156.00 Inspector Overtime (Hours 12+)................$194.00 Administrative Staff Operations Specialist...................................$75.00 Administrative Assistant I.............................$60.00 Administrative Assistant ll............................$67.00 J�"A A IMIDU w � _ k Engineering • of Southern •