HomeMy WebLinkAbout2021-076 Planning Application No. 2019-63 (Lakeview Plaza) MSHCPRESOLUTION NO. 2021-76
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, ADOPTING FINDINGS THAT PLANNING APPLICATION NO.
2019-63 (TENTATIVE PARCEL MAP NO. 37854 AND COMMERCIAL DESIGN
REVIEW NO. 2019-24) IS CONSISTENT WITH THE WESTERN RIVERSIDE
COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP)
Whereas, Shahin Motamed Hashemi, Lakeview Centre, LLC has filed an application with
the City of Lake Elsinore (City) requesting approval of Planning Application No. 2019-63
(Tentative Parcel Map No. 37854 and Commercial Design Review No. 2019-24) to subdivide the
3.9-acre vacant site into four (4) parcels ranging in size from 0.48 acres to 1.49 acres. The project
also proposes to construct a neighborhood retail center with four (4) buildings ranging in size from
3,480 sq. ft. to 15,600 sq. ft. (approximately 43,120 sq. ft. in total) with 207 parking spaces,
including 12 accessible spaces and 29 compact spaces and related improvements. The project
site is located north of Lakeshore Drive, northwest of Manning Street, and southwest of Ryan
Avenue (APNs 375-092-002, 375-092-003, 375-092-004, 375-092-005, and 375-092-006); and,
Whereas, Section 6.0 of the Multiple Species Habitat Conservation Plan (MSHCP)
requires that all discretionary projects within a MSHCP Criteria Cell undergo the Lake Elsinore
Acquisition Process (LEAP) and the Joint Project Review (JPR) to analyze the scope of the
proposed development and establish a building envelope that is consistent with the MSHCP
criteria; and,
Whereas, Section 6.0 of the MSHCP further requires that the City adopt consistency
findings demonstrating that the proposed discretionary entitlement complies with the MSHCP
Criteria Cell, and the MSHCP goals and objectives; and,
Whereas, pursuant to the Lake Elsinore Municipal Code (LEMC) Section 17.415.050
(Major Design Review), Chapter 16.24 (Tentative Map), Section 17.410.070 (Approving
Authority), and Section 17.410.030 (Multiple Applications), the Planning Commission
(Commission) has been delegated with the responsibility of making recommendations to the City
Council (Council) pertaining to tentative maps and design review applications; and,
Whereas, on May 18, 2021, at a duly noticed Public Hearing the Commission has
considered evidence presented by the Community Development Department and other interested
parties with respect to this item; and,
Whereas, on June 22, 2021 at a duly noticed Public Hearing, the Council has considered
the recommendation of the Commission as well as evidence presented by the Community
Development Department and other interested parties with respect to this item.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE DOES
HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1: The Council has considered the project and its consistency with the MSHCP
prior adopting Findings of Consistency with the MSHCP.
Section 2: That in accordance with the MSHCP, the Council makes the following findings
for MSHCP consistency:
DocuSign Envelope ID: 9E457BF6-FCF1-4F3C-9E4F-4F26412FA433
CC Reso. No. 2021-76
Page 2 of 4
1. The project is a project under the City’s MSHCP Resolution, and the City must make an
MSHCP Consistency finding before approval.
The project site is not located within a MSHCP Criteria Cell. Pursuant to the City’s MSHCP
Resolution, the project is required to be reviewed for MSHCP consistency, including
consistency with other “Plan Wide Requirements.” These include the Protection of Species
Associated with Riparian/Riverine Areas and Vernal Pool Guidelines (MSHCP, § 6.1.2),
Protection of Narrow Endemic Plant Species Guidelines (MSHCP, § 6.1.3), Additional Survey
Needs and Procedures (MSHCP, § 6.3.2), Urban/Wildlands Interface Guidelines (MSHCP, §
6.1.4), Vegetation Mapping (MSHCP, § 6.3.1) requirements, Fuels Management Guidelines
(MSHCP, § 6.4), and payment of the MSHCP Local Development Mitigation Fee (MSHCP
Ordinance, § 4).
2. The Project is subject to the City’s LEAP and the Western Riverside County Regional
Conservation Authority’s (RCA) Joint Project Review (JPR) processes.
As stated above, the project is not located within a Criteria Cell and therefore was not required
to go through the LEAP and JPR processes.
3. The Project is consistent with the Riparian/Riverine Areas and Vernal Pools Guidelines.
According to a MSHCP Consistency Analysis and Habitat Assessment prepared by Rincon
Consultants, Inc. dated September 2019, there are no areas that meet the MSHCP’s definition
of riparian/riverine areas or vernal pools that occur on the project site.
Section 6.1.2 of the MSHCP describes the process to protect species associated with
riparian/riverine areas and vernal pools. As defined in the MSHCP, riparian/riverine areas are
lands which contain habitat dominated by trees, shrubs, persistent emergents, or emergent
mosses and lichens, which occur close to or depend on a nearby freshwater source or areas
that contain a freshwater flow during all or a portion of the year. These areas may support one
or more species listed in Section 6.1.2 of the MSHCP.
