Loading...
HomeMy WebLinkAboutARDENWOOD WAY 39415 CITY OF , � IT LADE C-?,) LSI1�aI E BUILDING & SAFETY DREAM E�CTREME rM 130 South Main Street PERMIT PERMIT NO: 11-00000985 DATE: 10/26/11 JOB ADDRESS . . . . . 39415 1/2 ARDENWOOD WAY DESCRIPTION OF WORK ELECTRICAL OWNER CONTRACTOR SOURCE BROADBAND OF CALIFORNIA 3091 GOVERNORS LAKE DR, STE430 NORCROSS, GA 30071 951-940-8000 LIC EXP 0/00/00 A. P.## 347-120-020 3 SQUARE FOOTAGE 0 OCCUPANCY . . . GARAGE SQ FT 0 CONSTRUCTION . . FIRE SPRNKLR VALUATION . . . 500 ZONE . . . . . . R-1 ELECTRICAL PERMIT QTY UNIT CHG ITEM CHARGE BASE FEE 30 . 00 1 . 00 X 27 . 2500 100-200AMP SERVICE<600VLT 27 . 25 1 . 00 X 5 . 0000 PROFESSIONAL DEV FEE 5 . 00 FEE SUMMARY CHARGES PAID DUE PERMIT FEES ELECTRICAL PERMIT 62 . 25 . 00 62 . 25 OTHER FEES PLAN RETENTION FEE . 52 . 00 . 52 TOTAL 62 . 77 . 00 62 . 77 SPECIAL NOTES & CONDITIONS TIME WARNER PED AT RIDGESTONE APTS Open: CQNiER2 Type: IF Drawer: 1 Datg 10/25/11 2b tba-ipt no: 1737 2011 5m aJILDIW PERM I SEP.77 T VMN CARD Sb!.77 Tray date: 102b/11 Time: 10:56:03 City of Lake Elsinore Please read and initial Building Safety Division 1.I am Licensed under the provisions of Business and professional Code Section 7000 et seq.and my license is in full force. Post in conspicuous place (2-2.I,as owner of the property,or my employees w/wages as their sole compensation will do the work on the job and the structure is not intended or offered for sale. 3.I,as owner of the property,am exclusively contracting with licensed contractors to construct the You must furnish PERMIT NUMBER and the 1A project. JOB ADDRESS for each Iespective inspection: 4.1 have a certificate of consent to selfinsure or a certificate of Workers Compensation Insurance Approved plans must be on job or a certified copy thereof. at all times: 5.1 shall not employ any person in any manner so as to become subject to Workers Compensation Laws in the performance of the work for which this permit is issued. Note:If you should become subject to Workers Compensation after making this certification, Code Approvals Date Inspector you must forthwith comply with such provisions or this permit shall be deemed revoked. EL01 Temporary Electric Service PLO1 Soil Pipe Underground EL02 Electric Conduit Underground BP01 Footings BP02 I Steel Reinforcement BP03 Grout BP04 Slab Grade PLO1 Underground Water Pipe SS01 Rough Septic System SWO1 on Site Sewer BPO5 Floor Joists BP06 Floor Sheathing BP07 Roof Framing BP08 Roof Sheathing BP09 Shear Wall&Pre-Lath PL03 Rough Plumbing EL03 Rough Electric Conduit EL04 Rough Electric Wiring EL05 Rough Electric/ T-Bar ME01 Rough Mechanical ME02 1 Ducts,Ventilating PL04 I Rough Gas Pipe/Test PL02 Roof Drains BP 10 Framing&Flashing BP 12 Insulation BP13 Drywall Nailing BP1 1 Lathing&Siding PL99 Final Plumbing EL99 Final Electrical ME99 Final Mechanical BP99 IFinal Building Code 1 Pool&Spa Approvals Date Inspector OTHER DIVISION RELEASES Deputy Inspector Department Approval required prior to the P001 Pool Steel Rein./Forms building being released by the City P001 Pool Plumbing/Pressure Test P003 Pre-Gunite Approval Date Inspector EL06 Rough Pool Electric Planning Sub List Approval Landscape P004 Pool Fencing/Gates/Alarms Finance P005 Pre-Plaster Approval Engineering P009 I Final Pool/Spa