Vernal pools are seasonal wetlands that occur in depressions, typically have wetland
indicators that represent all three parameters (soils, vegetation, and hydrology), and are
defined based on vernal pool indicator plant species during the wetter portion of the growing
season but normally lack wetland indicators associated with vegetation and/or hydrology
during the drier portion of the growing season.
The single ditch observed within the project site does not drain into areas designated for
conservation under the MSHCP. Further, this ditch does not provide wetland habitat, did not
result from human actions to create open waters, or from the alteration of natural stream
courses, and does not contain habitat dominated by trees, shrubs, persistent emergents, or
emergent mosses and lichens, and is therefore excluded from the definitions of
riparian/riverine areas and vernal pools. Additionally, the ditch described does not contain
suitable habitat for MSHCP-covered species that occur in riparian/riverine areas (e.g., least
Bell’s vireo [Vireo bellii pusillus], southwestern willow flycatcher [Empidonax traillii extimus],
western yellow-billed cuckoo [Coccyzus americanus occidentalis], etc.). For these reasons, it
has been determined that the ditch does not provide any function or value to these MSHCP-
covered species. The project is therefore consistent with the Riparian/Riverine Areas and
DocuSign Envelope ID: 9E457BF6-FCF1-4F3C-9E4F-4F26412FA433
CC Reso. No. 2021-76
Page 3 of 4
Vernal Pool Guidelines set forth in Section 6.1.2 of the MSHCP. No further action regarding
this section of the MSHCP is required.
4. The Project is consistent with the Protection of Narrow Endemic Plant Species Guidelines.
The property is not in a Narrow Endemic Plant Species Survey Area (NEPSSA) for any narrow
endemic species, and no NEPSSA surveys are required. The proposed project is therefore
consistent with the Protection of Narrow Endemic Plant Species Guidelines.
5. The Project is consistent with the Additional Survey Needs and Procedures.
The project site is not subject to any of the Critical Area Species Survey Area Guidelines as
set forth in Section 6.3.2 of the MSHCP. Therefore, the project is consistent with MSHCP
Section 6.3.2.
6. The Project is consistent with the Urban/Wildlands Interface Guidelines.
According to section 6.1.4 of the MSHCP, the Urban/Wildlands Interface Guidelines are
intended to address indirect effects associated with locating development in proximity to the
MSHCP Conservation Area. The project site is not near a conservation area. Therefore, the
Urban/Wildlife Interface Guidelines are not applicable.
7. The Project is consistent with the Vegetation Mapping requirements.
There are no resources located on the project sites requiring mapping as set forth in MSHCP
Section 6.3.1.
8. The Project is consistent with the Fuels Management Guidelines.
Section 6.4 of the MSHCP requires that new developments adjacent to the MSHCP
Conservation Area or other undeveloped lands incorporate any fuel/brush management zones
and Best Management Practices. The project site is not located in or adjacent to a
conservation area, is proposed as a non-combustible commercial development consistent
with the Fire Code requirements, and undeveloped areas adjacent to the project site are
anticipated to be developed and is therefore not expected to be subject to fuel modification
requirements. The project will incorporate the BMPs outlined in Volume I, Appendix C of the
MSHCP as part of the development. Therefore, the project is consistent with the Fuels
Management Guidelines as set forth in Section 6.4 of the MSHCP.
9. The Project will be conditioned to pay the City’s MSHCP Local Development Mitigation Fee.
As a condition of approval, the project will be required to pay the City’s MSHCP Local
Development Mitigation Fee at the time of issuance of building permits.
10. The Project is consistent with the MSHCP.
The project site is not within or adjacent to any MSHCP Criteria Cell or conservation areas.
As described above, the project complies with all applicable MSHCP requirements.
Section 3: Based upon the evidence presented, both written and testimonial, and the
above findings, the Council hereby finds that the project is consistent with the MSHCP.
DocuSign Envelope ID: 9E457BF6-FCF1-4F3C-9E4F-4F26412FA433
CC Reso. No. 2021-76
Page 4 of 4
Section 4: This Resolution shall take effect immediately upon its adoption.
Section 5: The City Clerk shall certify to the adoption of this Resolution and enter it into
the book of original Resolutions.
Passed and Adopted at a regular meeting of the City Council of the City of Lake Elsinore,
California, this 22nd day of June 2021.
Robert E. Magee
Mayor
Attest:
Candice Alvarez, MMC
City Clerk
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF LAKE ELSINORE )
I, Candice Alvarez, MMC, City Clerk of the City of Lake Elsinore, California, do hereby certify that
Resolution No. 2021-76 was adopted by the City Council of the City of Lake Elsinore, California,
at the Regular meeting of June 22, 2021 and that the same was adopted by the following vote:
AYES: Council Members Tisdale, Johnson, and Manos; Mayor Pro Tem Sheridan; and
Mayor Magee
NOES: None
ABSENT: None
ABSTAIN: None
Candice Alvarez, MMC
City Clerk
DocuSign Envelope ID: 9E457BF6-FCF1-4F3C-9E4F-4F26412FA433